0% found this document useful (0 votes)
65 views1 page

Sales Invoice: PT. Gala Jaya Banjarmasin

PT. Gala Jaya Banjarmasin issued an invoice to Wijaya Karya Rekayasa Konstruksi for the rental of a 100Kva Cummins silent generator for 1 month. The rental price was IDR 11,000,000 with no discount and a 10% VAT of IDR 1,100,000, for a total invoice amount of IDR 12,100,000. The rental period was from January 18 to February 17, 2021 for 200 hours of use.

Uploaded by

Noor Sa'adah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views1 page

Sales Invoice: PT. Gala Jaya Banjarmasin

PT. Gala Jaya Banjarmasin issued an invoice to Wijaya Karya Rekayasa Konstruksi for the rental of a 100Kva Cummins silent generator for 1 month. The rental price was IDR 11,000,000 with no discount and a 10% VAT of IDR 1,100,000, for a total invoice amount of IDR 12,100,000. The rental period was from January 18 to February 17, 2021 for 200 hours of use.

Uploaded by

Noor Sa'adah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PT.

Gala Jaya Banjarmasin


Jl. Pramuka No. 19 A Yani Km. 6 Sales Invoice
Banjarmasin Invoice Date Invoice No.
Kalimantan Selatan 28 Feb 2021 FP/2021/02/0322
Terms FOB
Bill To : Wijaya Karya Rekayasa Konstruksi, PT
Net 120
Gedung WIKA Lt. 6Jl. DI Panjaitan Kav.9 RT.003 RW.011, Cipinang
Cempedak Ship Via Ship Date
Ship To : DKI JAKARTA
Wijaya - Indonesia
Karya Rekayasa Konstruksi, 28 Feb 2021
PT Gedung WIKA Lt. 6Jl. DI Panjaitan PO. No. Currency
Kav.9 RT.003 RW.011, Cipinang Cempedak - IDR

Item Item Description Qty Unit Price Disc % Amount


SG00100 Sewa Genset Cummins 100Kva Silent 1bln 11.000.000 0 11.000.000

Say : Twelve million one hundred thousand Sub Total : 11.000.000


Discount : 0
Description:
PPN : 1.100.000
Periode Sewa 18 Januari s/d 17 Februari 2021 (200 Jam)

Freight : 0
Prepared By Approved By Shipped By Received By Total Invoice : 12.100.000

__________ __________ __________ __________


Date: Date: Date: Date:

You might also like