APPENDIX E
CHECKLIST FOR KERBSTONE WORKS
Location / Identification:
Drawing No.:
YE N N/
No. Description
S O A
1 Safety precautions are taken before commence the work.
2 There is sufficient material to perform work at the site.
3 Kerbs are stored properly at the site.
4 Field compaction is passed.
5 Setting out is carried out for formwork and foundation concrete.
6 Foundation concrete is casted and cured properly.
7 Alignment and top level of kerb is checked.
8 Kerbstone is installed properly.
9 Backing concrete is casted and cured properly.
Remarks:
THE ABOVE ACTIVITIES WHERE CHECK AND COMPLIES WITH THE
REQUIREMENT
Construction Representative QA/QC Representative PMC Representative
Name:
Name: Name:
Signature:
Signature: Signature:
Date:
Date: Date:
TIP - QP - 001
APPENDIX F
CHECKLIST FOR SURVEY ACTIVITIES
Location / Identification:
Drawing No.:
YE N N/
No. Description
S O A
1 Survey equipment calibration
2 Determining the application point.
3 Establishing of control points for alignment, elevation and slopes.
4 Compliance with relevant Drawings.
5 Setting out of the existing utilities
6 Filling layer thickness.
Remarks:
THE ABOVE ACTIVITIES WHERE CHECK AND COMPLIES WITH THE
REQUIREMENT
Construction Representative QA/QC Representative PMC Representative
Name:
Name: Name:
Signature:
Signature: Signature:
Date:
Date: Date:
TIP - QP - 002