NOTES:
STANDARD TRACK CROSSING PLAN FOR OFC IN BETWEEN STATIONS 1. EXISTING WORK SHOWN IN BLACK.
2. PROPOSED WORK SHOWN IN RED.
3. M.S / H.D.P.E / C.I CASING PIPE TO BE PROVIDED IN BETWEEN RLY.
4. THE WORK WILL BE DONE BY HORIZONTAL BORING METHOD UNDER THE RLY.
APPLICATION ID NWR-JP-2024-WL-84 TOTAL LENGTH BETWEEN RLY LAND BOUNDARY = ( 50 )M
TRACK THROUGHOUT RLY. BOUNDARY AND PIT FOR BORING WILL BE MADE
OUTSIDE RLY. BOUNDARY.
5. CABLE INDICATING BOARDS TO BE FIXED AT RLY. BOUNDARIES BY THE PARTY.
B
( 20 )MM OFC CABLE 6. ANY DAMAGE IN U/G CABLE.PIPE LINE,DRAINS ETC. WILL BE BORNE BY THE
PARTY.
7. THE WORK TO BE DONE IM THE PRESENCE OF S&T SUPERVISOR.
RAILWAY LAND BOUNDARY
8. LAYING OF PROPER EARTHING ARRANGEMENT TOBE DONE UNDER RLY.
RAIL LEVEL-100.00(ASSUMED)
ELECT.SUPERVISOR.
(K.M-CH62/700 ) (K.M -CH62/800)
** PARTY SHOULD FILL ALL THE DETAILS CORRECTLY IN CONSULTATION WITH
FORM. LEVEL-( 99.33 )
( 20.5 ) M CONCERNED RAILWAY SUPERVISOR TO AVOID REJECTION OF APPLICATION.
C.L. OF ( 20 ) LINE
TO (SIRAS) ( )M TO (BANSATHALI NIWAI )
GROUND LEVEL-( 98.33 )
( 50 ) M
C.L. OF ( 30 ) LINE
MIN 2000 MM (K.M- 62/700) (K.M-62/800)
PROPOSED ( 2000 )MM
( 25 )M
TOP OF CASING PIPE = ( 96.33 ) ( 100 ) MM DIA. HDPE / C.I / M.S
CASING PIPE IN BETWEEN RLY.
BOUNDARY
( 100 ) MM DIA. HDPE / C.I / M.S ( )MM OFC CABLE
RAILWAY LAND BOUNDARY
CASING PIPE IN BETWEEN RLY.
CABLE INDICATING BOARD
BOUNDARY ON BOTH SIDES
A
TEMPORARY PIT
DRM JAIPUR
SECTION AT A-B TEMPORARY PIT
ADRM/INFRA
SITE PLAN
(SCALE: 1:1000)
Sr.DEN/C
Sr.DEN/( )
C.L. OF ( ) LINE C.L. OF ( ) LINE
( 25 ) M ( )M ( 25 ) M DEN/LAND/G
RAILWAY LAND BOUNDARY
RAILWAY LAND
RAIL LEVEL-100.00(ASSUMED) BOUNDARY
DIVISIONAL OFFICERS
FORM. LEVEL- ( 99.33 )
CABLE INDICATING BOARD
(JAIPUR) D I V I S I O N- ( NWR ) RAILWAY
GROUND LEVEL ( 98.33 )
GROUND LEVEL ( 98.33 )
( 3670 ) MM
C.C. BED BLOCK
600X600X300 C.C. BED BLOCK
MIN 2000 MM 600X600X300 WAY LEAVE FACILITIES FOR LAYING OF (100)
PROPOSED (2000)MM ( 100 ) MM DIA. HDPE / C.I / M.S
MM DIA. U/G HDPE /C.I / M.S CASING PIPE
CASING PIPE IN BETWEEN RLY.
BOUNDARY FOR PASSING OF (20) MM OFC CABLE AT
KM: (62/700) BET: ( SIRAS ) AND
( 20 )MM OFC CABLE
(50) M FEASIBILITY OF THE PROPOSAL HAS BEEN CHECKED
KM: (62/800)( BANSATHALI NIWAI ) RLY.
AND FOUND FEASIBLE AS SHOWN IN PLAN.
STN.
SECTION AT A-B
APPLICANT PARTY
ADEN/(LINE/JP)
(NOT TO SCALE) (WITH STAMP)