CHECK LIST FOR GAS CUTTING SET
PROJECT:                                LOCATION:                            DATE:
SL NO                                CHECK ITEMS                                     Y     N
        Protective valve cap firmly fixed for both cylinder(Check for
  1
        damage/crack in the valve cap)
        Pressure gauges two for each cylinder(inlet & out)are in working
  2
        condition(both Oxygen & Acetylene gas)
  3     Flash back arrestor (FBAs) is provided for acetylene & oxygen cylinders
        Non return valves (NRVs) is provided for both acetylene & oxygen
  4
        cylinders.
  5     Tight Crimping of hoses with jubilee clamps.
  6     Hose free from damage(cut and cracks )
  7     Cylinder secured by chain to the trolley.
  8     Trolley tire shall be free from damages.
        Availability of industrial type lighter (no match box / commercial
  9
        lighters).
  10    Cutting area Should be barricaded and warning boards to be displayed.
  11    Cutting area shall be free from debris and flammable materials.
  12    Availability of PPE (Cutting Goggles, Leather gloves Etc.)
Comments If any:
Signature of Safety Dept.                                  Signature of site engineer/incharge
                            CHECK SHEET FOR BAR BENDING MACHINE
PROJECT:                                      LOCATION:                                  DATE:
SL NO                                        CHECK ITEMS                                          Y       N
   1    Erected in a firm base concrete platform.
   2
        Machine is grouted properly/ Base wheel stopper provided
   3    Body Earthing is provided
        Emergency switch is available in working condition ( Front side and back side of the
   4
        m/c)
   5
        Power on & off switch with indicator light are available in working condition.
   6    Belt and other internal moving parts are covered/Guarded.
   7    No oil leakage
   8
        Both side hand guard is available.
   9    Limit switch (Both Side,below the job plate) are in working condition
  10    Availability of standard limit switch pin.
Comments If any:
Signature of Rcon safety incharge                                           Sign of Electrical / Maintenance
                                    CHECK LIST FOR CONCRETE MIXER
PROJECT:                                         LOCATION:                                 DATE:
SL NO                                          CHECK ITEMS                                                Y       N
   1     Condition of the base
   2     Presence of the mixer round handle stopper
   3     Condition of the m/c stand with wheel
   4     Presence of guard for rotating parts(pulley & chain)
   5     Condition of the sling of the feeder/hopper (free from damage)
   6     Cover of the starter
   7     Condition of radiator
   8     Wire rope/sling of the hopper fixed with the guide only by 'D' clamp.
   9     Condition of belt
   10    Diesel leakage from the diesel tank
   11    Condition of chain
   12    Guarding of revolving parts
   13    Ensure barricading on both sides of the hopper when the machine in operation
Comments If any:
Signature of site safety incharge                                                Signature of site engineer/incharge
                                       CHECK LIST FOR MINI DUMPER
PROJECT:                                       LOCATION:                                DATE:
SL NO                                        CHECK ITEMS                                            Y   N
   1     Physical damage in body of the vehicle and in the bucket
   2     Working condition of the vehicle forward and reversed gear
   3     Working condition of the hydraulic brakes (4 wheels)
   4     Oil leakage from the hydraulic cylinder and from the diesel tank.
   5     Starter shaft covered by guard
   6     No Damage in Tire ( Crack, cut, air pressure etc).
   7     Driver seat hood is available and no damage
   8     Head and tail lamps (for night working).
   9     Exhaust pipe is bended outside (Not faced on operator)
   10    Operator license.
Comments If any:
Signature of site safety incharge                             Signature of site engineer/incharge
                            CHECK LIST FOR FIRE EXTINGUISHER
PROJECT:                                LOCATION:                         DATE:
SL NO                                                                                Y     N
  1     Condition of the extinguisher (Clean and Tidy)
  2     Physical appearance for corrosion.
  3     Safety pin in position
  4     Condition of discharge nozzole (any blockage/damage)
  5     Conduction of hose ( Any leakage / Broken )
  6
        Weight of the extinguisher (Should be match with actual weight written
        in the body)
  7     Availability of visual board.
  8     All the indicator gages (where fitted) in green segment (not to be red)
  9     Extinguisher is not expired or refilled before refilled date
Comments If any:
Signature of Safety Dept.                                   Signature of site Incharge/Engineer
                                    CHECK LIST FOR GENERATOR (DG)
PROJECT:                                   LOCATION:                             DATE:
SL NO                                    CHECK ITEMS                                      Y   N
   1     Guard provided for any rotating parts.
   2     Hot surface is provided with guard.
   3     Rubber mat is provided in operator standing area.( around the D.G)
   4     No oil leakage from the oil tank & other parts of the m/c.
   5     Wheel stopper in case of vehicle mounted D.G
   6     Proper access to the D.G control panel
   7     Exhaust smoke pipe faced upwards & outside of D.G shelter.
   8     Dip tray for any oil leakage.
   9     Drive belt is in good condition (any cut,dent or damage)
   10    Adequate ventilation in case of indoor generator
   11    Presence of fire extinguisher (ABC type)
         Presence of damage free operating switch,Voltage and temperature
   12
         meter,circuite breaker,Oil level indicator, Emergency switch
   13    Earthing is provided with standard earthing pit.
      In case of mobile gen set, confirmation of inbuilt acoustic system. (If sound is
   14
      more than 85 dB)
Comments If any:
Signature of site safety incharge                                     Signature of site
                             CHECK SHEET FOR CHERRY PICKER (BOOM LIFT)
PROJECT:                                             LOCATION:                      DATE:
                                                              10                                           3
                                                                                           4
                                                 5
                                                              9
   7
                                                                           1
              10
                                                                   6
                                                                                                       2
SL NO                                           CHECK ITEMS                                        Y       N
   1     No Damage in Tire ( Crack, cut, air pressure etc).
   2     Platform is securely fastened to platform support.
   3     All member in the platform have safety belt
   4     Foot pedal in the bucket is in working condition.
   5     Outriggers & extendable axles are in smooth working condition.
   6     High engine and height drive cutout is in working condition.
   7     Any oil leakage in the Hydraulic systems.
   8     Warning lamp is in working condition.
      The cherry picker movement/ work area is leveled ,compacted and free from all
   9
      obstructions
Comments If any:
Signature of site safety incharge                                         Signature of site engineer/incharge
                            CHECKLIST FOR CHOPSAW MACHINE
PROJECT:                               LOCATION:                           DATE:
                        2
                                                                       5
                   1    7                          4       3
SL NO                                 CHECK ITEMS                                    Y      N
  1     Crack & Damage of the Cutting plate
  2     Presence of Cutting plate guard
  3     Presence of locking system for the plate & Guard
  4     Presence of job clamp and its condition
  5     Presence of handel and its condition
  6     Cable condition(Any cut,wear etc) and presence of wire top plug
  7     Presence cutting dust guard
Comments If any:
Signature of Safety Dept.                                      Sign of Electrical / Maintenance
                                         CHECK LIST FOR TRACTOR
PROJECT:                                       LOCATION:                                DATE:
SL NO                                        CHECK ITEMS                                             Y   N
   1     Protection (canopies, screens) is provided to shield operator from falling objects.
   2     Effective, working horn and reverse alarm
   3     Moving parts, shafts, sprockets, belts, etc.are guarded.
   4     Protection against contact with hot surfaces, exhaust, etc.is provided.
   5     Safe means of access (steps, grab bars, non-slip surfaces) to the cab is provided
   6     No Damage in Tire ( Crack, cut, air pressure etc).
   7     No Leakage of oil from the vehicle and vehicle oil tank.
   8     Vehicle rear view mirror
   9     Head light,Tail lamp are in working condition (for night work)
   10    Brake, accelerator, clutch are in good working condition
   11    Lock of the back door (traile) in good condition
   12    Inter locking system between the tractor and the trailer
   13    Operator license (LMV atleast) & I.D card.
   14    Vehicle valid insurance
   15    Visualization of Check sheet and Operator details with photo in the vehicle itself.
Comments If any:
Signature of site safety incharge                              Signature of site engineer/incharge
                              CHECKSHEET FOR DISTRIBUTION BOARD / PANEL BOARD
PROJECT:                                                           LOCATION:                    DATE:
                                                                       2    4
                                                                       3    8
                                                                    9        14
                                                                   5         7
                                                                   1
                                                                            6
                                                                  15
                                                                            13
                                                                                                  Y     N
SL NO                                                    CHECK ITEMS
   1    Firm Base with grouting & Easily accessable panel (height of the leg is equal to 1m)
   2    The Housing & connections of D.B is weather proof. (minimum of IP 44 type)
   3    Authorized Operator Name Photo, Contact No.on DB panel (Confirmation)
   4    Visualization of voltage, current and type of tools to be used in the socket & Panel.
   5    Identification of input and output cables
   6    Confirmation of LOTO availability
   7    Separate MCB for every socket
   8    Safety sign / isolate flammable Fire Hazard
   9    Double Earthing System of MDB / DB panel with Std earthing pit
  10    Separate ELCB with tripping current of 30 mA & in working condition.
  11    Hylem sheet to be provided over live bus bars
  12    Presence & Condition of Bus bar/ Terminal
  13    Condition of Cable,Power Socket and Plug without damage
  14    Color coding to be followed (RYB) for all cables/wires
  15    Presence of rubber mat infornt of the D.B (Operator standing Location)
  16    Plug-Socket should be Industrial type (IP 44 type)
Comments If any:
Signature of Safety Dept.   Sign of Electrical / Maintenance
                              CHECKLIST FOR MAGNETIC DRILL MACHINE
PROJECT:                                                 LOCATION:                    DATE:
                                                                              2
                                                                 5                    1
                       4
                                                                          3
                                                                                          6
                                                             7                    4
                                                                                              Y    N
SL NO                                               CHECK ITEMS
  1     Fore handle in good operating condition
  2     Presence of Cord strain reliever (glands).
  3     Presence of Drilling trigger switch lock.
  4     Drilling Bit should be in good condition.
  5     Electric wire without cuts and joints.
  6     Condition and presence of the On/off switch
  7     Monthly inspection sticker
  8     Presence of dust cleaning brush near the equipment
Comments If any:
Signature of Safety Dept.                                            Signature of site engineer/incharge
                                                        CHECK SHEET FOR EXCAVATOR
PROJECT:                                                          LOCATION:                                          DATE:
SL NO                                                     CHECK ITEMS                                                       Y   N
   1     Front & reverse horn
   2     Head & tail lamps(for working at night)
   3     Lakage of oil(in hydraulic & pneumatic systems)
   4     Loose bolts /connecting pins(bucket)
   5     Back view mirror
   6     Roller-crawler / tyre condition (check for damaged / missing idle rollers)
   7     Structure beem condition(damage,cut,crack)
   8     Diesel, oil and grease spillage.
   9     Licensed operator (heavy licence)
   10    Fire extinguisher in operator cabin
Comments If any:
Signature of site safety incharge                                                     Signature of site engineer/incharge
                                                CHECK LIST FOR FORK LIFT
PROJECT:                                             LOCATION:                                           DATE:
SL NO                                           CHECK ITEMS                                                      Y   N
   1     Front & reverse horn
   2     Head & tail lamps(for working at night)
   3     Leakage of oil(in hydraulic & pneumatic systems)
   4     Loose bolts /connecting pins(bucket)
   5     Back view mirror
   6     Tyre condition
   7     Structure beem condition(damage,cut,crack)
   8     Diesel, oil and grease spillage.
   9     Licensed operator (heavy licence)
   10    Fire extinguisher in operator cabin
Comments If any:
Signature of site safety incharge                                          Signature of site engineer/incharge
                            CHECK LIST FOR PORTABLE GRINDING MACHINE
PROJECT:                                               LOCATION:                                   DATE:
        2                                                                              1
                  1
                                                 4
                                                                       4
                                                          5        5
                                                 6
                                     7                        8                7
                                                                                       2
            3                                                      8       6
                                                                                                           3
SL NO                                                CHECK ITEMS                                     Y         N
  1     Fore handle without damage.
  2     Wheel guard (covering 3/4th area).
  3     Grinding wheel without any crack.
  4     Rear handle without any damage.
  5     Presence of Cord strain reliever (glands).
  6     Trigger switch without damage.
  7     Presence of Switch lock.
  8     Electric wire without cuts and joints.
Comments If any:
Signature of Safety Dept.                                                          Sign of Electrical / Maintenance
                                            CHECK LIST FOR           JCB
PROJECT:                                          LOCATION:                                            DATE:
                                    7                                                  1
                                                      10
           4
                                                                                                   5
                                                  6                                                         3
SL NO                                         CHECK ITEMS                                               Y       N
  1     Head & tail lamps(for working at night)
  2     Front & reverse horn
  3     Leakage of grease or oil(in hydraulic & pneumatic systems)
  4     Clutch / brake / Hand brake
  5     Back view mirror
  6     Tyre condition
  7     Seat Belt
  8     Operators fitness
  9     Licensed operator (heavy licence)
 10 Fire extinguisher in operator cabin
 11 Any other Points
Signature of site safety incharge                                          Sign of Electrical / Maintenance
                                              CHECK LIST FOR                 LADDER
PROJECT:                                                LOCATION:                                     DATE:
                                                                                                          9
                                                            2
                                                                                                                  1
                                                                3                    4                            0
                         16
                                                                                 6
                                                   4
                                                                         4
                                                                                         1
                    15                                                                   0
                                    20   21   22
            Extension                                                            1
            Ladder            14
                                                                    10       8
SL NO                                                  CHECK ITEMS                                            Y         N
   1     All the rungs, cleats, or steps are in good condition (Broken,missing,bend rungs)
   2     Side rails is intact without any cracks, bends, or breaks.
   3     The rungs, cleats, or steps is fit into the side rails without damage.
   4     Ladder is free from corrosion.
   5     Side rails and steps are free of oil or grease.
   6     Rungs are placed at regular intervals (30 cm gap between two rungs)
   7     Projection of loose nails, screws, bolts, or other metal parts
   8     At the time of using, the ladder should be placed at 65-75 degree angle (1:4 ratio)
   9     Ladder is extended at least 1 m above the landing platform (3 Rungs)
   10    Ladder is secured either at top or at the bottom
   11    Ladder rungs should not be painted.
   12    Reinforcement rod should not be used as ladder rungs
   13    The surface of the rungs should not be smooth
   14    Rubber feet for firm grip (in case of Aluminum ladder)
Comments If any:
Signature of site safety incharge                                                              Signature of site engineer/inc
                                        CHECK LIST FOR MOBILE CRANE (Hydra)
PROJECT:                                                       LOCATION:                                               DATE:
                                                                                                                  2
                                                                                                         1
                                                                     8                        10
                                                         11
                  3
                                                                          9
                                                                                                                                    6
SL NO                                                         CHECK ITEMS                                                   Y           N
   1    Safety latch in hook.
   2    Hoist limit switch (Or presence of plate).
   3    SWL marked in crane.
   4    Automatic safe load indicator
   5    Wire rope and slings free from tolerable damage( No kinks, broken wires more than 10% is N.G).
   6    No oil leak in hydraulic parts (piston drums).
   7    No Damage in Tire ( Crack, cut, air pressure etc.).
   8    Head and tail lamps (for night working).
   9    Front and reverse horn.
  10    Four outrigger are in good working condition
  11    Fire extinguisher in operator cabin.
  12    Operator license (heavy duty).
Comments If any:
Signature of Safety Dept.                                                                                    Signature of site engineer/inchar
                                                         CHECK LIST FOR HYDROULIC ROTARY MIXER
PROJECT:                                                          LOCATION:                                                  DATE:
                                                                                            3            10
                                       8
                                                                                                     6
                                                     5                                                   7
SL NO                                                           CHECK ITEMS                                                       Y   N
   1     Operator should pose a valid license.
   2     Driver has completed site-specific induction
   3     Hose – any leakage
   4     Engine & Chassis Condition
   5     No oil leak in hydraulic parts.
   6     Fire extinguisher fitted any fully operational
   7     Working condition of the Emergency Lever in the Operator Cabin.
   8     Guarding of revolving parts
   9     Warning horn fully operational
   10    No cracks in windscreen
   11    Availability of the Head and tail lamps (for night working).
   12    Signal man
Comments If any:
Signature of site safety incharge                                                               Signature of site engineer/incharge
                                                              CHECK LIST FOR MOBILE CRANE
PROJECT:                                                          LOCATION:                                                          DATE:
           11
SL NO                                                           CHECK ITEMS                                                                 Y   N
   1     Safety latch in hook.
   2     Hoist limit switch (Or presence of plate).
   3     SWL marked in crane.
   4     Wire rope and slings free from tolerable damage( No kinks, broken wires more than 10% is N.G).
   5     No oil leak in hydraulic parts (piston drums).
   6     No Damage in Tire ( Crack, cut, air pressure etc).
   7     Head and tail lamps (for night working).
   8     Front and reverse horn.
   9     Boom structure condition while full expansion (damage, crack and jamming while extending).
   10    Fire extinguisher in operator cabin.
   11    Four outrigger and flotpat are in good working condition
   12    Automatica safe load indicator
   13    Third party certificate(Form 32)
   14    Operator license (heavy duty).
   15    Vehicle valid insurance
   16    Road tax document
Comments If any:
Signature of site safety incharge                                                                     Signature of site engineer/incharge
                                             CHECK SHEET FOR SCISSOR LIFT
PROJECT:                                             LOCATION:
                                                            SL NO     CHECK ITEMS                   PHOTOS                    Y   N
                                                                    Level adjustment is
                                                              4     in good working
                                                                    condition
                                                                    Access lader to the
                                                                    platform is with out
                                                              5     any
                                                                    defects,missing
                                                                    rungs.
                                                                    Availability of limit
                                                              6     switch for the
                                                                    platform extension
                                                                    Mechanical stoper
                                                              7     for the platform
                                                                    lifter is in
SL NO     CHECK ITEMS               PHOTOS        Y     N
                                                                    Operator and
        Scissor lifter working
                                                                    scissor lifter
        platform is provided
  1                                                           8     capacity details
        with hand rail and
                                                                    displayed in the
        midrail
                                                                    liftefr.
        Availability of four                                        All hazards signs
        outrigger in four                                           and operating
  2                                                           9
        sides (Depends on                                           instruction
        type of lifter)                                             displayed .
  3
        All wheels are in
        good
Comments If any:
Signature of site safety incharge                                                       Signature of site engineer/incharge