0% found this document useful (0 votes)
50 views2 pages

Belman

This document is an invoice from Lawrence Maxim Rodrigues, a licensed electrical, drainage, and plumbing contractor, listing work and materials provided for a customer named Uday Kumar. It includes 18 line items for pumps, meters, wiring, plumbing materials and labor for a total of Rs. 1,26,312, with Rs. 75,000 already paid in advance leaving a balance due of Rs. 51,312.

Uploaded by

rodriguesmaxim9
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views2 pages

Belman

This document is an invoice from Lawrence Maxim Rodrigues, a licensed electrical, drainage, and plumbing contractor, listing work and materials provided for a customer named Uday Kumar. It includes 18 line items for pumps, meters, wiring, plumbing materials and labor for a total of Rs. 1,26,312, with Rs. 75,000 already paid in advance leaving a balance due of Rs. 51,312.

Uploaded by

rodriguesmaxim9
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Mobile: 9845046116

LAWRENCE MAXIM RODRIGUES


Class II Licensed Electrical, Drainage & Plumbing Contractor,
Kalkar House, Bajal Post, Mangaluru-575027

To, UDAY KUMAR (BELMAN) DATE:13-10-2023


SL.NO Quantity Rate Amount
Particulars

1. - - 21,898
Pump material H D’silva bill

2. - - 5,535
Meter cost bill , meter board current limiters
fuse, line man charges

3. Meter board & distribution board bill - - 2,850

4. Meter bill & labour charges - - 4,800

5. Ground floor & basement electrical chipping - 5,195 5,294


work material bill & labour +99

6. Well shed house SERVICE WIRE bill & labour - - 9,540


charges

7. IP set material & labour charges - - 14,965

8. Plumbing material bill - - 1,220

9. Exterior plumbing material bill - - 1,940

10 Chamber cover bill - - 3,330

11. Copper plates & 2 kg copper wire bill - - 2,800

12. 10*4 UG cable material bill - - 4,740

13. Outside waster water line, cable, earthing wire 4 no’s 4 days 16,000
fixing labour charges

14. IP set pole fixing labour charges - - 20,000


15. Punching holes on earth pipe ,hole clamp bill - - 1,200

16. I.P set office work charges - - 5,000

17. 7/20 3 wires, 1.5sqmm 1 wire ,3/20 3 wire for - - 2,200


inverter main supplying & fixing labour charges

18. Ceiling fan supplying & fixing 2 no’s 1,5000 3,000

1,26,312
TOTAL
Advance paid - - 75,000

51,312
TOTAL

You might also like