1 Division-30200T.PE: Foundations 180,908,650.40 780,272,633.20 917,853,661.83 180,158,606.40 784,821,992.20 921,832,612.37 100%
6 Division-30700T.PE: Roofing works/External Façade 1,141,165,110.00 1,141,165,110.00 2,274,336,434.68 398,457,793.00 2,128,090,651.57 186%
11 Division-31200T.PE: Interior Fittings 225,705,103.81 71,966,157.54 243,614,888.99 499,127,955.72 29,229,885.28 408,816,695.61 168%
4 Lift pits, Escalator pits, water tank, Ejector pits & etc. m3 525 525
Disposal
8 Lift pits, Escalator pits, water tank, Ejector pits & etc. m3 525 525
Filling
11 Keeping the site and all excavation free from all water by pumping Item 1 1
Anti-termite treatment
Grade 15 for lean concrete to ground beams, pits, ground floor slab & etc. as shown in the
Drawings and Specifications.
9 Beam corbels m3 79 79
15 Staircases including steps, landing beams & slabs; and top enclosure RC columns & roof m3 293 104
beams
Kerbs
17 200mm wide x 150mm high; including all reinforcement, formwork, angles, ends and m 816 28
intersections
Pier Extension Project BOQ
Add by ADC 115mm wide x 150mm high; including all reinforcement, formwork, angles, ends and m 1,065
intersections
Add by ADC 120mm wide x 150mm high; including all reinforcement, formwork, angles, ends and m 50
intersections
Add by ADC 150mm wide x 150mm high; including all reinforcement, formwork, angles, ends and m 248
intersections
Add by ADC 250mm wide x 150mm high; including all reinforcement, formwork, angles, ends and m 230
intersections
Add by ADC 350mm wide x 150mm high; including all reinforcement, formwork, angles, ends and m 386
intersections
Add by ADC 80mm wide x 200mm high; including all reinforcement, formwork, angles, ends and m 70
intersections
Add by ADC 115mm wide x 200mm high; including all reinforcement, formwork, angles, ends and m 360
intersections
Add by ADC 115mm wide x 300mm high; including all reinforcement, formwork, angles, ends and m 73
intersections
Add by ADC 150mm wide x 300mm high; including all reinforcement, formwork, angles, ends and m 3
intersections
Add by ADC 200mm wide x 300mm high; including all reinforcement, formwork, angles, ends and m 4
intersections
28 200mm wide x 250mm high; including all reinforcement, formwork, angles, ends and m 1
intersections
Extra over concrete flat slab for thickening, including extra reinforcement, formwork, stone
with concrete bed, excavation and disposal
Extra over concrete slab on grade for thickening, including extra reinforcement, formwork,
stone with concrete bed, excavation and disposal
30 Stools m3 1 1
31 Kerb m3 21 21
Stiffeners
Tie Beams
Expansion Joints
Supply & lay expansion joints as specified; laid in accordance with manufacturer's instructions
53 75mm thick Approved impregnated compressible filler to joint including approved bond m2 238 238
breaker and all necessary formwork
54 75mm x 25mm thick Approved 2-part polyurethane sealant squeezed into joint m 854 854
Supply & lay bearing pads as specified; laid in accordance with manufacturer's instructions
0.6mm thick approved polyethylene sheet damp proof membrane; lapping and sealing joints
Formwork to all reinforced concrete elements as shown in the drawings and specifications
11 Prayer Stool m2 - 25
13 Staircases including steps, landing beams & slabs; and top enclosure RC columns & roof m2 1,676 444
beams
Ground beams
Tie beams
Slab on grade
Beam Corbels
20 mm dia.
Lift pits, Escalator pits, water tank, Ejector pits & etc.
68 12mm dia. kg 61 61
Walls
Parapet wall
Staircases including steps, landing beams & slabs; and top enclosure RC columns & roof
beams
Plinths
Slab on grade
Plinths
Prayer Stools
Add by ADC Embankment and Compaction with procured Sand for 95% compaction including Material, m3 43,200
Loading, Tranportation, Unloading
Main Roof
1 Steel frame work in trusses, universal beams, bracings etc. kg 2,776,300 4,237,192
Steel Bolts
Façade
7 Steel frame work for façade structure, rectangular hollow sections etc. kg 828,520 1,456,678
Travellator Beam
Steel frame work for Travellator, rectangular hollow sections etc. as specified in drawings kg
14 Lift Enclosure
15 Steel frame work for lift structure, rectangular hollow sections etc. kg 60,996 63,744
Top Enclosure
18 Steel frame work for top enclosure structure, rectangular hollow sections etc kg 122,630 44,494
Metal Platform
21 Fixed to structure
22 1mm thick Condeck or Bondek profile steel sheeting complete with 19mm dia shear studs, m2 219 219
95mm length at 150mm centres
Maintenance Platform/Catwalk
23 Steel frame work for maintenance platform structure, rectangular hollow sections etc kg 4,843 4,843
24 Connections including steel plates, chequered plates & etc. kg 130 130
Metal Platform
Galvanised steel maintenance platform consisting of expanded metal gridmesh platform fixed
to structural framing supports as specified to manufacturer's details
Steel Stair
26 Steel frame work for steel staircase structure, rectangular hollow sections etc including kg 58,037 59,906
painting.
27 Connections including steel plates, chequed plates & etc. kg 1,540 27,326
Add by ADC NON-SHRINK GROUT m3 2
55 Steel frame work for composite slab structural support, rectangular hollow sections etc. kg 6,382 1,001,042
60 1mm thick Condeck or Bondek profile steel sheeting complete with 19mm dia shear studs, m2 229 7,754
95mm length at 150mm centres
Add by ADC concrete stopper h=150 m2 296
Handrail Support
61 Steel frame work for handrail support , rectangular hollow sections etc kg 699 944
Pier Extension Project BOQ
68 Steel frame work for cat ladder structural support, rectangular hollow sections etc. kg 1,984 1,984
Fireproofing Protection
87 Magnetic Particle no 44 44
88 Ultrasonic no 55 55
89 Radiographic no 6 6
90 Ultimate pull out capacity test of not less than 81KN for the proposed cast-in suspension no 2 2
inserts
Earthworks
1 Compact ground to 95% modified AASHTO density m2 11 11
2 Compacted stone layer 100t; (size 40 ~ 60mm) with concrete grade 15 m2 11 11
3 Keeping the site and all excavation free from all water by pumping Item 1 1
Concrete Works
Plain Concrete C15
Grade 15 for lean concrete to ground beams, pits, ground floor slab & etc. as shown in the
Drawings and Specifications.
4
Add by ADC Lean concrete 50mm thick m2 -
5
Add by ADC Column Stumps m3 177
Formwork
Formwork to all reinforced concrete elements as shown in the drawings and specifications
7
Add by ADC Column Stumps m2 554
SOG m2
Reinforcement Bars
SOG
10mm dia. kg
12mm dia. kg
17 Steel frame work for fixed gangway structure, rectangular hollow sections etc. kg 860,978 1,074,786
Steel bolts
22 Steel frame work for fixed gangway steel stair structure, rectangular hollow sections etc. kg
Steel bolts
Fireproofing Protection