100% found this document useful (1 vote)
624 views25 pages

Session Plan Core 1

The session plan covers learning outcomes related to installing electrical conduit, wire ways, cable trays, auxiliary cabinets and distribution panels. It includes learning activities such as lectures, self-paced instruction, group discussions and practice. The plan aims to teach students how to properly install these components for single-phase electrical systems based on performance standards through different instructional methods and assessments.

Uploaded by

Jdeified Dimol
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
624 views25 pages

Session Plan Core 1

The session plan covers learning outcomes related to installing electrical conduit, wire ways, cable trays, auxiliary cabinets and distribution panels. It includes learning activities such as lectures, self-paced instruction, group discussions and practice. The plan aims to teach students how to properly install these components for single-phase electrical systems based on performance standards through different instructional methods and assessments.

Uploaded by

Jdeified Dimol
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 25

SESSION PLAN

Sector : Electrical and Electronics Sector


Qualification Title : Electrical Installation and Maintenance NC II
Unit of Competency : Perform Roughing-in Activities, Wiring and Cabling works for Single-Phase
Distribution, Power, Lighting and Auxiliary Systems
Module Title : Performing Roughing-in Activities, Wiring and Cabling works for Single-Phase
Distribution, Power, Lighting and Auxiliary Systems

Learning Outcomes:
LO1 Install electrical metallic /nonmetallic (PVC conduit)
LO2 Install wire ways and cable tray
LO3 Install Auxiliary terminal cabinet and distribution panel
LO4 Prepare for cable pulling and installation
LO5 Perform wiring and cabling lay out
LO6 Notify completion of work

Electrical Installation and Date Developed: Document No.


Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 1 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
A. INTRODUCTION
This unit covers the knowledge, skills and attitudes on installing electrical metallic and non-metallic
conduit, wire ways and cable clamp, auxiliary terminal cabinet and distribution frame panel board/safety switch and used
in roughing-in based on the required performance standards.
This unit also covers the outcomes required in preparing for cable pulling and installation, performing
wiring and cabling lay-out and notifying completion of work for single-phase distribution, power, lighting and auxiliary
systems.

B. LEARNING ACTIVITIES

Learning
Methods Presentation Practice Feedback Resources Time
Content

LO 1: Install electrical metallic /nonmetallic (PVC conduit)


LCD Projector/ TV
Power point Oral Questions Answer Laptop
Lecture presentation 1.1.1 Questions 20 minutes
1.1.1 Power point references
Oral interview
Safety
CBLM / TR/CBC
procedures
CBLM
Self-paced Read Information
Sheet 1.1-1 on Answer Self Compare to TR/CBC 15 minutes
Instruction
safety procedures Check 1.1-1 Answer Key Other References
Electrical Installation and Date Developed: Document No.
Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 2 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
1.1-1 (Internet/Textbook)
Hand Outs

CBLM
Power point Compare to TR/CBC
presentation Answer Self
Lecture Answer Key Other References 20 minutes
Check 1.1-2
Oral interview 1.1-2 (Internet/Textbook)
Different types
Hand Outs
of metallic /
non-metallic CBLM
conduits Read Information
Answer Self Compare to TR/CBC
Self paced Sheet 1.1-2 on
Check 1.1-2 Answer Key 15 minutes
Instruction different types of Other References
1.1-2
metallic/non- (Internet/Textbook)
metallic conduits Hand Outs
LCD Projector/ TV
Laptop
Power point Answer
Group presentation Oral Questions Power point
Questions 20 minutes
Discussion 1.1-2 presentation references
Oral interview 1.1.2
CBLM
TR/CBC

Electrical Installation and Date Developed: Document No.


Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 3 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
LCD Projector/ TV
Power point Oral Questions Answer Laptop
Lecture presentation 1.1.3 Questions 25 minutes
1.1.3 Power point references
Oral interview
CBLM / TR/CBC
CBLM
Read Information
Answer Self Answer Key TR/CBC
Self paced Sheet 1.1-3 on
Check 1.1-3 1.1-3 15 minutes
Familiarize of Instruction familiarize of Other References
fittings and fittings and (Internet/Textbook)
accessories accessories Hand Outs
LCD Projector/ TV
Oral Questions Laptop
Power point 1.1-3 Answer
Group presentation Power point
Written Questions 20 minutes
Discussion presentation references
Examination 1.1-3
1.1-3 CBLM
TR/CBC
Proper tools Power point LCD Projector/ TV
and equipment presentation Written Answer
Laptop
needed to Lecture Examination Questions 15 minutes
Video 1.1-4 1.1-4 Power point
complete
presentation presentation references
requirements
Electrical Installation and Date Developed: Document No.
Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 4 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
CBLM
TR/CBC
Read Information CBLM
Sheet 1.1-3 on Answer Self Answer Key TR/CBC
Self paced proper tools and Check 1.1-4 1.1-4 15 minutes
Instruction equipment Other References
needed to (Internet/Textbook)
complete Hand Outs
requirements
LCD Projector/ TV
Oral Questions Laptop
Power point 1.1-4 Answer
Group presentation Power point
Written Questions 20 minutes
Discussion presentation references
Examination 1.1-4
1.1-4 CBLM
TR/CBC
Installation of LCD Projector/ TV
electrical metal Oral Questions Laptop
Power point
conduits, wire 1.1-5 Answer
presentation Power point
ways and Lecture Questions 20 minutes
Written presentation references
cables trays, Video 1.1-5
Examination
and auxiliary presentation CBLM
1.1-5
terminal
cabinets with TR/CBC

Electrical Installation and Date Developed: Document No.


Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 5 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
distribution Read Information
panel Sheet 1.1-3 on Answer Self Answer Key CBLM
installation of Check 1.1-5 1.1-5
electrical metal TR/CBC
Self paced conduits, wire
Other References 15 minutes
Instruction ways and cables
(Internet/Textbook)
trays, and
auxiliary terminal Hand Outs
cabinets with
distribution panel
Perform tasks Check 1. Tools, equipment
1.1-5 on performanc and testing
installation of e criteria devices:
electrical metal checklist  boxes
conduits, wire 1.1-5  utility box
ways and  junction
Procedural
cables trays, box
Checklist
Trainer’s and auxiliary  pull box/
Demonstration 1.1-5 4 hours
Demonstration terminal splice box
cabinets with  conduit
distribution supports
panel  conduit
strap
 connectors
(straight
and angle)
Electrical Installation and Date Developed: Document No.
Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 6 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
 spirit level
 hacksaw
 pipe cutter
 pipe
reamer
 plumb bob
 pipe
threader
 pipe
bender
 bolt cutter
 electric
drill

2. electrical power
tools
 power drills
 portable
grinder

LO 2: Install wire ways and cable tray

Electrical Installation and Date Developed: Document No.


Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 7 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
Identify use of Oral Questions LCD Projector/ TV
materials, tools Power point 1.2-1 Answer Laptop
and equipment Lecture presentation Questions
Written
1.2-1 Power point 20 minutes
Examination presentation references
1.2-1
Read Information
Sheet 1.2-1 on
Answer Self Compare to
uses of materials, Check 1.2-1 Answer Key
Modular tools and CBLM 30 minutes
1.2-1
equipment

Interpret
Electrical/Mec Oral Questions LCD Projector/ TV
Power point
hanical 1.2-2 Answer
presentation Laptop
drawing Lecture Questions
Written
Video 1.2-2 Power point 20 minutes
Examination
presentation presentation references
1.2-2
Read Information
Sheet 1.2-2 on Answer Self Compare to
Modular Interpreting CBLM 30 minutes
Check 1.2-2 Answer Key
Electrical/Mecha
1.2-2
nical drawing

Electrical Installation and Date Developed: Document No.


Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 8 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
Determine LCD Projector/ TV
suitability for Power point Written Answer Laptop
installation
Lecture presentation Examination Questions
and used of Power point 20 minutes
bus way, cable 1.2-3 1.2-3 presentation references
tray, fittings
and panels,
conformity Read Information Answer Self- Compare to
with the Sheet 1.2-3 on check 1.2-3 Answer Key
provision of the Determining 1.2-2
PEC Code. suitability for
installation and
Modular used of bus way, CBLM 30 minutes
cable tray,
fittings and
panels,
conformity with
the provision of
the PEC Code.
Practice wire
way and cable
tray
installation

Electrical Installation and Date Developed: Document No.


Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 9 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
LO 3: Install auxiliary terminal cabinet and distribution panel
PEC/NEC LCD Projector/ TV
provisions on Oral Questions
Power point 1.3-1 Laptop
terminal Answer
cabinet Lecture presentation Questions Power point references 20 minutes
Written
Examination 1.3-1 CBLM
1.3-1
TR/CBC
Read Information CBLM /TR/CBC
Self paced Sheet 1.3-1 on Answer Self Compare to Other References 15 minutes
Instruction PEC/NEC Check 1.3-1 Answer Key (Internet/Textbook)
provisions on 1.3-1
terminal cabinet Hand Outs
Group Power point Oral Questions LCD Projector/ TV
Answer 15 minutes
Discussion presentation 1.3-1 Questions Laptop
Electrical Installation and Date Developed: Document No.
Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 10 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
Written 1.3-1 Power point
Examination presentation references
1.3-1 CBLM
TR/CBC
Procedures LCD Projector/ TV
installation of Oral Questions
Lecture Power point Laptop
auxiliary 1.3-2 Answer
presentation
terminal Written Questions Power point references 20 minutes
Video 1.3-2
cabinet Examination CBLM
presentation
1.3-2
TR/CBC
Read Information CBLM
Sheet 1.3-9 on Answer Self Compare to TR/CBC
procedures Check 1.3-2 Answer Key
Self paced installation of Other References 15 minutes
1.3-2
Instruction auxiliary terminal (Internet/Textbook)
cabinet Hand Outs

Perform tasks Check Tools:


1.3-2 on performanc  boxes
Trainer’s
Demonstration procedures e criteria  utility box 4 hours
Demonstration
installation of checklist  junction
auxiliary 1.3-2 box
Electrical Installation and Date Developed: Document No.
Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 11 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
terminal Procedural  pull box/
cabinet Checklist splice box
1.3-2  conduit
supports
 conduit
strap
 connectors
(straight
and angle)
 spirit level
 hacksaw
 pipe cutter
 pipe
reamer
 plumb bob
 pipe
threader
 pipe
bender
 bolt cutter
 electric
drill

Electrical Installation and Date Developed: Document No.


Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 12 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
Installation of LCD Projector/ TV
distribution Oral Questions
Lecture Power point Laptop
frames 1.3-4 Answer
presentation Power point 20 minutes
Written Questions
Video presentation references
Examination 1.3-4
presentation CBLM
1.3-4
TR/CBC
LCD Projector/ TV
Read Information
Answer Self Compare to Laptop 15 minutes
Sheet 3.3.3 on
Check 1.3.4 Answer Key
Self paced Installation of Power point
1.3.4
Instruction distribution presentation references
frames CBLM
TR/CBC
Perform tasks Check Tools and device
1.3-4 on performanc drivers:
Installation of e criteria  boxes
distribution checklist  utility box
Trainer’s
Demonstration frames 1.3-4  junction 4 hours
Demonstration
Procedural box
Checklist  pull box/
1.3-4 splice box
 conduit

Electrical Installation and Date Developed: Document No.


Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 13 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
supports
 conduit
strap
 connectors
(straight
and angle)
 spirit level
 hacksaw
 pipe cutter
 pipe
reamer
 plumb bob
 pipe
threader
 pipe
bender
 bolt cutter
 electric
drill

LO4 Prepare for cable pulling and installation


Proper tools, Power point Written Exam LCD Projector/ TV
Lecture Answer 20 minutes
equipment, presentation 1.4-1 Questions Laptop
Electrical Installation and Date Developed: Document No.
Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 14 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
materials and Oral interview 1.4-1 Power point references
PPE needed for CBLM / TR/CBC
the job
Read Information CBLM
Sheet 1.1-8 on Answer Self Compare to TR/CBC
Self paced Proper tools, Check 1.4-1 Answer Key 15 minutes
Instruction equipment, Other References
1.4-1
materials and (Internet/Textbook)
PPE needed for Hand Outs
the job
LCD Projector/ TV
Laptop
Power point Written Answer
Group presentation Power point
Examination Questions 20 minutes
Discussion presentation references
1.3-3 1.3-3
CBLM
TR/CBC
Cable layout LCD Projector/ TV
and Power point Written Exam
Answer Laptop
installation Lecture presentation 1.4-2 Questions 20 minutes
using the right 1.4-2 Power point references
Oral interview
equipment CBLM / TR/CBC
Self paced Read Information CBLM 15 minutes
Instruction Sheet 1.1-8 on Answer Self Compare to
Electrical Installation and Date Developed: Document No.
Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 15 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
Cable layout and Check 1.4-2 Answer Key TR/CBC
installation using 1.4-2 Other References
the right (Internet/Textbook)
equipment
Hand Outs
Demonstration Trainer’s Perform Task Check Tools and device 4 hours
Demonstration Sheet 1.4-3 on performanc drivers:
cable layout e criteria  boxes
Video
and installation checklist  utility box
presentation
using the right 1.4-3  junction
equipment box
Procedural
Checklist  pull box/
1.4-3 splice box
 conduit
Hands On supports
Practice
 conduit
strap
 connectors
(straight
and angle)
 spirit level
 hacksaw
 pipe cutter
 pipe
reamer
Electrical Installation and Date Developed: Document No.
Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 16 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
 plumb bob
 pipe
threader
 pipe
bender
 bolt cutter
 electric
drill

Safety Oral Questions


LCD Projector/ TV
procedure in 1.4-3
Power point Answer
installing Laptop
Lecture presentation Written Exam Questions 20 minutes
cables Power point references
Oral interview 1.4-3 1.4-3
CBLM / TR/CBC

Read Information
Sheet 1.1-8 on CBLM
Answer Self Compare to
cable lay out & TR/CBC
Self paced Check 1.4-3 Answer Key
installation 15 minutes
Instruction 1.4-3 Other References
equipment is set
(Internet/Textbook)
up in accordance
with Hand Outs
manufacturer's
Electrical Installation and Date Developed: Document No.
Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 17 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
and job
requirements.

Proper usage of Oral Questions


LCD Projector/ TV
PPE and safety 1.4-4
Power point Answer
devices Laptop
Lecture presentation Written Exam Questions 20 minutes
1.4-4 Power point references
Oral interview 1.4-4
CBLM / TR/CBC

Read Information CBLM


Sheet 1.1-8 on Answer Self Compare to TR/CBC
Self paced Proper usage of Check 1.4-4 Answer Key Other References 15 minutes
Instruction PPE and safety 1.4-4 (Internet/Textbook)
devices
Hand Outs

LO5 Perform wiring and cabling lay out


Safety Oral Questions
LCD Projector/ TV
procedures 1.5-1
Power point Answer Laptop
Lecture presentation Written Exam Questions 20 minutes
1.5-1 Power point references
Oral interview 1.5-1
CBLM / TR/CBC

Electrical Installation and Date Developed: Document No.


Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 18 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
Read Information CBLM
Sheet 1.5-1 on Answer Self Compare to TR/CBC
Self paced safety procedures Check 1.5-1 Answer Key Other References 15 minutes
Instruction 1.5-1 (Internet/Textbook)
Hand Outs
Proper tools Oral Questions
LCD Projector/ TV
and materials 1.5-2
Power point Answer
for the work Laptop
Lecture presentation Written Exam Questions 20 minutes
needed Power point references
Oral interview 1.5-2 1.5-2
CBLM / TR/CBC

Read Information
Sheet 1.5-2 on CBLM
Answer Self Compare to
Proper tools and Check 1.5-2 Answer Key TR/CBC
materials for the
Self paced 1.5-2
work needed Other References 15 minutes
Instruction
(Internet/Textbook)
Hand Outs

Securing cable Power point Oral Questions Answer


Lecture LCD Projector/ TV 20 minutes
support presentation 1.5-3 Questions
Electrical Installation and Date Developed: Document No.
Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 19 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
structure Oral interview Written Exam 1.5-3 Laptop
1.5-3 Power point references
CBLM / TR/CBC
CBLM
Read Information Answer Self Compare to TR/CBC
Self paced Sheet 1.5-3 on Check 1.5-3 Answer Key Other References 15 minutes
Instruction Securing cable 1.5-3 (Internet/Textbook)
support structure
Hand Outs
LCD Projector/ TV
Laptop
Power point Written Answer
Group presentation Power point
Examination Questions 15 minutes
Discussion presentation references
1.5-3 1.5-3
CBLM
TR/CBC
Action taken to Oral Questions
LCD Projector/ TV
unplanned 1.5-4
Power point Answer
event that may Laptop
Lecture presentation Written Exam Questions 20 minutes
occur in the Power point references
work area Oral interview 1.5-4 1.5-4
CBLM / TR/CBC

Electrical Installation and Date Developed: Document No.


Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 20 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
Read Information CBLM
Sheet 1.1-8 on Answer Self Compare to TR/CBC
Self paced action taken to Check 1.5-4 Answer Key 15 minutes
Instruction unplanned event Other References
1.5-4
that may occur in (Internet/Textbook)
the work area Hand Outs
LCD Projector/ TV
Laptop
Power point Written Answer
Group presentation Power point
Examination Questions 15 minutes
Discussion presentation references
1.5-4 1.5-4
CBLM
TR/CBC
Checking the Oral Questions
LCD Projector/ TV
quality of work 1.5-5
Power point Answer
after Laptop
Lecture presentation Written Exam Questions 20 minutes
performing Power point references
wiring and Oral interview 1.5-5 1.5-5
cable layout CBLM / TR/CBC

Read Information CBLM


Self paced Sheet 1.5-5 on Answer Self Compare to TR/CBC 15 minutes
Instruction Checking the Check 1.5-5 Answer Key
quality of work Other References
Electrical Installation and Date Developed: Document No.
Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 21 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
after performing 1.5-5 (Internet/Textbook)
wiring and cable Hand Outs
layout

Demonstration Trainer’s Perform Task Check Tools and device 4 hours


Demonstration Sheet 1.5-5 performanc drivers:
e criteria  boxes
Video
checklist  utility box
presentation Hands On 1.5-5  junction
Practice box
Procedural
Checklist  pull box/
1.5-5 splice box
 conduit
supports
 conduit
strap
 connectors
(straight
and angle)
 spirit level
 hacksaw
 pipe cutter
 pipe
reamer
 plumb bob

Electrical Installation and Date Developed: Document No.


Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 22 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
 pipe
threader
 pipe
bender
 bolt cutter
 electric
drill

LO6 Notify completion of work

Inspecting and Oral Questions


LCD Projector/ TV
checking the 1.6-1
Power point
finished work Answer key Laptop
Lecture presentation Written Exam 20 minutes
1.6-1 Power point references
Oral interview 1.6-1
CBLM / TR/CBC

Read Information CBLM


Sheet 1.1-8 on Answer Self- Answer Key TR/CBC
Self paced inspecting and Check 1.6-1 1.6-1 15 minutes
Instruction checking the Other References
finished work (Internet/Textbook)
Hand Outs

Electrical Installation and Date Developed: Document No.


Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 23 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
Ensuring the LCD Projector/ TV
work is done Power point Written Exam
Answer key Laptop
properly Lecture presentation 1.6-2 20 minutes
1.6-2 Power point references
Oral interview
CBLM / TR/CBC
CBLM
Read Information
Answer Self Answer Key TR/CBC
Self paced Sheet 1.1-8 on
Check 1.6-2 1.6-2 15 minutes
Instruction ensuring the Other References
work is done (Internet/Textbook)
properly Hand Outs
Tools, Oral Questions
LCD Projector/ TV
materials and 1.6-3
Power point Answer
equipment Laptop
Lecture presentation Written Exam Questions 20 minutes
should be Power point references
check and Oral interview 1.6-3 1.6-3
store it to CBLM / TR/CBC
proper storage
Read Information CBLM
Self paced Sheet 1.1-8 on Answer Self Compare to TR/CBC
tools, materials 15 minutes
Instruction Check 1.6-3 Answer Key
and equipment Other References
1.6-3
should be check (Internet/Textbook)

Electrical Installation and Date Developed: Document No.


Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 24 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems
and store it to Hand Outs
proper storage
Cleaning the Oral Questions
LCD Projector/ TV
work area and 1.6-4
Power point Answer
made safe for Laptop
Lecture presentation Written Exam Questions 20 minutes
the usage of Power point references
the area Oral interview 1.6-4 1.6-4
CBLM / TR/CBC

Read Information CBLM


Sheet 1.1-8 Answer Self Compare to TR/CBC
Self paced cleaning the work Check 1.6-4 Answer Key Other References 15 minutes
Instruction area and made 1.6-4 (Internet/Textbook)
safe for the usage
of the area Hand Outs
C. ASSESSMENT PLAN
 Written Test – in giving written test based it on the self-check.
 Performance Test- in testing the students’ comprehension squared it by following the performance criteria.
D. TEACHER’S SELF-REFLECTION OF THE SESSION
 Encourage students’ participation during the discussion to reinforce their learning.
 Allowing the students/give chance to share their own experiences related to the lesson.

Electrical Installation and Date Developed: Document No.


Maintenance NC II August 2021 Issued by:
Date Revised: TSDC Page 25 of 25
Perform Roughing-in Activities, Developed by:
Wiring and Cabling works for Nelson M. Divino
Single-Phase Distribution, Power, Revision # 00
Lighting and Auxiliary Systems