List of Ongoing Projects Along with Source of Fund
Source of Fund
(State
Sl. Remar
Name of ongoing Projects NIT No. Plan/BRGF/PSDF/
No. ks
IRF/Special
Assistance etc)
Supply, erection, testing and commissioning
of Reliable communication and Data
79/PR/BSPTCL/
1. Acquisition for implementation of Integrated State Plan (80:20)
2018
Communication system upto 132 KVin Bihar
with AMC for 6 years
Construction of 03 Nos. of 132/33 KV
122/PR/BSPTCL
2. Transformer Bays in Biharsharif&Dehri-on- State Plan (80:20)
/2018
sone Transmission Circle on turnkey basis
Construction of 04 Nos of 132KV Line Bays
with SAS and construction of Switchyard 01/PR/BSPTCL/
3. State Plan (80:20)
Panel Room at 400/220/132KV GSS Saharsa 2021
(New) on turnkey basis
Construction of following on turnkey basis
under IRF (i) Construction of 01 Nos. of
132/33 KV Transformer bays each at GSS
Nirmali& GSS Rosera (ii) Construction of 01 46/PR/BSPTCL/
4. IRF
No. 220/132 KV transformer bay at GSS 2021
Pusauli& (iii) Construction of new
transformer foundation for 50 MVA Power
Transformer at 03 locations for transformers
Supply, Erection, Testing & Commissioning
of DLMS compliant 0.2s class ABT type
energy meter with implementation of 100%
metering, data acquisition and online ABT 09/PR/BSPTCL/
5. Special Assistance
monitoring for the transmission & sub 2022
transmission substations up to 33 KV level,
monthly energy accounting and service
maintenance on Turnkey basis
Completion of leftover works for Capacity
augmentation of GSS Hajipur, Gopalganj & 51/PR/BSPTCL/
6. Special Assistance
Darbhanga by replacement of power 2022
transformers
Augmentation of existing 132/33KV GSS
36/PR/BSPTCL/
7. Ekma (1x20MVA + 1x50MVA) by 3x50 MVA State Plan (80:20)
2018
capacity
Construction of 220/132/33 KV (2x160
MVA+ 3x50 MVA) GSS, at Garaul (District- 39/PR/BSPTCL/
8. State Plan (80:20)
Vaishali) complete with SAS including 2018
residential quarters
9. Construction of 220 KV D/c transmission line 51/PR/BSPTCL/ State Plan (80:20)
from 220/132/33 KV GSS Chapra(New) 2018
,Amnour to 400/220 KV GSS Muzaffarpur
(PG) with Zebra conductor (line length –
Approx. 65 KM) & 132 KV D/c transmission
line from 220/132/33 KV GSS Chapra(New),
Amnour to 132/33 KV GSS Vaishali with
Panther conductor (line length- Approx 40
KM)
Construction of 02 Nos. 132 KV line bays 65/PR/BSPTCL/
10. State Plan (80:20)
each at GSS Muzaffarpur & GSS Vaishali 2018
Construction of 02 nos. of 220KV line bays at
76/PR/BSPTCL/
11. GSS Motipur& 02 Nos. of 132KV line bay at State Plan (80:20)
2018
GSS Runnisaidpur
Construction of LILO of one Ckt of 132 KV
D/C Kishanganj (Old)-Forbesganj 69/PR/BSPTCL/
12. State Plan (80:20)
Transmission line at Palasi GSS with ACSR 2018
Panther Conductor
Construction of (2x500MVA+2x160 MVA)
15/PR/BSPTCL/
13. 400/220/132 KV GIS New Substation State Plan (80:20)
2019
Bakhtiyarpur
Construction of (2x200 MVA+ 3x50 MVA)
40/PR/BSPTCL/
14. 220/132/33 KV GSS, Raxaul (District-East State Plan (80:20)
2018
Champaran)
Construction of Following GIS bays on
turnkeybasis.-
1) 02 nos of 220KV GIS bays at GSS 44/PR/BSPTCL/
15. State Plan (80:20)
Dumraon (BGCL). 2021
2) 01 no of 220KV GIS bay at Darbhanga
(DMTCL).
Construction of 220 KV double circuit
transmission line from GSS Begusarai to
IOCL BarauniRefinery (15 RKM) partly on
40/PR/BSPTCL/
16. monopole tower and shifting of 4 nos. of 220 Deposit head
2020
KV Towers of existing transmission line
required for M/s IOCL on M/C monopole
Towers
Construction of 2 nos. of 220 KV line Bay,
demolish of old quarters & construction of
new quarters along with extension of control 24/PR/BSPTCL/
17. Deposit head
room and associated civil works at 220 KV 2020.
GSS Begusarai under deposit scheme of
IOCL
Construction of 132KV D/C Raxaul (New)
toRaxaul (old) Transmission line (Line
length-20 RKM), 2nd Ckt Stringing of 132 05/PR/BSPTCL/
18. MEA
KV Raxaul(Old) -Parwanipur line (07 RKM) 2021
& construction of 2 nos. 132 KV Line Bays at
220/132/33 KV GSS Raxaul
Re-conductoring of 12 Nos. 132 KV 14/PR/BSPTCL/ Special Assistance
19.
Transmission Lines with HTLS equivalent to 2022 to States for Capital
ACSR Panther conductor Investment for
2022-23.
Construction of 02 x 50 MVA 132/33 KV
37/PR/BSPTCL/
20. GSS Palasi with residential quarters. (Dist. – State Plan (80:20)
2018
Araria ) under State Plan
Construction of 02 nos. 132 KV line bays at
GSS Phulparas and 02 nos.132KV line bays 63/PR/BSPTCL/
21. State Plan (80:20)
at GSS Laukahi on turnkey basis under State 2018
Plan against NIT No:-63/PR/BSPTCL/2018
Construction of 132 KV D/C Tr. line by
(Line Length-31 RKM) making LILO
arrangement of 132 KV DCSS Benipatti-
Pupri Tr. line at Sitamarhi (New) GSS 71/PR/BSPTCL/
22. State Plan (80:20)
& Construction of LILO of Both circuit of 2018
Bettiah- Raxaul ,132 KV DC Tr. line at
Raxaul (New) GSS (Length-10 RKM)
Construction of 132 KV D/C transmission
line with 05 Nos. of Pile foundations for
river crossing (Koshi) (Route length-03RKM)
04/PR/BSPTCL/ Deposit head of
23. required for 33 KV feeder from 132/33 KV
2020 NBPDCL
SimriBakhtiyarpur GSS to U/C ALANI PSS
(Block-Salkhua) at Saharsa District under
deposit head.
(i) Construction of (2x160MVA+3x50 MVA),
220/132/33KVGSS, Tajpur (Dist.-
Samastipur) with SAS including Residential
Quarters.
(ii) Construction of (2x160MVA+3x50
MVA), 220/132/33KV GSS, Thakurganj
(Dist.-Kishanganj) with SAS including 49/PR/BSPTCL/
24. State Plan (80:20)
Residential 2022
Quarters
(iii) Construction of 220 KV D/C
Transmission Line from PGCIL Banka to
BGCL Goradih with ACSR Zebra Conductor
(Line Length - 39 RKM).
Supply, Erection, Testing and Commissioning
Special Assistance
of 20 Nos. of 50MVA,132/33 KV, Power
40/PR/BSPTCL/ to States for Capital
25. Transformer and its associated Works by
2022 Investment for
Manufacturers in different GSSs of BSPTCL
2023-24.
under IRF head on turnkey basis
(1)Construction of 132KV D/C Murliganj-
Udakishanganj T/L with Panther Conductor
(LL-50 RKM), (2) Construction of LILO of
15/PR/BSPTCL/
26. one circuit of 132KV D/C Ramnagar- State Plan & BRGF
2021
Dhanaha T/L with ACSR Panther Conductor
(LL-40 RKM) at GSS Bagaha and (3)
Construction of LILO of both circuits of
132KV GIS Goradih -GSS Sabour T/L (LL-
25x2=50 RKM) at GSS Barari on turnkey
basis against NIT No.15/PR/BSPTCL/2021
under state plan.
1. Construction of 05 nos. of 132 KV
Transmission tower (including 03 nos. of pile
foundation) ,stringing with ACSR panther
conductor for crossing of 33 KV line from
GSS Ramnagar to PSS Chautarava over
Massan River near Dainmarwa Village and
33/PR/BSPTCL/
27. 2. Construction of 02 nos. of 132 KV Deposit Head
2021
Transmission tower , stringing with ACSR
panther conductor for crossing of 33 KV line
from GSS Ramnagar to PSS Bagaha over
Massan River near Juda Village on turnkey
basis under Deposit Head against NIT-
33/PR/BSPTCL/2021.
Restoration of 132 KV Kishanganj(New)
- Barsoi
38/PR/BSPTCL/
28. DCSS Transmission Line against NIT No IRF head
2020
- 38/PR/BSPTCL/2020 under IRF head.
132 KV Darbhanga-Phulparas
111/PR/BSPTCL
29. transmission Line with HTLS Conductor State Plan (80:20)
/2018
equivalent to panther.
Construction of 2x50MVA, 132/33KV
GSS Bhorey (Dist. Gopalganj) with
Construction of associated 02nos. 132KV
Line bays at GSS Hathua& Construction 10/PR/BSPTCL/
30. State Plan
of its associated 132KV D/C Bhorey- 2023
Hathua Tr. Line with ACSR Panther
Conductor (Line lengh-60RKM)
Construction of 4 Nos of 220 KV GIS bays
16/PR/BSPTCL/
31. and 4 nos of 132 KV GIS bays at 220/132/33 State Plan (80:20)
2019
KV GSS Amnour
Construction of 2 Nos of 220 KV GIS Bays at
02/PR/BSPTCL/
32. 220/132/33 KV GSS Gopalganj State Plan (80:20)
2019
Construction of 132 KV D/C Thakurganj-
Araria Transmission Line with ACSR Panther
52/PR/BSPTCL/
33. Conductor and Construction of 220 KV D/C State Plan (80:20)
2018
Kishanganj (New)- Thakurganj Transmission
Line with ACSR Zebra Conductor
Construction of 132/33kV GSS Jagdishpur
(Bhagalpur New)&Construction of 132/33kV 10/PR/BSPTCL/
34. State Plan
GSS Korha (Dist- Katihar) 2016
Construction of 220 KV D/C by making 70/PR/BSPTCL/
35. State Plan (80:20)
LILO arrangement of both circuits of 220 KV 2018
D/C Purnea (PG) - Begusarai Transmission
line (14RKM) to 220/132/33 KV Korha GSS
36. Construction of 132/33 KV 2X50 MVA GSS 10/PR/BSPTCL/ State Plan & BRGF
Barari (Dist.-Bhagalpur), 132/33 KV 2X50 2021
MVA GSS Bagha (Dist.-West Champaran) &
132/33 KV 2X50 MVA GSS Murliganj (Dist.-
Madhepura) with 02 Nos. of line bay at GSS
Udakishanganj
37. Construction of single phase 132 KV 54/PR/BSPTCL/ Deposit Head of
Transmission line through underground XLPE 2022 Railway
cable from GSS Jamalpur to TSS Jamalpur as
a spare cable
38. Construction of 2X 50 MVA, 132/33 KV Grid 13/PR/BSPTCL/ BRGF.
Sub-station, Daudnagar (Block:-Daudnagar, 2021
Dist-Aurangabad) & 3X 50 MVA, 132/33 KV
Grid Sub-station, Nabinagar (Block:-
Nabinagar, Dist-Aurangabad)
39. Construction of 132 KV D/C Bakhtiyarpur 78/PR/BSPTCL/ State plan (80:20)
(New) to Harnaut (BSPTCL) Trans. line & 2018
Construction of LILO of 132 KV S/C
Baripahari- Harnaut Trans. line at GSS Barh
(Bakhtiyarpur)
40. Construction of DCDS 220 KV T/L from 24/PR/BSPTCL/ Special Assistance
Buxar Thermal Power Plant to GSS Dumraon 2021
(New), BGCL with Twin moose
conductor.(RL-72 KM)
41. Construction of new 3x80MVA, 132/33KV 38/PR/BSPTCL/ State Plan
GIS GSS Mithapur at Agriculture Research 2021
Institute, Mithapur and associated works
including dismantling of existing Mithapur
grid Sub station with all associated works.
Construction of 132KV transmission line
from new GIS GSS Mithapur to GSS
Karbigahiya through 1200sqmm XLPE
underground cable with associated work
including dismantling of existing cable
system.(RL- 2.7KM).
42. Construction of 2X 200 MVA + 2X80 MVA ), 18/PR/BSPTCL/ State Plan
220/132/33 KV GIS at Digha (New) 2019
43. Construction of following associated 220KV Line 1,
& 132KV D/C Transmission Lines of Line 2,
220/132/33KV GSS Asthawan (Dist. Line 3
Nalanda) on Turnkey Basis:- & Line
Line1: Construction of 220 KV D/C 4
58/PR/BSPTCL/
Transmission line from State Plan complet
2018
Sheikhopursarai(BGCL) to GSS Asthawan ed
with ACSR Zebra Conductor (Line Length-
20 RKM) Line 5
Line2: Construction of 220 KV D/C under
Transmission line from GSS Biharsharif to progres
GSS Asthawan with ACSR Zebra Conductor s
(Line Length - 20 RKM)
Line3: Construction of 132 KV D/C
Transmission line from GSS Asthawan to
GSS Barh with ACSR Panther Conductor
(Line Length - 40 RKM)
Line4: Construction of 132 KV D/C
Transmission line from GSS Asthawan to
GSS Rajgir with ACSR Panther Conductor
(Line Length - 40 RKM)
Line5: Construction of 132 KV D/C
Transmission line from GSS Asthawan to
GSS Nalanda with ACSRPanther Conductor
(Line Length - 30 RKM) Under state plan on
Turnkey Basis.
44. Construction of 04 nos of 220KV GIS bays at State Plan
GSS Sheikhpura(BGCL) and 02 nos of220KV 08/PR/BSPTCL/
GIS bays at GSS Hathidah (Total 06 nos of 2019
220KV bays)
45. Construction of 02 nos. 220 KV AIS Line State Plan
03/PR/BSPTCL/
Bays at GSS Fatuha and 02 nos. 132 KV AIS
2021
Line Bays at GSS Harnaut.
46. Construction of 2X 80, 132/33 KV GIS at 17/PR/BSPTCL/ State Plan
Board Colony Patna 2019
47. Construction of 132KV transmission line 19/PR/BSPTCL/ State Plan
from 132/33 KV GIS at Board Colony Patna 2019
to 220/132/33KV GIS Digha (New) and from
220/132/33KV GIS Digha (New) to
132/33KV GSS Digha (Old) through Under
ground cable
48. Successful completion of Balance work of 07/PR/BSPTCL/ IRF
construction of 220KV D/C transmission line 2020
Dehri to Pusauli against NIT No.
07/PR/BSPTCL/2020
49. Implementation of SAS for control & 08/PR/BSPTCL/ PSDF & IRF
monitoring of existing 12 Nos. of 220/132/33 2023
KV substations (Hajipur, Khagaul, Fatuha,
Gaurichak, Begusarai, Bodhgaya, Dehri-on-
Sone, Pusauli, Darbhanga, Gopalganj,
Madhepura & Bihta (New))
50. Construction of LILO of 132 KV Sonenagar- 14/PR/BSPTCL/ BRGF
Rihand (Ckt.-I) Transmission line at GSS 2021
Nabinagar and LILO of 132KV Sonenagar-
Chandauti at GSS Daudnagar
51. R&M of 02 Nos. 220/132 KV GSS Khagaul 24/PR/BSPTCL/ State Plan
and Bodhgaya 2022
52. R&M of 132/33 KV GSS Hajipur, 25/PR/BSPTCL/ State Plan
Sheikhpura, Jehanabad and Banjari 2022
53. Construction of 04 Nos. 220 KV Line Bays, 19/PR/BSPTCL/ State Plan
its erection, testing & commissioning at GSS 2021
Bodhgaya with associated works
54. Construction of 02 Nos. of 220 KV AIS line 25/PR/BSPTCL/ State Plan
bays at Dehri-On-Sone with associated work 2021
mentioned in the scope of work
55. Construction of 132/33 KV 2X50 MVA GSS 11/PR/BSPTCL/ BRGF
Barachatti (Dist.-Gaya) along with 2021
construction of 02 nos. of 132 KV line bays at
GSS Chandauti (new) & 132/33 KV 2X50
MVA GSS Bhore (Dist.-Gaya)
56. Construction of 132 KV D/C Chandauti 12/PR/BSPTCL/ BRGF
(New) to GSS Barachatti (Dist.-Gaya) 2021
Transmission Line and construction of LILO
of 132KV Barhi-Rajgir(L-29) and Barhi-
Nalanda(L-28) Transmission lines each at
GSS Bhore (Dist.-Gaya)
57. Construction of following transmission 23PR/BSPTCL/2 Special Assistance
lines on turnkey basis:- 021 + State Plan
1. Construction of DCDS 400KV from Buxar
Thermal Power Plant to Naubatpur
(BGCL) with twin Moose conductor.
2. Construction of DCDS 220KV from Buxar
Thermal Power Plant to GSS Karamnasa
with twin Moose conductor.
3. Construction of DCDS 220KV from Buxar
Thermal Power Plant to GSS Dehri- on -
Sone with single Zebra conductor.
58. construction of following lines :- 77/PR/BSPTCL/ State Plan [80:20] Line-1,
(i) LILO of Barh - Patna 400 KV D/C 2018 2&3
(Quad) Transmission line at Bakhitiyarpur complet
(new). ed
(ii) Bakhitiyarpur (new) to Sheikhpura (new)
220 KV D/C Transmission line.
(iii) Bakhitiyarpur (new) to Hathidah (new)
220 KV D/C Transmission line .
(iv) Bakhitiyarpur (new) to Fatuha
(BSPTCL) 220 KV D/C Transmission
line.