Grar Site

This document provides information on reinforcement bars used for a construction project, including the diameter, length, number of bars, and total weight of bars for different sizes. It lists the diameter, length, and number of bars used for various sections of the project. The owner of the project is AAHD and the contractor is Abera Mamo Building Contractor, with consultation provided by Addis Ababa Construction Design and Building Consulting Company.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views2 pages

Grar Site

This document provides information on reinforcement bars used for a construction project, including the diameter, length, number of bars, and total weight of bars for different sizes. It lists the diameter, length, and number of bars used for various sections of the project. The owner of the project is AAHD and the contractor is Abera Mamo Building Contractor, with consultation provided by Addis Ababa Construction Design and Building Consulting Company.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Owner: - AAHD App Block No 03

Contractror: -Abera Mamo Building Contractor


Consultant:- Addis Ababa Construction Design and Building Consulting Company

የብረት ርክክብ
Dia. (mm) Length No. of
(M) bars
Ø 8 (mm) Ø 10 (mm) Ø 12 (mm) Ø 14 (mm) Ø 16 (mm) Ø 20 (mm) weight
20 3.95 29.00 " " " " " 114.55 282.94
16 3.55 14.00 " " " " 49.70 " 78.53
16 4.25 63.00 " " " " 267.75 " 423.05
20 5.90 17.00 " " " " " 100.30 247.74
16 4.95 18.00 " " " " 89.10 " 140.78
20 7.70 45.00 " " " " " 346.50 855.86
20 9.30 36.00 " " " " " 334.80 826.96
14 6.10 50.00 " " " 305.00 " " 369.05
14 7.90 21.00 " " " 165.90 " " 200.74
16 12.00 27.00 " " " " 324.00 " 511.92
14 7.85 16.00 " " " 125.60 " " 151.98
16 4.00 15.00 " " " " 60.00 " 94.80
14 5.75 50.00 " " " 287.50 " " 347.88
20 3.10 50.00 " " " " " 155.00 382.85
14 4.10 36.00 " " " 147.60 " " 178.60
16 3.65 6.00 " " " " 21.90 " 34.60
20 12.00 9.00 " " " " " 108.00 266.76
10 12.00 1,070.00 " 12,840.00 " " " " 7,922.28
10 5.50 22.00 " 121.00 " " " " 74.66
12 12.00 41.00 " " 492.00 " " " 437.88
20 6.90 10.00 " " " " " 69.00 170.43
20 3.95 4.00 " " " " " 15.80 39.03
20 7.90 5.00 " " " " " 39.50 97.57
14 12.00 1.00 " " " 12.00 " " 14.52
20 3.95 15.00 " " " " " 59.25 146.35
8 145.16 83.00 12,048.28 " " " " " 4,759.07

Total Length 12,048.28 12,961.00 492.00 1,043.60 812.45 1,342.70 19,056.79

Weight/Kg 0.395 0.617 0.888 1.209 1.580 2.469

Total weight 4,759.22 7,996.94 436.90 1,261.71 1,283.67 3,315.13 -

አስረካቢ ኮንትራክተር ተረካቢ ኮንትራክተር አረካካቢ


የባለቤት ተወካይ የአማካሪ ተወካይ
የተወካይ ስም፡- የተወካይ ስም፡- ስም፡- __ ____________ ስም፡- __________________

የስራ ድርሻ፡- የስራ ድርሻ፡- የስራ ድርሻ፡-____________ የስራ ድርሻ፡- _________________

ፊርሚያ፡ ፊርሚያ፡ ፊርሚያ፡ ___________ ፊርሚያ፡ ________________

ቀን ቀን: ቀን: ቀን: ________________


Owner: - AAHD App Block No 03
Contractror: -Abera Mamo Building Contractor
Consultant:- Addis Ababa Construction Design and Building Consulting Company
Location: - Addis Ababa reinforcement bar

Length No. of
Dia. (mm) (M) bars
Ø 8 (mm) Ø 10 (mm) Ø 12 (mm) Ø 14 (mm) Ø 16 (mm) Ø 20 (mm) Ø 24 (mm)
10 12.00 997.00 " 11,964.00 " " " " "
10 2.40 33.00 " 79.20 " " " "
10 1.80 15.00 " 27.00 " " " " "
10 3.40 27.00 " 91.80 " " " " "
10 8.00 25.00 " 200.00 " " " " "
10 4.20 31.00 " 130.20 " " " " "
12 12.00 41.00 " " 492.00 " " " "
20 9.60 36.00 " " " " " 345.60 "
20 7.80 40.00 " " " " " 312.00 "
20 7.10 22.00 " " " " " 156.20 "
20 3.70 30.00 " " " " " 111.00 "
20 3.10 50.00 " " " " " 155.00 "
20 12.00 9.00 " " " " " 108.00 "
20 4.00 3.00 " " " " " 12.00 "
20 3.95 26.00 " " " " " 102.70 "
20 3.51 9.00 " " " " " 31.59 "
20 5.90 25.00 " " " " " 147.50 "
20 3.40 21.00 " " " " " 71.40 "
14 12.00 25.00 " " " 300.00 " " "
14 5.20 50.00 " " " 260.00 " " "
14 8.20 21.00 " " " 172.20 " " "
14 5.80 50.00 " " " 290.00 " " "
16 12.00 15.00 " " " " 180.00 " "
16 4.05 15.00 " " " " 60.75 " "
16 3.45 6.00 " " " " 20.70 " "
16 5.50 17.00 " " " " 93.50 " "
16 2.00 27.00 " " " " 54.00 " "
16 4.35 50.00 " " " " 217.50 " "
16 3.30 30.00 " " " " 99.00 " "
16 8.00 16.00 " " " " 128.00 " "
16 3.85 13.00 " " " " 50.05 " "

Total Length - 12,492.20 492.00 1,022.20 903.50 1,552.99 -

Weight/Kg 0.395 0.617 0.888 1.209 1.580 2.469 3.570

Total weight 4,759.22 7,707.69 436.90 1,235.84 1,427.53 3,834.33 -

TOTAL REINFORECEMENT BAR ONSITE 19,401.51 KG

TOLERANCE OF 5% WASTAGE 970.08 KG

TOTAL WITH W 20,371.58 KG

TOTAL REINFORCEMNT BAR DELIVERED TO SITE 20,366.22 KG

......................... .................. .......................


Contractor consultant Client