Owner-Architect
Agreement
                                                                        UAP Document – 401-A
Date           :        ________________________________________________________
Owner/Client :          ________________________________________________________
Attention      :        ________________________________________________________
Thru           :        ________________________________________________________
Subject        :        ________________________________________________________
Dear Sir/s     :        ________________________________________________________
This will confirm our agreement for me to furnish professional services as Architect of your
                        proposed         ___________________________________
                        located at       ___________________________________
In accordance with the following terms and conditions:
   I.        GENERAL SCOPE OF ARCHITECTURAL SERVICES
               The ARCHITECT/S shall perform professional services, which shall consist
               generally of the following:
               1. Preliminary services include conferences with the client and inspection of
                    the building site.
               2. Schematic Design based on the requirements/needs of the OWNER.
               3. Preparation of Final Design Development drawings including perspective.
               4. Preparation of Contract Documents consisting of the following:
                        4.1     Architectural Drawings and Details
                        4.2     Structural Drawings and Details
                        4.3     Electrical Drawings and Details
                        4.4     Sanitary and Plumbing Drawings and Details
                        4.5     Mechanical Drawings and Details if required
                        4.6     Specifications
                        4.7     Budgetary Cost Estimates
               5.       Periodic visits of Construction
                                                                           Owner-Architect
                                                                              Agreement
                                                                    UAP Document – 401-A
          (Note: 8-hour of full time supervision or construction management is not
          included but may be under separate contract)
II.    ARCHITECT’S FEE
       The owner agrees to pay the Architect in accordance with the Architect’s National
       Code (UAP Doc. 202) a basic fee of ____________percent (           %) of the total
       estimated project construction cost. However, the fee shall be adjusted up or
       down based on the final construction cost.
III.   MANNER OF PAYMENT
       1. Upon signing of this Agreement, the Owner-Client shall pay the Architect in
          the following manner: The amount of PESOS: _________________________
          (Php __________________________________) as minimum payment for
          Architect’s basic services. However, monthly retainer fees can be arranged
          and deducted from the total fees during the preparation of the different
          phases of the project up to completion of Contract Documents.
       2. Upon completion of the preparation of schematic design phase up to final
          design development drawings – 30 % of the Architect’s fee.
       3. Upon completion and submission of five (5) sets of signed and sealed
          Contract Documents – 50 % of the Architect’s fee. (equivalent to 85% of total
          fee).
       4. During construction implementation (periodic visits) – balance of fee
          computed on the final Project Construction Cost. Time frame for construction
          implementation shall not be more than 1.3 of the time allotted for the project.
          Any extra time necessary for periodic observation will be renegotiated.
       5. Upon request of the Architect, the Owner agrees to make partial payments
          during each of the various stages of work, provided that such payments are
          within the frame work of the payments outlined above.
IV.    DELAYED PAYMENT
       Any payment due the Architect beyond 30 days from receipt of billing shall bear
       2% interest per month.
                                                                               Owner-Architect
                                                                                  Agreement
                                                                       UAP Document – 401-A
V.     DATA REQUIRED FROM THE OWNER
       All technical description of property, duly certified lot and vicinity plans, contour
       maps, etc., at a convenient scale and other relevant data will be furnished by the
       Client/Owner so that the design of the project can start immediately.
VI.    CHANGES AND/OR REVISIONS
       Any changes and/or revisions requested by the Owner after the approval of final
       design shall be subjected to compensation agreed by both parties but not less
       than man-hour time charge plus materials used times a factor of 2.5.
VII.   OWNERSHIP OF DOCUMENTS
       Contract documents shall remain the property of the Architect in accordance with
       R.A. 9266 and R.A. 8293 whether the design is executed or not. Additional
       copies when required will be for account of the Owner.
       Very truly yours,
       _____________________________ Conforme ___________________________
                     Architect                                       Owner-Client
       _____________________________               Date ___________________________