Summer and Pre Monsoon

The document provides guidance for summer and pre-monsoon precautions for Indian Railways signaling systems. It lists measures to minimize effects of high temperatures including adjusting track circuits, points, signals, power supply, DG sets, relay rooms, and ensuring lightning and surge protection. Proper maintenance and functioning of equipment is emphasized.

Uploaded by

Siva Prasad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views3 pages

Summer and Pre Monsoon

The document provides guidance for summer and pre-monsoon precautions for Indian Railways signaling systems. It lists measures to minimize effects of high temperatures including adjusting track circuits, points, signals, power supply, DG sets, relay rooms, and ensuring lightning and surge protection. Proper maintenance and functioning of equipment is emphasized.

Uploaded by

Siva Prasad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

c:se

v{CSTES,
(~ All Indian Railways
:J COREl ALD and Metro Railway \ ~;r.>,
-',;> ,', ..>,. 20 MAR 2019
Kolkata
~~;t:'".
------ ... ~
Sub: Summer and Pre-Monsoon Precautions.

Followings measures, apart from local requirements, shall be taken to minimize


effect of high temperatures on Signalling systems during the ensuing Summer.

a. Track Circuits:
• Adjustment of track circuit parameter to keep track relay pick up Ivoltage within
safe limit. .
• Corroded track lead connections to be renewed & double bondings to be ensured.
• Arresting of creep to avoid crushing of end posts of insulated joints. At least one
.rail length on either side of the insulated joint should be provided with anti-creep
devices by Engineering Deptt.
• Provision of J-clip at glued joints by Engineering Deptt.

b. Points:
• Adjustment of point rodding, adjustable crank, rod compensators for rod
operated points.
• Joint inspections with P. Way staff of points & crossing and track circuits
and compliance of deficiencies noted during joint inspections.
• Ensure Point machine cover gaskets are effective to prevent ingress of rain water.
• Ensure that Point machine is responding properly.

c. Signals:
• Adjustment of wire runs for semaphore signals.
• Ensuring provision of hood on CLS Signals.
• Ensure Signal unit back cover gaskets are effective to prevent ingress of rain water.

d. Power Supply:
• Proper maintenance of IPS and functioning of exhaust fan of IPS.
• Proper ventilation and exhaust fan in IPS and Battery rooms.
• Proper working of auto-change over arrangement of Power Supply.
• In coordination with Sr. DEEIDEE, improvement in local power supply of
State Electricity Board at identified stations having unreliable & low voltage
supply.
• Proper working of stabilisers and inverters at CLS Stations.
• Proper working of distilled water plant.
• Checking of battery & ensuring adequate distilled water in cells for maintaining
required specific gravity.
• Cleaning of Solar panels and its proper functioning.

Contdl2
- --- ---- ---_.-
-2-

e. DG Sets:

• Proper functioning of DG sets and availability of sufficient spare parts, where two
DG sets are provided both shall be in working condition.
• Availability of portable DG sets at strategic locations for use in emergency.
• Adequate stock of diesel oil for working of DG sets during prolonged power cuts.

f. Relay Room:

• Proper working of air conditioning equipment wherever available.


• Proper ventilation in relay room for air circulation.
• Cleaning of relay room to make it dust free.
• Visual inspection of relay wiring to ensure proper locking of connector clips.
• Cable entries to be sealed 01'
• Provision of fire alarm / fire extinguisher systems and ensuring their proper
functioning.

g. General (Electronic Signalling System / Cable / Block):


""'jt-'" ~

• Ensuring proper Earthing for all electronic signalling systems & Block circuits and
earthing of cable armour at both ends.
• Tightening of terminals used for jfnnecting cables, equipments, wiring etc.
• Ensure adequate spares of all safety and vital equipment.
• Take measures to reduce temperature inside location boxes in high temperature areas.

h. Lightning and Surge Protection System:

• Check all existing A,B,C and D type protections available for their effectiveness and
replace ineffective ones.
• Earths connected to these devic ., .:hould be less than 1 ohm.
• Earth pits to be periodical!y w .ttO;~ure low earth values.
• Type A, B, C and D tY@} . ':;. .:!\iops should be provided in Lightening prone
wtiere' sqCL
areas, especially in locatitSD incidences have occurred in the past.

~
(Arjun Singh Tomar)
Director (Signal)

PCSTE