Workshop Drawings Combined-333
Workshop Drawings Combined-333
45
2,5
1,672
S1-1
1 9 .2 m
P.O BOX 100674, Kampala.
Tel: +256-(0)0776 003 799
3 .8 m
Web: info@pmconsultuganda.com
22.7m
3 2 .9
2
GENERAL NOTES
(1) Contractor to verify dimensions on site
m
31,
before commencement of works and
16,944
545
report any discrepancies to consulting
Architect.
7° (2) Architectural drawings to be read with
.8
96
relevant structural, mechanical and
19,5 electrical drawings.
35
(3) All retaining walls to be damp proofed
3
civil engineer's specification and
detailing.
(4) Drainage pipes under drive ways to have
mh 150mm concrete surrounding.
Storm
Water 11
Storm
21,5
23
,58 KEY FINISHING
Water
3,0
8
99
11,709
4,806
2 8 .9 m WALLS CEILING
6,515
Water tanks Stand
to detail FLOOR
3,184 3,464 2,424 4,602 17,739 47,610 4,509 (A) 30mm Cement/Sand Screed
1187.850 (B) In situ Concrete finish
Storm Storm (C) 10mm thick Ceramic Tiles
Water Water (D) 25mm thick Granite
(E) 10mm quary tiles finish
860
1,345 SKIRTING
(A) 150mm Cement/Sand Plaster
REF.
4
(B) 25mm, 150mm high Hardwood
mh
28 27 (C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
Ziwa Road
54.8m
WALLS
(A) 12mm thick painted Cement/Sand Plaster
29 26
P A R K I N G
(B) Wallpaper
1186.350 (C) 6mm Ceramic Tiles
(D) 12mm thick Granite
30
1
(E) Glass
25
CEILING
mh
(A) Painted Cement/Sand Plaster
23,851
31
(B) Powder coated aluminiumsuspended
24 ceiling (Hunter doorglass)
56.1m
(C) Armstrong ceiling
1079 (D) Gypsum plaster
2,484 1,608
1,000 23
DUAL FUEL PUMP
STATION REVISIONS
4,976 1186.200
982 4,258
22 NO. DATE. DESCRIPTION
725
10,000LITRE
TO BASEMENT
UNDERGROUND mh mh mh mh mh
211184.700
3,586
FUEL TANK
RAMP
1079 1 2 3 4 5 6 4,186
ISSUES
Legend NO. DATE. ISSUED TO NO. DATE.
1
Storm
Storm SEPTIC TANK
Water 1 Office Block-Future Development
Water Storm
Water
P A R K I N G 2 Workshop
5 L A W N
10,908
16, 10 9 8
7,8
TO LATER
7 DETAIL Storm Water Drainage Flow
L A Y - B Y
Storm
Water
14
Project:
,1
Contour Line
80
5,973
3,016
6,284
L A Y - B Y
2 9 .0 m
BAHAI ROAD 7,965
Site Plan
Location:
PLOTS 192, 193, 194, AND 196, BLOCK
207 KYADONDO KANYANYA , KAMPALA
2 9 .0 m DISTRICT
9,668
Scale 1:200/A1 Drawing Title:
S1-1 2 9 .0 m
Boundary Wall to Job No.: Dwg Ref.
Structural details Revision No.
Scale: As shown
1190.000 Date:
Workshop Building Drawn by:
1186.350
1186.200
Scale 1:100/A1
GSPublisherVersion 0.0.100.100
GSPublisherVersion 0.54.100.100
PAN MODERN
CONSULT LTD
GENERAL NOTES
(1) Contractor to verify dimensions on site
before commencement of works and
report any discrepancies to consulting
Architect.
(2) Architectural drawings to be read with
relevant structural, mechanical and
electrical drawings.
(3) All retaining walls to be damp proofed
1 W2 1
W3 W4 1
civil engineer's specification and
detailing.
W1
(4) Drainage pipes under drive ways to have
A1-13 A1-14 A1-15 150mm concrete surrounding.
1
10 A1-12 11 12 13 14 15 16 17 18 19 20 21 22 23 24
KEY FINISHING
FLOOR SKIRTING
6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000
300
250
7500
7500
7250
WALLS
13725
WELDING & PANNEL CEILING
(A) Painted Cement/Sand Plaster
3250 250
3250
(D) Gypsum plaster
1000
21775
REVISIONS
G G NO. DATE. DESCRIPTION
3250
3250
3250
UP
250
F F REVISIONS
NO. DATE. ISSUED TO NO. DATE.
S P R A Y B O O T H
7500
7500
7250
7500
GD PROJECT:
A A
PROPOSED ISO TRANSPORT WORKSHOP
250
E E
CLIENT:
250 23750 238 23762 250 23750 250 11750 250 OFFICE OF THE PRESIDENT OF THE
REPUBLIC OF UGANDA
1
250 7375 3000 13375 250
4 5742 258 5742 258 5742 6004 250 23750 250 11750 250 3 A1-17
A1-17
6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 SITE:
KANYANYA
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 1 1 1
A1-12
W1 A1-13
W2 A1-14
W3 W4 A1-15
DRAWING TITLE :
Checked by Checker
DRAWING NO.
Plot 20, Kenneth Dale,
Off Kira Road, Kamwokya,
P.O BOX 100674, Kampala.
Tel: +256-(0)0776 003 799
Web: info@pmconsultuganda.com
GENERAL NOTES
(1) Contractor to verify dimensions on site
before commencement of works and
report any discrepancies to consulting
Architect.
(2) Architectural drawings to be read with
relevant structural, mechanical and
electrical drawings.
(3) All retaining walls to be damp proofed
civil engineer's specification and
detailing.
(4) Drainage pipes under drive ways to have
150mm concrete surrounding.
W1 W2 W3 W4
1 1 1 1
A1-12 A1-13 A1-14 A1-15
KEY FINISHING
FLOOR SKIRTING
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 WALLS CEILING
6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 FLOOR
(A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
(D) 25mm thick Granite
84250 (E) 10mm quary tiles finish
SKIRTING
(A) 150mm Cement/Sand Plaster
250 23750 250 23750 250 35750 250 (B) 25mm, 150mm high Hardwood
(C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
13No.Truss T4 13No.Truss T3 12No.Truss T2 7No.Truss T1 WALLS
(A) 12mm thick painted Cement/Sand Plaster
I I (B) Wallpaper
(C) 6mm Ceramic Tiles
(D) 12mm thick Granite
(E) Glass
CEILING
(A) Painted Cement/Sand Plaster
T4 T4 T4 T4 T4 T4 T4 T4 T4 T4 T4 T4 T4 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T1 T1 T1 T1 T1 T1 T1
7500
7500
8700
REVISIONS
H H NO. DATE. DESCRIPTION
3250
3250
3250
22825
G G
ISSUES
3250
3250
NO. DATE. ISSUED TO NO. DATE.
3300
F F
Client:
7500
INTERNAL SECURITY ORGANISATION
7575
Project:
6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000
Location:
PLOTS 192, 193, 194, AND 196, BLOCK
207 KYADONDO KANYANYA , KAMPALA
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 DISTRICT
Drawing Title:
1 1
W2
1
W3 W4 1
WORKSHOP
W1
A1-12 A1-13 A1-14 A1-15
ROOF PLAN
Roof Plan
Scale:
Date:
Drawn by:
DRAWING NO :
GSPublisherVersion 0.46.100.100
Plot 20, Kenneth Dale,
Off Kira Road, Kamwokya,
P.O BOX 100674, Kampala.
Tel: +256-(0)0776 003 799
Web: info@pmconsultuganda.com
GENERAL NOTES
(1) Contractor to verify dimensions on site
before commencement of works and
report any discrepancies to consulting
Architect.
(2) Architectural drawings to be read with
relevant structural, mechanical and
I H G F E
electrical drawings.
(3) All retaining walls to be damp proofed
civil engineer's specification and
detailing.
7500 3250 3250 7500 (4) Drainage pipes under drive ways to have
150mm concrete surrounding.
KEY FINISHING
FLOOR SKIRTING
WALLS CEILING
FLOOR
(A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
WORKSHOP LV2 WORKSHOP LV2 (D) 25mm thick Granite
(E) 10mm quary tiles finish
11420 11420 SKIRTING
(A) 150mm Cement/Sand Plaster
(B) 25mm, 150mm high Hardwood
(C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
WALLS
(A) 12mm thick painted Cement/Sand Plaster
(B) Wallpaper
3200
(C) 6mm Ceramic Tiles
(D) 12mm thick Granite
(E) Glass
CEILING
(A) Painted Cement/Sand Plaster
(B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
(C) Armstrong ceiling
(D) Gypsum plaster
WORKSHOP LV1 WORKSHOP LV1
8220 8220 REVISIONS
NO. DATE. DESCRIPTION
ISSUES
NO. DATE. ISSUED TO NO. DATE.
STORAGE
Down pipe to detail MEZZANINE
4000
6000
5700
5800
Client:
WORKSHOP MEZZANINE WORKSHOP MEZZANINE OFFICE OF THE PRESIDENT
INTERNAL SECURITY ORGANISATION
4920 4920
Project:
Location:
WORKSHOP FLOOR PLAN WORKSHOP FLOOR PLAN PLOTS 192, 193, 194, AND 196, BLOCK
207 KYADONDO KANYANYA , KAMPALA
2420 2420 DISTRICT
Drawing Title:
BASE WORKSHOP
1323 SECTION
SPT BASE
770 Job No.: Dwg Ref.
Revision No.
Scale: As shown
Date:
Drawn by:
Checked by: Arch. Rubongoya. P
DRAWING NO :
SECTION W1
Scale 1:50
GSPublisherVersion 0.46.100.100
Plot 20, Kenneth Dale,
Off Kira Road, Kamwokya,
P.O BOX 100674, Kampala.
Tel: +256-(0)0776 003 799
Web: info@pmconsultuganda.com
GENERAL NOTES
(1) Contractor to verify dimensions on site
before commencement of works and
I H G F E report any discrepancies to consulting
Architect.
KEY FINISHING
FLOOR SKIRTING
WALLS CEILING
6500
(B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
8000
REVISIONS
NO. DATE. DESCRIPTION
9000
MEZZANINE ISSUES
NO. DATE. ISSUED TO NO. DATE.
5700
2500
2
A1-16
Tanking along the Project:
7948
1000
Drawing Title:
SPT BASE
WORKSHOP
770
SECTION
DRAWING NO :
SECTION W2
Scale 1:50
GSPublisherVersion 0.46.100.100
Plot 20, Kenneth Dale,
Off Kira Road, Kamwokya,
P.O BOX 100674, Kampala.
Tel: +256-(0)0776 003 799
Web: info@pmconsultuganda.com
GENERAL NOTES
(1) Contractor to verify dimensions on site
before commencement of works and
report any discrepancies to consulting
Architect.
(2) Architectural drawings to be read with
relevant structural, mechanical and
electrical drawings.
(3) All retaining walls to be damp proofed
civil engineer's specification and
detailing.
(4) Drainage pipes under drive ways to have
150mm concrete surrounding.
I H G F E
KEY FINISHING
WALLS CEILING
FLOOR
(A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
(D) 25mm thick Granite
(E) 10mm quary tiles finish
SKIRTING
(A) 150mm Cement/Sand Plaster
(B) 25mm, 150mm high Hardwood
(C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
WALLS
(A) 12mm thick painted Cement/Sand Plaster
WORKSHOP LV1 (B) Wallpaper
(C) 6mm Ceramic Tiles
8220 (D) 12mm thick Granite
(E) Glass
CEILING
(A) Painted Cement/Sand Plaster
(B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
(C) Armstrong ceiling
(D) Gypsum plaster
3300
Down pipe to detail REVISIONS
NO. DATE. DESCRIPTION
WORKSHOP MEZZANINE
ISSUES
4920 NO. DATE. ISSUED TO NO. DATE.
2500
Client:
BASE
1323
SPT BASE Location:
PLOTS 192, 193, 194, AND 196, BLOCK
770 207 KYADONDO KANYANYA , KAMPALA
DISTRICT
Drawing Title:
WORKSHOP
SECTION
Drawn by:
Checked by: Arch. Rubongoya. P
DRAWING NO :
SECTION W3
Scale 1:50
GSPublisherVersion 0.46.100.100
Plot 20, Kenneth Dale,
Off Kira Road, Kamwokya,
P.O BOX 100674, Kampala.
Tel: +256-(0)0776 003 799
Web: info@pmconsultuganda.com
E F G H I
GENERAL NOTES
(1) Contractor to verify dimensions on site
before commencement of works and
report any discrepancies to consulting
Architect.
(2) Architectural drawings to be read with
7500 3250 3250 7500 relevant structural, mechanical and
electrical drawings.
(3) All retaining walls to be damp proofed
civil engineer's specification and
detailing.
(4) Drainage pipes under drive ways to have
150mm concrete surrounding.
KEY FINISHING
FLOOR SKIRTING
WORKSHOP LV2
WALLS CEILING
11420
FLOOR
(A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
(D) 25mm thick Granite
(E) 10mm quary tiles finish
SKIRTING
3200
3200
(A) 150mm Cement/Sand Plaster
(B) 25mm, 150mm high Hardwood
(C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
WALLS
(A) 12mm thick painted Cement/Sand Plaster
(B) Wallpaper
(C) 6mm Ceramic Tiles
(D) 12mm thick Granite
WORKSHOP LV1 (E) Glass
CEILING
8220 (A) Painted Cement/Sand Plaster
(B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
(C) Armstrong ceiling
(D) Gypsum plaster
REVISIONS
3300
3300
NO. DATE. DESCRIPTION
MEZZANINE
5700 ISSUES
Down pipe to detail NO. DATE. ISSUED TO NO. DATE.
WORKSHOP MEZZANINE
4920
Client:
2500
2500
OFFICE OF THE PRESIDENT
INTERNAL SECURITY ORGANISATION
Project:
WORKSHOP FLOOR PLAN PROPOSED TRANSPORT EQUIPMENT
WORKSHOP
2420
BASE Location:
PLOTS 192, 193, 194, AND 196, BLOCK
1323 207 KYADONDO KANYANYA , KAMPALA
DISTRICT
Drawing Title:
WORKSHOP
SECTION
Drawn by:
Checked by: Arch. Rubongoya. P
DRAWING NO :
SECTION W4
Scale 1:50
GSPublisherVersion 0.46.100.100
PAN MODERN
CONSULT LTD
I G
975 250 250 250 250 250 250 250 250 250 1682 80 3736 750 960 PLOT 20,KENETH DALE,
OFF KIIRA ROAD, KAMWOKYA,
P.O BOX 4550,
599
W2 10 9 8 7 6 5 4 3 2 1
W2 TEL: 0772 409 277, 0776 003 799
KAMPALA.
1000
1 DN 1
A1-13 A1-13
GENERAL NOTES
(1) Contractor to verify dimensions on site
before commencement of works and
599
report any discrepancies to consulting
Architect.
(2) Architectural drawings to be read with
relevant structural, mechanical and
TIRE BARRIER electrical drawings.
(3) All retaining walls to be damp proofed
civil engineer's specification and
detailing.
(4) Drainage pipes under drive ways to have
150mm concrete surrounding.
I G
TYPICAL SERVICE PIT KEY FINISHING
1 DETAIL
1 : 50
FLOOR SKIRTING
WALLS CEILING
FLOOR
(A) 10mm thick super terrazor finish
(B) Power floated Concrete finish
(C) 10mm thick Tiles To Approval.
(D) 25mm thick Granite
(E) 10mm quary tiles finish
(F) Weather proof synthetic timber decking to Approval
(G) Polished Concrete to approval.
SKIRTING
(A) 150mm super terrazor
(B) 150mm in-situ concrete finish.
(C) 9mm, 150mm high Tiles to Approval
(D) 25mm, 150mm high Hardwood
(E) 150mm high Granite
WALLS
(A) 12mm thick painted Cement/Sand Plaster
(B) Wallpaper
(C) 6mm Ceramic Tiles
(D) 12mm thick Granite
(E) Glass
I H G CEILING
(A) Painted Cement/Sand Plaster
7500 3250 (B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
(C) Armstrong ceiling
(D) Gypsum plaster
REVISIONS
NO. DATE. DESCRIPTION
REVISIONS
NO. DATE. ISSUED TO NO. DATE.
CLIENT:
1650
OFFICE OF THE PRESIDENT OF THE
REPUBLIC OF UGANDA
SITE:
KANYANYA
SPT BASE
770
DRAWING TITLE :
Checked by Checker
DRAWING NO.
SECTION W2 - Callout 1
2 1 : 25
PAN MODERN
CONSULT LTD
electrical drawings.
(3) All retaining walls to be damp proofed
civil engineer's specification and
WORKSHOP LV1 detailing.
(4) Drainage pipes under drive ways to have
8220 150mm concrete surrounding.
3300
4500
CEILING
(A) Painted Cement/Sand Plaster
(B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
(C) Armstrong ceiling
(D) Gypsum plaster
REVISIONS
NO. DATE. DESCRIPTION
REVISIONS
NO. DATE. ISSUED TO NO. DATE.
I H G F E E F G H I
7500 3250 3250 7500
7500 3250 3250 7500
PROJECT:
PROPOSED ISO TRANSPORT WORKSHOP
WORKSHOP LV2 WORKSHOP LV2
11420 11420
3200
3200
CLIENT:
OFFICE OF THE PRESIDENT OF THE
REPUBLIC OF UGANDA
3300
KANYANYA
2500
Checked by Checker
DRAWING NO.
1.0 -ARCHITECTURAL DRAWINGS
1.1 -Workshop and Stores
1,939
before commencement of works and
report any discrepancies to consulting
Architect.
dressing bench
29 (2) Architectural drawings to be read with
29 relevant structural, mechanical and
dressing bench
T1 electrical drawings.
(3) All retaining walls to be damp proofed
civil engineer's specification and
detailing.
(4) Drainage pipes under drive ways to have
150mm concrete surrounding.
2,100
P1 P1 P1 P1 P2 P2 P2 P2
6412
KEY FINISHING
Parapet Wall T1
5300
FLOOR SKIRTING
G E N T S'
Fall
lockers to WALLS CEILING
furniture detail.
7663
FLOOR
2,100
(A) 30mm Cement/Sand Screed
C1 C1 C1 C1 (B) In situ Concrete finish
JANITOR
A1-21 A1-21 A1-21 A1-21 (C) 10mm thick Ceramic Tiles
(D) 25mm thick Granite
(E) 10mm quary tiles finish
L A D I E S' T1 SKIRTING
10538
250
28 28 28 (D) 150mm high Granite
2,100
WALLS
(A) 12mm thick painted Cement/Sand Plaster
(B) Wallpaper
(C) 6mm Ceramic Tiles
(D) 12mm thick Granite
(E) Glass
T1
27 27 27 CEILING
3000
3075
GATE HOUSE (A) Painted Cement/Sand Plaster
(B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
(C) Armstrong ceiling
(D) Gypsum plaster
1375
100
26 26 26 NO. DATE. DESCRIPTION
1575
1500
1500
T2
ISSUES
25 25 25
NO. DATE. ISSUED TO NO. DATE.
350
250 2750 250 1325 100 4325 250 250 2750 250 1325 100 4325 250
Location:
PLOTS 192, 193, 194, AND 196, BLOCK
207 KYADONDO KANYANYA , KAMPALA
RC COLUMN TO SE' DETAIL. RC COLUMN TO SE' DETAIL. 3 DISTRICT
Drawing Title:
Drawn by:
Checked by: Arch. Rubongoya. P
GSPublisherVersion 0.46.100.100
4,319 4,488 732 4,319
1,435 1,409 1,475 1,475 1,475 1,538 732 1,435 1,409 1,475 702
1,440
1,440 4,340 Plot 20, Kenneth Dale,
1,480 Off Kira Road, Kamwokya,
1,480 P.O BOX 100674, Kampala.
1,480 Tel: +256-(0)0776 003 799
1,550
833
833
Web: info@pmconsultuganda.com
702
391
GENERAL NOTES
(1) Contractor to verify dimensions on site
before commencement of works and
report any discrepancies to consulting
Architect.
4No.Truss T1
relevant structural, mechanical and
5 Roof pitch Pre-painted Gauge 26 sheets on to approval
o electrical drawings.
(3) All retaining walls to be damp proofed
100x50x3mm Z-purlins on, civil engineer's specification and
detailing.
75x50mm Rafter on, (4) Drainage pipes under drive ways to have
150mm concrete surrounding.
FLOOR SKIRTING
WALLS CEILING
FLOOR
E1 E2 E3 E4 E5 (A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
Soffit Eaves to details
3000 1500 2000 2500
(C) 10mm thick Ceramic Tiles
(D) 25mm thick Granite
(E) 10mm quary tiles finish
SKIRTING
(A) 150mm Cement/Sand Plaster
(B) 25mm, 150mm high Hardwood
1,431 1,438 1,478 1,475 1,479 1,529 702 Rainwater goods: (C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
CEILING
(A) Painted Cement/Sand Plaster
(B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
(C) Armstrong ceiling
(D) Gypsum plaster
CR Ring beam
450 350
REVISIONS
5200
450 350
NO. DATE. DESCRIPTION
ISSUES
NO. DATE. ISSUED TO NO. DATE.
1600
2900
Client:
2100
OFFICE OF THE PRESIDENT
INTERNAL SECURITY ORGANISATION
Project:
1000
2300 Location:
PLOTS 192, 193, 194, AND 196, BLOCK
207 KYADONDO KANYANYA , KAMPALA
DISTRICT
Drawing Title:
SECTION
50mm sand blinding on, Scale 1:25/A1 be not less than 1000-1500mm.
200mm thick hardcore filling over Column bases and all structural reinforcements to
consolidated back fill to approval structural engineer's drawings & sepecifications
GENERAL NOTES
(1) Contractor to verify dimensions on site
before commencement of works and
report any discrepancies to consulting
Eq. 90
Eq.
Architect.
(2) Architectural drawings to be read with
relevant structural, mechanical and
electrical drawings.
(3) All retaining walls to be damp proofed
2,200
civil engineer's specification and
detailing.
(4) Drainage pipes under drive ways to have
150mm concrete surrounding.
1,200
KEY FINISHING
FLOOR SKIRTING
WALLS CEILING
FLOOR
(A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
ELEVATION Refer to detail (D) 25mm thick Granite
(E) 10mm quary tiles finish
SKIRTING
300 3,000 300 3,000 300 6,300 300 3,000 300
(A) 150mm Cement/Sand Plaster
(B) 25mm, 150mm high Hardwood
Alternating secondary stand alone solar light to approval
C
(C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
A
WALLS
(A) 12mm thick painted Cement/Sand Plaster
(B) Wallpaper
(C) 6mm Ceramic Tiles
(D) 12mm thick Granite
230
(E) Glass
CEILING
(A) Painted Cement/Sand Plaster
(B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
A
REVISIONS
NO. DATE. DESCRIPTION
300x300mm RC Column
450mm diameter Razor coil
450 450
50X50X3mm RHS verticle posts 3No.
RC Coping to S.E detail
50X50X3mm RHS Frame 2No.
RC Coping to S.E detail Client:
450mm diameter Razor coil OFFICE OF THE PRESIDENT
900
R.C column
50x50x4mm Y-shaped support INTERNAL SECURITY ORGANISATION
450
100
Project:
2,200
Location:
PLOTS 192, 193, 194, AND 196, BLOCK
207 KYADONDO KANYANYA, KAMPALA
DPC to Approval DISTRICT
Drawing Title:
Drawn by:
Checked by: Arch. Rubongoya. P
SECTION C-C
SCALE 1:25 SECTION A-A DRAWING NO :
SCALE 1:25
BOUNDARY WALL
(SCALE 1:25/A1)
GSPublisherVersion 0.0.100.100
50X50X3mm Angles welded to 60x60x3mm frame (16NO)
RC Coping to S.E detail
Alternating secondary stand alone solar light to approval
300x300mm RC Column
50X50X3mm RHS verticle posts 3No. Alternating mains supply Security light to specification
50X50X3mm RHS Frame 2No.
RC Coping to S.E detail
450mm diameter Razor coil 450mm diameter Razor coil
50x50x4mm Y-shaped support
Plot 20, Kenneth Dale,
Off Kira Road, Kamwokya,
50x50x4mm Y-shaped support P.O BOX 100674, Kampala.
Tel: +256-(0)0776 003 799
450 Web: info@pmconsultuganda.com
RC Coping to S.E detail
22
GENERAL NOTES
(1) Contractor to verify dimensions on site
before commencement of works and
Ends provided with lugs and
1,000
report any discrepancies to consulting
90
Eq.
anchored into columns R.C column Architect.
(2) Architectural drawings to be read with
450 relevant structural, mechanical and
electrical drawings.
(3) All retaining walls to be damp proofed
civil engineer's specification and
100
detailing.
(4) Drainage pipes under drive ways to have
150mm concrete surrounding.
1,200
1,200
KEY FINISHING
FLOOR SKIRTING
FLOOR
(A) 30mm Cement/Sand Screed
Ground level to be determined at site (B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
ELEVATION (D) 25mm thick Granite
(E) 10mm quary tiles finish
Scale 1:25 foundantion to S.E detail SKIRTING
(A) 150mm Cement/Sand Plaster
300 3,000 300 (B) 25mm, 150mm high Hardwood
A
(C) 9mm, 150mm high Ceramic Tiles
Alternating secondary stand alone solar light to approval (D) 150mm high Granite
WALLS
(A) 12mm thick painted Cement/Sand Plaster
(B) Wallpaper
(C) 6mm Ceramic Tiles
(D) 12mm thick Granite
(E) Glass
SECTION A-A CEILING
SCALE 1:25 (A) Painted Cement/Sand Plaster
(B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
450
100
Client:
Project:
230mm Solid block walling
PROPOSED TRANSPORT EQUIPMENT
2,100
WORKSHOP
Location:
PLOTS 192, 193, 194, AND 196, BLOCK
207 KYADONDO KANYANYA, KAMPALA
DISTRICT
BOUNDARY WALL:
Ground level to be determined at site.
PLANS , ELEVATIONS AND SECTIONS
ELEVATION foundantion to S.E detail.
Scale 1:25 Job No.: Dwg Ref.
Revision No.
300 3,000 300 3,000 300 3,000 300 Scale: As shown
Date:
C
Alternating secondary stand alone solar light to approval Drawn by:
Checked by: Arch. Rubongoya. P
230mm Solid block walling
DRAWING NO :
SECTION C-C
230
SCALE 1:25
PLAN
SECTION TYPE 2 - Back Scale 1:25 E-02
C
BOUNDARY WALL
(SCALE 1:25/A1)
GSPublisherVersion 0.0.100.100
Plot 20, Kenneth Dale,
Off Kira Road, Kamwokya,
P.O BOX 100674, Kampala.
Tel: +256-(0)0776 003 799
Web: info@pmconsultuganda.com
A B GENERAL NOTES
Roof Notes (1) Contractor to verify dimensions on site
1 2 7o Roofing pitch 3 4 before commencement of works and
report any discrepancies to consulting
IT4 Sheets guage 24 on;
Architect.
100x50x3mm z-purlins on;
(2) Architectural drawings to be read with
75x50x3mm Rafter on;
relevant structural, mechanical and
50x50x3mm Ties/Strut on; electrical drawings.
75x50x3mm Tie Beam on;
1 1 Ring beam to S.E Details.
(3) All retaining walls to be damp proofed
civil engineer's specification and
detailing.
(4) Drainage pipes under drive ways to have
1
150mm concrete surrounding.
Coping to S.E Detail
150
KEY FINISHING
FLOOR SKIRTING
1,306
WALLS CEILING
2 2
250
PVC rain round gutter to approval
FLOOR
(A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
(D) 25mm thick Granite
(E) 10mm quary tiles finish
SKIRTING
(A) 150mm Cement/Sand Plaster
(B) 25mm, 150mm high Hardwood
1700
1,200
(C) 9mm, 150mm high Ceramic Tiles
GUARD HOUSE (D) 150mm high Granite
Guard WALLS
2500
75
450
350 1,406 CEILING
(A) Painted Cement/Sand Plaster
(B) Powder coated aluminiumsuspended
1,125
ceiling (Hunter doorglass)
(C) Armstrong ceiling
625
Foundation
750
150mm thick concrete Slab on; (D) Gypsum plaster
50mm sand blinding on;
150mm hardcore on;
approved well compacted murram.
REVISIONS
500
IN
500
Security counter
OUT
3 400 225 400
3 NO.
ISSUES
DATE. ISSUED TO NO. DATE.
Drawing Title:
BOUNDARY WALL:
Drawn by:
Checked by: Arch. Rubongoya. P
DRAWING NO :
GSPublisherVersion 0.0.100.100
1.0 -ARCHITECTURAL DRAWINGS
1.1 -Workshop and Stores
GENERAL NOTES
(1) Contractor to verify dimensions on site
before commencement of works and
report any discrepancies to consulting
TANK 3 Architect.
10473 (2) Architectural drawings to be read with
relevant structural, mechanical and
electrical drawings.
TANK 3 (3) All retaining walls to be damp proofed
civil engineer's specification and
10473 detailing.
(4) Drainage pipes under drive ways to have
150mm concrete surrounding.
KEY FINISHING
FLOOR SKIRTING
TANK 2
7473
WALLS CEILING
3000
FLOOR
(A) 10mm thick super terrazor finish
(B) Power floated Concrete finish
(C) 10mm thick Tiles To Approval.
(D) 25mm thick Granite
(E) 10mm quary tiles finish
(F) Weather proof synthetic timber decking to Approval
(G) Polished Concrete to approval.
SKIRTING
(A) 150mm super terrazor
(B) 150mm in-situ concrete finish.
TANK 1 (C) 9mm, 150mm high Tiles to Approval
(D) 25mm, 150mm high Hardwood
(E) 150mm high Granite
4473
WALLS
(A) 12mm thick painted Cement/Sand Plaster
TANK 2 (B) Wallpaper
(C) 6mm Ceramic Tiles
7473 (D) 12mm thick Granite
(E) Glass
CEILING
(A) Painted Cement/Sand Plaster
(B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
(C) Armstrong ceiling
(D) Gypsum plaster
REVISIONS
NO. DATE. DESCRIPTION
3000
Elevation 1 - a
4 1 : 50 NO.
REVISIONS
DATE. ISSUED TO NO. DATE.
PROJECT:
PROPOSED ISO TRANSPORT WORKSHOP
TANK 1
4473
3 3
A1-22 A1-22
CLIENT:
50
OFFICE OF THE PRESIDENT OF THE
REPUBLIC OF UGANDA
450
30 31 30 31
50
3500
3500 RC concrete pedestal to
SITE:
SE's detail.
450
1000mm Gaurd rail to approval.
KANYANYA
50
500
T2 T2 T2 T2
3150
450
DRAWING TITLE :
50
3000
450
3000
3500
2500
3254
4 A1-22 4 A1-22
JOB NO.
240 50
0001 DWG REF
510
500
T1 T1 T1 T1 Drawn by Author
BASE
400 3100 400 1323 Checked by Checker
steel section to SE's
RC slab deck to SE's detail.
3900 specifications
TYPICAL TANK-STAND
TANK BASE
1 1 : 50
2 DECK
1 : 50
SECTION 19
3 1 : 25
2.0 -STRUCTURAL DRAWINGS
17 6000
250mm
Thic k R.C R
etaining
wall
2. CONCRETE MIXES
16 6000
250mm
Thick R
.C Retaining
w all
Reinforced concrete to have a min.
15 6000
7500
wall
250mm
Thick R
.C Ret
aining
works cube strength of 30N/mm² at
14 6000
250mm
Thick R
.C Ret
aining
wall
28 days with 20mm max.aggregate
13 6000
250mm
Thick R
.C Ret
aining
wall
size
12 6000
250mm
Thick R
.C Ret
aining
wall
I
11 6000
250mm
Thic k R.C R
etaining
wall F1
C1
3. REINFORCEMENT
(a) High Tensile Ribbed bars to BS4461and
10 6000 aining
wall F1
3250
.C Ret C1
Thick R
250mm are marked"T" on these dwgs
6000 ng wal
l F1
250mm
Thick R
.C Retaini C1
H (b) Mild steel marked "R" on these dwgs to
22000
6000 etai ning w
all F1
250mm
Thick R.C R C1
be round bars to BS4483
6000 .C Ret
aining
wall F1
C1
3250
Thick R
250mm
6000 etaining
wall F1
4. MINIMUM COVER TO ALL STEEL IN
.C Ret
aining w
all
250mm Thic
k R.C R
F1
C1
C1
F1
G (a) Foundations = 50mm
Thick R
250mm C1
(b) Beams = 30mm
2500
F1
F1
(d) Ground slab = 30mm
J
C1
F1 F1
F1
C1 C1
(e) Retaining Wall = 30mm
C1 F1 F1
C1
C1
F1 F1
5500
F1
7500
C1
C1 F1
C1 5. ABBREVIATIONS
F1
C1 F1
C1 F1
C1
M.C = Mass Concrete
F1 F1
E R.C = Reinforced Concrete
F1
C1
C1
C1
G F1 T = Top
C1
F1
C1
B = Bottom
I G F1
3250
C1
17 6000
All dimensions to be confirmed on site.
16 6000
24 This drawing must be read in conjunction with
H 15 6000
23 the relevant architectural,Mechanical,Electrical
14 6000
22 drawings.
13 E 6000
21 Any discrepancy MUST be brought to attention
12 6000
20 of the Structural Engineer.
11 19
10 REVISIONS
18
No. Date: Descriptions:
Structural Engineer.
TASK FORCE
500
8T8-04-150mm c/c
50 O/D removable casting
template MKD CTT1
9T16-01-150 5618
100x100x6mm thk
anchor plates
50mm Grade 15 100x4mm thick x100 long
02 02 02 02 02 02 02 02 02 02 Concrete blinding
anchor plates
TYPICAL SECTION A-A
(SCALE 1:5)
Q Q
350
(SCALE 1:5) B B Designed: Dwg No.:
B
T.P
Checked:
K.F
IsoU:01/S-02
03 03
Date: Sheet No.
350 NOV. 2022 001
1:100 or AS INDICATED
NOTES
1. FOUNDATIONS
They shall generally be taken 1200mm
24 min. below existing ground level after
23 removal of organic layer and all
22 excavations to be confirmed by the
21 Engineer before concrete blinding is laid.
20
19 6000 J Weak pockets of bearing strata to be dug
out and filled with C20 mass concrete.
18 6000
250mm
Thick R
.C Retaini
ng wal
l
17 6000
250mm
Thick R
.C Ret
aining
wall
2. CONCRETE MIXES
16 6000 wall
Reinforced concrete to have a min.
d Beam
ng
.C Retaini
Thick R
250mm
m Groun
6000
7500
ng w all
.C Retaini
Thick R
d Beam
250mm
28 days with 20mm max.aggregate
14
400x200m
6000 ning w
all
d Beam
m Groun
.C Retai
Thick R
250mm
S size
13 6000 ng w all
m Groun
Retaini
400x200m
.C
Thick R S
d Beam
250mm
12
400x200m
6000 wall
I
m Groun
.C Ret
aining
3. REINFORCEMENT
d Beam
Thick R
250mm
11 6000
400x200m
ng wal
l
(a) High Tensile Ribbed bars to BS4461and
m Groun
am
R.C Retaini C1
Be
Thick
250mm d Beam
10 m Groun
are marked"T" on these dwgs
Ground
6000 52 400x200m
400x200m
. A- 2
all
ai ning w
3250
.C Ret ef
esh R
C1
Thick R
d Beam
250mm
m
eld M els Ground
Beam
(b) Mild steel marked "R" on these dwgs to
400x200m
6000 W m
l 400x200m
ng wal
B.R.C st in pan
aini
H
m Groun
.C Ret
with
C1
Thick R ca
ottom lab to be be round bars to BS4483
d Beam
250mm
22000
d Beam
B d Beam
m Groun
6000 wall op & , S 400x200m
400x200m
Retaini
ng T m
ed on ver of 50m
m Groun
R.C C1
am
m Groun
m Thick
nforc
b Rei inimum co
d Beam
250m d Beam
und Be
m Groun
6000 aining
wall ic k sla
m Th Having a
m 400x200m
4. MINIMUM COVER TO ALL STEEL IN
400x200m
400x200m
.C Ret C1
0mm Gro
3250
m Groun
d Beam
Thick R
250mm 200m m Groun
d Beam
d Beam
d Beam
6000 wall 400x200m
d Beam
aining
(a) Foundations = 50mm
m Groun
.C Ret
400x200m
400x20
Thick R C1
250mm
m Groun
d Beam
m Groun
m Groun
m Groun
400x200m ed (b) Beams = 30mm
forc
d Beam
400x200m
all
Retai ning w C1
Rein
400x200m
b
400x200m
hick R.C
k sla
400x200m
Beam
d Beam
T
250mm Ground
(c) Columns = 30mm
m Groun
C1
Thic
am
m
400x200m d Beam
mm
d Be
m Groun
2500
d Beam
200 400x200m
m Groun
d Beam
(d) Ground slab = 30mm
m Groun
400x200m
G
C1
m Groun
400x200m d Beam
m Groun
m Groun
400x200m
d Beam
400x200m
(e) Retaining Wall = 30mm
d Beam
400x200m
und Beam K
J
C1
m Gro
400x200m
400x200m am
m Groun
mG round Be
m Groun
infor
ced K 400x200m
d Beam
C1 d Beam
d Beam m Groun
m Groun Re am
C1
400x200m
slab und Be
400x200m
400x200m 0mm Gro und Beam d 5. ABBREVIATIONS
400x200m
m Th
C1 400x d Beam
m Groun r
fo
C1
m Groun
d Beam 200m d Beam
C1 400x200m
in
400x200m m Groun am
Re M.C = Mass Concrete
d Beam
und Be
5500
400x200m
400x200m
d Beam
0mm Gro
7500
C1 400x20
C1 b
m Groun
d Beam
d Beam C1
sla R.C = Reinforced Concrete
m Groun
400x200m m Groun
m Groun
am
400x200m 0mm Gro
und Be ck
C1
C1 400x20 hi
T T = Top
d Beam
d Beam
400x200m
C1
m Groun d Beam
400x200m
400x200m m Groun m
C1
400x200m
G 20
0 m
E B = Bottom
m Groun
C1
d Beam
m Groun
400x200m
400x200m
C1
C1
d Beam
m Groun
400x200m
C1
All dimensions to be confirmed on site.
I G 400x200m
m Groun
d Beam
3250
C1
400
R8 101 @200 R8 101 @200 R8 101 @200
2T16 104
2T16 104 2T16 103
1000 gauge damp BRC Welded Mesh ref. no.A142 D.P.C 1000 gauge damp - 200mm Grade 30 concrete reinforced on bottom and Top with
proof membrane BRC Welded Mesh ref. no.A252 proof membrane BRC Welded Mesh ref. no.A252 BRC Welded Mesh ref. no.A252
- 1000 gauge micro slip
200mm C30 concrete 200mm C30 concrete Damp proof membrane
1530
OF UGANDA
200mm Blockwork 200mm Blockwork Drawing Title:
1:100 or AS INDICATED
NOTES
1. FOUNDATIONS
They shall generally be taken 1200mm
min. below existing ground level after
removal of organic layer and all
24 excavations to be confirmed by the
Engineer before concrete blinding is laid.
23
22 Weak pockets of bearing strata to be dug
21 out and filled with C20 mass concrete.
20
19 6000 J 2. CONCRETE MIXES
Reinforced concrete to have a min.
18 6000
works cube strength of 30N/mm² at
17 6000 28 days with 20mm max.aggregate
16 6000 size
15 6000
7500
3. REINFORCEMENT
14 6000
(a) High Tensile Ribbed bars to BS4461and
13 6000
UKB 254X
146X31
are marked"T" on these dwgs
12 6000
I
60X5MM
(b) Mild steel marked "R" on these dwgs to
+4.5 52
)
16M
2
60X5MM
E 0. D WI SHS 60X
A
11 be round bars to BS4483
9MM TH
6000
SHS 60X
1500
IPE 180
( (
10
146X31
5MM
6000
UAG CE
60X
3250
4. MINIMUM COVER TO ALL STEEL IN
SHS 60X
UKB 254X
F G NFOR
1500
IPE 180
6000
H (a) Foundations = 50mm
5MM
E T O RE I
22000
60X
SHS 60X
6000 (b) Beams = 30mm
1500
IPE 180
SHE AB
146X31
5M M
V.I E SL
60X
60X5MM
SHS 60X
6000 (c) Columns = 30mm
UKB 254X
PER SIT
SHS 60X
3250
1500
IPE 180
(d) Ground slab = 30mm
60X5MM
SUP MPO
X
6000
G
SHS 60X
(e) Retaining Wall = 30mm
ON E CO
146X31
Detail B
1500
UKB 254X
60X5MM
60X5MM
146X31
SHS 60X
60X
ble MCONC
S
5. ABBREVIATIONS
SH
2500
UKB 254X
X
1500
IPE 180
31
4X146X
M.C = Mass Concrete
60X5MM
M
1 0M
SHS 60X
UKB525
J
Dou
146X31 R.C = Reinforced Concrete
1750
UKB 254X
60X5MM
60X5MM
T = Top
146X31
Detail E
60X5MM
SHS 60X
SHS 60X
B = Bottom
IPE 180
SHS 60X
UKB 254X
1500
IPE 180
31
254X146X
5500
7500
60X5MM
DN
All dimensions to be confirmed on site.
UKB
IPE 180
Detail D 146X31
1750
SHS 60X
UKB 254X
1500
1500
936
E
564
470
G
1030
X
MAZZANINE FLOOR LAYOUT PLAN AND REINFORCEMENT DETAILS Structural Engineer.
TASK FORCE
SCALE 1 : 100
Architects:
Client:
UKB254X146X31 steel
beam
OFFICE OF THE PRESIDENT
OF UGANDA
UKB254X146X31 Stanchion Drawing Title:
1:100 or AS INDICATED
NOTES
1. FOUNDATIONS
They shall generally be taken 1200mm
min. below existing ground level after
removal of organic layer and all
excavations to be confirmed by the
Engineer before concrete blinding is laid.
2. CONCRETE MIXES
Reinforced concrete to have a min.
works cube strength of 30N/mm² at
28 days with 20mm max.aggregate
size
3. REINFORCEMENT
1
A1-10 A1-11
1
(a) High Tensile Ribbed bars to BS4461and
are marked"T" on these dwgs
(b) Mild steel marked "R" on these dwgs to
1
A1-13
be round bars to BS4483
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
200
(b) Beams = 30mm
(c) Columns = 30mm
UKB 254X146X31
UKB 254X146X31
UKB 254X146X31
UKB 254X146X31
UKB 254X146X31
(d) Ground slab = 30mm
4000
3800
(e) Retaining Wall = 30mm
200
200
200
UKB 254X146X31
UKB 254X146X31
UKB 254X146X31
UKB 254X146X31
UKB 254X146X31
9000
M.C = Mass Concrete
UKB 254X146X31
UKB 254X146X31
UKB 254X146X31
UKB 254X146X31
UKB 254X146X31
UKB 254X146X31
UKB 254X146X31
UKB 254X146X31
UKB 254X146X31
R.C = Reinforced Concrete
2500
2650
2300
2450
6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 T = Top
4000
3800
3800
254
200
5000
5000
5000
5000
5000
B = Bottom
150
UKB 254X146X31 1000 gauge damp
proof membrane 200mm thick solid slab
1150
1096
reinforced with a double
2500
A252 BRC mesh
2350
All dimensions to be confirmed on site.
2350
1m high RETAINING WALL 1m high RETAINING WALL 1m high RETAINING WALL 1m high RETAINING WALL 1m high RETAINING WALL 1m high RETAINING WALL 1m high RETAINING WALL 1m high RETAINING WALL 1m high RETAINING WALL
1m high RETAINING WALL 1m high RETAINING WALL
1000
1000
1000
1000
1m high RETAINING WALL
REVISIONS
Date: Descriptions:
Structural Engineer.
J I H G F E
TASK FORCE
7500 3250 3250 2500 5500
DETAIL - 1
1380
7587
Architects:
1444
1628
1590
1222
1019
856
612
7500 3250
UKB254x146x31
4000
UKB254x146x31
IPE200
IPE 200
10550
IPE 200
IPE 200
UKB254x146x31
4000
UKB254x146x31
IPE 200
reinforced with a double
IPE 200
IPE 200
1000
PROPOSED TRANSPORT
WORKSHOP
350X350MM R.C COLUMN
50mm thick sand
blinding
7500
IPE 200 28 days with 20mm max.aggregate
14
Directi
6000 size
1 TYPE
1 TYPE
on of 5
13
TYPE
6000
IPE 200
1 TYPE
IPE 200
° slope
TYPE
12 3. REINFORCEMENT
Directi
1 TYPE
TRUSS
6000
I
IPE 200
TRUSS
1 TYPE
IPE 200
TYPE
TRUSS
(a) High Tensile Ribbed bars to BS4461and
on of 5
11 Detail A
1
TYPE
TRUSS
6000
IPE 200
TRUSS
2 TYPE
IPE 200
° slope
are marked"T" on these dwgs
TYPE
TRUSS
10 GUTTER
Directi
2
TYPE
TRUSS
6000
IPE 200
TRUSS
2 TYPE
(b) Mild steel marked "R" on these dwgs to
3250
IPE 200
TYPE
TRUSS
IPE 200
on of 5
2
TYPE
TRUSS
6000
IPE 200
be round bars to BS4483
H
TRUSS
2 TYPE
° slope
IPE 200
2 TYPE
TRUSS
22000
IPE 200
IPE 200
TYPE
2
TYPE
TRUSS
6000
IPE 200
TYPE
2
2 TYPE
TRUSS
3 TYPE
TRUSS
GUTTER 4. MINIMUM COVER TO ALL STEEL IN
IPE 200
TYPE
IPE 200
IPE 200
TRUSS
6000
TRUSS 0
3
TYPE
TRUSS
IPE 20
3
TRUSS
IPE 200
3250
IPE 200 (a) Foundations = 50mm
TRUSS
Directi
TYPE
TRUSS
IPE 200
6000
3
TYPE
TRUSS
GUTTER G
3
(b) Beams = 30mm
TRUSS
TYPE
IPE 200
on of 5
Directi
Directi
TYPE
TYPE
TYPE
TRUSS
IPE 200
TYPE
IPE 200
Directi
3
TYPE
(c) Columns = 30mm
4 TYPE
° slope
on of 5
on of 5
3
TRUSS
TYPE
Directi
IPE 200
TYPE
Detail C
IPE 200
TRUSS
on of 5
4
3
TYPE
IPE 200
3
(d) Ground slab = 30mm
TRUSS
° slope
° slope
4
IPE 200
IPE 200
TRUSS
4 TYPE
TRUSS
2500
on of 5
IPE 200
3
Directi
TRUSS
IPE 200
TYPE
TRUSS
° slope
Directi
G'
IPE 200
TRUSS
IPE 200
4
(e) Retaining Wall = 30mm
Directi
4 TYPE
TRUSS
TRUSS
°
on of 5
4
TRUSS
4 TYPE
slope
IPE 200
on of 5
TYPE
TRUSS
on of 5
J
IPE 200
IPE 200
IPE 200
4 TYPE
TRUSS
° slope
Directi
° slope
4 TYPE
TRUSS
° slope
5. ABBREVIATIONS
TRUSS
IPE 200
Directi
IPE 200
4
IPE 200
TRUSS
on of 5
IPE 200
TRUSS
Directi
on of 5
IPE 200
IPE 200
IPE 200
TRUSS
IPE 200
IPE 200
° slope
TRUSS
IPE 200
5500
IPE 200 R.C = Reinforced Concrete
on of 5
° slope
7500
IPE 200
IPE 200
IPE 200 IPE 200 T = Top
° slope
IPE 200 IPE 200
IPE 200
B = Bottom
IPE 200
G E
All dimensions to be confirmed on site.
IPE 200
GUTTER
I IPE 200 GUTTER This drawing must be read in conjunction with
3250
H 15 6000
23
Any discrepancy MUST be brought to attention
of the Structural Engineer.
14 6000
22
13 E 6000
21 REVISIONS
12 6000
20
11 19
10 TRUSS 1 TYPE DETAILS 18
Date: Descriptions:
I TASK FORCE
DETAIL - 1
G G' E
300mm Girth with 3mm thickness
pre galvanized eave gutters riveted
DETAIL - 2
J 14556
on 40x40x4mm angle section gutters riveted
with 3 bolts per revert of 2no (3mm dia) per support
Architects:
100x50x3mm .
7587
1590
1444
1425
1380
1234
1222
1170
1025
1019
960
856
815
750
612
605
540
50x50x3mm .
410
DETAIL - 3
100x50x3mm .
1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200
DETAIL - 1 DETAIL - 1
7500 6500 2500 5500
CENTERLINE
PROPOSED TRANSPORT
RIDGE
8MM
WELD ROOFING SHEETS 110mm long, J - Bolts with a washer
WORKSHOP
26 GAUGE Galv Painted SHEETS ON
STEEL Z-PURLIN ON
IPE160 TRUSS TO S.E SPECIFICATIONS ON
100X50X3MM TOP
CHORD
100X50mm Z-purlins
bolted to R.S.A cleat
90°
10° 5°
800
128
Designed:
136
200
WELDED JOINT
T.P Dwg No.:
32
DETAIL 2
(scale 1:20) DETAIL 3
75x75x4mm ANGLE
CLEATS
4, 14mm DIA. BOLT HOLES
TO RECEIVE 12mm BOLTS
OF GRADE 8.8
IsoU:01/S-02
(scale 1:20)
TYPICAL TRUSS AND RING BEAM
CONNECTION DETAIL
Checked:
SCALE 1:25 K.F
1:100 or AS INDICATED
NOTES
1. FOUNDATIONS
They shall generally be taken 1200mm
J 1200
28
Reinforced concrete to have a min.
works cube strength of 30N/mm²
days with 20mm max.aggregate
at
size
1628
7587
1590
1444
1425
3. REINFORCEMENT
1380
1234
1222
(a) High Tensile Ribbed bars to BS4461and
1170
1019
are marked"T" on these dwgs
856
(b) Mild steel marked "R" on these dwgs to
612
be round bars to BS4483
410
DETAIL - 3
4. MINIMUM COVER TO ALL STEEL IN
(a) Foundations = 50mm
1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 (b) Beams = 30mm
(c) Columns = 30mm
(d) Ground slab = 30mm
7500 6500 (e) Retaining Wall = 30mm
5. ABBREVIATIONS
M.C = Mass Concrete
1380
7587
1444
1628
1590
Structural Engineer.
1222
TASK FORCE
1019
856
612
410
Architects:
1200 1200 1200 1200 1200 1200 1200 1200 1200
PAN MODERN CONSULT
7500 6500
1628
1222
1019
Client:
OF UGANDA
410
Drawing Title:
ROOF TRUSS DETAILS
PL 8
IPE 200 IPE 200
PL 8 12 M16 L80X6 L80X6 Weak pockets of bearing strata to be dug
12M16 PL 8 IPE180 out and filled with C20 mass concrete.
UKB245X146X31 Front Back
PL 10 PL 8 IPE180 L80X6
IPE 200 PL 8
PL 10 2. CONCRETE MIXES
PL 8 Reinforced concrete to have a min.
PL 8 12M16 Detail E 28
works cube strength of 30N/mm²
days with 20mm max.aggregate
at
PL 8
Back
PL 8 PL 8
Front Section Front-Front Section Back-Back 3. REINFORCEMENT
(a) High Tensile Ribbed bars to BS4461and
are marked"T" on these dwgs
(b) Mild steel marked "R" on these dwgs to
be round bars to BS4483
IPE 200
5. ABBREVIATIONS
M.C = Mass Concrete
IPE180 L80X6 R.C = Reinforced Concrete
IPE180 IPE180 T = Top
B = Bottom
L80X6 L80X6 L80X6 L80X6
All dimensions to be confirmed on site.
UKB254X146X31 L80X6 L80X6
IPE180 IPE200
PL 8 UKB245X146X31 UKB245X146X31 This drawing must be read in conjunction with
PL 8 L80X6 the relevant architectural,Mechanical,Electrical
Back Front
PL 8
PL 8
PL 8 PL 8
Back Front
UKB254X146X37
Detail B
Scale: 1/25 Architects:
UKB254X146X31
PL 8 UKB245X146X31 UKB245X146X31
12M16
PL 8 Front PL 8
PL 8
PL 8 PL 8
Section Back-Back
Detail D
Client:
Front
UKB305X165X46
CONNECTIONS DETAILS
Back
Back
1:100 or AS INDICATED
2.0 -STRUCTURAL DRAWINGS
2514
Weak pockets of bearing strata to be dug
9065 F1 2514
29
29 9065 out and filled with C20 mass concrete.
2018
2018
1507 C1
d Beam
29
Beam
29 X X 3. REINFORCEMENT
300x200mm Groun
d
(a) High Tensile Ribbed bars to BS4461and
300x200mm Groun
are marked"T" on these dwgs
Beam
Mesh (b) Mild steel marked "R" on these dwgs to
A142
be round bars to BS4483
d
Mesh
h,
300x200mm Groun
es
A142
5540
M
42
-1
5540
A
ve ith
4. MINIMUM COVER TO ALL STEEL IN
co d w
r
um rce
nim nfo
(a) Foundations = 50mm
mi , rei
mm lab
50 S
(b) Beams = 30mm
th nd
wi rou
G
top rete
(c) Columns = 30mm
nc
Co
ck
(d) Ground slab = 30mm
thi
m
0m
F1
15
(e) Retaining Wall = 30mm
F1 300x200mm Ground Beam 28
10290
F1 28 300x200mm Ground Beam
10290
C1
C1
C1 150mm 5. ABBREVIATIONS
d Beam
C1 thick Con
28 crete Gro
top with und Slab, rein
M.C = Mass Concrete
28 forc
d Beam
50mm m
inimum ed with A -142
cover Mesh,
1500
F1 Mesh R.C = Reinforced Concrete
F1
1500
F1
300x200mm Groun
A142
300x200mm Ground Beam 27 T = Top
C1 27
300x200mm Groun
C1
C1 Mesh B = Bottom
A142
27
d Beam
27 Y Y All dimensions to be confirmed on site.
1750
1750
300x200mm Groun
F1 26 This drawing must be read in conjunction with
F1 26 300x200mm Ground Beam
C1
150m
the relevant architectural,Mechanical,Electrical
C1 26 m thic
k Con
crete
top w Ground Sla
drawings.
26 ith 50 b
mm m , reinforce
d
Any discrepancy MUST be brought to attention
1500
Mesh inimu
m cov with A -14
er 2 Me
sh ,
1500
A142
F1 F1 30 of the Structural Engineer.
F1 30 300x200mm Ground Beam
C1 C1
C1
30 REVISIONS
30
CHANGING ROOM
proof membrane
4R8-04 200
150
150mm C30 concrete
300X200 G/BEAM
4T12 105 200mm Blockwork
2200
02 02 02
6T16-01 200 B2
02 02 02 02
50mm Concrete
Blinding 105 105 200mm Blockwork
10R8 102 200
200
TYPICAL SECTION F-F R8 102 150 200mm C30 Mass concrete
600
200
Scale: 1:25
600 SECTION Y-Y(scale 1:10)
800mm min. lap
PROPOSED
105 105
75mm kicker
TRANSPORTWORKSHOP
6T16-01 200 B2
6T16-01 200 B1
200 Note: Roof Details.
1200
S
1' 1 2 3 4 4
excavations to be confirmed by the
15451 Engineer before concrete blinding is laid.
804 4500 4076 625 6250
Weak pockets of bearing strata to be dug
out and filled with C20 mass concrete.
A A
2. CONCRETE MIXES
1650
1650
Reinforced concrete to have a min.
Property Boundary wall
F2 F2
works cube strength of 30N/mm² at
C2 C2 28 days with 20mm max.aggregate
3275
3275
B B 6T16-03
S
4T12 103 03 03 03 size
2200
2200
F1 F1 F1
1625
1625
F3
103 103 3. REINFORCEMENT
400
C1 C1 C1 C1
200
03 03 03
75mm kicker
75mm kicker
(e) Retaining Wall = 30mm
15451 200 5. ABBREVIATIONS
M.C = Mass Concrete
R.C = Reinforced Concrete
T = Top
B = Bottom
FOUNDATION LAYOUT PLAN TYPICAL 250mm x 250mm TYPICAL 400mm x 500mm drawings.
Any discrepancy MUST be brought to attention
R.C COLUMN TYPE C2, 02 No. R.C COLUMN TYPE C1, 05 No. of the Structural Engineer.
Scale: 1:100 Scale: 1:20 REVISIONS
Scale: 1:20
Ground Beam Reinforcements No. Date: Descriptions:
4R8-04 200
4R8-04 200
8T8-04-150mm c/c
C30 Concrete.
03 03 03 Structural Engineer.
200mm C30 concrete
200
6T16-170 G.S.L TASK FORCE
4T12 05 6T16-03 220mm thick Plinth wall 50mm Sand blinding
400
6T16-170
450 200mm Hardcore on a
well graded lateritic Gravel
base, compacted to 95% M.D.D
200mm thick strip foundation
11T16-01-150 Architects:
02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02
50mm Concrete
02 02 02
6T16-01 200 B2
02 02 02 02
Blinding
T16-01 200 B1
50mm Grade 15 12T16-01 200 B212T16-01 200 B1 200mm Blockwork
PAN MODERN CONSULT
1200 02 02 02 02 02 02 02 02 02 02 Concrete blinding
450 600 450
TYPICAL SECTION F-F 1500
200
200mm C30 Mass concrete
Scale: 1:25 TYPICAL SECTION R-R 50mm concrete blinding
Scale: 1:10
600
6T16-01 200 B1
12T16-01 200 B1
500
1200
F F
Q Q
TRANSPORTWORKSHOP
500
Designed:
450 600 450 T.P Dwg No.:
Checked:
K.F
IsoU:01/S-02
TYPICAL PLAN OF 2000x2000x400mm
Date: Sheet No.
NOV. 2022 001
COLUMN BASE, TYPE F3, C1, 1No.(Scale
1:10)
1:100 or AS INDICATED
2.0 -STRUCTURAL DRAWINGS
IN CONCRETE POCKET
IN CONCRETE POCKET
IN CONCRETE POCKET
(1) Contractor to verify dimensions on site
6T12-05 6T12-05 before commencement of works and
report any discrepancies to consulting
Architect.
1263
1263
(2) Architectural drawings to be read with
100
2100
relevant structural, mechanical and
50X50X3MM SHS
electrical drawings.
2100
2100
(3) All retaining walls to be damp proofed
civil engineer's specification and
APPROVED DPC BLOCK WALL
CONCRETE detailing.
6T12-05 (4) Drainage pipes under drive ways to have
21R8-04-200 LINKS
21R8-04-200 LINKS
150mm concrete surrounding.
1263
200
200
DPC KEY FINISHING
50X50X3MM SHS ANCHORED
250
6T12-03 6T12-03
G.L FLOOR SKIRTING
238 101
IN CONCRETE POCKET
800
800
on site (1000mm)min
6T12-05
To be determined
21R8-04-200 LINKS
WALLS CEILING
1000
FLOOR
1263
75
75
(A) 30mm Cement/Sand Screed
200
Minimum Depth=850mm.
Otherwise, Dimension
250 200 250
C25 COLUMN FOOTING (B) In situ Concrete finish
To Be Determined
DETAILED
IN ELEVATION.
(C) 10mm thick Ceramic Tiles
C15 CONCRETE STRIP (D) 25mm thick Granite
On site.
6T12-03 (E) 10mm quary tiles finish
200
250
800
200
SKIRTING
1747
21R8-04-200 LINKS
75
50 300
50 300
Minimum Depth=850mm.
200
200
APPROVED DPC
6T12-02-200B2/T2 7T12-01-200B1/T1 6T12-02-200B2/T2 7T12-01-200B1/T1 (D) 12mm thick Granite
1100 1100 (E) Glass
50 300
C15 MASS CONCRETE STRIP 1425
(B) Powder coated aluminiumsuspended
Minimum Depth=850mm.
Otherwise, Dimension
400 300 400 400 300 25 300 400 ceiling (Hunter doorglass)
To Be Determined
7T12-01-200B1/T1
03 03 03 03
300
300
200
6T12-02-200B2/T2 7T12-01-200B1/T1 03 03 03 03
03 03 03
REVISIONS
7T12-01-200B1/T1
1100
NO. DATE. DESCRIPTION
R8-04-200 LINKS
1300
1300
R8-04-200 LINKS R8-04-200 LINKS
50 300
C15 MASS CONCRETE STRIP ECCENTRIC OPTION: BOUNDARY WALL TYPE ELEVATION FOR SLOPING REGIONS.
1000
1000
(SCALE 1:20) 7T12-02-200B2/T2
6T12-02-200B2/T2
02 02 02 02 02 02
6T12-02-200B2/T2 7T12-01-200B1/T1
ISSUES
1100 DETAIL FOR ECCENTRIC FOOTING F1 DETAIL FOR ECCENTRIC FOOTING F2 NO. DATE. ISSUED TO NO. DATE.
Dimensions:1100X1300X300mm Dimensions:1425X1300X350mm
(SCALE 1:20) (SCALE 1:20)
50 50
IN CONCRETE POCKET
IN CONCRETE POCKET
IN CONCRETE POCKET
1050
1050
1050
1050
1050
Project:
6T12-05 6T12-05 6T12-05 6T12-05 6T12-05
1510
PROPOSED TRANSPORT EQUIPMENT
WORKSHOP
2100
200
200
200
200
200
50X50X3MM SHS
17R8-04-200 LINKS
17R8-04-200 LINKS
17R8-04-200 LINKS
17R8-04-200 LINKS
17R8-04-200 LINKS
Location:
200 90
APPROVED DPC DPC MEMBRANE PLOTS 192, 193, 194, AND 196, BLOCK
800
800
800
800
800
207 KYADONDO KANYANYA, KAMPALA
DISTRICT
VARYING GROUND LEVEL VARYING GROUND LEVEL
300
Drawing Title:
75
75
75
75
75
Minimum Depth=850mm.
Otherwise, Dimension
6T12-03 6T12-03 6T12-03 BOUNDARY WALL:
To Be Determined
6T12-03
STRUCTURAL DETAILS
On site.
850
6T12-03
Works Cube
Job No.: Dwg Ref.
MEMBER
Revision No.
Strength N/mm2
Scale: As shown
200
200
200
50 300
300
MM
350
Date:
100
150
7 days 28 days
50
50
50mm Concrete Blinding 50mm Concrete Blinding 50mm Concrete Blinding Drawn by:
50
50
02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 50mm Concrete Blinding
02 02 02 02 02 02 02
Arch. Rubongoya. P
C15 MASS CONCRETE STRIP X C15 MASS CONCRETE STRIP C15 MASS CONCRETE STRIP
Checked by:
GSPublisherVersion 0.0.100.100
Plot 20, Kenneth Dale,
Off Kira Road, Kamwokya,
P.O BOX 100674, Kampala.
Tel: +256-(0)0776 003 799
Web: info@pmconsultuganda.com
GENERAL NOTES
(1) Contractor to verify dimensions on site
before commencement of works and
3300 3300 3300 report any discrepancies to consulting
LINE OF PLOT BOUNDARY Architect.
(2) Architectural drawings to be read with
relevant structural, mechanical and
550 550 2200 550 550 X 2200 550 550 2200 550 325 550 electrical drawings.
(3) All retaining walls to be damp proofed
03 03 03 03 03 civil engineer's specification and
03 03 03 03 03 03 03 03
200
200
detailing.
300
300
(4) Drainage pipes under drive ways to have
03 03 03 03 03 03 03 03
150mm concrete surrounding.
03 03 03 03 03
500
C1
C1 C1 C2 C2
1300
KEY FINISHING
1100
1000
F1 FLOOR SKIRTING
X
WALLS CEILING
F1 F1 F2
FLOOR
(A) 30mm Cement/Sand Screed
250 300 300 250 2200 250 300 300 250 2200 250 300 300 250 2200 400 300 25 300 400 (B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
1100 1100 1100 1425 (D) 25mm thick Granite
ECCENTRIC OPTION: PLAN DETAIL OF BOUNDARY WALL (E) 10mm quary tiles finish
(SCALE 1:20) SKIRTING
(A) 150mm Cement/Sand Plaster
(B) 25mm, 150mm high Hardwood
(C) 9mm, 150mm high Ceramic Tiles
3300 3300 (D) 150mm high Granite
(E) Glass
6T12-02-200B2 7T12-02-200B2
550
400
400
250
250
CEILING
6T12-01-200B1
6T12-01-200B1
03 03 03 03
03 03 03 03 03 03 (A) Painted Cement/Sand Plaster
03 03 03
1100
1100
1100
(B) Powder coated aluminiumsuspended
300
700
200
200
03 03 03 03
1100
1100
ceiling (Hunter doorglass)
300
300
03 03 03 03 03 03
03 03 03 03 (C) Armstrong ceiling
250
250
03 03 03 03 (D) Gypsum plaster
550
03 03 03
400
400
400
F1 F1 F2 REVISIONS
R8-04-200 LINKS R8-04-200 LINKS R8-04-200 LINKS
NO. DATE. DESCRIPTION
400 300 400 2200 1100 2200 400 300 25 300 400
1100 1425 DETAIL FOR FOOTING F1 DETAIL FOR FOOTING F2
CONCENTRIC OPTION: PLAN DETAIL OF BOUNDARY WALL Dimensions:1100X1100X250mm Dimensions:1425X1100X300mm
(SCALE 1:20) (SCALE 1:20) (SCALE 1:20)
ISSUES
NO. DATE. ISSUED TO NO. DATE.
Client:
Project:
Location:
PLOTS 192, 193, 194, AND 196, BLOCK
207 KYADONDO KANYANYA, KAMPALA
DISTRICT
Drawing Title:
Drawn by:
Checked by: Arch. Rubongoya. P
DRAWING NO :
MM
7 days 28 days
GSPublisherVersion 0.0.100.100
Plot 20, Kenneth Dale,
Off Kira Road, Kamwokya,
P.O BOX 100674, Kampala.
Tel: +256-(0)0776 003 799
Web: info@pmconsultuganda.com
GENERAL NOTES
(1) Contractor to verify dimensions on site
3300 3300
before commencement of works and
report any discrepancies to consulting
6T12-05 6T12-05 Architect.
(2) Architectural drawings to be read with
relevant structural, mechanical and
1263
1263
electrical drawings.
100
2100
(3) All retaining walls to be damp proofed
2100
2100
civil engineer's specification and
detailing.
(4) Drainage pipes under drive ways to have
CONCRETE
APPROVED DPC BLOCK WALL 150mm concrete surrounding.
6T12-05
21R8-04-200 LINKS
21R8-04-200 LINKS
KEY FINISHING
1263
200
200
DPC FLOOR SKIRTING
250
6T12-03 6T12-03
G.L
238 101
WALLS CEILING
800
800
on site (1000mm)min
6T12-05
To be determined
21R8-04-200 LINKS
FLOOR
(A) 30mm Cement/Sand Screed
1000
(B) In situ Concrete finish
1263
75
75
(C) 10mm thick Ceramic Tiles
200
Minimum Depth=850mm.
Otherwise, Dimension
250 200 250
C25 COLUMN FOOTING (D) 25mm thick Granite
To Be Determined
DETAILED
IN ELEVATION. (E) 10mm quary tiles finish
C15 CONCRETE STRIP
On site.
SKIRTING
6T12-03
200
(A) 150mm Cement/Sand Plaster
250
800
200
1747
(B) 25mm, 150mm high Hardwood
21R8-04-200 LINKS
75
50 300
50 300
Minimum Depth=850mm.
200
SECTION X-X THROUGH BOUNDARY WALL (A) 12mm thick painted Cement/Sand Plaster
Otherwise, Dimension
(B) Wallpaper
To Be Determined
(SCALE 1:25)
02 02 02 02 02 02 02 02 02 02 02 02 (C) 6mm Ceramic Tiles
On site.
200
6T12-02-200B2/T2 7T12-01-200B1/T1 6T12-02-200B2/T2 7T12-01-200B1/T1
APPROVED DPC CEILING
1100 1100 (A) Painted Cement/Sand Plaster
LINE OF PLOT BOUNDARY (B) Powder coated aluminiumsuspended
1100 ceiling (Hunter doorglass)
75
50 300
C15 MASS CONCRETE STRIP 1425
Minimum Depth=850mm.
02 02 02 02 02 02 03 03 03
On site.
7T12-01-200B1/T1
03 03 03 03
300
300
REVISIONS
200
6T12-02-200B2/T2 7T12-01-200B1/T1 03 03 03 03
03 03 03 NO. DATE. DESCRIPTION
7T12-01-200B1/T1
1100
R8-04-200 LINKS
1300
1300
R8-04-200 LINKS R8-04-200 LINKS
50 300
C15 MASS CONCRETE STRIP ECCENTRIC OPTION: BOUNDARY WALL BACK/SIDE ELEVATION FOR SLOPING REGIONS.
1000
1000
(SCALE 1:20) 7T12-02-200B2/T2
6T12-02-200B2/T2
02 02 02 02 02 02
ISSUES
6T12-02-200B2/T2 7T12-01-200B1/T1 NO. DATE. ISSUED TO NO. DATE.
1100 DETAIL FOR ECCENTRIC FOOTING F1 DETAIL FOR ECCENTRIC FOOTING F2
Dimensions:1100X1300X300mm Dimensions:1425X1300X350mm
(SCALE 1:20) (SCALE 1:20)
50 50
Project:
1050
1050
1050
1050
1050
PROPOSED TRANSPORT EQUIPMENT
6T12-05 6T12-05 6T12-05 6T12-05 6T12-05 WORKSHOP
1510
2100
200
200
200
200
200
17R8-04-200 LINKS
17R8-04-200 LINKS
17R8-04-200 LINKS
17R8-04-200 LINKS
17R8-04-200 LINKS
Location:
PLOTS 192, 193, 194, AND 196, BLOCK
207 KYADONDO KANYANYA, KAMPALA
200 90
APPROVED DPC DPC MEMBRANE
DISTRICT
800
800
800
800
800
VARYING GROUND LEVEL VARYING GROUND LEVEL Drawing Title:
300
BOUNDARY WALL:
75
75
75
75
75
Minimum Depth=850mm.
Otherwise, Dimension
6T12-03 6T12-03 6T12-03 STRUCTURAL DRAWINGS
To Be Determined
6T12-03
On site.
850
6T12-03
Job No.: Dwg Ref.
Revision No.
Scale: As shown
MEMBER Works Cube
Strength N/mm2 Date:
200
200
200
50 300
300
MM
Drawn by:
350
100
150
Arch. Rubongoya. P
7 days 28 days
Checked by:
50
50
50
50
02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 50mm Concrete Blinding
02 02 02 02 02 02 02
C15 MASS CONCRETE STRIP X C15 MASS CONCRETE STRIP C15 MASS CONCRETE STRIP DRAWING NO :
6T12-02-200B2/T2 7T12-01-200B1/T1 6T12-02-200B2/T2 7T12-01-200B1/T1 6T12-02-200B2/T2 7T12-01-200B1/T1
7T12-02-200B2/T2 7T12-01-200B1/T1
GSPublisherVersion 0.0.100.100
Plot 20, Kenneth Dale,
Off Kira Road, Kamwokya,
P.O BOX 100674, Kampala.
Tel: +256-(0)0776 003 799
Web: info@pmconsultuganda.com
GENERAL NOTES
(1) Contractor to verify dimensions on site
IN CONCRETE POCKET
IN CONCRETE POCKET
IN CONCRETE POCKET
IN CONCRETE POCKET
Architect.
6T12-05 6T12-05 (2) Architectural drawings to be read with
relevant structural, mechanical and
electrical drawings.
1263
1263
(3) All retaining walls to be damp proofed
100
2100
civil engineer's specification and
50X50X3MM SHS
detailing.
IN CONCRETE POCKET
IN CONCRETE POCKET
IN CONCRETE POCKET
APPROVED DPC
6T12-05
21R8-04-200 LINKS
21R8-04-200 LINKS
KEY FINISHING
1263
FLOOR SKIRTING
200
200
50X50X3MM SHS
50X50X3MM SHS ANCHORED
50X50X3MM SHS
6T12-03 6T12-03
WALLS CEILING
238 101
IN CONCRETE POCKET
IN CONCRETE POCKET
IN CONCRETE POCKET
IN CONCRETE POCKET
800
800
FLOOR
6T12-05
21R8-04-200 LINKS
(A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
(D) 25mm thick Granite
1263
75
75
200
Minimum Depth=850mm.
(E) 10mm quary tiles finish
Otherwise, Dimension
50X50X3MM SHS
To Be Determined
SKIRTING
(A) 150mm Cement/Sand Plaster
On site.
6T12-03 (B) 25mm, 150mm high Hardwood
800
(C) 9mm, 150mm high Ceramic Tiles
200
1747
21R8-04-200 LINKS
75
(B) Wallpaper
50 300
50 300
Minimum Depth=850mm.
200
Otherwise, Dimension
02 02 02 02 02 02 02 02 02 02 02 02
(D) 12mm thick Granite
(E) Glass
On site.
6T12-03 CEILING
800
200
6T12-02-200B2/T2 7T12-01-200B1/T1 6T12-02-200B2/T2 7T12-01-200B1/T1 (A) Painted Cement/Sand Plaster
APPROVED DPC
1100 1100 (B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
LINE OF PLOT BOUNDARY (C) Armstrong ceiling
1100 (D) Gypsum plaster
75
50 300
C15 MASS CONCRETE STRIP 1425
Minimum Depth=850mm.
Otherwise, Dimension
02 02 02 02 02 02 03 03 03
REVISIONS
On site.
7T12-01-200B1/T1
03 03 03 03
300
300
NO. DATE. DESCRIPTION
200
6T12-02-200B2/T2 7T12-01-200B1/T1 03 03 03 03
03 03 03
7T12-01-200B1/T1
1100
R8-04-200 LINKS
1300
1300
R8-04-200 LINKS R8-04-200 LINKS
50 300
C15 MASS CONCRETE STRIP ECCENTRIC OPTION: BOUNDARY WALL FRONT ELEVATION FOR SLOPING REGIONS.
1000
1000
(SCALE 1:20) 7T12-02-200B2/T2
6T12-02-200B2/T2
02 02 02 02 02 02 ISSUES
NO. DATE. ISSUED TO NO. DATE.
6T12-02-200B2/T2 7T12-01-200B1/T1
1100 DETAIL FOR ECCENTRIC FOOTING F1 DETAIL FOR ECCENTRIC FOOTING F2
Dimensions:1100X1300X300mm Dimensions:1425X1300X350mm
(SCALE 1:20) (SCALE 1:20)
Client:
3300 3300 3300
OFFICE OF THE PRESIDENT
INTERNAL SECURITY ORGANISATION
25mm EXPANSION JOINT EVERY AFTER 15m
Project:
50X50X3MM SHS ANCHORED
IN CONCRETE POCKET
IN CONCRETE POCKET
IN CONCRETE POCKET
IN CONCRETE POCKET
IN CONCRETE POCKET
IN CONCRETE POCKET
IN CONCRETE POCKET
IN CONCRETE POCKET
IN CONCRETE POCKET
1050
1050
1050
1050
1050
6T12-05 6T12-05 6T12-05 6T12-05 6T12-05
1510
2100
Location:
200
200
200
200
200
200
50X50X3MM SHS 50X50X3MM SHS 50X50X3MM SHS PLOTS 192, 193, 194, AND 196, BLOCK
17R8-04-200 LINKS
17R8-04-200 LINKS
17R8-04-200 LINKS
17R8-04-200 LINKS
17R8-04-200 LINKS
207 KYADONDO KANYANYA, KAMPALA
DISTRICT
200 90
APPROVED DPC DPC MEMBRANE
800
800
800
800
800
Drawing Title:
300
STRUCTURAL DRAWINGS
75
75
75
75
75
Minimum Depth=850mm.
Otherwise, Dimension
6T12-03 6T12-03 6T12-03
To Be Determined
6T12-03 Dwg Ref.
Job No.:
On site.
850
6T12-03 Scale: As shown Revision No.
Date:
MEMBER Works Cube
Strength N/mm2 Drawn by:
Arch. Rubongoya. P
200
200
200
Checked by:
50 300
300
MM
350
100
150
7 days 28 days
50
50
50mm Concrete Blinding 50mm Concrete Blinding 50mm Concrete Blinding DRAWING NO :
50
50
02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 50mm Concrete Blinding
02 02 02 02 02 02 02
C15 MASS CONCRETE STRIP X C15 MASS CONCRETE STRIP C15 MASS CONCRETE STRIP
6T12-02-200B2/T2 7T12-01-200B1/T1 6T12-02-200B2/T2 7T12-01-200B1/T1 6T12-02-200B2/T2 7T12-01-200B1/T1
7T12-02-200B2/T2 7T12-01-200B1/T1
GSPublisherVersion 0.0.100.100
Plot 20, Kenneth Dale,
Off Kira Road, Kamwokya,
P.O BOX 100674, Kampala.
Tel: +256-(0)0776 003 799
Web: info@pmconsultuganda.com
200
300
300
(2) Architectural drawings to be read with
03 03 03 03 03 03 03 03 relevant structural, mechanical and
03 03 03 03 03
electrical drawings.
500
C1 (3) All retaining walls to be damp proofed
C1 C1 C2 C2
civil engineer's specification and
1300
1100
detailing.
1000
F1 (4) Drainage pipes under drive ways to have
150mm concrete surrounding.
X
F1 F1 F2
KEY FINISHING
250 300 300 250 2200 250 300 300 250 2200 250 300 300 250 2200 400 300 25 300 400
FLOOR SKIRTING
1100 1100 1100 1425
ECCENTRIC OPTION: PLAN DETAIL OF BOUNDARY WALL
(SCALE 1:20) WALLS CEILING
FLOOR
3300 3300 (A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
550 550 2200 550 550 1900 550 325 550 1100 1425 (C) 10mm thick Ceramic Tiles
400 300 400 400 300 25 300 400 (D) 25mm thick Granite
(E) 10mm quary tiles finish
C1 C1 C2 C2
SKIRTING
400
6T12-02-200B2 7T12-02-200B2
550
400
400
250
250
6T12-01-200B1
6T12-01-200B1
03 03 03 03 (B) 25mm, 150mm high Hardwood
03 03 03 03 03 03 03 03 03 (C) 9mm, 150mm high Ceramic Tiles
1100
1100
1100
200
200
300
700
1100
1100
300
300
03 03 03 03 03 03
03 03 03 03 WALLS
250
250
03 03 03 03
550
(B) Wallpaper
400
400
F1 F1 F2 (C) 6mm Ceramic Tiles
R8-04-200 LINKS R8-04-200 LINKS R8-04-200 LINKS (D) 12mm thick Granite
400 300 400 2200 1100 2200 400 300 25 300 400
(E) Glass
REVISIONS
NO. DATE. DESCRIPTION
ISSUES
NO. DATE. ISSUED TO NO. DATE.
Client:
Project:
Location:
PLOTS 192, 193, 194, AND 196, BLOCK
207 KYADONDO KANYANYA, KAMPALA
DISTRICT
Drawing Title:
BOUNDARY WALL:
STRUCTURAL DRAWINGS
MM
Checked by: Arch. Rubongoya. P
7 days 28 days
DRAWING NO :
GSPublisherVersion 0.0.100.100
3.0 -MECHANICAL ELECTRICAL AND PLUMBING (MEP)/ICT DRAWINGS
DN
Notes:
MEP CONSULTANT
PROJECT:
CLIENT:
DRAWING TITLE:
Distribution Board
3Ø Socket Outlet
Notes:
MEP CONSULTANT
DN
Light & Lights Technologies Ltd
.....we love what we
E l e c t r do.....
i c a l & M e c h a n i c a l E n g i n e e r s
PROJECT:
CLIENT:
ARCHITECT:
CAM-No
CCTV IP Camera
CAM-No44
CAM-No43
CAM-No42
CAM-No39
CAM-No38
Notes:
CAM-No36 CAM-No37
CAM-No45 Rev Date Description By
CAM-No35
CAM-No41 CAM-No47
DN
Light & Lights Technologies Ltd
.....we love what we
E l e c t r do.....
i c a l & M e c h a n i c a l E n g i n e e r s
PROJECT:
CLIENT:
ARCHITECT:
Notes:
MEP CONSULTANT
PROJECT:
CLIENT:
ARCHITECT:
LIGHTING LAYOUT - CHANGING ROOMS &GUARD HOUSE LIGHTING LAYOUT - STAFF QUARTERS M/s PAN MODERN CONSULT
Proposed ISO Transport Work Shop To Be Built in Kanyanya Kawempe- Kampala District Proposed ISO Transport Work Shop To Be Built in Kanyanya Kawempe- Kampala District
DRAWING TITLE:
Distribution Board
IP CCTV Camera
Notes:
MEP CONSULTANT
PROJECT:
CLIENT:
ARCHITECT:
DRAWING TITLE:
SMALL POWER LAYOUT - CHANGING ROOMS &GUARD HOUSE SMALL POWER LAYOUT - STAFF QUARTERS ELECTRICAL INSTALLATION DRAWING
SMALL POWER LAYOUT - UPPER GROUND FLOOR
Proposed ISO Transport Work Shop To Be Built in Kanyanya Kawempe- Kampala District
Proposed ISO Transport Work Shop To Be Built in Kanyanya Kawempe- Kampala District
IP CCTV Camera
Smoke Detector
HD Heat Detector
Break Glass
Sounder
Notes:
HD
Rev Date Description By
MEP CONSULTANT
PROJECT:
ARCHITECT:
DRAWING TITLE:
CCTV, FIRE DETECTION & ALARM LAYOUT - CHANGING ROOMS &GUARD HOUSE Date: Approved by Scale:
Proposed ISO Transport Work Shop To Be Built in Kanyanya Kawempe- Kampala District Nov. 2022 AH NTS
Revision Job No. Drawing No.
LL/022/AN/02 LL/022/E15
4. External Lighting
SYMBOL DESCRIPTION
5000
7°
.8
96
GENERAL NOTES
a) Wiring should be made in accordance with Electrical
Regulation Authority Wiring Act and a certificate conforming
Systems compliance to be issued after.
2160
- Refer to the wiring circuits to determine cables sizes
b) All Sockets to be installed at 3500mm AFFL unless indicated
otherwise
1079 c) All Switches to be installed at 1500mm AFFL unless indicated
otherwise
REF. d) Eletrical Drawing Should be used in relation to other working
3000
Notes:
Rev Date Description By
MEP CONSULTANT
1079
450
1000
Light & Lights Technologies
.....we love Ltd
E l e c t r what
i c a l we
& Mdo.....
e c h a n i c a l E n g i n e e r s
PROJECT:
CLIENT:
DRAWING TITLE:
Gate Valve
Bib Taps
Water Heater
20mm CIW
25mm CIW
20mm CIW
20mm CIW 20mm CIW
Notes:
32mm CIW
MEP CONSULTANT
PROJECT:
ARCHITECT:
DRAWING TITLE:
COLD AND HOT WATER LAYOUT - CHANGING ROOMS &GUARD HOUSE Date: Approved by Scale:
Proposed ISO Transport Work Shop To Be Built in Kanyanya Kawempe- Kampala District Nov. 2022 AH NTS
Revision Job No. Drawing No.
LL/022/AN/02 LL/022/M2
SYMBOL DESCRIPTION
MH ManHole
RE Roding Eye
Floor Drain
MH7
SVP Solvent Pie
110mm CISF
50mm CISF
MH
G G
110mm CISF
Notes:
MH7
Rev Date Description By
MEP CONSULTANT
FOUL DRAINAGE LAYOUT - STAFF QUARTERS PROPOSED ISO TRANSPORT WORK SHOP TO BE
BUILT IN KANYANYA KAWEMPE- KAMPALA
Proposed ISO Transport Work Shop To Be Built in Kanyanya Kawempe- Kampala District DISTRICT
CLIENT:
ARCHITECT:
DRAWING TITLE:
FOUL DRAINAGE LAYOUT - CHANGING ROOMS &GUARD HOUSE Designed by: Checked by: Issue Status:
Proposed ISO Transport Work Shop To Be Built in Kanyanya Kawempe- Kampala District MR MR KCCA submission