SIFY INFINIT SPACES LIMITED SIRUSERI
JSA FOR LIFTING(CRANE)
     Basic Job
                             Potential Hazard                                      Control Measure                                 Responsible Person
     Sequence
                                                                •   Obtain correct Permit to Work
                         •   Injury / damage as a result of     •   Only authorized person allowed
1. Obtain PTW                incorrect information              •   All Workers must be inducted                                   SITE ENGINEER / SAFETY
                         •   Unauthorized personal                                                                                        OFFICER
                                                                •   All personnel to be project and zone inducted
                                                                •   Ensure all approved controls and prevention measures are
                                                                    discussed and JSA discussed with all persons involved in the
                                                                    work.
2. Tool box talk             Unauthorized access/egress,        •   All personnel to attend daily toolbox talk prior to the        SITE ENGINEER / SAFETY
                              working platform, Unsafe              commencement of work.                                                 OFFICER
                              conditions                        •   All personnel should be Wear proper PPE
                                                                •   Safety induction to new employees, specialized training to
                         •   Risk of injury due to low              craftsmen
                             awareness of work activities       •   job pre start Meeting / Tool box meeting                       SITE ENGINEER / SAFETY
3. Identify work
                             and area condition                 •   Mandatory use Of PPE’s                                                OFFICER
   Area
                         •   Unsafe Access                      •   Work area pre inspection        Provide proper access.
                         •   Risk of Electrical injury due to   •   Safety induction to all area employees
                             electrical shock.                  •   Job pre start meeting / Tool box meeting
                         •   Electrocution (death due to        •   Required to maintain proper work distances
3. Overhead powerlines       electrical shock)                  •   Provide proper access                                          SITE ENGINEER / SAFETY
                         •   Burns due to electrical shock      •   Area should not be wet because Electric hazards can be made           OFFICER
                         •   Falls due to electrical shock          worse if the worker, location or equipment is wet
                                                                                                                                                   1
                                    SIFY INFINIT SPACES LIMITED SIRUSERI
                                           JSA FOR LIFTING(CRANE)
      Basic Job
      Sequence        Potential Hazard                              Control Measure                                  Responsible Person
                                                 •   Area should be clear from any debris
                  •   Improper access            •   Material must be segregate
                  •   Personal injury            •   Housekeeping must be done prior to start the job and finished
                  •   Uneven ground pavement         the job
4 .Lifting area   •   Bad housekeeping           •   Adequate access.
   preparation    •   Scattered materials        •   Ensure area is properly prepared for job
                  •   Slip, trip                 •   Ground pavement must be levelled properly                       SITE ENGINEER / SAFETY
                  •   Un authorized entry        •   Provide proper barricades                                              OFFICER
                  •   Excavations and trenches   •   Provide signage
                                                 •   Provided spill tray for flammable oils
                                                 •   Provide adequate fire extinguisher
                                                 •   Follow the monthly colour code
                                                 •   Maintain safe distance from Excavation and trenches.
                                    SIFY INFINIT SPACES LIMITED SIRUSERI
                                           JSA FOR LIFTING(CRANE)
      Basic Job
      Sequence        Potential Hazard                              Control Measure                                  Responsible Person
                                                                                                                                     2
                                                            •   Pre inspection of crane equipment prior to start the job.
                          •   Personal injury               •   Ensure crane is third party certified
                          •   Improper access               •   Follow safe operating procedures
                          •   Sharp edges                   •   Proper supervision from immediate supervisor
                          •   Hand injury                   •   Prepare proper signage and barricade prior to lifting job
                          •   Pinch point                   •   Use PPE’s as per requirements
                          •   Hit by/hit by objects         •   Ensure that overhead object has properly place and tied off
                          •   Rolling over of stack pipes   •   Material should be properly stacked
                          •   Slip, trip hazard             •   Good house keeping
                          •   Improper stacking of pipes    •   If working at height must be undergo training of working at
                          •   Property damage                   heights
                          •   Falling objects               •   Use fall protection gear
                          •   Scattered pipe materials      •   Proper segregation of pipes as per sizes
                          •   Fire                          •   Ensure proper fire extinguisher is available in the area       SITE ENGINEER / SAFETY
5. Material preparation
                          •   Fall of height                •   Don’t put the hands in between two objects                            OFFICER
                          •   Mechanical failure            •   Ensure sling is third party certified
                          •   Lifting tackle failure        •   Inspect the sling thoroughly prior to use
                          •   Caught in between             •   Ensure lifting gear has third party certified and valid
                          •   Vision blocked                •   Ensure lifting gear has no signed of damage, if damage found
                                                                don’t use it or replace immediately
                                                            •   Ensure out rigging pad available and no defects
                                                            •   Follow monthly colour code
                                                            •   Operation vision must be clear
                                                            •   Proper communication between operator and Rigger.
                                             SIFY INFINIT SPACES LIMITED SIRUSERI
                                                     JSA FOR LIFTING(CRANE)
     Basic Job
     Sequence                 Potential Hazard                                 Control Measure                                 Responsible Person
                                                                                                                                               3
                           •   Uneven ground pavement         •   Ensure crane must third party certified
                           •   Falling objects/pipes          •   Only competent rigger allowed to performed the job
                           •   Struck by/hit by               •   Only qualified crane operator can Performed the job
                           •   Crane overload                 •   Ensure the ground pavement level properly
6 Lifting work (by means
                           •   Inadequate access              •   Provide proper barricade
         of crane)
                           •   Crane overturning / Property   •   Provide proper signage
                               damage                         •   Ensure clear visibility between rigger and crane operator
                                                              •   Ensure outrigger pad is free of damage
                           •   Mechanical failure
                                                              •   Ensure proper sling position
                           •   Uncontrolled movements of      •   Inspect lifting gear prior to use
                               lifted pipes/objects           •   Lifting gear must third party certified
                           •   Improper communication bet.    •   Regular inspection of lifting equipment's prior to use
                               Crane operator and rigger      •   Lifting tackles must have a third party certified and valid
                           •   Oil spill                      •   Use PPE’s as per requirements
                           •   Slip, trip                     •   Don’t put hands in between two objects
                           •   Pinch point                    •   Ensure proper access
                           •   Personal injury                •   Use two tag lines                                             SITE ENGINEER / SAFETY
                           •   Failure of lifting equipment   •   No people should stand beneath the lifted object              OFFICER
                           •   Collision of objects/pipes     •   Maintain safe distance from lifted objects
                           •   Vision blocked                 •   Be sure no overhead objects within boom range
                           •   Caught in between              •   Crane load chart must strictly Followed
                                                              •   Ensure lifted objects must be in proper
                                                              •   Use wooden wedge block
                                                              •   No person should stay within boom range
                                                              •   Never sit stand, walk, work under suspended load
                                                              •   Ensure no hydraulic leakage of crane
                                                              •   Maintain safe distance from DSL cables box bar
                                              SIFY INFINIT SPACES LIMITED SIRUSERI
                                                     JSA FOR LIFTING(CRANE)
                                                                                                                                                  4
   Basic Job
   Sequence              Potential Hazard                               Control Measure                               Responsible Person
                     •   Irregular inspection on all   •   Wire rope shall be provided properly identified for SWL
                         lifting tackles                   and manufacturer.
                     •   Shackle improperly            •   Inspections shall be done by authorized personnel and by
7. chain block and       maintained and inspected          the safety department Shall keep the records.
    rigging gear     •   Wear and tear of wire ropes   •   Safe working load stamp shall provide by the
                     •   Mechanical failure                manufacturer
                     •   Chain block failure           •   Only trained persons may use electric or pneumatic tools.
                     •   Over loading of chain block   •   Defective tools or equipment shall not Allowed to use
                     •   Improper coordination         •   Ensure proper rigid mounting
                     •   Falling of lifted pipes       •   Ensure to use PPE
                     •   Collapse of loads             •   Stay away from lifted loads
                     •   Collapse of rigid mounting    •   Lift the pipes slowly
                     •   Personal injury               •   Provide sufficient access as possible
                     •   Inadequate access             •   Be sure not to over load the capacity of chain block
                                                                                                                     SITE ENGINEER / SAFETY
                     •   Property damages              •   Be sure not to over load the maximum strength of wire     OFFICER
                     •   Fall from height                  ropes
                                                       •   Inspect chain blocks before use
                                                       •   All chain blocks should be 3rd party certified
                                                       •   Use two tag lines to control load movements
                                                       •   Use fall protection if working at height
                                                       •   Only qualified personnel allowed to do the job
                                                       •   Barricade the area
                                                       •   Provide proper signage
                                                       •   all lifting tackles must be 3rd party certified
                                      SIFY INFINIT SPACES LIMITED SIRUSERI
                                                                                                                                       5
                                          JSA FOR LIFTING(CRANE)
     Basic Job
     Sequence         Potential Hazard                               Control Measure                                    Responsible Person
                                                  •   Arrange/ stage all the material in neat orderly manner.
                      Tripping Hazards            •   Remove damage, banding, crate material, nails etc. and
                                                      dispose of properly
                                                  •   Provide trash for work areas means for maintaining.
                  •   Waste disposal              •   All containers should be labelled
8. Housekeeping                                                                                                         SITE ENGINEER / SAFETY
                  •   Fire                        •   Clean the spill area immediately, and reporting of incident and
                                                                                                                               OFFICER
                  •   Slip, trip, Fall                spillage.
                  •   Crushed by EOT crane        •   Stay away from EOT crane.
                                                  •   Maintain safe distance from live box bar
Prepared by:                   Reviewed by:                            Approved by:                                        Date
Safety Officer                 Project Engineer                        Sify SafetyTeam                                     06/ 01 / 2024
JISHNU N C                     G Prabhakaran
DINESH T