DOWN HOLE TOOLS INTERNATIONAL
PRODUCT MANUAL
KICKQVER TOOL   2719" 1" VALVE
   15/16UN STD SERVTCE
                         ho i(        i tle
                                 )m
                                                                       Downhole Tools lnternational LTD
INTRODUCTION
The Wireline conveyed DTI Kickover Tool (KOT) enables the
reliable, repeatable running and retrieval of gas lift valves into
compatible side pocket mandrels. Typical side pocket mandrels
include type KBMG and KBUG.
DESCRIPTION
Each KOT is designed to operate in one specific tubing size and
for one specific valve size. The DTI Kickover Tool outlined below
is designed to run and pull 1" valves.
The trigger engagement in the Side Pocket Mandrel (SPM)
ensures the correct orientation, then picking up further brings the
tool into the "kicked over" position. Gas lift valves size 1" may then
be installed or removed from the SPM using the correct running or
retrieval tool (see data sheet). Typical valves include type BKF-6,
BKF-3, DCK-2, LK-3, E Dummy, BKO.
Once the KOT has been fully picked up through the SPM the
locator pin shears and the tool locks in the rigid position to allow
the BHA to pass through other SPM's.
DTI Kickover Tools for   l" valves are available for SPM sizes 2 3/8,
2718,3%,4 and 4%.
                                                                       Downhole Tools lnternational LTD
OPERATION RUNNING
Standard wireline tool string should include sufficient stem bar weight, hydraulic jar,
link jar and a swivel joint above the kickover tool. Ensure the correct running tool for
the gas lift valve being run is fitted to the bottom of the KOT. lnstall a 3/16" brass
shear pin in trigger key and pin the gas lift valve into running tool.
Lower the KOT several feet past the side pocket mandrel desired to be set.
   1.   Raise KOT slowly with the wireline until enough weight increase is noted to
        indicate the KOT has oriented and reached end of slot in the mandrel
        orienting sleeve, (An increase of 25# will usually show this.)
   2.   Grhdually apply an "extra" 200# load upward pull on the wireline. This will
        ensure that the KOT is kicked over and latched in place. Wells deviated more
        than 60 Deg. may take 300# extra.
   3.   Lower the valve slowly into the side pocket. The positioning tool will
        automatically align the valve with the pocket.
   4.   ll lor some reason (not kicked over enough to latch) the valve misses the
        pocket, try again from step 2 and increase the "extra" load 100 pounds.
   5.   Normal wireline procedures may now be followed for jarring the valve into
        place and shearing off the valve.
   6.   The KOT will then be raised back to the mandrel orienting sleeve. The KOT
        trigger will shoulder the orienting slot and will shear the 3/16" pin holding the
        trigger key in place by over pull jar action.
   7.   Once this is done, the KOT kigger key will permanently retract so the trigger
        will no longer orient at each side pocket mandrel as it is pulled thru returning
        to the surface. The kicked over arm of the tool will also straighten out and lock
        In the straight position to come out of the hole. This feature eliminates
        considerable wear due to rubbing on the tubing walls.
   8.   When the tool is back on the surface, the key trigger must be re-pinned and
        another valve attached to the running tool. (The key and trigger may be line
        up by hand and the old pin tapped out and a new pin inserted with the help of
        a 1/8" pin punch).
OPERATION PULLING
   1.   Ensure the correct Pulling tool for the gas lift valve being pulled is fitted to the
        bottom of the KOT.
   2.   Repeat steps 1-4.
   3.   Normal wireline procedures may now be followed for latching and pulling the
        valve.
   4.   Repeat steps 6-8.
                                                                 Downhole Tools lnternational LTD
                                             I       2           3           4             5
GLV PULLING SCHEMATIC
Schematic 1, shows the kot run
below the mandrel. Since the kot is
Iocked in a rigid position, it is                                    I
designed not to kick over
accidentally.
Schematic 2, shows the kot raised
until the key engages the sleeve in
the mandrel. Continued upward                                        \
movement rotates the kot until the
key enters a slot, When the key
reaches the top of the slot, the
weight indicator shows increased
weight signalling that the tool is
properly orientated.
Schematic 3, shows that with
additional pull, the pivot arm is
designed to kick and lock out. This
action locates the valve or pulling                          I
tool above the pocket or latch on
the gas lift valve.
Schematic 4, shows the kot is
locked in the offset position and the
mandrel is guiding the valve or
pulling tool to accurately land the                                                            frt
valve or engage the latch on the                                                           ...
valve.                                                                                           I
Schematic 5, illustrates straight,
upward pull shearing a pin, when
the key reaches the top of the slot.                                                  ll       t"t
This action allows the trigger to
glide freely out of the slot and
                                                                                               d_tl
through the tubing. When the pivot                                               I
                                        tl
arm reaches the small upper
section of the mandrel, it is
designed to snap back and lock into
its vertical running position,
reducing drag on the tool and valve
as it rs removed.
                                                         I
                                                 I
                                                         x
                                                                             Downhole Tools lnternational LTD
PRODUCT PARTS IIST
 001      AA51220            HOISTING PLUG 2       7   /8   KICK OVER TOOL               7
 002       4451,221             HOUSING 2 7/8 KICK OVER TOOL                              1
 003      DA51222                   KE\ 2 718 KICK OVER TOOL                              I
 004     DPS18-063            DOWEL PIN STEEL 3/16            X   5/8"   LONG             1,        RK
 004A    sPB18-063            SHEAR PIN BRASS 3/16 X              5/8"   LONG             7         RK
 005      AB51223               TRIGGER 2    7/8   KICK OVER TOOL                         1
 006       s   PG371         SPRING TRIGGER 3,5,, KICK OVER TOOL                          1
 007      D PS2 5-   112     DOWEL PIN STEEL 1/4" X 1,125" 1ONG                           1,        RK
 008     sssl0NF-050       SET SCREW HEX SKT       10-32 UNF       X 1/2''   LONG         4         RK
 009       AA51213           LEVER PLU NG ER 2     3/8      KICK OVER TOOL                1,
 010       SPG075                   SPRING LATCH            KOI 2 3/8                     L
 011      DPS18-125           DoWEL PIN STEEL 3/16 x 1 1/4" LONG                          7         RK
 oL2       AA5t274                 LATCH 2   3/8   K|CK OVER TOOL                         1
 0L3       AA51215         LATCH SPRTNG GUIDE 2         3/8   KICK OVER TOOL              t
 014       AA5t224           PtN   PTVOT   ARM 2 7/8 KICK OVER TOOL                       1
 015           5t217        PIVOT ARM WELDMENT KICK OVER TOOL                             1
 015      AB512]-7 -2              PIVOT BODY KICK OVER TOOL                              1
 015      A851211-3                PIVOT ARM KICK OVER TOOL                               1,
 015     A850341-4              CLEVIS END    3.5"     KICK OVER TOOL                     1
 016       sPG003            SPRING ADAPTOR 3,5'' KICK OVER TOOL                          L
 o77      ssB-0437            BALL STEEL 7/16 GRADE 1OO CHROME                            7         RK
 018       AA50342         ADAPTOR LOWER KICKOVER TOOL l"VALVE                            1,
 019       AA50343             PIN ADAPTOR 3,5'' KICK OVER TOOL                           7
 100     M-278KOTW                  MANUAL TECHNICAL DATA                                 1
                   Downhole Tools lnternational LTD
ASSEMBLY DRAWING
                                                                   Downhole Tools lnternational LTD
ASSEMBLY INSTRUCTIONS
Ensure all parts are clean, oiled and threads greased. SAE 30 oil and Molycote 77 is
recommended. Always use new shear pins and where necessary, set screws and
dowel pins. Redress kits are inexpensive and readily available.
   1   .
       Pin lower adapter (18) to pivot arm (15) with spring ('16) and ball (17) using
       pin (19) and secure with set screws (8), aligning the detents provided.
   2. lnsert lever plunger (9) in housing (2) to make sure of sliding freedom and full
       travel.
   3. Adsemble spring (10) and latch spring guide (13) to lever plunger (9) retain
       latch (12) with pin (1 1) thro lever plunger (9) and latch (12). Note, this
       operation requires that the Spring Guide/ Latch Spring is compressed over
       100lbs and this is best achieved by 2 persons- one to compress the spring
       and one to insert the pin.
   4. Pin pivot arm (15) to main housing (2) with pin (14) and secure with set
       screws (8), aligning the detents provided . lf pin fits loosely, stake edges of
       hole to retain it.
   5. Assemble key (3) to Trigger (5) with pivot pin (4).
   6. lnsert lever plunger assembly with spring (6) in hole in slot. (Make sure
       housing lD is clean and plunger is lubricated with 30 weight oil or Molykote.)
   7. With slots in plunger (9) and housing (2) aligned, depress spring (6) and insert
       plunger into housing (2).
   8. lnstall Hoisting Plug (1) and screw in to align 114" hole in plunger (9) with
        11132" hole in housing (2). lnsert trigger (5) thru slot in housing.
   9. Pin trigger (5) to plunger with pin (7) making sure pin is centred in plunger (9).
       Tighten hoisting plug (1) and install 3/16" shear pin (4A) through key (3) and
       trigger (5).
   10. Check for depressing freedom of trigger (5). lt should depress and return
       quite freely but not protrude past landing stop.
   11.Tool is now fully assembled and may be activated by applying enough force
       (approx. 200lbs) on trigger (5) to move the plunger (9) forward 1/32" and kick
       over the tool.
                                                                  Downhole Tools lnternational LTD
DISASSEMBLY lNSTRUCTIONS
  1.   Place the KOT assembly in a G-Vice, and clamp Housing (2) behind the
      trigger, without using excessive force. Ensure the Pivot Arm (15) is in the
       straight position and not kicked over,
  2. Unscrew the Hoisting Plug (1) from the KOT Housing (2).
  2 Remove the two Locking Screws (8) and tap out the Pivot Pin (14). Remove
       the Pivot Arm (1 5).
  4. Push the Lever Plunger (9) forward slightly until the Trigger Pin (4) aligns with
       the hole in the Housing (2). Tap out the pin (4).
  E
       With the pin removed, push the Trigger (5) down so that the Lever Plunger (9)
       cdn be pushed out of the Housing (2).
  b. Once out, the Trigger (5) and Spring (6) are free to be removed.
  7. It is not usually necessary to remove the Latch/ Latch Spring/ Guide (10, 12,
       13). However, it may be required for periodic cleaning. Note- the spring is pre-
       loaded to around 100 lbs so disassembly is best achieved by two persons,
       one to tap out the pin and one to hold the latch.
  t,. The same can be said of the Lower Adaptor/ Spring/ Ball ('16,17,1 8). For
       periodic cleaning, hold the Pivot arm in a vice.
  o Remove the two Locking Screws (8) and tap out the Lower Pivot Pin (19).
       Remove the ball (17) and the Spring (16).
  '10, Ensure all parts are in good order, referring to the maintenance section of this
       manual.
                                                                   Downhole Tools lnternational LTD
MAINTENANCE
The DTI Wireline Kick Over Tool has been designed to give long and reliable
service. However, it is strongly recommended that the tool should be disassembled
and thoroughly cleaned after each use to prevent the build-up of deposits, which
could interfere with the operation of the tool. Thorough cleaning is particularly
important when the tool has been used in a corrosive environment.
Ensure all parts, threads and seals are clean and ljghtly oiled or greased. (Molykote
77 or SAE 30 oil is recommended).
After every run the tool should be completely stripped, cleaned and, if necessary, all
seals and shear pins should be replaced. During inspection any damaged or worn
parts should be replaced.
Particular attention should be paid to pivoting parts and shear pins. The Trigger, Key,
Lever Plunger, Prvot Arm and Pivot Pins are especially critrcal and should all be
inspected for wear, damage and corrosion.
                                                                         Downhole Tools lnternational LTD
SPECIFICATIONS SHEET
                                 DTI KICKOVER Tool 2            7/8"
                                   Technical Data Sheet
             Designation                         278KOTW
            Suits GLV sizes                            1
           Dlmensional data
               Body OD                               2.160
     Upper Thread Connection                    15116-10 UN Pin
              Fish Neck                              1.7   50
     Lower Thread Connection                   15/16-10 UN Box
            A Max oD (in)                            2.28'
       B   to pass thru Nipple                       2.373
                 c (in)                             26.20"
       D   Trigger Width (in)                         .55"
                 E   (in)                            38.0"
                                                      STD
                Length                               26.20"
            Body Material                      414X STEEL, 11OKSI
        Tensile (min yield)                        20,000 Ibs
                THIS DATA IS FOR REFERENCE ONLY DTI RESERVES THE RIGHT TO REVISE
                                                             Downhole Tools lnternational LTD
REVISION
                DATE                     REV             INITIALS
               01t06117                                    ARB
ABOUT DTI
DTI products are wide ranging and              DTI's people are at the heart of our
include an ensemble of Flow Control            ability to conceive, design and
Equipment and a complete portfolio of          deliver downhole solutions on time
Well lntervention and Fishing                  and on budget to our worldwide
Equipment for both Wireline and                customer base.
Coiled Tubing conveyed applications.
                                               Through our design experience
 A hugely experienced design and               and commitment to quality we
manufacturing team enables DTI to              provide well engineered, effective,
utilise a vast knowledge of downhole           durable products at competitive
tools along with a desire to innovate,         prices tp meet our customer's
update and evolve to ensure we are at          deadlines.
the forefront of Well lntervention
Technology.