Checklist ‐ PVC Conduiting embeddeed in Slab
b/Column
n for Electtrical Worrks
DAR Ref.: DAR/ELLECT./ Date:
D D IR Ref.
P
Project : King Abd dullah Financial District Pro
oject (DB‐‐06B) Paarcel
S
Specified
d Location n: Co
ontrol#
D
Drawing Title: Dwwg. No.
Description of Acctivities Contrractor’s Check DAR
R AL RIYAD
DH REMARKS
ELectriical QA//QC
YES NO YES NO YES NO HO OLD
Are Safety Precautions ssatisfactory??
A
(
(Safety Chec ck list Attach hed)
A
Are Scalff fo lds & Accesss ways
c
correct ?
1
1.Is Approve ed material u used?
2
2.Are condu uits & its fitttings correct
size & typee?
3
3.Is Woodeen Frames installed fo or
Electrical o
openings.
4
4.Are the Pa artition wallss & Grid No os.
is markeed properlly by civvil
discipline for
f the corrrect location ns
of Power/D Data/Tel Bacck Boxes.
5
5.Are installeed conduits iin accordancce
with drawiing in a workkmanship likke
manner?
6
6.Are Condu uits tightene ed with steel
bar @ prop per intervalss?
7
7.Are condu its adequate ely supporteed
by means of special steel chairs
where ever more cond duits passingg.
8
8.Are condu its tighten w with steel bars
on both sides of PVC P Conduits
couplers.
9
9.Are PVCC Conduitss alignmen nt
Page 1 of 3
File: KA
AFD/PERVEEZ/ELECT.//PVC condu
uiting
correct fo or vertical PVC
P conduits
runs with h adequate supports /
tighten by means of steel wire?
1
10.Are neces ssary fittingss installed foor
the conduits passing througgh
expansion n joints?
11.Are condu uits runs no
ot passing via
v
toilets / bathroom are eas?
1
12.Are the minimum re ecommendeed
gap (2D) between PVC condu uit
maintaineed?
1
13.Are instaalled condu uits properrly
caped by means of Polyethylen ne
sheets / masking
m tap
pes to protect
from conccrete / dust.
1
14.Are coonduits id dentification ns
marked / flaged.
15
5.Are thee minimum m distancce
between Power & & Data PV VC
conduit not
n less than n or equal to
t
300mm.
1
16.Are the distances between
b puull
boxes maintained @ 25m intervaals
or less?
1
17.Are the circuit
c looping and hom me
runs up to
t Panel Bo oards as peer
drawing.
1
18.Are the mounting height
h & th
he
clearances for all ittems as peer
drawing.
1
19.Are PVCC Circular Boxes fo or
Lighting Fixtures
F coorrdinated witth
Back Bo oxes of Fire Alarm
Detectorss & PA/VA Sp peakers?
20
0.Are conduits bend ds free of o
damage?
Page 2 of 3
File: KA
AFD/PERVEEZ/ELECT.//PVC condu
uiting
21.Are JB//PB/BB insstalled witth
2
correct sizzes?
22.Are JB/PB//BB installedd with propeer
supports & correct elevation &
location?
23
3.Are JB//PB/BB identification ns
marked?
2
24.Are φ32m mm vertical PVC condu uit
runs thrrough core walls & Staair
cases not available.
2
25.Is instru
ucted corre ective actio on
completed d?
C
Consultant’s s Comments.
C
CHECKED BY: INSPECTED B
BY: W
WITNESSED BY
Y:
C
Contractor Re
epresentative
e: Q.C. Inspecto
or, Contracto
or Co
onsultant
Page 3 of 3
File: KA
AFD/PERVEEZ/ELECT.//PVC condu
uiting