0% found this document useful (0 votes)
84 views9 pages

Wilson

The document provides a summary of Engr Edwin Okonkwo Uroko's career qualifications and experience. It outlines his objective to be a recognized expert in tank farm construction and project management. It details his 15+ years of experience in the oil and gas sector, as well as his educational background which includes a B.Eng in Mechanical Engineering and pursuing an MSc in Process Engineering. The document highlights his achievements and leadership roles on various construction projects. It also lists his personal qualities, professional memberships, trainings and over 15 years of work experience managing fabrication and construction projects in the oil and gas industry.

Uploaded by

edwineghwilson
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views9 pages

Wilson

The document provides a summary of Engr Edwin Okonkwo Uroko's career qualifications and experience. It outlines his objective to be a recognized expert in tank farm construction and project management. It details his 15+ years of experience in the oil and gas sector, as well as his educational background which includes a B.Eng in Mechanical Engineering and pursuing an MSc in Process Engineering. The document highlights his achievements and leadership roles on various construction projects. It also lists his personal qualities, professional memberships, trainings and over 15 years of work experience managing fabrication and construction projects in the oil and gas industry.

Uploaded by

edwineghwilson
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

NAME; Engr Edwin Okonkwo Uroko

Email ; edwinegh34@yahoo.com
edwinegh34@gmail.com
PHONE; 08039321732, 08025571920
Contact Address: 9 Akinwumi Street, Ile Iwe, Egbe, Lagos

CAREER OBJECTIVE:
A Recognized Expert in tank farm and static equipment construction, Pressure vessels, Piping, project management;
experienced in all aspects of Site Management, Execution & Inspection.
Comprehensive experience of more than 15 years in oil and gas sector. An analytical mindset and an individual
committed to delivering solutions and meeting deadlines.

EDUCATIONAL BACKGROUND:
Institution Qualification Year Obtained
Enugu state University of B.ENG (Mechanical Engineering) Second class lower 2000
Technology
University of Lagos MSC (Process Engineering) 2020 (in view)
Boys’ High School Orba SSCE
1993 (Dec)
Union Primary school ,Ohom
Orba FSLC 1986

ACHIEVEMENTS:
 Managed the successful fabrication of NLNG New Boil Off Gas Compressor Project (Fabrication of
pipe racks 1, 2, 3, 4, and 5, Liquid return platforms, Compressor building structures, Valve access
platforms, Lube oil shelter, Fire monitory platforms, Cable tray and Pipe Supports) -NLNG.

 Successfully Handled the construction of a Quench pressure vessel 3V -3404 -NLNG

 Managed the successful construction of limestone bed pressure vessel V-4501E- NLNG

 Successfully managed the prefabrication of Drinking water tank T4503 and demineralized water
tank T4602- NLNG

 Successfully handled the existing facilities upgrade, fuel gas system, process control, crude dehydration and
stabilization, off shore pipelines, coating and installation of 48” export pipelines and water disposal
Pipelines with 52 personnel - Hyundai/Shell- Bonny Island, Rivers state

 Managed the successful construction of 14 numbers carbon steel tanks and 3 numbers internal floating
roof dome tanks and its interconnecting piping with 42 work men –MRS OIL Tincan Lagos

 Managed the successful construction and installation of stilling wells in Total Ibafon, Coconut Depot PMS
Tanks in Lagos – TOTAL

 Managed the successful construction of 2 LPG spherical tanks: capacity 8181 metre cube with 32 personnel
–TISSOT/CAKASA Lagos. Navgas Creek RD Apapa
 Led the successful construction of 2 numbers of 40-meter diameter by 20metre high, 4 numbers of 30
meters diameter by 20meter high of PMS storage tanks and its interconnecting piping with 43 personnel
AITEO/CAKASA, Lagos -Dockyard Rd Apapa

 Led the successful construction of three 25000-barrel crude oil storage tanks and its interconnecting piping
with 15 work men – ADDAX, NDPR / CAKASA, Izombe flow station, Imo State

 Led the successful construction of 7 numbers of stainless-steel tanks and 8 numbers of carbon steel tanks
and its interconnecting piping with 27 personnel – Rom oil/Cakasa. Ibadan

 Managed the successful construction of two 25000 barrels crude tanks and its interconnecting piping
Otakikpo marginal field Rivers State. - Green Energy ltd

PERSONAL QUALITIES:
 Excellent Communication skill, very good Interpersonal Skills, familiar with Leadership Positions and a very
good team player.
 Experience in planning and coordinating projects to an enviable standard.
 Leadership, negotiation and budget management skills/cost control
 Very Flexible, able to Learn fast as well as the Resilience to work under pressure.
 Excellent in Conceptualizing ideas, making Mental Pictures of technical issues and expectations; and
relatively fast in calculative reasoning: problem solving skills
 Prompt safely and quality service delivery, Solution advice and subcontractor/stake holders’ management
 Very computer literate / ICT Compliant
LEADERSHIP POSITIONS HELD:
 Construction Supervisor
 Construction Supervisor
 Construction Superintendent
 Lead Project Engineer
 Lead Project Engineer
 QA/QC ENGINEER
 Senior Piping Engineer
TRAININGS / CERTIFICATIONS / COMPETENCIES:
 Coren Registered Engineer
 Member Nigerian society of Engineers
 PMP Trained
 Microsoft office project
 CSWIP 3.1 Certified
 ISO 9001 2015 , Lead Auditor Certified
 ISO 14001 and OHSAS 18001 Certificate of Training
 ASNT LEVEL II radiographic film interpretation
 ASNT LEVEL II Dye penetrant inspection
 ASNT LEVEL II Magnetic particle inspection

 ASNT Ultrasonic Testing

 Level 3 Safety supervision Nigerian Institute of Safety Professional

PROFESSIONAL MEMBERSHIP:
 Corporate Member Council for the Regulation of Engineering in Nigeria (COREN)
 Corporate Member- Nigerian Society of Engineers
 Member-Nigerian Institute of Mechanical Engineers

WORK EXPERIENCE
SHELL PETROLEUM DEVELOPMENT COMPANY (WINORAC ENGINEERING LTD) – June 2022 till Date.
Project: Assa North Gas Project (Fabrication and Supply of pipe racks, Air receivers and Fuel Gas
Treatment Skids)
Position: Project Supervisor
 Coordinating, planning and supervising of the on-going Construction (prefabrication, erection,
installation of fuel gas skids and pipe racks 1 to 6
 Coordinates workforce for optimum utilization. Monitored all work for compliance to applicable
codes: ASME 8 and DEP etc
 Prepares budget for the project and managed budget at completion through monitoring of
cost/schedule variances and earned value analysis
 Ensures material take-off was adequate for the project scope.
 Manages communication and QA/QC processes during the construction phase.
 Manages the stakeholders on the project and ensures that all their requirements within the
contract scope are fully met
 Reviews design to ensure company and project specifications are to asset construction.
 Makes recommendations to the engineering to ensure fit for purpose.
 Ensures that personnel were provided with the necessary tools and knowledge to execute the
project scope.
 Interprets project drawings, provides safety leadership, and manages the preparation, issuance
and revision of all documents.
 Preparation of project schedules
 Manages subcontractors, host communities, relationships and contacts with the various interface
parties and reported progress to the General Manager on a regular basis. Coordinates with vendors
on supply of working materials to the site and inspection of the materials to ensure interface liaison
occurs between engineering, procurement and construction such that a fully integrated design
results.
 Attends work progress review meeting with the client and closed out all issues raised on site-
construction technical queries etc.
 Develops piping/pipeline MTO for the work package.
 Carries out site support services for AS-Built engineering.
 Provides piping technical inputs to P&ID including piping classes, valves types etc
 Provides support to all purchase activities and evaluate all vendor submittals.
 Coordinates with various teams to administer all assignments.
 Interprets all codes and maintain overall performance of all piping activities.
 Provides support to all CADD functions and develop and maintain all activities according to project schedule
and prepare appropriate forecasts.
 Generally, performs work, within Piping & Plant Layout discipline.
 Supervision of discipline personnel and allocation of work.
 Approval, checking and preparation of design/engineering documentation
 Undertakes staff appraisals of discipline staff.
 Develops and enhance processes and systems for wider use in the discipline
 Provides input to cost estimates and execution plans.
 Ensures technical integrity of all discipline deliverables on the project
 Plans and maintains the discipline progress of the project.

Nigeria LNG Limited -Bonny (AMAIDEN ENERGY NIG LTD), August 2021 to May 2022
PROJECT: New Boil Off Gas Compressor Project (Fabrication of pipe racks 1, 2, 3, 4, and 5, Liquid return
platforms, Compressor building structures, Valve access platforms, Lube oil shelter, Fire monitory
platform, Cable tray and Pipe Supports)
POSITION: Project Supervisor
 Co-ordinated, planned, supervised and closed out the Construction (prefabrication, erection,
installation of Pipe racks, Liquid return pump platforms, Valve access platforms and other activities.
 Coordinated workforce for optimum utilization. Monitored all work for compliance to applicable
codes: ASME 8 and DEP etc
 Prepared budget for the project and managed budget at completion through monitoring of
cost/schedule variances and earned value analysis
 Ensured material take-off was adequate for the project scope.
 Managed communication and QA/QC processes during the construction phase.
 Managed the stakeholders on the project and ensured that all their requirements within the
contract scope are fully met
 Reviewed design to ensure company and project specifications are to asset construction.
 Made recommendations to the engineering to ensure fit for purpose.
 Ensured that personnel were provided with the necessary tools and knowledge to execute the
project scope.
 Interpreted project drawings, provided safety leadership, and managed the preparation, issuance
and revision of all documents.
 Preparation of project schedules
 Managed subcontractors, host communities, relationships and contacts with the various interface
parties and reported progress to the General manager on a regular basis. Coordinated with
vendors on supply of working materials to the site and inspection of the materials to ensure
interface liaison occurs between engineering, procurement and construction such that a fully
integrated design results.
 Attended work progress review meeting with the client and closed out all issues raised on site-
construction technical queries etc.
 Developed piping/pipeline MTO for the work package.
 Carried out site support services for AS-Built engineering.
 Provided piping technical inputs to P&ID including piping classes, valves types etc
 Provide support to all expense projects and maintain accuracy in all piping project and ensure compliance to
all piping material specifications and maintain knowledge on all orders.
 Provide support to all purchase activities and evaluate all vendor submittals.
 Coordinate with various teams to administer all assignments.

Nigeria LNG Limited -Bonny (AMAIDEN ENERGY NIG LTD), August 2020 to July 2021
Project: Construction of limestone bed pressure vessel V-4501E and Quench pressure Vessel 3V-3404
POSITION: Project Supervisor
 Co-ordinated, planned, supervised and closed out the Construction (prefabrication, erection,
installation of Limestone Low Bed Vessel and Quench pressure vessel
 Coordinated workforce for optimum utilization. Monitored all work for compliance to applicable
codes: ASME 8 and DEP etc
 Prepared budget for the project and managed budget at completion through monitoring of
cost/schedule variances and earned value analysis
 Ensured material take-off was adequate for the project scope.
 Managed communication and QA/QC processes during the construction phase.
 Managed the stakeholders on the project and ensured that all their requirements within the
contract scope are fully met
 Reviewed design to ensure company and project specifications are to asset construction.
 Made recommendations to the engineering to ensure fit for purpose.
 Ensured that personnel were provided with the necessary tools and knowledge to execute the
project scope.
 Interpreted project drawings, provided safety leadership, and managed the preparation, issuance
and revision of all documents.
 Preparation of project schedules
 Managed subcontractors, host communities, relationships and contacts with the various interface
parties and reported progress to the General manager on a regular basis. Coordinated with
vendors on supply of working materials to the site and inspection of the materials to ensure
interface liaison occurs between engineering, procurement and construction such that a fully
integrated design results.
 Attended work progress review meeting with the client and closed out all issues raised on site-
construction technical queries etc.
 Developed piping/pipeline MTO for the work package.
 Carried out site support services for AS-Built engineering.
 Provided piping technical inputs to P&ID including piping classes, valves types etc
 Provide support to all expense projects and maintain accuracy in all piping project and ensure compliance to
all piping material specifications and maintain knowledge on all orders.
 Provide support to all purchase activities and evaluate all vendor submittals.
 Coordinated with various teams to administer all assignments.
NIGERIA LIQUIDFIED NATURAL GAS LTD (AMAIDEN ENERGY LTD) - Jan 2019 to June 2020
PROJECT: PREFABRICATION OF DRINKING WATER TANK T4503 AND DEMINERALISED WATER TANK
T4602 AT NIFAVER YARD, LAGOS
POSITION: QA/QC ENGINEER:
DUTIES:
 Monitored all work for compliance to project specifications and other applicable codes ASME, API,
AWS, ANSI etc
 Established welding procedures to guide production and welding personnel relating to
specification restrictions, material processes, pre-and post-heating requirements which involve use
of complex alloys, unusual fabrication methods and welding of critical joints.
 Performed experimental welding to evaluate new equipment, techniques and materials.
 Developed welding techniques, procedures and application of welding equipment to problems
involving fabrication of metals, utilizing knowledge of production specifications, properties and
characteristics of metals and metal alloys and engineering principles
 Directed and coordinated technical personnel in performing inspections to ensure worker’s
compliance with established welding procedures and ITP.
 Monitored all work for compliance to ISO 9001 and other applicable codes
 Coordinated with Vendors, Construction Team and Subcontractors to ensure defect free products.
 Preparation/interpretation of weld symbols/joint configuration
 Monitored the rooting, hot pass and capping
 Co-ordinated all the welding activities on site/shop.
 Resolution of non-conformities.
 Carried out inspection on subcontractors lifting equipment and other devices
 Interpretation of project drawings.
 Preparation of quality assurance/quality control documents.
 Co-ordinated the calibration of equipment before use.
 Isolation of non-conforming products.
 Carried out fit-up and visual inspections.
 Interpretation of radiographic films.
 Preparation of weld summary/ traceability report

Client: MRS OIL AND GAS LTD, Tincan Island Lagos – May 2015 to Dec 2018
Project: Construction of 3 numbers of carbon steel dome tanks (32m dia x 25m high) and 14 numbers of 14m
dia x 25m high carbon steel tanks and its interconnecting piping
POSITION : LEAD PROJECT ENGINEER
 Co-ordinated, planned, supervised and closed out the Construction (prefabrication, erection,
installation of 3 numbers internal floating roof (IFR)dome tanks and 14 numbers carbon steel tanks.
 Coordinated workforce for optimum utilization. Monitored all work for compliance to applicable
codes: ASME, API, AWS, ANSI etc
 Prepared budget for the project and managed budget at completion through monitoring of
cost/schedule variances.
 Ensured material take-off was adequate for the project scope.
 Managed communication and QA/QC processes during the construction phase.
 Managed the stakeholders on the project and ensured that all their requirements within the
contract scope are fully met
 Reviewed design to ensure company and project specifications are to asset construction.
 Made recommendations to the engineering to ensure fit for purpose.
 Ensured that personnel were provided with the necessary tools and knowledge to execute the
project scope.
 Interpreted project drawings, provided safety leadership, and managed the preparation, issuance
and revision of all documents.
 Preparation of project schedules.
 Managed subcontractors, host communities, relationships and contacts with the various interface
parties and reported progress to the General manager on a regular basis. Coordinated with
vendors on supply of working materials to the site and inspection of the materials to ensure
interface liaison occurs between engineering, procurement and construction such that a fully
integrated design results.
 Attended work progress review meeting with the client and closed out all issues raised on site-
construction technical queries etc.
 Developed piping/pipeline MTO for the work package.
 Carried out site support services for AS-Built engineering.
 Provided piping technical inputs to P&ID including piping classes, valves types etc
 Provide support to all expense projects and maintain accuracy in all piping project and ensure compliance to
all piping material specifications and maintain knowledge on all orders.
 Provide support to all purchase activities and evaluate all vendor submittals.
 Coordinate with various teams to administer all assignments.
 Interpret all codes and maintain overall performance of all piping activities.
 Provide support to all CADD functions and develop and maintain all activities according to project schedule
and prepare appropriate forecasts.
 Develop new methods to recommend improvements to all activities of piping section.
 Generally, performs work, within Piping & Plant Layout discipline.
 Supervision of discipline personnel and allocation of work.
 Approval, checking and preparation of design/engineering documentation
 Undertake staff appraisals of discipline staff.
 Develop and enhance processes and systems for wider use in the discipline
 Undertake training of less experienced engineers, including duties as a mentor.
 Provide input to cost estimates and execution plans.
 Ensure technical integrity of all discipline deliverables on the project

CAKASA NIGERIA COMPANY LTD: Oct 2007 to Feb 2015


POSITION: LEAD PROJECT ENGINEER
Client: Aiteo Oil & Gas Ltd
 Co-ordinated, planned, supervised and closed out the Construction (prefabrication, erection,
installation of 3 numbers of 30m dia x 20m high carbon steel tanks and 2 numbers of 40m dia x
20m high carbon steel tanks.
 Provided direction to meet job priorities and changes as required by the client.
 Managed the QA/QC process during the construction phase, and coordinated workforce for
optimum utilization. Monitored all work for compliance to ISO 9001 and other applicable codes
ASME, API, AWS, ANSI etc
 Prepared budget and managed budget at completion through monitoring of cost/schedule
variances and earned value analysis
 Managed the stakeholders on the project and ensured that all their requirements within the
contract scope are fully met
 Reviewed design to ensure company and project specifications are to asset construction
 Managed communication during the construction phase.
 Made recommendations to the engineering to ensure fit for purpose.
 Ensured that personnel were provided with the necessary tools and knowledge to execute the
project scope. Ensured material take-off was adequate for the project scope.
 Interpreted project drawings, provided safety leadership, and managed the preparation, issuance
and revision of all documents.
 Preparation of project/work break down packages.
 Managed subcontractors, host communities, relationships and contacts with the various interface
parties and reported progress to the General manager on a regular basis. Coordinated with
vendors on supply of working materials to the site and inspection of the materials to ensure
interface liaison occurs between engineering, procurement and construction such that a fully
integrated design result.
 Attended work progress review meeting with the client and closed out all issues raised on site-
construction technical queries etc.
 Managed the stakeholders on the project and ensured that all their requirements within the
contract scope are fully met
 Reviewed design to ensure company and project specifications are to asset construction
 Managed communication during the construction phase

HYUNDAI HEAVY INDUSTRIES CO. LTD, Bonny Island Rivers State. June 2003 – sept 2007
Client: SHELL PETROLEUM DEVELOPMENT COMPANY, Bonny Island, Rivers State
Project: Bonny Terminal Integrated Project
SCOPE OF WORK: Existing Facilities Upgrade, Fuel Gas System, Process Control, Crude Dehydration and
Stabilization, Off Shore Pipelines, Supply, Coating and Installation Of 48” Export Pipelines And Water
Disposal Pipelines
LOCATION: BONNY ISLAND

SENIOR PROJECT ENGINEER


DUTIES:
 Prepared budget for the project
 Ensured material take-off was adequate for the project scope
 Managed the QA/QC processes during the construction phase
 Provided piping technical inputs to P&ID including piping classes, valves types etc
 Managed host communities, relationships and contacts with the various interface parties and
reported progress to the General construction manager
 Ensured that the personnel were provided with adequate knowledge to execute the project
scope
 Developed piping/pipeline specifications and site visit reports.
 Developed piping/pipeline MTO for the work package.
 Carried out site support services for AS-Built engineering.
 Managed the stakeholders on the project and ensured that all their requirements within the
contract scope are fully met
 Reviewed design to ensure company and project specifications are to asset construction
 Managed communication during the construction phase.
 Made recommendations to the engineering to ensure fit for purpose.
 Ensured that personnel were provided with the necessary tools and knowledge to execute the
project scope. Ensured material take-off was adequate for the project scope.
Interpreted project drawings, provided safety leadership, and managed the pr
 Attended work progress review meeting with the client and closed out all issues raised on site-
construction technical queries, NCR etc.