Management Checklist
DAY                                                           DATE                                         MOD
                                         DAYTIME                                                                    DINNER SERVICE
7:30AM                                                                            3:00PM
            Visual Inspection of Exterior                                                       Conduct Shift Change with Closing MOD
            Windows           Sidewalk      Debris        Patio                                       Prep List Review
            Inspect Dining Rooms, Bathrooms, Bar and Kitchen                                          Count Safe together
            Dining Rooms (tables set to spec, S&P Full, Check Reservations                            Walk Restaurant/Review open items
            Bathroom          Flush Toilets Check for products                                  Run AM Report
            Bar               Check Cleanliness of All Fixtures                                 Send Mid Days Sales & Labor / Send AM Paperwork
            Visual Inspection of Office - Review Manager Log                      4:00PM
            Review Financials From Night Before                                                 Post Position Chart
            Check Messages/Email                                                                Coordinate Specials With Kitchen
            Verify Safe Contents                                                                Input Specials/86 in Computers
            Call in change Order / Plan Bank Deposit                                            Produce Menu / Staff Special List
            Issue Cashier & Manager Drawer (s)                                                  Assign Sidework
            Check On Catering Production/Assist if needed                                       Prepare Premeal
            Check RCS, print and communicate any new orders                       4:30PM
            Write Position Chart                                                                Complete LINE CHECK - Utilizing Line Check Form
            Write Prep List                                                                     Verify all Staff present
            Turn On Oven                                                                        Walk Restaurant for review of Set-up and Sidework
            Turn On All Line Equipment(add water if necessary)                    4:45PM
            Turn On Espresso Machine                                                            Premeal (Meeting & Hand Out Closing Checklists)
            Work On Red Book To Do Grid - Complete all necessary items            4:55PM
9:00AM                                                                                          Quick Review of Readiness
            Post Position Chart                                                                 Lights / Music / Staff Ready / Restrooms / OPEN Sign on
            Coordinate Specials With Kitchen                                      5:00PM
            Input Specials/86 in Computers                                                      Manage Dinner / Closing Manager Focuses on Bar through Happy Hour
            Produce Menu / Staff Special List                                                   Use waiting servers to assist with seating
            Assign Sidework                                                                     Manager Must be Visible During Full Dinner Period
10:00AM                                                                                         Use the Host Stand as Base
            Verify all Staff present                                                            Constant Follow-up on Standards
            Prepare Premeal (Utilize Special Sheets, manager log, schedules)      6:00PM
10:30AM                                                                                         Conduct second premeal for those who missed the first
            Complete LINE CHECK - Utilizing Line Check Form                                     Manage Dinner
            Walk Restaurant for review of Set-up and Sidework                     8:00 - 8:30:PM
            (Make Notes to cover/assign in Pre-meal)                                            Shift Close Down (based on quest flow))
10:45AM                                                                                               Begin Server Cash-out
            Premeal (Meeting & Hand Out Shift Change/Closing Checklists)                              Reduce Staff Levels
10:55AM                                                                                               Check Sidework is being done
            Quick Review of Readiness                                                                 Coordinate with Shift Leader
            Lights / Music / Staff Ready / Restrooms / OPEN Sign on                                   Completely Check Restaurant with Shift Leader
                                                                                  9:00 / 10:00PM
11:30AM Manage Lunch                                                                            Close Kitchen (9:00 Sun, Mon- Thur, 10:00 Fri & Sat)
1:30 to 3                                                                                                        EVERYDAY CLOSING
            Shift Close Down (based on quest flow))                            POST CLOSE
            Reduce Staff Levels / Check Sidework is being done                          Manage Cleaning and Cash Out on the floor as much as possible
                                                                                        (This is not Office Time)
            Follow up Catering Phone Calls – No Excuses **                              Check Out Every Employee Using the Closing Checklist and leave for AM mgr
            Confirm Tomorrows Orders                                                    Be conscious of Security Issues When Closing
            Log Call Backs                                                              Leave detailed notes of shift and any pressing issues in Red Book
            Mailers & Street Marketing Follow                                           Check All food Equipment is off (Ovens, Heat Lamps, Steam Wells, etc.)
            Log Street Marketing Database                                               Check Refrigerator and Freezer Temperatures
                                                                                        Complete Red Book Closing Checklist
3:00pm      Close Kitchen Sun - Thur                                                    Complete Deposit Log
            Check RCS, print and communicate any new orders                             Closing Safe Count - All Drawers counted with count sheet in each
4pm         Kitchen Should be Clean and Closed                                 Final Walk Out
            Complete Managers Closing                                                   Conduct Final Walk thru                            Music Off
            Work On Red Book To Do Grid - Complete all necessary items                  Equipment off                                      All Doors Locked
                                                                                        HVAC at Proper Setting                             All monies in safe & locked
                                                                                        Appropriate Lights on                              Alarms activated
                                                                                        All walk-ins, Refrigerators functioning properly