0% found this document useful (0 votes)
75 views2 pages

Ship Plans & Stability Certification

Zeacom Marine Engineering Services certifies that HI-ENERGY MARINE SERVICES INC. has commissioned them for ship plans drawing and stability calculations for ten tugboats. The project, awarded on September 4, 2023, includes ongoing 'AS-BUILT' plans and is expected to be completed within 21 days following on-board surveys. The document includes contact information for Zeacom Marine Engineering Services.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views2 pages

Ship Plans & Stability Certification

Zeacom Marine Engineering Services certifies that HI-ENERGY MARINE SERVICES INC. has commissioned them for ship plans drawing and stability calculations for ten tugboats. The project, awarded on September 4, 2023, includes ongoing 'AS-BUILT' plans and is expected to be completed within 21 days following on-board surveys. The document includes contact information for Zeacom Marine Engineering Services.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

ZEACOM MARINE ENGINEERING SERVICES

444 CADORNIGA ST. BRGY NAVOTAS WEST, NAVOTAS CITY


Email Add: Zeacom2023@gmail.com Contact No.: 0915-693-7198
CERTIFICATE
OF
SHIP PLANS DESIGN
AND
STABILITY CALCULATIONS

This is to certify that HI-ENERGY MARINE SERVICES INC. awarded the service of
ship plans drawing and Intact Stability booklet of the Tugboat Fleet with following ship
name listed below:
1. M/TUG ENERGY POLARIS
2. M/TUG ENERGY VENUS
3. M/TUG ENERGY SUCCESS
4. M/TUG ENERGY INTEGRITY
5. M/TUG ENERGY AGILA
6. M/TUG ENERGY PACIFIC
7. M/TUG ENERGY GALAXY
8. M/TUG ENERGY AQUARIUS
9. M/TUG ENERGY MASTER
10. M/TUG ENERGY STAR

On-going “AS-BUILT” ship plans drawing is taking place, schedule survey was arranged to
accommodate on-board actual measurement, data gathering and verification of equipment for
each tugboat.
It was awarded last Sept.04.2023 and projected to accomplish within 21 days from
completion of on-board surveys.

09-12-2023
Engr. Rodolfo P. Zosimo Jr.
RNAME / REE
Zeacom Marine Engineering Services
VP-Shipright Marine Surveying Inc
ZEACOM MARINE ENGINEERING SERVICES
444 CADORNIGA ST. BRGY NAVOTAS WEST, NAVOTAS CITY
Email Add: Zeacom2023@gmail.com Contact No.: 0915-693-7198

You might also like