Contractor Invoice for Electrical Work

This document is an invoice from Lawrence Maxim Rodrigues, a licensed electrical, drainage, and plumbing contractor, to Navil Das dated March 18, 2023. It provides a breakdown of materials and labor for an electrical project including various metal boxes, distribution boards, pipes, bends, and labor charges for a total of 60,570 rupees.

Uploaded by

rodriguesmaxim9
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views2 pages

Contractor Invoice for Electrical Work

This document is an invoice from Lawrence Maxim Rodrigues, a licensed electrical, drainage, and plumbing contractor, to Navil Das dated March 18, 2023. It provides a breakdown of materials and labor for an electrical project including various metal boxes, distribution boards, pipes, bends, and labor charges for a total of 60,570 rupees.

Uploaded by

rodriguesmaxim9
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Mobile: 9845046116

LAWRENCE MAXIM RODRIGUES


Class II Licensed Electrical, Drainage & Plumbing Contractor,
Kalkar House, Bajal Post, Mangaluru-575027

To, NAVIL DAS DATE:18-03-2023


SL.NO Quantity Rate Amount
Particulars

1. 30 no’s 130 3,900


8 module metal box

2. 45 no’s 75 3,375
3 module metal box

3. 2 module metal box 12 no’s 45 540

4. 12 module metal box 3 no’s 175 525

5. 4 module metal box 18 no’s 95 1,710

6. 6 module metal box 13 no’s 130 1,690

7. Slap concealed fan box 24 no’s 200 4,800

8. Concealed 3*3 block 24 no’s 20 480

9. 12 way D.B 1 no 1,850 1,850

10. 24 way D.B 2 no’s 4,250 8,500

11. Concealed slap pipe ¾” heavy pipe 50 length 55 2,750

12. 1st & 2nd floor heavy pipe 120 55 6,600

13. 1st floor ¾” heavy bend 60 no’s 15 900

14. 2nd floor 1” heavy bend 30 no’s 20 600

15. 2nd floor 1” heavy pipe 30 length 95 2,850

16. Fall ceiling ¾” pipe junction, bend, flexible pipes - - 7,500


& material

17. Ground,first & second floor wall chipping & - - 12,000


concealed box fixing labour charges

60,570
TOTAL