Water Proofing

The document describes the hazards and controls for a waterproofing project. It identifies 8 key work activities and their associated hazards and existing control measures. The activities include arrival and site induction, inspecting substrates, surface preparation, installing screed and shower bases, selecting and installing floor membranes, installing bond breakers, installing floor membrane to drains, and housekeeping.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views2 pages

Water Proofing

The document describes the hazards and controls for a waterproofing project. It identifies 8 key work activities and their associated hazards and existing control measures. The activities include arrival and site induction, inspecting substrates, surface preparation, installing screed and shower bases, selecting and installing floor membranes, installing bond breakers, installing floor membrane to drains, and housekeeping.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

WORK ACTIVITY JOB HAZARD ANALYSIS

PROJECT: WP5-2300 Clubhouse Structural SERIAL NO: JHA-T3G-000____


works, Hann Reserve Project
ACTIVITY/PROCESS

WATER PROOFING WORKS

IDENTIFIED HAZARDS KEY RISKS EXISTING CONTROL


MEASURES/PRECAUTIONS
1. Arrival of personnel and  Unfamiliar in  Ensure all workers are fully briefed on
equipment onsite site situation task and responsibilities
and with site  Ensure all workers that already inducted
regulation. prior to mobilization to site
 Ensure all workers are undergone the
safety induction onsite.
2. Inspect substrate condition and  Work site  All employee to be informed of work
site environmental cluttered conditions and materials MSDS via a
 Concrete cured toolbox meeting talk
 Plumbing  All workers are worn of appropriate ppe
penetration in for this task.
suitable
condition

3. prepare surfaces with joint  Solvent based  Area to be barricade off, with no entry
sealant and priming polyurethane signage posed.
and silicon  Ensure the site is well ventilated
sealant to be  Follow product safety procedures.
cleaned off  All workers are worn of appropriate ppe
excess for this task.
surfaces and
self
 Primed
surfaces are
not spread to
non-work area.

 Material  Area to be barricade off, with no entry


4. install screed to fall / hobs signage posed.
handling and
performed shower base  Ensure the site is well ventilated
cutting
procedures  Follow product safety procedures.
 All workers are worn of appropriate ppe
for this task

5. Select floor membrane and  Materials  Area to be barricade off, with no entry
install membrane to substrate handling for signage posed.
heavy buckets  Ensure the site is well ventilated
 Back strain  Follow product safety procedures.
 Kneeling  All workers are worn of appropriate ppe
positions to for this task.
cause stress  Provide hand wash station at the
 Back strain workplace area.
 Dust inhalation  Ensure the proper manual handling
 Heat stroke procedures is followed

Form No.: TCD-WP-JHA-2024


Rev. 1, 01 April 2024
6. install bond breaker to all
wall/floor and penetrations joints.  Area to be barricade off, with no entry
 Kneeling
signage posed.
positions to
 Ensure the site is well ventilated
cause stress
 Careful cutting
 Follow product safety procedures.
of fabric tape  All workers are worn of appropriate ppe
materials for this task.
 Back strain  Provide hand wash station at the
workplace area.
 Dust inhalation
 Heat stroke
 Ensure the proper manual handling
procedures is followed.
 Workers are well experienced to this
task

7. install floor membrane over


screed into exit drains  Area to be barricade off, with no entry
 Materials signage posed.
handling for  Ensure the site is well ventilated
heavy buckets  Follow product safety procedures.
 Back strain  All workers are worn of appropriate ppe
 Kneeling for this task.
positions to  Provide hand wash station at the
cause stress workplace area.
 Back strain  Ensure the proper manual handling
 Dust inhalation procedures is followed.
 Heat stroke  Workers are well experienced to this
task

 Back strain
8. Housekeeping
 Dust inhalation
 Hand laceration  Toolbox / Patos must be needed
 Slip and trip  Proper communication and coordination
 Use of appropriate ppe
 Observe the working place prior to start
the work activity.

OPS. Area In-Charge: RICHARD SIBUG EHS. Area In-Charge:

Position: SR. ENGINEER INCHARGE Position:

Date: April 2024 Date: April 2024

Project Manager: LEONILO MUNSAYAC Safety Manager: MARK O.YABES

Date: April 2024 Date: April 2024

Form No.: TCD-WP-JHA-2024


Rev. 1, 01 April 2024

You might also like