0% found this document useful (0 votes)
37 views1 page

Title Name(s) Date: Background: Proposed Countermeasure(s)

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views1 page

Title Name(s) Date: Background: Proposed Countermeasure(s)

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

A3 v1.

A3

Title Name(s) Date

Background: Proposed Countermeasure(s):


Why you are talking about it. Your proposal to reach the future state, the target condition.
- What alternatives could be considered?
What is the business reason for choosing this issue? - How will you choose among the options? What decision criteria?

How your recommended countermeasures will impact the root cause to


change the current situation and achieve the target.

Current Conditions:
Where things stand today.
- What’s the problem with that, with where we stand?
Implementation Plan:
- What is the actual symptom that the business feels that requires action?
A chart or table that shows actions/outcomes, timeline and responsibilities.
Show visually – pareto charts, graphs, drawings, maps, etc.
May include details on the specific means of implementation.
- Who will do what, when and how?

Indicators of performance, of progress.


Target(s)/Goal(s) - How will we know if the actions have the impact needed?
The specific outcome required for the business. - What are the critical few, visual, most natural measures?
- What is the specific change you want to accomplish now.?
- How will you measure success?

Analysis
The root cause(s) of the problem.
- Why are we experiencing the symptom?
Follow Up:
- What constraints prevent us from the goal?
Choose the simplest problem-solving tool for this issue: Remaining issues that can be anticipated.
- Five whys - Any failure modes to watch out for? Any unintended consequences?
- Fishbone
- QC Tools Ensure ongoing P-D-C-A.
- LSS Tools

_x000D_Copyright 2014 GoLeanSixSigma.com. All Rights Reserved.

You might also like