DOC NO
PAGE
PROJECT HANDOVER CHECK LIST
ISSUE DATE
REV
Department Operation And Maintenance Financial Year 2013-14
Project / Customer SAP Code / Project Code
Address
Contact Person and
Contact No
Plant Capacity [DC] / [AC]
Documents to be Receipt status
Document / Drawing Name
Sl No handed over to Document / DRG No
(If applicable to the Project)
O&M team Yes No
1 Customer PO / MOU
2 Land Registration Document (For each client)
1 Land Documents 3 Plot No details
4 Gram Panchayat NOC
5 Geo – Technical Land Survey Reports
1 Land conversion certificate
2 Gram Panchayat approval letter with drawings
Occupancy Certificate
3 VAT registration copy
4 CEIG Approval letter copy
5 Synchronization letter copy
2 Other Documents required 6 Open access agreement copy
7 IEM acknowlegment
8 Copy of registration under labor act
9 Copy of registration under Factories act
10 System User Manual
11 PVSyst report
12 Safety equipment list
CTE (Consent to Establish) &
CTO (Consent to Operate)
3 If in the scope
Certificate from Pollution
Control Board
1 Street Light Layout
2 Internal Pathway
4 Plant Layout 3 Peripheral Boundary
4 Master layout of PV ON / OFF grid system
5 Outdoor common switchyard plan & elevation
1 DC side
2 AC Side
Plant SLD (Single Line 3 AJB
5
Diagram) 4 AC/DCDB
5 Structure
6 HT Side
Electrical Circuit Diagram of
6
all Electrical System in Plant.
1 Modules
2 DC cables
3 AJB
4 Inverters/PCU
5 Battery
6 Earthing DC/AC/Transfomer/Yard
7 AC/DC DB (If applicable)
8 LT / HT Panel
Warranty Certificate or copy
7 of same for all Equipments 9 Transformers
in plant
10 AC cables
11 CT / PT (LT / HT Panel)
12 AB (Air Breakers) switch (Switch Yard)
13 CT / PT (Switch Yard)
14 ABT meters
15 Transmission Lines & Poles
16 Insulators (Transmission Lines Poles).
17 Transmission Lines (Earthing)
1 Modules
2 DC cables
3 AJB
4 Inverters/PCU
5 DC Earthing
6 AC Earthing
7 AC/DC DB (If applicable)
8 LT / HT Panel
9 Transformers
10 Transformer Earthing
11 AC cables
12 CT / PT (LT / HT Panel)
Waranty Terms,Vendor
Contact Information of all 13 AB (Air Breakers) switch (Switch Yard)
8
Components installed in 14 CT / PT (Switch Yard)
Plant
15 Control Rooms Earthing details
16 Yard Earthing
17 ABT meters
18 Transmission Lines & Poles
19 Insulators (Transmission Lines Poles).
20 Transmission Lines (Earthing)
21 Electrical Contractor
22 Civil Contractor
23 Liasoning & Statutory Approvals Contractor
24 CEIG Approval Contractor.
25 CEIG compliance & rectification reports.
26 MNRE approval related documents.
Synchronization & Commissioning Certificate of
1
the Plant.
2 Pre Commissioning Check List with all Mesurement
Commissioning Certificate of 3 Site Photo Graphs
9
Plant
4 Inverter / PCU
5 Battery
6 AC / DC DB
7 AJB
1 Modules
2 AJBs
3 Inverters/PCU
4 Battery
Test Certificate of all Major 5 DC Cables
10
Equipments
6 AC Cables
7 Transformers
CT/ PT Calibration / Test reports (wherever
8
applicable).
9 ABT meters Calibration / Test reports.
During synchronization, the meter readings taken
11 Copy of First meter readings 1 along with the signature of the approved
designated authorities. Eg., APCPDCL, M&P etc.
1 Modules
2 DC cables
3 AJB
4 Inverters/PCU
5 DC Earthing
6 AC Earthing
7 AC / DC DB
8 LT / HT Panel
9 Transformers
Technical specification 10 Transformer Earthing
12 documents of all Equipments
Installed in Plant 11 AC cables
12 CT / PT (LT / HT Panel)
13 AB (Air Breakers) switch (Switch Yard)
14 CT / PT (Switch Yard)
15 Control Room Earthing details
16 Yard Earthing
17 ABT meters
18 Transmission Lines & Poles
19 Insulators (Transmission Lines Poles)
20 Transmission Lines (Earthing)
Name:
1 Qualification:
Experience:
Name:
2 Qualification:
Experience:
13 Site O&M staff details
Name:
3 Qualification:
Experience:
Name:
4 Qualification:
Experience:
1 Insulation tester / Megger (1000V)
2 Clamp Meter
3 Multi Meter
4 PV Modules
5 MC4 crimping tool
6 Wrench set
7 Cutter
8 Screw Driver Set
9 Testers
10 Plier
11 Hydro meter to check specific gravity of battery
12 Strippers
13 Spares/tools/PPEs
13 DC Cables ( DC Side)
14 AC Side Cables.
15 MC4 connectors
16 Earth resistance tester
33kV hand gloves, Safety Helmets/ Safety Shoes
17
(5 Nos)
18 Insulation tapes (RYB).
19 Infrared Camera
20 9Volts Battery
21 First Aid box
22 Contact no of all village panchayat
23 All equipments as per the safety equipment list
Water connection / Source of
14
water
PM Remarks:
Engg Remarks:
Conclusion from O&M:
Signature Of PM Signature of ENGG Signature of O&M