High Voltage Equipment Project
High Voltage Equipment Project
                                                                                                                         D
            VOLTAGE EQUIPMENT INCLUDING SECONDARY DEVICES (NAGA AND PITOGO SUBSTATIONS) AND
            MINDANAO SUBSTATION EXPANSION 3 PROJECT, DESIGN, SUPPLY, INSTALLATION, TESTING AND
               COMMISSIONING OF POWER TRANSFORMER AND ASSOCIATED HIGH VOLTAGE EQUIPMENT
                                                                                                          VE
              INCLUDING SECONDARY DEVICES (PITOGO SUBSTATION) - Sp21.MSE4P(III)&ZPVIP(II).Mt- 0544
                                                                                              O
                                                                                                                                                                     APPROVED                             NOTED/INFO/REFERENCE
                                                                          PR
                                                                                                                                                                               AWCI                         RETURNED W/O ACTION
RECOMMENDED:
                                                                                                                                                                                                         APPROVED:
                                                      AP
                                                      NO.                     DWG TITLE
                                                                                                                              Approval of the Contractor's drawings shall not be held to relieve the Contractor or any part
                                                                                                                              of the Contractor's obligations to meet the requirements of the Specifications nor of the
                                                                                                                              responsibility for the correctness of the Contractor's drawings.
                                                      1     145kV Voltage Transformer -Cover Sheet
                                                      2     145kV Voltage Transformer -Outline with civil guide                                                      FOR APPROVAL
                                                                                                                             OWNER:
                                                                                                                                                                                     NATIONAL GRID CORPORATION
                                                      3     145kV Voltage Transformer -Nameplate                                                                                          OF THE PHILIPPINES
                                                                                                                                                                                                   NGCP Building, Power Center Complex
4 145kV Voltage Transformer -Primary terminal Quezon Avenue cor BIR Road, Diliman, Quezon City
CONTRACTOR:
                                                      5     145kV Voltage Transformer -Secondary terminal box                                                                             NEW NORTHEAST ELECTRIC GROUP HIGH
                                                                                                                                                                                             VOLTAGE SWITCHGEAR CO., LTD.
                                                      6     145kV Voltage Transformer -Diagram of Electrical Principle
                                                                                                                             SUPPLIER/MANUFACTURER:
                                                                                                                                                                                 SIEYUAN ELECTRIC CO., LTD.
                                                      7     145kV Voltage Transformer-Bushing                                                Sieyuan                             (No.3399, Huaning Road, Minhang Dist, Shanghai, China)
                                                      8     145kV Voltage Transformer-Shipping dimensions and weight         PROJECT NAME:
                                                                                                                             MINDANAO SUBSTATION EXPANSION 4 PROJECT, SCHEDULE III - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF HIGH VOLTAGE
                                                                                                                             EQUIPMENT INCLUDING SECONDARY DEVICES (NAGA, POLANCO, AGUS 6 AND MARAMAG SUBSTATIONS) AND ZAMBOANGA PENINSULA VOLTAGE IMPROVEMENT
                                                                                                                             PROJECT, SCHEDULE II - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CAPACITOR BANKS AND ASSOCIATED HIGH VOLTAGE EQUIPMENT
                                                                                                                             INCLUDING SECONDARY DEVICES (NAGA AND PITOGO SUBSTATIONS) AND MINDANAO SUBSTATION EXPANSION 3 PROJECT, DESIGN, SUPPLY, INSTALLATION,
                                                                                                                             TESTING AND COMMISSIONING OF POWER TRANSFORMER AND ASSOCIATED HIGH VOLTAGE EQUIPMENT INCLUDING SECONDARY DEVICES (PITOGO
                                                                                                                             SUBSTATION)
                                                                                                                             -Sp21.MSE4P(III)&ZPVIP(II).Mt- 0544
                                                                                                          1     0.115-0.0664kV                                                                                    AGUS 6
                                                                                                                                                                                            1+1pcs
                                                                                                                0.2/0.2/0.2                                                                                       SUBSTATION
                                                                                                                12.5/12.5/12.5VA
                                                                                                                                                                                                                  MARAMAG
                                                                                                                                                                                             3+1pcs
                                                                                                                                                                                                                  SUBSTATION
                                                                                                                                                                                                                  PITOGO
                                                                                                                                                                                             3+1pcs
                                                                                                                                                                                                                  SUBSTATION
                                                                        D
                                                                Ampacity for terminal pad:990A
                                                                Material:Aluminum
                                                            VE
                                                                           H
                                                                          1:5
                                                            (Dimension of Earthing Terminal)
                                                                                    t12
                                                           O
                                                                                                                                                               APPROVED                             NOTED/INFO/REFERENCE
                                                       PR
                                                                                                                                                                         AWCI                         RETURNED W/O ACTION
RECOMMENDED:
                                                                                                                                                                                                   APPROVED:
                                                      AP
                                                                                                                       Approval of the Contractor's drawings shall not be held to relieve the Contractor or any part
                                                                                                                       of the Contractor's obligations to meet the requirements of the Specifications nor of the
                                                                   Rated voltage:138kV                                 responsibility for the correctness of the Contractor's drawings.
PROJECT NAME:
                                                                   Shipping weight:362kg(1 pcs)                        MINDANAO SUBSTATION EXPANSION 4 PROJECT, SCHEDULE III - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF HIGH VOLTAGE
                                                                                                                       EQUIPMENT INCLUDING SECONDARY DEVICES (NAGA, POLANCO, AGUS 6 AND MARAMAG SUBSTATIONS) AND ZAMBOANGA PENINSULA VOLTAGE IMPROVEMENT
                                                                                                                       PROJECT, SCHEDULE II - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CAPACITOR BANKS AND ASSOCIATED HIGH VOLTAGE EQUIPMENT
                                                                                                                       INCLUDING SECONDARY DEVICES (NAGA AND PITOGO SUBSTATIONS) AND MINDANAO SUBSTATION EXPANSION 3 PROJECT, DESIGN, SUPPLY, INSTALLATION,
                                                                                                                       TESTING AND COMMISSIONING OF POWER TRANSFORMER AND ASSOCIATED HIGH VOLTAGE EQUIPMENT INCLUDING SECONDARY DEVICES (PITOGO
                                                                                                                       SUBSTATION)
                                                                                                                       -Sp21.MSE4P(III)&ZPVIP(II).Mt- 0544
30
                      R4
                                                      IEC 61869-5: 2015
                                                                                 D
                                                                                                  Note:
                                                                                                  1. All texts/writings shall be engraved and painted in
                                                                                110
                                                                                      117
                                                                                            125
                                                                                                   permanent black ink.
                                                                               VE
                                                                                                  2. Nameplate material shall be Grade 316 Stainless Steel.
                                                                                                  3. Confirm to fill before shipment Date, Serial No., C, C1, C2, etc.
                                                                           O
                                                                                                                                                                APPROVED                             NOTED/INFO/REFERENCE
                                                                          PR
                                                                                                                                                                          AWCI                         RETURNED W/O ACTION
145 SECTION
152 RECOMMENDED:
                                                                 160                                                                                                                                APPROVED:
                                                        AP
                                                                                                                         Approval of the Contractor's drawings shall not be held to relieve the Contractor or any part
                                                                                                                         of the Contractor's obligations to meet the requirements of the Specifications nor of the
                                                                                                                         responsibility for the correctness of the Contractor's drawings.
                                                                                                                                                                FOR APPROVAL
                                                                 152                                                    OWNER:
                                                                                                                                                                                NATIONAL GRID CORPORATION
                                                                                                                                                                                     OF THE PHILIPPINES
                                                                                                                                                                                              NGCP Building, Power Center Complex
                                                                                                                                                                                         Quezon Avenue cor BIR Road, Diliman, Quezon City
CONTRACTOR:
                                                                                                                        PROJECT NAME:
                       10
                                                                                                                        MINDANAO SUBSTATION EXPANSION 4 PROJECT, SCHEDULE III - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF HIGH VOLTAGE
                                                                                                                        EQUIPMENT INCLUDING SECONDARY DEVICES (NAGA, POLANCO, AGUS 6 AND MARAMAG SUBSTATIONS) AND ZAMBOANGA PENINSULA VOLTAGE IMPROVEMENT
                                                                                                                        PROJECT, SCHEDULE II - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CAPACITOR BANKS AND ASSOCIATED HIGH VOLTAGE EQUIPMENT
                                                                                                                        INCLUDING SECONDARY DEVICES (NAGA AND PITOGO SUBSTATIONS) AND MINDANAO SUBSTATION EXPANSION 3 PROJECT, DESIGN, SUPPLY, INSTALLATION,
                                                                                                                        TESTING AND COMMISSIONING OF POWER TRANSFORMER AND ASSOCIATED HIGH VOLTAGE EQUIPMENT INCLUDING SECONDARY DEVICES (PITOGO
                                                                                                                        SUBSTATION)
                                                                                                                        -Sp21.MSE4P(III)&ZPVIP(II).Mt- 0544
                                                                                                                      Fz=1000N
                            t15
                         Aluminum
Fx=1250N
                                                                                D
                                                                    VE
                                                                                    Fy=1000N
                                                              O
                                                                                                                                APPROVED                             NOTED/INFO/REFERENCE
                                                       PR
                                                                                                                                          AWCI                         RETURNED W/O ACTION
RECOMMENDED:
                                                                                                                                                                    APPROVED:
                                                      AP
                                                                                         Approval of the Contractor's drawings shall not be held to relieve the Contractor or any part
                                                                                         of the Contractor's obligations to meet the requirements of the Specifications nor of the
                                                                                         responsibility for the correctness of the Contractor's drawings.
                                                                                                                                FOR APPROVAL
                                                                                        OWNER:
                                                                                                                                                NATIONAL GRID CORPORATION
                                                                                                                                                     OF THE PHILIPPINES
                                                                                                                                                              NGCP Building, Power Center Complex
                                                                                                                                                         Quezon Avenue cor BIR Road, Diliman, Quezon City
CONTRACTOR:
PROJECT NAME:
MINDANAO SUBSTATION EXPANSION 4 PROJECT, SCHEDULE III - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF HIGH VOLTAGE
                               Ampacity for terminal pad:990A,NEMA 4-HOLE,              EQUIPMENT INCLUDING SECONDARY DEVICES (NAGA, POLANCO, AGUS 6 AND MARAMAG SUBSTATIONS) AND ZAMBOANGA PENINSULA VOLTAGE IMPROVEMENT
                                                                                        PROJECT, SCHEDULE II - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CAPACITOR BANKS AND ASSOCIATED HIGH VOLTAGE EQUIPMENT
                                                                                        INCLUDING SECONDARY DEVICES (NAGA AND PITOGO SUBSTATIONS) AND MINDANAO SUBSTATION EXPANSION 3 PROJECT, DESIGN, SUPPLY, INSTALLATION,
                                                                                        TESTING AND COMMISSIONING OF POWER TRANSFORMER AND ASSOCIATED HIGH VOLTAGE EQUIPMENT INCLUDING SECONDARY DEVICES (PITOGO
                                                                                        SUBSTATION)
                                                                                        -Sp21.MSE4P(III)&ZPVIP(II).Mt- 0544
Note: APPROVED:
                                                                                        CHECKED:
                                                                                                         CHR
                                                                                                         ZY
                                                                                                                                        DATE:
                                                                                                                                        05/16/2022
                                                                                                                                        DATE:
                                                                                                                                                                                  -Primary Terminal
                                                                               A
                                                                    M6
                                                                                       D
                                                                                      VE
                                                        B                                                                                                               Stainless steel
                                                                                                                                                                         /
                    Holes are to be
                    drilled ON-SITE                                                            NO.   Description                                 Quantity                       Material
                                                         295
                                                                             O
                                                      150
APPROVED NOTED/INFO/REFERENCE
                                                                    PR
                                                                                                                                                        AWCI                         RETURNED W/O ACTION
90
SECTION
                                                                                                                                                                                  RECOMMENDED:
                                    85
                                                                                                                                                                                  APPROVED:
                                                            AP
                                                      176                                              Approval of the Contractor's drawings shall not be held to relieve the Contractor or any part
                                                                                                       of the Contractor's obligations to meet the requirements of the Specifications nor of the
                                                                                                       responsibility for the correctness of the Contractor's drawings.
                                                                                                                                              FOR APPROVAL
                                                                                                      OWNER:
                                                                                                                                                              NATIONAL GRID CORPORATION
                                                                                                                                                                   OF THE PHILIPPINES
                                                                                                                                                                            NGCP Building, Power Center Complex
                                                                                                                                                                       Quezon Avenue cor BIR Road, Diliman, Quezon City
CONTRACTOR:
                                                                                                      MINDANAO SUBSTATION EXPANSION 4 PROJECT, SCHEDULE III - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF HIGH VOLTAGE
                                                                                                      EQUIPMENT INCLUDING SECONDARY DEVICES (NAGA, POLANCO, AGUS 6 AND MARAMAG SUBSTATIONS) AND ZAMBOANGA PENINSULA VOLTAGE IMPROVEMENT
                                                                                                      PROJECT, SCHEDULE II - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CAPACITOR BANKS AND ASSOCIATED HIGH VOLTAGE EQUIPMENT
       4. Removable gland Plate is suitable for 1-75mm diameter conduit glands.                       INCLUDING SECONDARY DEVICES (NAGA AND PITOGO SUBSTATIONS) AND MINDANAO SUBSTATION EXPANSION 3 PROJECT, DESIGN, SUPPLY, INSTALLATION,
                                                                                                      TESTING AND COMMISSIONING OF POWER TRANSFORMER AND ASSOCIATED HIGH VOLTAGE EQUIPMENT INCLUDING SECONDARY DEVICES (PITOGO
                                                                                                      SUBSTATION)
                                                                                                      -Sp21.MSE4P(III)&ZPVIP(II).Mt- 0544
                                                                    A - High-voltage terminal
                (Diagram of Electrical Principle)                   C1 - High-voltage capacitor
                                                                    C2 - Intermediate-voltage capacitor
            A
                                                      T             N - Low-voltage terminal of a capacitor divider
                                                              1a1
                                                                                  D
      C1                                                            E - Earth terminal
                                                              1a2   F - Protective gap
                                                          Z
                                                                         VE
                                                              1n    L - Compensation reactor
     C2                                                       2a1   T - Intermediate transformer
                                     L                        2a2   P1 P2 - Protective gap terminal
                                                                    O
                                                                    R - Protective resistance
              R                                               2n
     N                                                              1a1 1a2 1n - Secondary winding                                              APPROVED                             NOTED/INFO/REFERENCE
3a1
                                                              PR
                                                                                                                                                          AWCI                         RETURNED W/O ACTION
                     F                                              2a1 2a2 2n - Secondary winding
             P1            P2                                 3a2                                                                                               RFC                            FOR CONSTRUCTION
E 3n RECOMMENDED:
                                                                                                                                                FOR APPROVAL
                                                                                                        OWNER:
                                                                                                                                                                NATIONAL GRID CORPORATION
                                                                                                                                                                     OF THE PHILIPPINES
                                                                                                                                                                              NGCP Building, Power Center Complex
                                                                                                                                                                         Quezon Avenue cor BIR Road, Diliman, Quezon City
CONTRACTOR:
PROJECT NAME:
                                                                                                        MINDANAO SUBSTATION EXPANSION 4 PROJECT, SCHEDULE III - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF HIGH VOLTAGE
                                                                                                        EQUIPMENT INCLUDING SECONDARY DEVICES (NAGA, POLANCO, AGUS 6 AND MARAMAG SUBSTATIONS) AND ZAMBOANGA PENINSULA VOLTAGE IMPROVEMENT
                                                                                                        PROJECT, SCHEDULE II - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CAPACITOR BANKS AND ASSOCIATED HIGH VOLTAGE EQUIPMENT
                                                                                                        INCLUDING SECONDARY DEVICES (NAGA AND PITOGO SUBSTATIONS) AND MINDANAO SUBSTATION EXPANSION 3 PROJECT, DESIGN, SUPPLY, INSTALLATION,
                                                                                                        TESTING AND COMMISSIONING OF POWER TRANSFORMER AND ASSOCIATED HIGH VOLTAGE EQUIPMENT INCLUDING SECONDARY DEVICES (PITOGO
                                                                                                        SUBSTATION)
                                                                                                        -Sp21.MSE4P(III)&ZPVIP(II).Mt- 0544
-3
                                                                                                       -3
                   0
                                                                                                       0
                                                                                                   D
                                                                                      VE
                                                                        1139
                                                                               O
                                                                                                                                                    APPROVED                             NOTED/INFO/REFERENCE
                                                                 PR
                                                                                                                                                              AWCI                         RETURNED W/O ACTION
RECOMMENDED:
                                                                                                                                                                                        APPROVED:
                                     Note:
                                                      AP
                                     1. Lightning Impulse withstand voltage: 650kV                           Approval of the Contractor's drawings shall not be held to relieve the Contractor or any part
                                                                                                             of the Contractor's obligations to meet the requirements of the Specifications nor of the
2. Power frequency withstand voltage: 275kV responsibility for the correctness of the Contractor's drawings.
PROJECT NAME:
                                                                                                            MINDANAO SUBSTATION EXPANSION 4 PROJECT, SCHEDULE III - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF HIGH VOLTAGE
                                                                                                            EQUIPMENT INCLUDING SECONDARY DEVICES (NAGA, POLANCO, AGUS 6 AND MARAMAG SUBSTATIONS) AND ZAMBOANGA PENINSULA VOLTAGE IMPROVEMENT
                                                                                                            PROJECT, SCHEDULE II - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CAPACITOR BANKS AND ASSOCIATED HIGH VOLTAGE EQUIPMENT
                                                                                                            INCLUDING SECONDARY DEVICES (NAGA AND PITOGO SUBSTATIONS) AND MINDANAO SUBSTATION EXPANSION 3 PROJECT, DESIGN, SUPPLY, INSTALLATION,
                                                                                                            TESTING AND COMMISSIONING OF POWER TRANSFORMER AND ASSOCIATED HIGH VOLTAGE EQUIPMENT INCLUDING SECONDARY DEVICES (PITOGO
                                                                                                            SUBSTATION)
                                                                                                            -Sp21.MSE4P(III)&ZPVIP(II).Mt- 0544
                                                                                            D
                                                                                                10. Storage place: (Indoor with controlled temperature/
                                                                                                Outdoor with cover)
                                                                                           VE
                                                                                       O
                                                                                                                                                    APPROVED                             NOTED/INFO/REFERENCE
                                                                                      PR
                                                                                                                                                              AWCI                         RETURNED W/O ACTION
RECOMMENDED:
                                                                                                                                                                                        APPROVED:
                                                        AP
                                                                                                             Approval of the Contractor's drawings shall not be held to relieve the Contractor or any part
                                                      Coinciding with the direction                          of the Contractor's obligations to meet the requirements of the Specifications nor of the
                                                                                                             responsibility for the correctness of the Contractor's drawings.
                                                                                                                                                    FOR APPROVAL
                                                                                                            OWNER:
                                                                                                                                                                    NATIONAL GRID CORPORATION
                                                                                                                                                                         OF THE PHILIPPINES
                                                                                                                                                                                  NGCP Building, Power Center Complex
                                                                                                                                                                             Quezon Avenue cor BIR Road, Diliman, Quezon City
CONTRACTOR:
PROJECT NAME:
                                                                                                            MINDANAO SUBSTATION EXPANSION 4 PROJECT, SCHEDULE III - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF HIGH VOLTAGE
                                                                                                            EQUIPMENT INCLUDING SECONDARY DEVICES (NAGA, POLANCO, AGUS 6 AND MARAMAG SUBSTATIONS) AND ZAMBOANGA PENINSULA VOLTAGE IMPROVEMENT
                                                                                                            PROJECT, SCHEDULE II - DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CAPACITOR BANKS AND ASSOCIATED HIGH VOLTAGE EQUIPMENT
                                                                                                            INCLUDING SECONDARY DEVICES (NAGA AND PITOGO SUBSTATIONS) AND MINDANAO SUBSTATION EXPANSION 3 PROJECT, DESIGN, SUPPLY, INSTALLATION,
                                                                                                            TESTING AND COMMISSIONING OF POWER TRANSFORMER AND ASSOCIATED HIGH VOLTAGE EQUIPMENT INCLUDING SECONDARY DEVICES (PITOGO
                                                                                                            SUBSTATION)
                                                                                                            -Sp21.MSE4P(III)&ZPVIP(II).Mt- 0544
                                                                              D
                                                       VE
                                           O
                       PR
   AP