Checklist For Chamber Construction

The document contains two checklists for construction projects. The first checklist is for chamber construction and includes items like invert level, concrete grade and thickness, chamber depth, blockwork size and grade, plaster thickness and grade, curing, and cover slab thickness and grade. The second checklist is for hume pipe laying and includes items like pipe grade and size, invert level, excavation, compaction, dust spreading, pipe laying, collar packing, backfilling, bituminous macadam, and bituminous concrete. Both checklists require signatures from the site engineer and client engineer/manager.

Uploaded by

bishu70
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
868 views

Checklist For Chamber Construction

The document contains two checklists for construction projects. The first checklist is for chamber construction and includes items like invert level, concrete grade and thickness, chamber depth, blockwork size and grade, plaster thickness and grade, curing, and cover slab thickness and grade. The second checklist is for hume pipe laying and includes items like pipe grade and size, invert level, excavation, compaction, dust spreading, pipe laying, collar packing, backfilling, bituminous macadam, and bituminous concrete. Both checklists require signatures from the site engineer and client engineer/manager.

Uploaded by

bishu70
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

CHECKLIST FOR CHAMBER CONST

Work Order No:


Project Name :
Work Location :
Reference Drawing :
Size of Chamber:
Sl.No
Points To Check
1
Invert Level As per Drg
2
PCC - Grade & Thickness
3
Depth Of Chamber
4
Blockwork - Size & Grade
5
Internal plastering - Thickness & Grade
6
Curing
7
Cover Slab - Thickness & Grade of RCC
Signature of Site Engineer

ST FOR CHAMBER CONSTRUCTION


Date :

Remarks

Signature of Client Engineer/Manger

CHECKLIST FOR HUME PIPE LAYING


Date :
Work Order No:
Project Name :
Work Location :
Reference Drawing :
Sl.No
Points To Check
1
Grade & Size of Hume Pipe
2
Pipe line invert level
3
Excavation
4
Compaction with Earth rammer
5
Dust spreading & leveling
6
Pipe line laying
7
Collers packing with Hemp
8
Back Filling/Consolidation
9
Bituminous Macadam
10 Bituminous Concrete
Signature of Site Engineer

Signature of Client Engineer/Manger

IPE LAYING
Date :

re of Client Engineer/Manger

Remarks