Appendix E: Checklist For Kerbstone Works Location / Identification: Drawing No.: No. Description Yes No N/A

This document contains two checklists for construction projects. The first checklist is for kerbstone works and contains 9 items to check such as safety precautions, sufficient materials, proper storage, compaction, setting out, concrete work, alignment, installation, and curing. The second checklist is for survey activities and contains 6 items to check like equipment calibration, control points, drawings, utilities, and layer thickness. Both checklists are to be signed off by construction, QA/QC, and project management representatives to verify the activities were properly checked and complied with requirements.

Uploaded by

JericFuentes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
706 views2 pages

Appendix E: Checklist For Kerbstone Works Location / Identification: Drawing No.: No. Description Yes No N/A

This document contains two checklists for construction projects. The first checklist is for kerbstone works and contains 9 items to check such as safety precautions, sufficient materials, proper storage, compaction, setting out, concrete work, alignment, installation, and curing. The second checklist is for survey activities and contains 6 items to check like equipment calibration, control points, drawings, utilities, and layer thickness. Both checklists are to be signed off by construction, QA/QC, and project management representatives to verify the activities were properly checked and complied with requirements.

Uploaded by

JericFuentes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

APPENDIX E

CHECKLIST FOR KERBSTONE WORKS

Location / Identification:

Drawing No.:

No. Description YES NO N/A

1 Safety precautions are taken before commence the work.

2 There is sufficient material to perform work at the site.

3 Kerbs are stored properly at the site.

4 Field compaction is passed.

5 Setting out is carried out for formwork and foundation concrete.

6 Foundation concrete is casted and cured properly.

7 Alignment and top level of kerb is checked.

8 Kerbstone is installed properly.

9 Backing concrete is casted and cured properly.

Remarks:

THE ABOVE ACTIVITIES WHERE CHECK AND COMPLIES WITH THE REQUIREMENT

Construction Representative QA/QC Representative PMC Representative

Name:
Name: Name:

Signature:
Signature: Signature:

Date:
Date: Date:

TIP - QP - 001
APPENDIX F:

CHECKLIST FOR SURVEY ACTIVITIES

Location / Identification:

Drawing No.:

No. Description YES NO N/A

1 Survey equipment calibration

2 Determining the application point.

3 Establishing of control points for alignment, elevation and slopes.

4 Compliance with relevant Drawings.

5 Setting out of the existing utilities

6 Filling layer thickness.

Remarks:

THE ABOVE ACTIVITIES WHERE CHECK AND COMPLIES WITH THE REQUIREMENT

Construction Representative QA/QC Representative PMC Representative

Name:
Name: Name:

Signature:
Signature: Signature:

Date:
Date: Date: