COMPANY PROFILE
PROJECTS HISTORY- CURRENT AND PAST
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
1. First Hydrocarbon OGINI OGINI Flowstation Detailed Engineering Design and Ongoing
Nigeria Limited, FLOWSTATION Debottlenecking Procurement:
NPDC/FHN Project- PHASE 1 o FEED, DED
o Process Vessels, Equipment
o Produced Water Handling
Facilities
2. First Hydrocarbon OGINI OGINI Flowstation Site Installation and Construction Ongoing
Nigeria Limited, FLOWSTATION Debottlenecking o Structural foundations
NPDC/FHN Project- PHASE 2
o Fabrication Works
o Installation
o Commissioning
3. Movido Exploration and Offshore Delta $70m Asset EPCI- 30,000 BOPD MOPU Ongoing
Production State, OML 88 Development and Concept Development
Upgrade of the Ekeh FEED Design
Field, OML 88 for Detailed Design
Movido Exploration Procurement & Installation
and Production
Lease/Own/Operate Arrangement
Limited
with Companies in Partnership.
Drilling and Completions
4. EPCM INDEPENDENT Delta State 2 x 10,000 BOPD Concept Development Ongoing
PROJECT Crude Oil Refinery FEED Design
Projects Detailed Design
Products: Gasoline, Procurement & Installation
Associated Gas Oil,
Page 1 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
Aviation Fuel, Naphtha Lease/Own/Operate Arrangement
and Lubricating Oil. with Cluster Companies in
Partnership.
5. First E & P Offshore OML 83 Concept Selection Flow assurance and sizing of February 2018
and OML 85 Studies for OML upstream raw gas supply pipelines
83&85 Gas Processing Estimation of required chemicals
Facility and Pipelines quantities to mitigate flow
assurance challenges and
corrosion, especially to allow use of
carbon steel for the pipelines
Sizing of slug catcher at the plant
inlet and feasibility of installing one
slug catcher for the full plant
capacity (1,050 MMscf/d)
Estimate of slug catcher weight –
dry and wet
Prepare and recommend adequate
inlet manifold arrangement that
allows testing of wet gas inlet
streams from different suppliers
Propose options of custody transfer
requirements to cover 2
possibilities – supplier’s fence and
central gas plant fence
Recommendation and selection of
preferred options as applicable
6. First E & P Swamp/Onshore ISENI Gas Concept Gas Technology Options 2017
Development Study Comparison/Analysis (TWISTER,
TURBO EXPANDER, MRU, JT, ETC)
Preliminary Concept Development
Page 2 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
Preliminary FEED
Options Risk Assessment
Concept Selection Report
7. Energia/Oando JV OML Kwale, Delta State OSBL (Outside FEED Completed
56 Nigeria Refinery Battery Limit) DED
FEED and DED for
Energia’s 10,000 IFC Documentation Development
BOPD Refinery Project Project Management Services
8. Energia/Oando JV OML Kwale, Delta State Modular 17,500 Process Studies on Current Completed
56 Nigeria Production Unit production profile
complete with Static and Dynamic Process
Pressure Vessels, Simulation studies
Water treatment,
pumps, metering Development of Modular Engineering
systems, plus Design for Easy-to-install and
integrated safety integrate modules.
systems to recover Conduct HAZOP/HAZID/Risk
production and cater Assessments on design
for new wells.
9. OANDO Plc Oshodi, Lagos, Detailed Engineering Concept Design Development Completed
Nigeria and Construction Detailed Design
Design, PM and
Commissioning of Procurement
OANDO Plc’s 10 Specifications/Datasheets
MMSCFD CNG Mother Construction Project Management
station Facilities HAZOP Study
Constructability Reviews
Risk Analysis
Page 3 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
Development of Facility Control
Philosophy Manuals
Execution Project Management
10. Oando PLC, Nigeria Port-Harcourt OER 10KM x 12” AGI- Route Selection Risk/Opportunity Completed
BUA Gas Distribution Analysis
Pipeline FEED Project Detailed Process, Mechanical, E & I
Design and Specifications
Procurement Datasheets
IFC documents/drawings
11. Independent Project Kwale/Niger Delta
Development of an Concept definition Completed
100 MMSCFD Engineering Design
Condensate
Recover/Gas Equipment sizing and selection
Processing Plant to Procurement
Optimize on Package selection and Integration
oil/condensate
recovery and generate
revenue through LPG
production and
Natural Gas for
Pipeline sales.
12. Energia/Oando JV OML Kwale, Delta State Conceptual/Feasibility Identification of Alternative Export Completed
56 Nigeria Studies on Alternate Options
Direct Crude Oil Export Concepts Development
Facilities: 30,000-
50,000 BOPD Export Network Outlay
Capacity Options Risk Assessment
Page 4 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
Preliminary Route Surveys &
Assessment
FEED for Pipelines, Jetty and
Associated Facilities
Project Execution Cost estimates
Bill of Materials
13. Midwestern Oil & Gas Umusadege, Delta Project Management: Project Manager Completed
Company Plc State, Nigeria. Construction of Umu- Project Engineers
East to Central
Processing Facility Welding Inspection Services
Flowlines/Pipelines QA/QC- Quality Assurance and Quality
Control
HSE Inspectors
Pre-Commissioning and
Commissioning
As-Built documentat
14. Midwestern Oil & Gas Umusadege, Delta UMU-EAST Flowline Concept Development Completed
Company Plc State, Nigeria. and Pipeline FEED and Options Outlay
DETAILED DESIGN
Options Risk Assessment
FEED Process, Mechanical, Electrical,
Instrumentation, Structural/Civil
Deliverables
Detailed Engineering Design: Process,
Mechanical, Electrical,
Instrumentation, Structural/Civil
Deliverables
Page 5 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
Detailed Bill of Materials and Cost
Estimates
15. Midwestern Oil & Gas Umusadege, Delta 2 X 40,000 BBLs Concept Development and Selection Completed
Company Plc State, Nigeria. Storage Tank FEED Studies
and Detailed Civil/Structural Design and
Engineering Design Specifications
Mechanical Design and Specifications
in line with API RP 650
Process Design and Specifications
E & I Design and Specifications
Cathodic Protection System
Export Pumps Sizing and Selection
Equipment Sizing and Selection
Process Piping Design
Materials Selection
Process, Mechanical, Electrical,
Safety, Civil/Structural Deliverables
Site Integration Works
16. Midwestern Oil & Gas Umusadege, Delta CPF Debottlenecking Development of Problem Statement Ongoing
Company Plc. State, Nigeria. Project: Increase CPF Modelling and Problem
production capacity Resolution
from 20,000 BOPD to
40,000 BOPD. Flow Assurance and Hydraulic
Calculations
Mechanical Design
Page 6 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
Piping Stress Analysis
3D Concept Design
Isometrics and Layout Drawings
Civil and Foundation Drawing
Project Costing
Project Management
Value Engineering
17. Midwestern Oil & Gas Umusadege, Delta Eriemu Manifold & Flow Assurance and Hydraulic Completed
Company Plc State, Nigeria. Pipeline Design Calculations
Mechanical Design
Piping Stress Analysis
3D Concept Design
Isometrics and Layout Drawings
Civil and Foundation Drawing
Project Costing
Project Management
18. Pillar Oil Limited, Delta State, Debottlenecking and Solution Conception Completed
Umusadege, Delta State, Nigeria. Design/LP Separator 3D Concept Design
Nigeria. EPC and Installation
Project : Increase 3D Plant Layout Drawings
production capacity 3D Installation Drawings
from 2,000 BOPD to Procurement of LP Separator
7,500 BOPD
New LP Separator Instrumentation
Hook-up and Fabrication of
Page 7 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
Associated Tie-ins to Existing
Oil/Water/Gas Outlets
Fabrication/Construction and
Delivery of Piping Modifications –
Existing HP Separator PCV Bypass
Piping, Oil/Water Line Tie-in, Flash
Separator Piping Modifications, EPF
Flash Separator PCV Tie-in,
Material Procurement
Vessel/Material Delivery to Site
Site Integration and Hook-up
Activities
19. Energia/Oando JV OML Delta State Nigeria 2 x 30,000 BBLS Concept Development and Selection Completed
56 in Kwale Crude Oil Storage Tank Studies
FEED Project Civil/Structural Design and
Specifications
Mechanical Design and Specifications
in line with API RP 650
Process Design and Specifications
E & I Design and Specifications
Cathodic Protection System
Export Pumps Sizing and Selection
Equipment Sizing and Selection
Process Piping Design
Materials Selection
Page 8 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
Process, Mechanical, Electrical,
Safety, Civil/Structural Deliverables
Site Integration Works
20. Energia/Oando JV OML Delta State Nigeria 5,000 BOPD Topping Concept development and Selection Ongoing
56 in Kwale Plant/Refinery Project FEED Development
– Concept, FEED, ITT
for EPC 3D Drawings
Mechanical design and specifications
Process design and specifications
E & I design and Specifications
Equipment sizing and selection
Process Piping Design
Materials Selection
Process, Mechanical, Electrical,
Safety, Civil/Structural Deliverables.
21. Midwestern Oil & Gas Delta State, Crude Gathering Concept development and Selection Completed
Company Plc Nigeria. Project FEED Development
3D Drawings
Mechanical design and specifications
Process design and specifications
E & I design and Specifications
Equipment sizing and selection
Process Piping Design
Materials Selection
Page 9 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
Process, Mechanical, Electrical,
Safety, Civil/Structural Deliverables.
Site Integration Works
22. Polar Habour Nigeria
Lekki-Epe Building Construction 5-Bedroom Duplex + 2-Bedroom BQ – Completed
Limited Expressway, Projects. External and Internal Tiles Finishing,
Lagos. Plot D486, Royal Indoor Swimming Pool,
Lakowe Phase Garden Estate. 8 Units of 3-Bedroom Duplexes + 1-
II, Lekki-Epe Bedroom BQ
Olokonla, Housing
Expressway
Victory Estate, Golf 5 Units of 4-Bedroom Twin Semi-
#4, Tabuko Detached Duplexes
Road.
Gere Close,
Bakare CO-116 Complex. Office Complex – Conference
Facilities, Training Facilities, External
Estate,
Tiles Finishing,
Agungi,
Lekki.
23. Energia/Oando JV OML Delta State Nigeria 30,000 BOPD Develop Basic Concept OPTIONS and Completed
56 Facilities Upgrade perform Concept Selection Analysis
Concept Studies, Perform Simulation Studies(PIPESIM
Selection & Design Modelling, HYSYS Process Modelling,
Flowline/Pipeline Analysis, Process
Train Capacity Checks, sizing &
Evaluation)
Concept Selection Matrix/Concept
Selection Workshop
Base Cost Estimates(Parametric,
Grounds Up, others)
Page 10 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
Debottlenecking of existing Facilities
from 10,000 BOPD capacity to 15,000
BOPD Capacity
Expansion facilities to upgrade to
combined capacity of 30,000 BOPD
FEED on Adopted Concept
Detailed Design on Modular
Expansion Modules
Basis Of Design, PFDs, P&IDs, Gas,
Isometrics, Electrical Line Diagrams,
Structural Drawings
Procurement Datasheets
Bill of Materials
Process Training for company
Engineers
24. Energia/Oando JV Ebendo Debottlenecking and Design of Flare and Vent Tips Completed
Facilities Flowstation in Design, Procurement Flare Thermal Radiation Analysis
Delta State Nigeria and Installation of New
LP and HP Flare Radiation Isopleth plots
Systems Installation drawings- GAs, Isometrics
Procurement of Flare LP Knock Out
Drum
Procurement of LP and HP Flare
Successfully commissioned.
Project enabled the company to tie-in
4 new additional wells which had been
Page 11 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
shut-in due to capacity limits on the
Process Plant.
25. Midwestern Oil & Gas Delta State, 12”x 53km UACL Pre-Start-up Inspection Completed
Company Plc, Nigeria Crude Oil Pipeline Verification
Certification:
Commissioning and Certification and Calibration
Start-Up Accelerated Pump/piping modification
to meet First Oil Targets
Piping Isometrics
Bill of Materials
26. General Public – Bakare Estate, FEDP Career Program started in 2009 as 2-week Completed
Engineering and Science Agungi, Lekki, Development Program workshops.
Graduates Lagos. for Engineers and Program upgraded to 4-month
Science graduates Intensive FEDP-111 format which
Commenced February 3, 2014.
Current Class commenced June 2,
2014
Next Class starts September 2, 2014.
Programs all ADVERTIZED in THE
GUARDIAN NEWSPAPER
27. NAVGAS Limited Apapa, Lagos LPG Blending Facilities Final detailed design specifications for Completed
Detailed Blender, Pumps and Piping systems
Equipment Procurement Datasheets
Line Pipe Procurement Datasheets
General Equipment Plot plans
Piping General Arrangement Drawings
Page 12 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
Piping Isometrics
Process, Mechanical, Electrical,
Safety, Civil/Structural Deliverables.
28. NAVGAS Limited Apapa, Lagos LPG Blending Facilities Concept selection studies Completed
FEED Equipment sizing and selection
Process Piping Design
Materials Selection
Pump Sizing and Selection
Process, Mechanical, Electrical,
Safety, Civil/Structural Deliverables.
29. Oando Reservoir And Eket, Akwa-Ibom, FEED & FEED Update, Flow lines Design Completed
Production Nigeria EPF/Central Crude Oil Pipeline Design
Services/Network E & P Processing Facilities
Geotechnical Surveys
Heavy Oil and Light Oil Blending
Surface Production, Storage and
Export Facilities
Produced Water System packages
Process, Mechanical, Electrical,
Civil/Structural Engineering
deliverables.
30. PAN OCEAN Oil Flare Thermal Flare back-pressure analysis Completed
Corporation Radiation Analysis. Flare Thermal Radiation analysis
Thermal radiation plots
HAZID
Page 13 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
Quantitative Risk Analysis
31. OANDO Plc Concept Development Concept Development and FEED Completed
Studies for OANDO’s Pre-Construction Risk Analysis
Akepo Offshore and
Onshore Crude Oil
Production Facilities.
32. OANDO Plc HAZOP Studies and HAZOP & RA Report Completed
Risk Assessment Action Tracking Register
workshop for Detailed
Design of Akepo Risk Bubble Plots
Wellhead and Pipeline
Facilities
33. ENERGIA/OANDO JV Technical and Feasibility Study Reports Completed
Economic Feasibility Trucking Procedure Manuals
Study for Road Tanker
Crude Oil Sales.
34. ENERGIA/OANDO JV HAZOP Study Data gathering/Document Collation Completed
facilitation for (PFD, P&IDs, Cause and Effect Matrix)
OANDO/ENERGIA JV Study Workshop Facilitation
NGL Gas Processing
plant Issue Final Study Report
Page 14 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
35. East Horizon Gas Calabar, Cross Design, Procurement Design Completed
Company (EHGC) River State and Construction of Procurement
Access Platforms for
EHGC PRMS Facilities Construction/Commissioning
at City Gate and
UNICEM locations
36. East Horizon Gas Calabar, Cross Design, Procurement Design Completed
Company (EHGC) River State and Construction of 2 x Procurement
44000 Firewater
Storage Tank for EHGC Construction
City Gate PRMS Commissioning
Facilities
37. East Horizon Gas Calabar, Cross Design, Construction Installation Design Completed
Company (EHGC) River State and Installation works Start-Up/Operations Procedures and
on 2 x 100% Capacity manuals
Weishaupt/Vitoplex
200 Boiler/Burner Troubleshooting
units Commissioning
38. East Horizon Gas Calabar, Cross Fire Consequence and Fire Protection System guidelines Completed
Company (EHGC) River State QRA Studies for Phased Installation Plan
OANDO/EHGC PRMS
Facilities in Cross River
State
39. East Horizon Gas Calabar, Cross Pre-Commissioning Pre-Commissioning Punch list Completed
Company (EHGC) River State and Commissioning development and stewardship to
Engineering closure
Consultants for 18” x Commissioning Procedure Manuals
128Km EHGC Natural
Gas Pipeline Facilities Nitrogen Purging Procedures
Start-Up Procedures and Plans
Page 15 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
from Akwa Ibom to Fire And Gas Protection System
Cross River State design, execution and Operating
Manual
Isolation Procedures
Blow-down Philosophy/Procedures
Vent Dispersion Studies
Boiler Commissioning Procedures
Vitoplex 200 Boiler Operating
Procedures and Manuals
40. ENERGIA/OANDO JV Design of 6” Crude Detailed Process, Mechanical, E & I Completed
Delivery Pipeline Design and Specifications
Procurement Datasheets
IFC documents/drawings
41. ENERGIA/OANDO JV Early Production Data gathering/Document Collation Completed
Facility Concept Risk (PFD, P&IDs, Cause and Effect Matrix)
Assessment. Consequence Modelling Analysis
Risk Assessment Workshop
Issue Final Study Report (Risk
assessment Report and Action
Tracking Register)
42. ENERGIA/OANDO JV OANDO/ENERGIA EPF Data gathering/Document Collation Completed
Detailed Design (PFD, P&IDs, Cause and Effect Matrix)
HAZOP Study Study Workshop Facilitation
Issue Final Study Report
Page 16 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
43. ENERGIA/OANDO JV Kwale, Delta State 2 x 10, 000 Barrels Civil/Structural design and Completed
Crude Storage Tank specifications
FEED, Detailed Mechanical design and specifications
Engineering Design in line with API RP 650
and Project
Management Process design and specifications
E & I design and Specifications
Cathodic Protection System
Crude oil Inter-Tank Transfer and
Export pumps
Tank Operating System Manuals
Start-Up and Commissioning
Procedures
Facility Interconnection/Procedure
Manuals
Construction Project Management
and Execution Procedures & Manuals
44. ENERGIA/OANDO JV FEED and Detailed Flow-station Perimeter Fence Completed
design Procurement and Installation of Mini
Separator
Design & Const of 4'' In-let manifold to
accommodate well 4 & 5
Design & Const of 2 x 4'' x 400m Flow
line from well 4 to Inlet manifold
Design Fabrication/Installation of a
gas scrubber.
Design and Construction of MCC
Page 17 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
Design of Mini Warehouse for the
flow-station.
Design and Construction of Produced
water Treatment Facility
Procurement and installation of
500KVA Transformer.
Procurement and Installation of
500KVA gas fired generators
Design of gas metering system at the
flowstation
45. ENERGIA/OANDO JV Detailed Design of Civil, Mechanical, Process, E & I Completed
Produced Water Design specifications
System Equipment Datasheets
Demolition Plan
Construction Procedures
Operating Procedures
Maintenance Procedures/Plan
Bill of Materials
Cost Estimates/Budget
46. ENERGIA/OANDO JV Detailed design of Civil Design specifications Completed
Energia’s New Demolition Plan
Administration and
Accommodation Construction Procedures
Complex Bill of Materials
Cost Estimates/Budget
Page 18 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
47. ENERGIA/OANDO JV Development of Site Inspection /Visitation Completed
Energia Facility As- Facility Survey/Data gathering
Built 2D/3D Layout
drawings & Operations Review Construction MOC
Data Develop 2D/3D Layout Drawing
48. ENERGIA/OANDO JV Energia Flowstation Test Separator design & Completed
Process Capacity Specifications
Upgrade to HP Separator Control System upgrade
10,000BOPD.
LP Separator Control System upgrade
Flare System Capacity upgrade
Setting Tank/Surge vessel upgrade
Process Piping upgrade re-design
49. PAN OCEAN OIL 200 MMSCFD Gas Concept Development Completed
CORPORATION processing facility Front End Engineering Design
Front End Engineering
design (FEED). ITT Package
50. PAN OCEAN OIL Mini LPG Plant Concept Development Completed
CORPORATION Facilities Design and Front End Engineering Design
Evacuation Pipeline
(FEED)
51. PAN OCEAN OIL Flare Thermal Data gathering and gap analysis Completed
CORPORATION Radiation Study/Fire Site Inspection
Consequence Analysis
Study Workshop Facilitation
Issue Final Study Report
Page 19 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
52. PAN OCEAN OIL Gas Processing Plant Statement of Fitness Completed
CORPORATION HSE Case Review of Operating Philosophy and
Upgrades
Development of Asset Integrity
Procedures
Development of
Operating/Maintenance Procedures
Failure Modes and Effects Analysis
(FMEA) and Reporting
Fire Consequence Analysis
Risk Assessments and Report
HSE Case structure Development
HSE/Safety Management System
Hazard/Risk Register Development
53. PAN OCEAN OIL Production Flowstation Statement of Fitness Completed
CORPORATION HSE Case Review of Operating Philosophy and
Upgrades
Development of Asset Integrity
Procedures
Development of
Operating/Maintenance Procedures
Failure Modes and Effects Analysis
(FMEA) and Reporting
Fire Consequence Analysis
Risk Assessments and Report
Page 20 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
HSE Case structure Development
HSE/Safety Management System
Hazard/Risk Register Development
54. PAN OCEAN OIL Conducted Safety Data gathering Completed
CORPORATION Integrity Level (SIL) Study Workshop Facilitation
Assessment for PAN
OCEAN Issue Final Study Report
CORPORATION’s 65
MMSCFD Gas
Processing Plant
55. FRONTIER OIL LIMITED Uquo Field Early Production & Feasibility Study Completed
Production, Eket. Crude Trucking Sales Frequency Modelling
Planning, Risk
Assessment and Consequence Modelling analysis
Journey Management Risk Assessment
for Frontier Oil Limited Issue final Report
(FOL).
56. Frontier, Universal & Eket, Akwa Ibom. FUN-MPN QIT-Facilities Construction Contractor Bid Analysis Completed
Network (FUN) Design, Construction and Selection
Project Management & Procurement RFQ Bid Analysis, MPN
Commissioning Requirements
Project. reconciliation/alignment, Contractor
Clarifications/response
MPN-FUN Interface Project
Management- 3 Months
Development of 36# Operations and
Maintenance Manuals
Page 21 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.
COMPANY PROFILE
Brief Project Execution
S/No Client Project Location Scope of Work Performed
Description Date/Duration
Development of Construction Work
Packs and Procedures for Civil,
Mechanical, Electrical and
Instrumentation Work Scopes.
Modification design of Civil/Structural
Foundation for Construction Phase +
Re-design of buried pipeline to
Surface pipeline.
57. LINETRALE GAS Apapa, Lagos. Detailed Design Data gathering Completed
LIMITED HAZOP Studies for Study Workshop Facilitation
Linetrale Gas Ltd 240
Tons LPG Storage & Issue Final Study Report
Distribution Terminal.
58. LINETRALE GAS Apapa, Lagos. Development of Document collation gathering and Completed
LIMITED Detailed HSE gap analysis.
Management Issue Final HSE MS Document
System Manuals for
Linetrale Gas
Limited’s LPG Plant
and Distribution
Facilities
Page 22 of 22 www.epcmengineers.com, info@epcmengineers.com, CO-116 Complex, Bakare Estate, Agungi, Lekki.