Pre Inspection Report

The document discusses several infrastructure projects in Barangay Plaridel including the improvement of the water system, rehabilitation of a fish sanctuary, fabrication of hanging basketball boards, construction of an evacuation center, and repair of the water system.

Uploaded by

Maribel Montajes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
608 views9 pages

Pre Inspection Report

The document discusses several infrastructure projects in Barangay Plaridel including the improvement of the water system, rehabilitation of a fish sanctuary, fabrication of hanging basketball boards, construction of an evacuation center, and repair of the water system.

Uploaded by

Maribel Montajes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Republic of the Philippines

Province of Leyte
City of Baybay
Barangay Plaridel

OFFICE OF THE BARANGAY CHAIRMAN

PRE INSPECTION REPORT

COA OFFICE
BAYBAY CITY, LEYTE

Madam;

This is to inform your good office that our Barangay council has come to
an approval for the IMPROVEMENT OF WATER SYSTEM. The said
project will provide potable water to the constituents of Barangay
Plaridel.

Checked / Reviewed by:

FRANCISCO ESCALA
Brgy. Kagawad
Noted by:

HON. FELIPE T. CERILLA


Punong Barangay
NOTICE TO COMMENCE WORK

JJ JAHAY GEN. MDSE.


BAYBAY CITY, LEYTE

Madam;

You are hereby inform that the REHABILITATION OF FISH


SANCTUARY at Brgy. Plaridel, Baybay City, Leyte with the price of
Forty Thousand pesos (P40,000.00) has been approved.

You are therefore directed to commence the work two (2) days receipt
hereof, informing this office before the work started, in order that the
Project Engineer/Inspector assigned thereto will be present.

Very truly yours,

HON. FELIPE T. CERILLA


Punong Barangay
NOTICE OF AWARD OF CONTRACT

JIANES TECH ENTERPRISE


BAYBAY CITY, LEYTE

Madam;

You are hereby informed that the bid/tender submitted, accepted


and opened last ____________ of the FABRICATION OF HANGING
BASKETBALL BOARD (2 UNITS), at Brgy. Plaridel, Baybay City,
Leyte has been recommended by the PBAC for approval and has been
approved.

In view thereof, you are respectfully requesting to enter into


contract vis-à-vis of the said project.

Very truly yours,

HON. FELIPE T. CERILLA


Punong Barangay
JIANES TECH ENTERPRISES
LOYUNSAWANG ABUYOG, LEYTE

TURN OVER

Pursuant to the program and thrust of the City Hall of Baybay City
fomal notice is hereby made to the effect that the FABRICATION OF
HANGING BASKETBALL BOARD (2 UNITS) at the Barangay
Plaridel, Baybay City, Leyte under the direct supervision of the City
Engineer’s office, Baybay City thereby relieving the responsibility of the
contractor.

DONE this _____ day of _______________, Baybay City, Leyte


Philippines.

JIANES TECH ENTERPRISE


Contractor
CERTIFICATE OF ACCEPTANCE

TO WHOM IT MAY CONCERN:

THIS IS TO CERTIFY that the FABRICATION OF HANGING


BASKETBALL BOARD (2 UNITS) at Barangay Plaridel Baybay
City, which was turn-over to this city Hall, by JIANES TECH.
ENTERPRISE is hereby accepted as to the quality, dimension and
specifications.

DONE this _____ date of _______________, Baybay City, Leyte


Philippines.

Very truly yours,

HON. FELIPE T. CERILLA


Punong Barangay
Republic of the Philippines
Province of Leyte
City of Baybay
Barangay Plaridel

OFFICE OF THE BARANGAY CHAIRMAN

POST INSPECTION REPORT

COA OFFICE
BAYBAY CITY, LEYTE

Madam;

As per office survey of the Property Inspector, the


FABRICATION OF HANGING BASKETBALL BOARD (2 UNITS)
has already been furnished, and that the Brgy. Chairman has accepted it.
The said project is currently being utilized.

Inspected this ________ day of ______________ and found


satisfactorily accomplished.

Checked / Reviewed by:

FRANCISCO A. ESCALA
Brgy. Kagawad-Infra
Noted by:

HON. FELIPE T. CERILLA


Punong Barangay

Republic of the Philippines


Province of Leyte
City of Baybay

OFFICE OF THE MUNICIPAL ENGINEER

INSPECTION REPORT
Name of Project: CONSTRUCTION OF EVACUATION CENTER

Location: BARANGAY PLARIDEL BAYBAY CITY, LEYTE

Contract Amount: Php. 90,000.00

Contractor: JJ JHAY GEN. MERCHANDISE

Out that all items were undertaken, as shown in the table below:
ITEMS DESCRIPTION PERCENTAGE% AMOUNT

1 CONSTRUCTION OF 100% 90,000.00


EVACUATION CENTER

100% Php. 90,000.00

Prepared by: Checked:

JESUS M. YAP JR. REX RETANA


CEO staff Engineer IV

Verified: Conformed:

PATRICK POSTRERO HON.FELIPE T. CERILLA


City Planning & Development Coordinator Punong Barangay

Approved:
RANULFO A. TAGOLGOL
City Engineer

Republic of the Philippines


Province of Leyte
City of Baybay
BARANGAY PLARIDEL

OFFICE OF THE BARANGAY CHAIRMAN

ACCOMPLISHMENT REPORT
COA OFFICE
BAYBAY CITY, LEYTE

Sir/Madam;

This is to inform your good office that the Repair of Water Sytem has already been furnish.

NET AMOUNT VAT & WTAX PERCENTAGE AMOUNT

Issued this_______day of _____________________ 2018 and found satisfactorily accomplished.

Prepared by: Checked:

JESUS M. YAP JR. REX RETANA


CEO-Staff Engineer IV

Verified: Conforme:

PATRICK POSTRERO HON.FELIPE T. CERILLA


City Planning & Development Coordinator Punong Barangay

Approved:
RANULFO A. TAGOLGOL
City Engineer