0% found this document useful (0 votes)
34 views20 pages

PM 3PM

The document provides an overview of SAP S/4 HANA plant maintenance. It discusses SAP introduction, SAP S/4 HANA live projects, master data in SAP PM including equipment, functional locations, and work centers. It also covers breakdown maintenance, preventive maintenance including single cycle plans, strategy based plans and time based plans.

Uploaded by

Naveen Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views20 pages

PM 3PM

The document provides an overview of SAP S/4 HANA plant maintenance. It discusses SAP introduction, SAP S/4 HANA live projects, master data in SAP PM including equipment, functional locations, and work centers. It also covers breakdown maintenance, preventive maintenance including single cycle plans, strategy based plans and time based plans.

Uploaded by

Naveen Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 20

SAP S/4 HANA PLANT MAINTENANCE

 SAP S/4 HANA INTRODUCTION

SAP  SYSTEM APPLICATIONS PRODUCTS IN DATA PROCESSING

ERP TOOLS  ENTERPRISE RESOURCE PLANNING

ORACLE/MICROSOFT/JD-EDWARDS…

SAP  ROLL ROYZE  BRAND  MIN 6 >5Y (MIN 1CR >>>) 3CR

4YEARS WITH 1 END TO END

ORACLE  HONDA  6MON (MAX 1CR) > 10Y WITH 5 PROJECTS

ECC – ERP CENTRAL COMPONENT  SYBASE

S/4 HANA  SAP BUSINESS SUITE 4 HIGH PERFORMANCE ANALYTIC


APPLICANCE  HANA DB
 SAP S/4 HANA LIVE PROJECTS

1. GREEN FIELD IMPLEMENTATION – FRESH (E2E)


2. BROWN FIELD IMPLEMENTATION -- RESTART
3. ROLL OUT -- EXTENTION
4. SUPPORT – ONLINE/OFFLINE
5. MIGRATION – UPGRADTION

IMPLEMENTATION PARTNER  IMPLEMENTATION CHARGES

TEAM

FUNCTIONAL CONSULTANT  PM/PP/MM/FICO/SD

TECHNICAL CONSULTANT  ABAP/BASIS/FIORI.

PM CONSULTANT???

IMPLEMENTATION METHODOLOGY

 ASAP METHODOLOGY (ECC)


1. PROJECT PREPARATION
2. BLUEPRINT
3. CONFIGURATION
4. UAT
5. GO-LIVE

 ACTIVATE METHODOLOGY (S/4)


1. PREPARE
2. REALIZE
3. EXPLORE
4. DEPLOY
 SAP S/4 HANA ARCHITECTURE
 SAP S/4 HANA NAVIGATION & TOOLS

CUSTOMER BUYS SAP

SOFTWARE  FREE TILL ECC !!!

S/4 HANA  IMD  RAM

RAM – HANA DB  IMD  RAM  128/256/512/1TB…

ECC  SYBASE (FREE)

SYBASE DOESN’T GO WELL !!!

SAP ECC  WE CAN USE ANY DB (ORACLE/AMAZON)

LATE 2015…

S/4 HANA  HANA DATABASE  NO FREE  IMD PAY


SAP RELEASES

EVOLUTION
SAP ECC & S/4 HANA ARCHITECTURE
SAP S/4 NAVIGATION & TOOLS

PC  LOADING SAP INTO IT  700GB

GUI  GRAPHICAL USER INTERFACE

PC/LAPTOP  TOOL  1GB

MULTIPLE CONNECTIONS 

FIORI APPS  WEB BASED TOOL  URL

PC/LAPTOP/TABLET/SMARTPHONES

CONFIGURATION

SANDBOX1

SANDBOX2

900 DEVELOPMENT SERVER  ROUGH NOTE  40%

800 QUALITY SERVER  40% >>>>80%>>>90-100%

600 PRODUCTION SERVER  100%


ENTERPRISE STRUCTURE OF SAP PM

SPRO  SAP PROJECT REFERENCE OBJECT

SAP REF IMG  SAP REF IMPLEMENTATION GUIDE


ABC GROUP OF COMPANIES

MAINTENANCE PLANTS

PLANT A  MACHINES/CRANES/GENSETS…

PLANT B  WAREHOUSE

PLANT C  PRODUCTIVE MACHINES

PLANNING PLANT
MASTER DATA IN SAP PM

 EQUIPMENT MASTER - IE01(CREAE)/IE02(CHANGE)/IE03(DISPLAY

MACHINE/CRANE/MACHINERIES

CNC --> MANY PROD ---BREAKDOWN

INTERNAL -- 100004 TO 1999999

EXTERNAL --- NOT APPLICABLE

 FUNCTIONAL LOCATION -- IL01/IL02/IL03

PLACE TO HAVE MACHINES

ROLL ROYZE

ROLL ROYZE - PLANTA

ROLL ROYZE - PLANTA - DIVISION1

ROLL ROYZE - PLANTA - DIVISION1- MACHINE

XXXX-XXN-XXXX-XXXXSS

RR01

X- BOTH LETTERS & NUMBERS

A- ONLY LETTERS

N- NUMERIC/NUMBER

S-NUMBERS/LET/SPECIAL CHAR
NOTIFICATION -- PP

DASHBOARD

CREATE A ORDER

PARTS/TOOLS CARRY

WORKCENTER -- CAPACITY + COST

CONFIRMATION

CLOSE THE ORDER


PM MASTER DATA’S

EQUIPMENT

FUNCTIONAL LOCATION

WORKCENTER -- CR01/CR02/CR03

 PASS TO COST CENTER  FINANCE

LABOURS  2  COST  PER HOUR COST  100  200

CNC -- 2

HMC – 3BBBBBBBBBBBBBB

VMC-- 1

TASK LIST –

EQUIPMENT TASK LIST

FUNCTIONAL LOCATION TASK LIST

GENERAL TASK LIST

SEQ OF OPERATION TO PERFORM

MACHINE A – TASK LIST

PREVENTIVE MAINTENACE

1) CHECK THE TEMPERATURE


2) CHECK THE RUNNING TIME
3) CHECK THE WIRING
4) CLEAN THE MACHINE

CATALOG

MEASURING POINT

PERMIT
TASK LIST

 EQUIPMENT TASK LIST – IA01


 FUNCTIONAL LOCATION TASK LIST – IA11
 GENERAL TASK LIST – IA05

BREAKDOWN MAINTENANCE

1. CREATE A NOTIFICATION – PP (IW21)


2. NOTIFICATION DASHBOARD – PLANNING GUY (IW28)
3. PRIORITY
4. VISIT THE MACHINE FIR
5. IF SERIOUS  CREATE OF ORDER / IF NOT SERIOUS 
COMPLETE THE NOTIFICATION
6. SETUP THE ORDER
7. TASK/COMPONENTS…(RESERVATION)
8. GET THE COMPONENTS FROM STORE
9. START THE BREAKDOWN MAITENANCE
10.CONFIRMATION – IW41
11.COMPLETE THE ORDER
12.SETTLE THE ORDER

----------------------------50%-----------------------------------------------
ASSIGNMENT

ENTERPRISE STRUCTURE

MASTER DATA’S

BREAKDOWN

PREVENTIVE MAINTENANCE

SINGLE

STRATEGY

TIME
PREVENTIVE MAINTENANCE

 SINGLE CYCLE PLAN – IP41

CAR – 30DAYS  MULTIPLE EQUIPMENTS

CREATE A PLAN – IP41

SCHEDULE RUN – IP10

NOTIFICATION

ORDER

RELEASE

GET THE MATERIAL FROM STORE

START THE MAINTENANCE

CONFIRMATION

CLOSE
 STRATEGY BASED PLAN

SINGLE – 30/60/90

STRATEGY – 30+60+90+120

CREATE A STRATEGY – IP11

CREATE A PLAN (STRATEGY) – IP42

TASK LIST - STRATEGY

SCHEDULING

NOTIFICATION

ORDER

RELEASE

GET THE MATERIAL FROM STORE

START THE MAINTENANCE

CONFIRMATION

CLOSE
 TIME BASED PLAN

 CONDITION BASED PLAN

 PERFORMANCE BASED PLAN

 COUNTER PLAN

 MULTIPLE COUNTER PLAN

 CALIBRATION

 REFURBISHMENT
MEASURING POINT  AT WHAT TIME TO MEASURE

MEASURING DOC  RECORD OF DOC

CALIBRATION IN SAP PM

EQUIPMENT – MACHINES

EQUIPMENT --- TOOLS

MIC – MASTER INSPECTION CHARACTERISTICS (QS21)

TASK LIST

PLANNING

SCHEDULING

CREATE A ORDER

RELEASE

QUALITY INSPECTION

RESULT RECORDING

USAGE DECISION

COME TO WORK
QUANTITATTIVE –

TOOL – 30M TO 40M  41M

QUALITATIVE  VISUAL INSPECTION

TOOL  YELLOW

REFURBISHMENT IN SAP PM

NEW ITEM

DAMAGED ITEM

REFURBISHED ITEM

MATERIAL  SPLIT VALUATION ACTIVE

CONFIGURE THE SPLIT VALUATION

ORDER1: NEW ITEM INTO DAMAGED ITEM

ORDER2: DAMAGED ITEM INTO REFURBISHED ITEM

REFURBISHMENT ORDER

You might also like