0% found this document useful (0 votes)
2K views1 page

Concrete Inspection Checklist

This 3 sentence summary provides the key details from the concrete post-pour inspection report: The inspection report documents an inspection of a concrete pour for the ABC project of client XYZ, noting checks for proper curing, stripping of forms, positioning of embedments, and any surface defects, with defects addressed through approved repair methods. The report lists activities inspected, notes yes, no, or not applicable findings, and includes remarks from both the company and client engineers.

Uploaded by

Kamal Fitri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views1 page

Concrete Inspection Checklist

This 3 sentence summary provides the key details from the concrete post-pour inspection report: The inspection report documents an inspection of a concrete pour for the ABC project of client XYZ, noting checks for proper curing, stripping of forms, positioning of embedments, and any surface defects, with defects addressed through approved repair methods. The report lists activities inspected, notes yes, no, or not applicable findings, and includes remarks from both the company and client engineers.

Uploaded by

Kamal Fitri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

COMPANY NAME

CONCRETE POST-POUR INSPECTION REPORT

Project ABC
Client XYZ
Report No. Date of Inspection
Location of the Ref.Drawing No.
Structure
Work done TIME : from to

S.No. Description of Activity YES NO N/A Remarks

Cured by covering with Wet Hessian bags / Sprinkling water / application of


01
Curing compound
Checked for Stripping of Formwork/Supports etc. after specified duration of
02
Stripping time

03 Checked for Position of Embedment plates,Inserts,Joints,Pipes etc. if any


Checked for presence of any Surface Defects i.e., minor/major cracks, voids,
04
segregation of aggregate etc. if any
Repaired and Finished all Surface Defects by specifications / approved
05
methods

COMAPNY ENGINEER CLIENT ENGINEER


Name Name
Sign Sign
Sign Date