This document provides an overview of plant maintenance in SAP S/4 HANA including key concepts like master data, technical objects, work centers, task lists, preventative maintenance plans, and order processing for breakdown and planned maintenance.

Uploaded by

Naveen Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views17 pages

PM 9.30 PM New

This document provides an overview of plant maintenance in SAP S/4 HANA including key concepts like master data, technical objects, work centers, task lists, preventative maintenance plans, and order processing for breakdown and planned maintenance.

Uploaded by

Naveen Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 17

SAP S/4 HANA PLANT MAINTENANCE

SAP S/4 HANA OVERVIEW

SAP ARCHITECTURE

SAP NAVIGATION
GUI -- GRAPHICAL USER INTERFACE

200 SANDBOX -- initial -- 40%

900 DEVELOPMENT -- INITIAL TESTING - 60%

800 QUALITY -- 100% -- USERS TESTING

700 PROD SERVER - LIVE

ECC – OLD

R1 ( REALTIME)

R2

R3

ECC

ECC EHP 6 7 8 ( ENHANCEMENT PACKAGE)

DATABASE – SYBASE – FREE

SAP ECC – CAN BE INSTALLED IN ANY DB

ERP CENTRAL COMPONENT

S/4 HANA - 2015

S/4 HANA – HANA DB – IMD ( IN MEMORY DATABASE)

RAM – 128.256,512…
ON PREMISE EDITION – OWN SERVER – FLEXIBILITY

ON PREMISE EDITION – RENTAL CLOUD - FLEXIBILITY

PUBLIC CLOUD

PRIVATE CLOUD

PREDEFINED ERP SUITE- BEST PRACTISE

BUSINESS ONE

ENTERPRISE STRUCTURE

MM - PLANT

MAINTAIN

MAINTENANCE PLANT – WHICH PLANT YOU’RE GOING

MAINTAIN

M1 – M1 – PUNE

M2 – M2 - PP

M3 – M2 -- CHENNAI
PLANNING PLANT

SPRO – SAP PROJECT REF OBJECT

SAP REF IMG – SAP REF IMPLEMENTATION GUIDE

MASTER DATA’S OF PM

TECHNICAL OBJECTS

MACHINE/CRANE/FORKLIFT/TOOLS

EQUIPMENT MASTER -- EVERY SINGLE ASSET

IE01/IE02/IE03

NUMBER RANGES

INTERNAL – RANGE- 10000 - 19999

EXTERNAL – CR001200

MDG – MASTER DATA GOVERNANCE

FUNCTIONAL LOCATION – IL01/IL02/IL03

WORK CENTER

TASK LIST
CATALOG

MEASURING POINTS

PERMITS

CRANE 200TON

PM – EQUIPMENT

FI - ASSET

ERECTION & COMMISSIONING

INTERNAL ORDER  ASSET  AUC

SETTLEMENT  AUC TO FIXED ASSET (DEP)

WC – 2LAB – PER/100

3HRS – 300 -- > CC------------FICO


1. KIA

2. KIA – SECTORA

3. KIA – SECTORA – DIV1

4. KIA – SECTORA – DIV1 – M1

XXX-XXXXXXN-NNNN-XX

KIA-SECTORA-DIV1-M1

X-BOTH LETTERS & NUMBERS

A-ONLY LETTERS

N- ONLY NUMERIC

S- SPECIAL CHAR,NUM,LETTERS
WORK CENTER – LABOUR – CR01/CR02/CR03

MACHINE/TOOL/MANPOWER/PLACE

TASK LIST

1. EQUIPM ENT – IA01

CRANE 100TO

A) DISMANTLE THE COVER

B) CHECK THE MOTOR & REPLACE

C) ASSY THE COVER

D) PAINTING & QUALITY CHECK

2. FUNCTIONAL LOCATION – IA11

FL – TASK LIST

3. GENERAL – IA05
BREAKDOWN MAINTENANCE

 CREATE A NOTIFICATION (MANUAL) – PRODUCTION

(IW21,22,23)

 DASHBOARD TO VIEW THE NOTIFICATION

 PRIORITIZE THE NOTIFICATIONS

 ALLOCATE A PERSON TO ANALYZE

 GET THE RESULT OF ANALYSIS – CLOSE MY

NOTIFICATION

 DECISION MAKING- YES / NO

 CONVERT NOTIFICATION TO ORDER

 ORDER SETUP

 RELEASE THE ORDER

 GET THE COMPONENTS FROM STORE (IF NEEDED)

 EXECUTE THE PROCESS/MAINTENANCE

 CONFIRMATION OF ORDER

 COMPLETE THE ORDER

 SETTLE THE ORDER


PREVENTIVE MAINTENANCE

SINGLE CYCLE PLAN – 30 days

STRATEGY BASED PLAN – 30 / 60 / 90

TIME BASED

PERFORMANCE BASED

COUNTER PLAN – 30 days or 2000kms and

MULTIPLE COUNTER

CALIBRATION

REFURBISHMENT
BOM – BILL OF MATERIALS

EQUIPMENT BOM – IB01/IB02/IB03

FUNCTIONAL LOCATION BOM – IB11/IB12/IB13

MATERIAL BOM – ASSEMBLY PARTS

CRANE -- BREAKDOWN

GEAR MOTOR

PUMP

SENSOR
SINGLE CYCLE PLAN

CRANE 100 TON – 60 DAYS

PLAN 1 – 60 DAYS

CRANE 100

CRANE 50

CRANE 25

CREATE A PLAN

SCHEDULE

FREQUENCY OF PLAN EXPLODE

AUTO NOTIFICATIONS/ORDER

ORDER RELEASE

PICK THE COMPONENTS

CONFIRMATION

CLOSE
STRATEGY BASED PLAN

SINGLE CYCLE PLAN – 30 DAYS

EQUIPMENTS …..

MULTIPLE SINGLE CYCLE PLAN

30 DAYS – ENGINE OIL

60 DAYS – GEAR OIL

90 DAYS – HRADAULIC OIL

CREATE A STRATEGY

CREATE A PLAN + STRATEGY

SCHEDULE

FREQUENCY OF PLAN EXPLODE

AUTO NOTIFICATIONS/ORDER

ORDER RELEASE

PICK THE COMPONENTS

CONFIRMATION

CLOSE
COUNTER BASED

CREATE A CYCLE SET – IP11Z

CHRACTERISTICS

MEASURING POINT

CREATE A PLAN + CYCLE SET

SCHEDULE

FREQUENCY OF PLAN EXPLODE

AUTO NOTIFICATIONS/ORDER

ORDER RELEASE

PICK THE COMPONENTS

CONFIRMATION

CLOSE
CALIBRATION IN PLANT MAINTENANCE

MIC – MASTER INSPECTION CHARACTERISTICS – QS21

TASK LIST – MAP MIC

CREATE A PLAN

SCHEDULING

GET THE ORDER

RELEASE

QUALITY INSPECTION

RESULT RECORDING

USAGE DECISION

CLOSE THE ORDER


QUANTITATIVE – MEASURE

LENGTH – 10M TO 25M

QUALITATIVE – VISUAL INSPECTION

GREEN COLOUR

SQUARE SHAPE
REFURBISHMENT IN SAP PM

MATERIAL – SPLIT VALUATION TO ACTIVATE

MOTOR – 5 NOS

1 NO – NEW ITEM (500)

3 NO – DAMAGED ITEM (100)

1 NO – REFURBISHED ITEM (250)

SPLIT VALUATION CONFIGURATION

1) ORDER 1 : NEW ITEM INTO DAMAGED ITEM

2) ORDER 2: REFURBISHED ORDER – DAMAGED TO

REFURBISHED

You might also like