0% found this document useful (0 votes)
176 views6 pages

Crane Lifting JSA: Hazards & Controls

This document outlines job safety analysis (JSA) steps for lifting operations using a crane at Sify Infinit Spaces Limited in Siruseri. It identifies potential hazards at each step and the control measures and responsible parties to ensure safety. The 6 key steps are: 1) obtaining a permit to work, 2) toolbox talks, 3) identifying the work area, 4) preparing the lifting area, 5) preparing materials for lifting, and 6) performing the lifting work. Hazards include injury, electrocution, falling, slipping, improper lifting, and more. Controls include inspections, permits, PPE, training, supervision, signage, and clear communication between the crane operator and rigger. The

Uploaded by

JISHNU EHS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
176 views6 pages

Crane Lifting JSA: Hazards & Controls

This document outlines job safety analysis (JSA) steps for lifting operations using a crane at Sify Infinit Spaces Limited in Siruseri. It identifies potential hazards at each step and the control measures and responsible parties to ensure safety. The 6 key steps are: 1) obtaining a permit to work, 2) toolbox talks, 3) identifying the work area, 4) preparing the lifting area, 5) preparing materials for lifting, and 6) performing the lifting work. Hazards include injury, electrocution, falling, slipping, improper lifting, and more. Controls include inspections, permits, PPE, training, supervision, signage, and clear communication between the crane operator and rigger. The

Uploaded by

JISHNU EHS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

SIFY INFINIT SPACES LIMITED SIRUSERI

JSA FOR LIFTING(CRANE)

Basic Job
Potential Hazard Control Measure Responsible Person
Sequence
• Obtain correct Permit to Work
• Injury / damage as a result of • Only authorized person allowed
1. Obtain PTW incorrect information • All Workers must be inducted SITE ENGINEER / SAFETY
• Unauthorized personal OFFICER
• All personnel to be project and zone inducted
• Ensure all approved controls and prevention measures are
discussed and JSA discussed with all persons involved in the
work.
2. Tool box talk Unauthorized access/egress, • All personnel to attend daily toolbox talk prior to the SITE ENGINEER / SAFETY
working platform, Unsafe commencement of work. OFFICER
conditions • All personnel should be Wear proper PPE

• Safety induction to new employees, specialized training to


• Risk of injury due to low craftsmen
awareness of work activities • job pre start Meeting / Tool box meeting SITE ENGINEER / SAFETY
3. Identify work
and area condition • Mandatory use Of PPE’s OFFICER
Area
• Unsafe Access • Work area pre inspection Provide proper access.

• Risk of Electrical injury due to • Safety induction to all area employees


electrical shock. • Job pre start meeting / Tool box meeting
• Electrocution (death due to • Required to maintain proper work distances
3. Overhead powerlines electrical shock) • Provide proper access SITE ENGINEER / SAFETY
• Burns due to electrical shock • Area should not be wet because Electric hazards can be made OFFICER
• Falls due to electrical shock worse if the worker, location or equipment is wet

1
SIFY INFINIT SPACES LIMITED SIRUSERI

JSA FOR LIFTING(CRANE)

Basic Job
Sequence Potential Hazard Control Measure Responsible Person
• Area should be clear from any debris
• Improper access • Material must be segregate
• Personal injury • Housekeeping must be done prior to start the job and finished
• Uneven ground pavement the job
4 .Lifting area • Bad housekeeping • Adequate access.
preparation • Scattered materials • Ensure area is properly prepared for job
• Slip, trip • Ground pavement must be levelled properly SITE ENGINEER / SAFETY
• Un authorized entry • Provide proper barricades OFFICER
• Excavations and trenches • Provide signage
• Provided spill tray for flammable oils
• Provide adequate fire extinguisher
• Follow the monthly colour code
• Maintain safe distance from Excavation and trenches.

SIFY INFINIT SPACES LIMITED SIRUSERI

JSA FOR LIFTING(CRANE)

Basic Job
Sequence Potential Hazard Control Measure Responsible Person

2
• Pre inspection of crane equipment prior to start the job.
• Personal injury • Ensure crane is third party certified
• Improper access • Follow safe operating procedures
• Sharp edges • Proper supervision from immediate supervisor
• Hand injury • Prepare proper signage and barricade prior to lifting job
• Pinch point • Use PPE’s as per requirements
• Hit by/hit by objects • Ensure that overhead object has properly place and tied off
• Rolling over of stack pipes • Material should be properly stacked
• Slip, trip hazard • Good house keeping
• Improper stacking of pipes • If working at height must be undergo training of working at
• Property damage heights
• Falling objects • Use fall protection gear
• Scattered pipe materials • Proper segregation of pipes as per sizes
• Fire • Ensure proper fire extinguisher is available in the area SITE ENGINEER / SAFETY
5. Material preparation
• Fall of height • Don’t put the hands in between two objects OFFICER
• Mechanical failure • Ensure sling is third party certified
• Lifting tackle failure • Inspect the sling thoroughly prior to use
• Caught in between • Ensure lifting gear has third party certified and valid
• Vision blocked • Ensure lifting gear has no signed of damage, if damage found
don’t use it or replace immediately
• Ensure out rigging pad available and no defects
• Follow monthly colour code
• Operation vision must be clear
• Proper communication between operator and Rigger.

SIFY INFINIT SPACES LIMITED SIRUSERI

JSA FOR LIFTING(CRANE)

Basic Job
Sequence Potential Hazard Control Measure Responsible Person

3
• Uneven ground pavement • Ensure crane must third party certified
• Falling objects/pipes • Only competent rigger allowed to performed the job
• Struck by/hit by • Only qualified crane operator can Performed the job
• Crane overload • Ensure the ground pavement level properly
6 Lifting work (by means
• Inadequate access • Provide proper barricade
of crane)
• Crane overturning / Property • Provide proper signage
damage • Ensure clear visibility between rigger and crane operator
• Ensure outrigger pad is free of damage
• Mechanical failure
• Ensure proper sling position
• Uncontrolled movements of • Inspect lifting gear prior to use
lifted pipes/objects • Lifting gear must third party certified
• Improper communication bet. • Regular inspection of lifting equipment's prior to use
Crane operator and rigger • Lifting tackles must have a third party certified and valid
• Oil spill • Use PPE’s as per requirements
• Slip, trip • Don’t put hands in between two objects
• Pinch point • Ensure proper access
• Personal injury • Use two tag lines SITE ENGINEER / SAFETY
• Failure of lifting equipment • No people should stand beneath the lifted object OFFICER
• Collision of objects/pipes • Maintain safe distance from lifted objects
• Vision blocked • Be sure no overhead objects within boom range
• Caught in between • Crane load chart must strictly Followed
• Ensure lifted objects must be in proper
• Use wooden wedge block
• No person should stay within boom range
• Never sit stand, walk, work under suspended load
• Ensure no hydraulic leakage of crane
• Maintain safe distance from DSL cables box bar

SIFY INFINIT SPACES LIMITED SIRUSERI

JSA FOR LIFTING(CRANE)

4
Basic Job
Sequence Potential Hazard Control Measure Responsible Person
• Irregular inspection on all • Wire rope shall be provided properly identified for SWL
lifting tackles and manufacturer.
• Shackle improperly • Inspections shall be done by authorized personnel and by
7. chain block and maintained and inspected the safety department Shall keep the records.
rigging gear • Wear and tear of wire ropes • Safe working load stamp shall provide by the
• Mechanical failure manufacturer
• Chain block failure • Only trained persons may use electric or pneumatic tools.
• Over loading of chain block • Defective tools or equipment shall not Allowed to use
• Improper coordination • Ensure proper rigid mounting
• Falling of lifted pipes • Ensure to use PPE
• Collapse of loads • Stay away from lifted loads
• Collapse of rigid mounting • Lift the pipes slowly
• Personal injury • Provide sufficient access as possible
• Inadequate access • Be sure not to over load the capacity of chain block
SITE ENGINEER / SAFETY
• Property damages • Be sure not to over load the maximum strength of wire OFFICER
• Fall from height ropes
• Inspect chain blocks before use
• All chain blocks should be 3rd party certified
• Use two tag lines to control load movements
• Use fall protection if working at height
• Only qualified personnel allowed to do the job
• Barricade the area
• Provide proper signage
• all lifting tackles must be 3rd party certified

SIFY INFINIT SPACES LIMITED SIRUSERI

5
JSA FOR LIFTING(CRANE)

Basic Job
Sequence Potential Hazard Control Measure Responsible Person
• Arrange/ stage all the material in neat orderly manner.
Tripping Hazards • Remove damage, banding, crate material, nails etc. and
dispose of properly

• Provide trash for work areas means for maintaining.


• Waste disposal • All containers should be labelled
8. Housekeeping SITE ENGINEER / SAFETY
• Fire • Clean the spill area immediately, and reporting of incident and
OFFICER
• Slip, trip, Fall spillage.
• Crushed by EOT crane • Stay away from EOT crane.
• Maintain safe distance from live box bar

Prepared by: Reviewed by: Approved by: Date

Safety Officer Project Engineer Sify SafetyTeam 06/ 01 / 2024


JISHNU N C G Prabhakaran
DINESH T