0% found this document useful (0 votes)
160 views42 pages

Road Construction Payment Statement

This document provides a stage payment statement for the construction and improvement of a road from km 0 to km 32.49. It details the project name, parties involved, project timeline and budget, work completed, payments made, taxes deducted, amounts withheld and released.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
160 views42 pages

Road Construction Payment Statement

This document provides a stage payment statement for the construction and improvement of a road from km 0 to km 32.49. It details the project name, parties involved, project timeline and budget, work completed, payments made, taxes deducted, amounts withheld and released.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 42

BORDER ROAD ORGANISATION

Ministry of Defence
Government of india

CONSTRUCTION AND IMPROVEMENT OF ROAD BAKHASAR-MAVASARI FROM KM 0.00 TO


KM 32.49 (DESIGN LENGTH=31.703 KM) FROM EXISTING CL-9 SPECIFICATIONS TO NHDL
SPECIFICATIONS UNDER 45 BRTF OF PROJECT CHETAK IN RAJASTHAN AND GUJARAT
STATE IN EPC MODE

Stage Payment Statment No. - 11

Period 1st March 2024 to 20th March 2024


.

Authority
CHIEF ENGINEER PROJECT CHETAK

Authority Engineer
M/s. GLOBAL INFRA SOLUTIONS ASSOCIATION WITH MS CONSULTANT

EPC Contractor
M/s. MKC INFRASTRUCTURE LTD.
Period 1st March 2024 to 20th March 2024
Stage Payment Statment No. - 11
Schedule -O
CONSTRUCTION AND IMPROVEMENT OF ROAD BAKHASAR-MAVASARI FROM KM 0.00 TO KM 32.49 (DESIGN LENGTH=31.703 KM) FROM EXISTING CL-9
Project Name
SPECIFICATIONS TO NHDL SPECIFICATIONS UNDER 45 BRTF OF PROJECT CHETAK IN RAJASTHAN AND GUJARAT STATE IN EPC MODE
Authority CHIEF ENGINEER PROJECT CHETAK
Authority's Engineer M/s. GLOBAL INFRA SOLUTIONS ASSOCIATION WITH MS CONSULTANT
Contractor M/s. MKC INFRASTRUCTURE LTD.
Project Length 31.703 Km
Date of Appoinment 24-02-2023
Complition Period 730 Days (24 Month)
Contract Price 2881500000/- (Two Hunderd Eighty Eight Crore Fifteen lakh only)
90% Part Payment 10% Balance
Cumulative up to this Till Previous SPS/IPC
This SPS/IPC Amount against this SPS/IPC Payable amount
Item No. Description of items SPS/IPC Amount
(Rs.) recommended by AE for this IPC
(Rs.) (Rs.)
(Rs.) (Rs.)
Work Done incl.

The estimated amount for Works Executed in accordance with Clause


of GST @12%

1 1,50,39,98,682.78 1,22,95,18,872.42 27,44,79,810.37


19.3.1 Subsequent to the last claim

2 Adjustment in price (Price Escalation) - -

5 Sub Total (1 to 4) 1,50,39,98,683.00 1,22,95,18,872.00 27,44,79,810.00

The estimated amount for Works Executed in accordance with Clause


Work Done excl.

6 1,34,28,55,967.00 1,09,77,84,708.00 24,50,71,259.00


19.3.1 Subsequent to the last claim (1/1.12)
GST

Amounts reflecting adjustments in price for the aforesaid claim


7 - - -
Pursuant to Clause no 19.10.
Payment

8 Total Work Done (6+7) 1,34,28,55,967.00 1,09,77,84,708.00 24,50,71,259.00

9 GST @ 12% on (8) 16,11,42,715.00 13,17,34,164.00 2,94,08,551.00

10 Total Work Done inclusive of GST @ 12% 1,50,39,98,682.00 1,22,95,18,872.00 27,44,79,810.00

11 Advance Payment as per Clause 19.2.7

12 Total Amount (10+11) 1,50,39,98,682.00 1,22,95,18,872.00 27,44,79,810.00


Advances

13 GST additional @ 6% under Change in Law (Annexure-A) 8,05,71,362.00 6,58,67,085.00 1,47,04,277.00


13-A Release Withheld Amount GST @ 6% of (Ref.-29& 30)

14 Total Amount (12+13+13-A) 1,58,45,70,044.00 1,29,53,85,957.00 28,91,84,087.00


Recovery of Mobilization Advance Payment @15% of Contract Price as
15
per Clause 19.2.1
Recoveries

16 Other Advance
17 Material Advance
18 Total Recoveries (15+16+17)
Amount after Recovery of Mobilization Advance Payment
19 1,58,45,70,044.00 1,29,53,85,957.00 28,91,84,087.00
(14-18)
20 Deductions

21 Retention Money @ 6% - -

Deductions 22 Income Tax @ 2% on [14-15] 3,16,91,402.00 2,59,07,720.00 57,83,682.00

23 TDS @2% as per GST Act on [14-15] 3,16,91,407.00 2,59,07,725.00 57,83,682.00

24 Labour Cess 1% on [14] 1,58,45,700.00 1,29,53,859.00 28,91,841.00

25 Health & Education Cess @ 4% on [22] 6,05,010.00 3,73,663.00 2,31,347.00

26 Interest on Mobilization Advance

27 Total Deducted Amount (20 to 26) 7,98,33,519.00 6,51,42,967.00 1,46,90,552.00

28 Amount due after taxes deduction (19-27) 1,50,47,36,525.00 1,23,02,42,990.00 27,44,93,535.00

29 Withheld Amount
Amount hold by Authority's Engineer due to change in dia of bar in
30 60,00,000.00 60,00,000.00 -
piles without approval
31 Withheld Amount (20% Amount held due to observation of Authority) 1,44,91,253.00 1,44,91,253.00 -
Withheld details

Withheld Additional GST @ 6% due to the non Submission of GST


31 - -
Challan & other documents.

32 Amount hold by Authority's Engineer due to Pile Testing 30,00,000.00 10,00,000.00 20,00,000.00

33 Amount hold by Authority Engineer due to Slope Protection 10,00,000.00

34 Total Withheld amount after release (29 to 33) 2,34,91,253.00 2,14,91,253.00 30,00,000.00
35 Release of withheld amount & GST
Release amount details

36 Release Amount 20% Amount hold due to observation of Authority 1,44,91,253.00 1,44,91,253.00 -

37 Release Withheld Amount Withheld for Observation of RTE Team 60,00,000.00 60,00,000.00 -

38 Release Amount hold by Authority's Engineer due to Pile Testing 10,00,000.00 10,00,000.00

39 Total Release Amount (35 to 38) 2,14,91,253.00 2,14,91,253.00 - -

40 Release of Retention Money (21)

41 Net Due to EPC Contractor=[28-33+39+40] 1,50,27,36,525.00 1,23,02,42,990.00 27,14,93,535.00 24,43,44,181.00 2,71,49,354.00

Amount In words (INR) : Rupees Twenty four Crores Forty Three Lacs Forty Four Thousand One Hundred Eighty One Only

Submitted by: Certified by:

Project Manager Team Leader


MKC Infrastructure Ltd. Global Infra Solutions
Period 1st March 2024 to 20th March 2024
Stage Payment Statment No. - 11
Schedule(H) of Payment
As per Contract Executed Quantity Amount(INR)
Weightage in %
Item
Item to the Contract Item Description Splitted Certified Certified Certified Remarks
No. Weightage (%) Total Amount Unit Qty Unit Rate This bill Certified Upto Date This bill
price Wt. Upto Date Upto Previous Upto Previous

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
B-1 Reconstruction/New 8-Lane Realignment / Bypass (Flexible pavement)
Embankment upto 50% Ht 40% Km. 28.867 57,91,867.90 27.896 27.896 - 16,15,67,051.00 16,15,67,051.00 -
1 Embankment upto 50 to 100% 50.02% 40% 41,79,84,627.00 Km. 28.867 57,91,867.90 27.874 27.874 - 16,14,42,525.84 16,14,42,525.84 -
Road works Subgrade Top 20% Km. 28.867 28,95,933.95 26.475 26.475 - 7,66,68,403.36 7,66,68,403.36 -
including 2 Sub Base Course 8.56% 7,15,30,356.00 Km. 28.867 24,77,928.29 15.299 11.314 3.985 3,79,09,824.91 2,80,35,280.67 98,74,544.24
culverts, - 0.000 - - -
29.00% 3 Non Bituminous Base Course 5.13% 4,28,68,075.50 Km. 28.867 14,85,020.11
widening and
repair of 4 Bituminous Base Course 12.67% 10,58,74,954.50 Km. 28.867 36,67,681.25 - 0.000 - - -
culverts. 5 Wearing Coat 7.47% 6,24,21,934.50 Km. 28.867 21,62,397.70 - 0.000 - - -
D New culverts, on existing road, realignments, bypasses:-
1 Culverts (Length<6m) 85.00% Nos. 65.000 17,64,796.84 65.000 65.000 0.000 11,47,11,794.60 11,47,11,794.60 -
16.15% 13,49,55,052.50
1 Culverts (Length<6m) 15.00% Nos. 65.000 3,11,434.74 40.000 0.000 40.00 1,24,57,389.60 - 1,24,57,389.60
Sub Total (A) 100% 83,56,35,000 56,47,56,989.32 54,24,25,055.48 2,23,31,933.84
A-2 New Minor Bridges (6m>Length<60m)
1 Foundation 65.00% Mtr. 286.000 3,18,593.05 286.000 266.000 20.00 9,11,17,612.30 8,47,45,751.30 63,71,861.00
85.80% 14,01,80,940.90
2 Sub-structure 35.00% Mtr. 286.000 1,71,550.10 286.000 230.000 56.00 4,90,63,328.60 3,94,56,523.00 96,06,805.60

Minor 3 Super-structure 7.14% 1,16,65,406.97 Mtr. 286.000 40,788.14 286.000 158.000 128.00 1,16,65,408.04 64,44,526.12 52,20,881.92
Bridges/
5.67% 4 Approaches
Underpasses/
Overpasses 6 Guide Bunds and River Training Works 2.18% 35,61,706.89 Mtr. 286.000 12,453.52 - 0.000 - - -
B-2 New Underpass/Overpass
1 Foundation 4.76% 77,76,937.98 Mtr. 14.000 5,55,495.57 14.000 14.000 - 77,76,937.98 77,76,937.98 -

3 Super-structure 0.12% 1,96,057.26 Mtr. 14.000 14,004.09 14.000 14.000 - 1,96,057.26 1,96,057.26 -
Sub Total(B) 100.00% 16,33,81,050.00 15,98,19,344.18 13,86,19,795.66 2,11,99,548.52
A-2 New Major Bridges
1 Foundation ( upto Pile Work ) 67.00% Mtr. 2,750.00 1,26,436.15 2692.857 2621.429 71.43 34,04,74,489.64 33,14,43,336.07 90,31,153.57
39.53% 51,89,54,346.42
Major Foundation ( upto Pile Cap) 33.00% Mtr. 2,750.00 62,274.52 1945.263 1036.447 908.82 12,11,40,329.43 6,45,44,262.37 5,65,96,067.06
bridge(length> 2 Sub-structure 7.48% 9,81,98,292.72 Mtr. 2,750.00 35,708.47 407.50 0.000 407.50 1,45,51,201.53 - 1,45,51,201.53
60m) works
3 Super-Structure - (upto Girder Pre-Cast) 40.00% Mtr. 2,750.00 94,178.70 1955.556 800.000 1155.56 18,41,71,680.00 7,53,42,960.00 10,88,28,720.00
and
Super-Structure - (upto Stressing Work Done) 49.32% 10.00% 64,74,78,582.48 Mtr. 2,750.00 23,544.68 - 0.000 - - -
ROB/RUB/elev
45.56% Super-Structure - (upto Slab, including bearing) 50.00% Mtr. 2,750.00 1,17,723.38 - 0.000 - - -
ated
4 Wearing coat including expansion joints 2.20% 2,88,81,850.80 Mtr. 2,750.00 10,502.49 - 0.000 - - -
sections/flyov
ers including
Miscellaneous items like hand rails, crash barriers, road
viaducts, if 5 0.84% 1,10,27,615.76 Mtr. 2,750.00 4,010.04 - 0.000 - - -
marking etc.)
any
6 Wing wall / Return wall 0.55% 72,20,462.70 Mtr. 2,750.00 2,625.62 - 0.000 - - -
7 Guide Bunds and River Training Works 0.08% 10,50,249.12 Mtr. 2,750.00 381.91 - 0.000 - - -
Sub Total(C) 100.00% 1,31,28,11,400.00 66,03,37,700.60 47,13,30,558.45 18,90,07,142.15
Other Works
i Toll Plaza 0.00% - - - - - 0.000 - - -

iii Road side drains 2.73% 1,49,07,008.03 Km. 28.87 5,16,403.09 - 0.000 - - -

iv Road Signs, Markings, km stone, safety device 29.08% 15,87,89,667.90 Km. 31.70 50,08,663.78 - 0.000 - - -

v Project facilities 0.00% - - - - - 0.000 - - -


Other works 18.95%
vi Busways and Bus shelter 0.14% 7,64,461.95 Nos. 4.00 1,91,115.49 - 0.000 - - -

vii Truck lay-byes 0.18% 9,82,879.65 Nos. 2.00 4,91,439.83 - 0.000 - - -

viii Road side plantation 0.18% 9,82,879.65 Km. 31.70 31,002.73 - 0.000 - - -

ix Protection Works other than approaches 67.69% 36,96,17,352.83 Km. 28.19 1,31,10,717.68 9.08 5.884 3.199 11,90,84,648.69 7,71,43,462.83 4,19,41,185.86
Sub Total(D) 100.00% 54,60,44,250.01 - 0.000 - - -

i HT/LT Line 31.21% 73,74,392.43 Rmt 3,000.00 2,458.13 - 0.000 - - - -


Utility Shifting 0.82%
ii Water Pipeline 68.79% 1,62,53,907.57 Rmt 28,135.00 577.71 - 0.000 - - -
Period 1st March 2024 to 20th March 2024
Stage Payment Statment No. - 11
Schedule(H) of Payment
As per Contract Executed Quantity Amount(INR)
Weightage in %
Item
Item to the Contract Item Description Splitted Certified Certified Certified Remarks
No. Weightage (%) Total Amount Unit Qty Unit Rate This bill Certified Upto Date This bill
price Wt. Upto Date Upto Previous Upto Previous

100.00% Sub Total(E) 100.00% 2,36,28,300.00 11,90,84,648.69 7,71,43,462.83 4,19,41,185.86

Withheld Amount - - -

Grand Total (A+B+C+D) 2,88,15,00,000 1,50,39,98,682.78 1,22,95,18,872.42 27,44,79,810.37

Submitted by: Certified by:

Project Manager Team Leader


MKC Infrastructure Ltd. Global Infra Solutions
CONSTRUCTION AND IMPROVEMENT OF ROAD BAKHASAR-MAVASARI FROM KM 0.00 TO KM 32.49 (DESIGN LENGTH=31.703 KM) FROM EXISTING CL-9 SPECIFICATIONS TO NHDL SPECIFICATIONS UNDER 45 BRTF OF PROJECT
PROJECT NAME
CHETAK IN RAJASTHAN AND GUJARAT STATE IN EPC MODE
AUTHORITY CHIEF ENGINEER PROJECT CHETAK
AUTHORITY ENGINEER M/s. GLOBAL INFRA SOLUTIONS ASSOCIATION WITH MS CONSULTANT
EPC CONTRACTOR MKC Infrastructure Limited
TOTAL LENGTH OF PROJECT 31.703KM
Details of Amount withheld/Released
WITHHELD AMOUNT DETAIL RELEASE AMOUNT DETAIL
1 2 3 4 5 6 7 7 8 9 10 11 12 13 14
Withheld 20% Amount Amount hold by Amount hold by Total witheld Withheld Amount Amount hold by
Sr No Amount Withhel 20% Amount hold Total Release
Test Report Additional hold due to Authority's Authority amount = Test Report Additional Withhel for Authority's
Highway NCR for Observation Highway NCR due to observation amount =
Pending Amount GST @ observation of Engineer due to Engineer due to (1+2+3+4+ Pending Amount GST @ Observation of Engineer due to
of RTE Team of Authority ( 7+8+9+10+11 )
6% of SPS-01 Authority Pile Testing Slope Protection 5+6) 6% of SPS-01 RTE Team Pile Testing
SPS-01 43,43,901.00 10,00,000.00 97,68,245.00 1,51,12,146.00 -

SPS-02 1,44,91,253.00 60,00,000.00 2,04,91,253.00 43,43,901.00 10,00,000.00 97,68,245.00 1,51,12,146.00

SPS-03 - 1,44,91,253.00 60,00,000.00 2,04,91,253.00

SPS-08 10,00,000.00 10,00,000.00 -

SPS-09 - 10,00,000.00 10,00,000.00

SPS-11 20,00,000.00 20,00,000.00

SPS-11 10,00,000.00 10,00,000.00

Total 43,43,901.00 10,00,000.00 97,68,245.00 1,44,91,253.00 60,00,000.00 30,00,000.00 3,96,03,399.00 3,66,03,399.00

For contractor For Authority Engineer For Authority Engineer

Project Manager Quantity Surveyor Team Leader


PROJECT NAME CHIEF ENGINEER PROJECT CHETAK
AUTHORITY M/s. GLOBAL INFRA SOLUTIONS ASSOCIATION WITH MS CONSULTANT
AUTHORITY ENGINEER MKC Infrastructure Limited
EPC CONTRACTOR 31.703KM
TOTAL LENGTH OF PROJECT 2881500000

Cumulative work Health & Education Withheld @ Witheld for IPC


Details BILL Date Bill Amount Bill Amount CGST @ 9% SGST @ 9% IT @ 2% Labour Cess @ 1% GST @2% Withheld Release Total Deduction NET AMOUNT Cheque Amount
done Amount Cess @4% on IT CL.19.5.4 Cl.19.5.1

SPS-01(90%) 27-04-2023 16,28,04,085.59 16,28,04,085.59 97,68,245.00 97,68,245.00 18,23,40,575.59 36,46,812.00 18,23,406.00 36,46,812.00 - 91,17,030.00 17,32,23,545.59 1,73,22,354.56 15,59,01,192.00

IPC-01(10%) 25-05-2023 53,43,901.00 53,43,901.00 -53,43,901.00 1,19,78,453.56

SPS -02(90%) 15-06-2023 21,51,19,875.00 21,51,19,875.00 1,93,60,789.00 1,93,60,789.00 26,36,09,698.14 47,44,975.00 23,72,487.00 47,44,975.00 1,84,42,127.70 48,09,510.90 3,03,04,564.70 23,81,14,644.34 2,63,60,969.81 21,17,53,675.00

IPC-02(10%) 15-06-2023 5,27,219.00 2,63,610.00 5,27,219.00 20,49,125.30 5,34,390.10 33,67,173.30 -28,32,783.20 2,35,28,186.61

SPS -03(90%) 01-07-2023 8,28,24,937.38 8,28,24,937.38 74,54,244.00 74,54,244.00 9,77,33,425.38 17,59,202.00 8,79,601.00 17,59,202.00 1,84,42,127.70 43,98,005.00 11,17,77,548.08 97,73,342.54 10,20,04,206.00

IPC-03(10%) 15-07-2023 1,95,467.00 97,733.00 1,95,467.00 - 20,49,125.30 4,88,667.00 15,60,458.30 1,13,33,800.84

SPS -04(90%) 09-08-2023 6,56,07,125.07 6,56,07,125.07 59,04,641.00 59,04,641.00 7,74,16,407.07 13,93,495.00 6,96,748.00 13,93,495.00 34,83,738.00 7,39,32,669.07 77,41,640.71 6,61,91,029.00

IPC-04(10%) 14-08-2023 1,54,833.00 77,416.00 1,54,833.00 - 3,87,082.00 -3,87,082.00 73,54,558.71

SPS -05(90%) 02-09-2023 7,45,75,470.53 7,45,75,470.53 67,11,792.00 67,11,792.00 8,79,99,054.53 15,83,983.00 7,91,991.00 15,83,983.00 39,59,957.00 8,40,39,097.53 87,99,905.45 7,52,39,193.00

IPC-05(10%) 25-09-2023 1,75,998.00 87,999.00 1,75,998.00 4,39,995.00 -4,39,995.00 83,59,910.45

SPS -06(90%) 20-09-2023 6,22,50,231.81 6,22,50,231.81 56,02,521.00 56,02,521.00 7,34,55,273.81 13,22,195.00 6,61,097.00 13,22,195.00 33,05,487.00 7,01,49,786.81 73,45,527.38 6,28,04,260.00

IPC-06(10%) 28-09-2024 1,46,911.00 73,455.00 1,46,911.00 3,67,277.00 -3,67,277.00 69,78,250.38

SPS -07(90%) 21-12-2023 3,87,73,829.26 3,87,73,829.26 34,89,645.00 34,89,645.00 4,57,53,119.26 8,23,556.00 4,11,778.00 8,23,556.00 20,58,890.00 4,36,94,229.26 45,75,311.93 3,91,18,918.00

IPC-07(10%) 06-01-2024 91,506.00 45,753.00 91,506.00 2,28,765.00 -2,28,765.00 43,46,546.93

SPS -08(90%) 12-01-2024 8,03,86,225.00 8,03,86,225.00 72,34,760.00 72,34,760.00 9,48,55,745.00 17,07,403.00 8,53,702.00 17,07,403.00 75,884.56 9,00,000.00 52,44,392.56 8,96,11,352.44 94,85,574.50 8,01,25,778.00

IPC-08(10%) 02-02-2024 1,89,711.00 94,856.00 1,89,711.00 1,00,000.00 5,74,278.00 -5,74,278.00 89,11,296.50

SPS -09(90%) 10-02-2024 13,49,82,991.00 13,49,82,991.00 1,21,48,469.19 1,21,48,469.19 15,92,79,929.38 31,85,599.00 15,92,799.00 31,85,599.00 1,27,424.00 10,00,000.00 70,91,421.00 15,21,88,508.38 1,52,18,850.84 13,69,69,657.54

IPC-09(10%) 10-02-2024 1,52,18,850.84

SPS -10(90%) 18,04,59,937.00 18,04,59,937.00 1,62,41,394.33 1,62,41,394.33 21,29,42,725.66 42,58,855.00 21,29,427.00 42,58,856.00 1,70,354.00 1,08,17,492.00 20,21,25,233.66 2,02,12,523.37 18,19,12,710.29

IPC-10(10%) 2,02,12,523.37

TOTAL 1,09,77,84,707.64 1,09,77,84,707.64 9,39,16,500.52 9,39,16,500.52 1,29,53,85,953.82 2,59,07,720.00 1,29,53,858.00 2,59,07,721.00 3,73,662.56 2,68,35,154.00 2,68,35,154.00 9,09,78,115.56 1,23,02,42,992.26 12,68,36,001.08 1,23,02,42,997.02

Submitted by: Certified by:

Project Manager Team Leader


MKC Infrastructure Ltd. Global Infra Solutions
PROJECT NAME Construction and improvement of Road bakhasar-mavasari from km 0.000 to 32.490(net length 32.49 km) (design
AUTHORITY CHIEF ENGINEER PROJECT CHETAK
AUTHORITY ENGINEER M/s. GLOBAL INFRA SOLUTIONS
EPC CONTRACTOR M/S. MKC Infrastructure Ltd.
Stage Payment Statment No. - 11
Period 1st March 2024 to 20th March 2024
Measurement Sheet
Description of Item :- Construction of GSB Top Layer- LHS
SR. No. Item From To Side unit Length RFI No. Date IPC No. Remarks
1 GSB Top Layer 02+300 02+500 LHS Km 0.200 MKC/BRO/HWY/1989 24-11-2023 IPC-7
2 GSB Top Layer 02+500 02+700 LHS Km 0.200 MKC/BRO/HWY/1991 25-11-2023 IPC-7
3 GSB Top Layer 07+300 07+645 LHS Km 0.345 MKC/BRO/HWY/1992 26-11-2023 IPC-7
4 GSB Top Layer 07+665 08+000 LHS Km 0.335 MKC/BRO/HWY/1994 28-11-2023 IPC-7

1 GSB Top Layer 02+950 03+260 LHS Km 0.310 MKC/BRO/HWY/2035 29-12-2023 IPC-8
2 GSB Top Layer 03+260 03+400 LHS Km 0.140 MKC/BRO/HWY/2037 30-12-2023 IPC-8
3 GSB Top Layer 03+706 04+000 LHS Km 0.294 MKC/BRO/HWY/2010 15-12-2023 IPC-8
4 GSB Top Layer 04+200 04+400 LHS Km 0.200 MKC/BRO/HWY/2012 16-12-2023 IPC-8
5 GSB Top Layer 04+400 04+580 LHS Km 0.180 MKC/BRO/HWY/2019 21-12-2023 IPC-8
6 GSB Top Layer 04+750 04+977 LHS Km 0.227 MKC/BRO/HWY/2030 26-12-2023 IPC-8
7 GSB Top Layer 04+980 05+168 LHS Km 0.188 MKC/BRO/HWY/2036 29-12-2023 IPC-8
8 GSB Top Layer 05+182 05+250 LHS Km 0.068 MKC/BRO/HWY/2038 30-12-2023 IPC-8

1 GSB Top Layer 05+845 05+919 LHS Km 0.074 MKC/BRO/HWY/2040 02-01-2024 IPC-9
2 GSB Top Layer 02+700 02+928 LHS Km 0.228 MKC/BRO/HWY/2043 04-01-2024 IPC-9
3 GSB Top Layer 03+400 03+693 LHS Km 0.293 MKC/BRO/HWY/2044 04-01-2024 IPC-9
4 GSB Top Layer 05+931 06+144 LHS Km 0.213 MKC/BRO/HWY/2046 04-01-2024 IPC-9
5 GSB Top Layer 04+000 04+169 LHS Km 0.169 MKC/BRO/HWY/2048 05-01-2024 IPC-9
6 GSB Top Layer 04+181 04+200 LHS Km 0.019 MKC/BRO/HWY/2049 05-01-2024 IPC-9
7 GSB Top Layer 04+580 04+654 LHS Km 0.074 MKC/BRO/HWY/2057 10-01-2024 IPC-9
8 GSB Top Layer 04+666 04+750 LHS Km 0.084 MKC/BRO/HWY/2058 10-01-2024 IPC-9
9 GSB Top Layer 27+580 27+905 LHS Km 0.325 MKC/BRO/HWY/2062 13-01-2024 IPC-9
10 GSB Top Layer 27+915 28+320 LHS Km 0.405 MKC/BRO/HWY/2064 13-01-2024 IPC-9
11 GSB Top Layer 28+330 28+500 LHS Km 0.170 MKC/BRO/HWY/2071 16-01-2024 IPC-9
12 GSB Top Layer 05+250 05+500 LHS Km 0.250 MKC/BRO/HWY/2081 22-01-2024 IPC-9
13 GSB Top Layer 05+500 05+825 LHS Km 0.325 MKC/BRO/HWY/2083 23-01-2024 IPC-9
14 GSB Top Layer 06+156 06+359 LHS Km 0.203 MKC/BRO/HWY/2085 24-01-2024 IPC-9
15 GSB Top Layer 29+765 30+020 LHS Km 0.255 MKC/BRO/HWY/2089 25-01-2024 IPC-9
16 GSB Top Layer 30+030 30+245 LHS Km 0.215 MKC/BRO/HWY/2090 25-01-2024 IPC-9
17 GSB Top Layer 30+255 30+535 LHS Km 0.280 MKC/BRO/HWY/2091 25-01-2024 IPC-9

1 GSB Top Layer 00+246 00+500 LHS Km 0.254 MKC/BRO/HWY/2129 04-02-2024 IPC-10
2 GSB Top Layer 00+500 00+715 LHS Km 0.215 MKC/BRO/HWY/2133 05-02-2024 IPC-10
3 GSB Top Layer 00+900 01+135 LHS Km 0.235 MKC/BRO/HWY/2143 08-02-2024 IPC-10
4 GSB Top Layer 01+135 01+345 LHS Km 0.210 MKC/BRO/HWY/2158 11-02-2024 IPC-10
5 GSB Top Layer 01+345 01+451 LHS Km 0.106 MKC/BRO/HWY/2164 13-02-2024 IPC-10
6 GSB Top Layer 01+451 01+648 LHS Km 0.197 MKC/BRO/HWY/2167 14-02-2024 IPC-10
7 GSB Top Layer 01+662 01+720 LHS Km 0.058 MKC/BRO/HWY/2144 08-02-2024 IPC-10
8 GSB Top Layer 01+720 01+800 LHS Km 0.080 MKC/BRO/HWY/2154 10-02-2024 IPC-10
9 GSB Top Layer 01+857 02+087 LHS Km 0.230 MKC/BRO/HWY/2113 02-02-2024 IPC-10
10 GSB Top Layer 11+280 11+450 LHS Km 0.170 MKC/BRO/HWY/2178 17-02-2024 IPC-10
11 GSB Top Layer 23+000 23+060 LHS Km 0.060 MKC/BRO/HWY/2168 14-02-2024 IPC-10
12 GSB Top Layer 23+080 23+250 LHS Km 0.170 MKC/BRO/HWY/2182 18-02-2024 IPC-10
13 GSB Top Layer 23+250 23+400 LHS Km 0.150 MKC/BRO/HWY/2185 19-02-2024 IPC-10
14 GSB Top Layer 23+415 23+650 LHS Km 0.235 MKC/BRO/HWY/2195 22-02-2024 IPC-10
15 GSB Top Layer 23+670 23+900 LHS Km 0.230 MKC/BRO/HWY/2189 20-02-2024 IPC-10
16 GSB Top Layer 25+200 25+280 LHS Km 0.080 MKC/BRO/HWY/2169 14-02-2024 IPC-10
17 GSB Top Layer 25+280 25+310 LHS Km 0.030 MKC/BRO/HWY/2186 19-02-2024 IPC-10
18 GSB Top Layer 25+310 25+620 LHS Km 0.310 MKC/BRO/HWY/2211 27-02-2024 IPC-10
19 GSB Top Layer 25+630 25+830 LHS Km 0.200 MKC/BRO/HWY/2215 28-02-2024 IPC-10
20 GSB Top Layer 25+830 26+020 LHS Km 0.190 MKC/BRO/HWY/2219 29-02-2024 IPC-10
21 GSB Top Layer 26+040 26+140 LHS Km 0.100 MKC/BRO/HWY/2161 12-02-2024 IPC-10
22 GSB Top Layer 26+140 26+585 LHS Km 0.445 MKC/BRO/HWY/2172 15-02-2024 IPC-10
23 GSB Top Layer 26+595 26+700 LHS Km 0.105 MKC/BRO/HWY/2216 28-02-2024 IPC-10
24 GSB Top Layer 26+700 26+895 LHS Km 0.195 MKC/BRO/HWY/2175 16-02-2024 IPC-10
25 GSB Top Layer 26+905 27+000 LHS Km 0.095 MKC/BRO/HWY/2191 21-02-2024 IPC-10
26 GSB Top Layer 27+000 27+220 LHS Km 0.220 MKC/BRO/HWY/2203 24-02-2024 IPC-10
27 GSB Top Layer 27+230 27+570 LHS Km 0.340 MKC/BRO/HWY/2200 23-02-2024 IPC-10
28 GSB Top Layer 30+560 30+695 LHS Km 0.135 MKC/BRO/HWY/2206 25-02-2024 IPC-10

1 GSB Top Layer 00+715 00+900 LHS Km 0.185 MKC/BRO/HWY/2223 02-03-2024 IPC-11

2 GSB Top Layer 11+520 11+720 LHS Km 0.200 MKC/BRO/HWY/2226 04-03-2024 IPC-11

3 GSB Top Layer 11+780 12+072 LHS Km 0.292 MKC/BRO/HWY/2235 07-03-2024 IPC-11

4 GSB Top Layer 14+275 14+460 LHS Km 0.185 MKC/BRO/HWY/2236 07-03-2024 IPC-11

5 GSB Top Layer 14+475 14+655 LHS Km 0.180 MKC/BRO/HWY/2241 08-03-2024 IPC-11

6 GSB Top Layer 14+666 14+930 LHS Km 0.264 MKC/BRO/HWY/2234 06-03-2024 IPC-11

7 GSB Top Layer 14+941 15+135 LHS Km 0.194 MKC/BRO/HWY/2275 20-03-2024 IPC-11

8 GSB Top Layer 15+160 15+480 LHS Km 0.320 MKC/BRO/HWY/2273 19-03-2024 IPC-11

9 GSB Top Layer 15+490 15+690 LHS Km 0.200 MKC/BRO/HWY/2271 18-03-2024 IPC-11

10 GSB Top Layer 15+700 16+020 LHS Km 0.320 MKC/BRO/HWY/2268 17-03-2024 IPC-11

11 GSB Top Layer 16+030 16+255 LHS Km 0.225 MKC/BRO/HWY/2244 09-03-2024 IPC-11

12 GSB Top Layer 16+270 16+590 LHS Km 0.320 MKC/BRO/HWY/2231 05-03-2024 IPC-11

13 GSB Top Layer 20+400 20+640 LHS Km 0.240 MKC/BRO/HWY/2266 16-03-2024 IPC-11

14 GSB Top Layer 20+650 20+805 LHS Km 0.155 MKC/BRO/HWY/2263 15-03-2024 IPC-11

15 GSB Top Layer 20+815 21+020 LHS Km 0.205 MKC/BRO/HWY/2254 12-03-2024 IPC-11

16 GSB Top Layer 21+250 21+500 LHS Km 0.250 MKC/BRO/HWY/2256 13-03-2024 IPC-11

17 GSB Top Layer 21+560 21+810 LHS Km 0.250 MKC/BRO/HWY/2259 14-03-2024 IPC-11

Cummulative Qty up to Date bill LHS 15.299

Cummulative Qty Upto Previous Qty LHS 11.314

This Bill Qty LHS 3.985

Summary of GSB Top BHS Side


Cummulative Qty up to Date bill (LHS+RHS)/2 - BHS 15.299
Cummulative Qty Upto Previous Qty (LHS+RHS)/2 - BHS 11.314
This Bill Qty (LHS+RHS)/2 - BHS 3.985
For contractor For Authority Engineer For Authority Engineer For Authority Engineer

Authorized Signatory Quantity Surveyor Resident Engineer Team Leader,


MKC Infrastructur Ltd. Global Infra Solutions Global Infra Solutions Global Infra Solutions
PROJECT NAME Construction and improvement of Road bakhasar-mavasari from km 0.000 to 32.490(net length 32.49 km) (design
AUTHORITY CHIEF ENGINEER PROJECT CHETAK
AUTHORITY ENGINEER M/s. GLOBAL INFRA SOLUTIONS
EPC CONTRACTOR M/S. MKC Infrastructure Ltd.
Stage Payment Statment No. - 11
Period 1st March 2024 to 20th March 2024
Measurement Sheet
Description of Item :- Construction of GSB Top Layer- RHS
SR. No. Item From To Side unit Length RFI No. Date IPC No. Remarks
1 GSB Top Layer 02+300 02+500 RHS Km 0.200 MKC/BRO/HWY/1989 24-11-2023 IPC-7
2 GSB Top Layer 02+500 02+700 RHS Km 0.200 MKC/BRO/HWY/1991 25-11-2023 IPC-7
3 GSB Top Layer 07+300 07+645 RHS Km 0.345 MKC/BRO/HWY/1992 26-11-2023 IPC-7
4 GSB Top Layer 07+665 08+000 RHS Km 0.335 MKC/BRO/HWY/1994 28-11-2023 IPC-7

1 GSB Top Layer 02+950 03+260 RHS Km 0.310 MKC/BRO/HWY/2035 29-12-2023 IPC-8
2 GSB Top Layer 03+260 03+400 RHS Km 0.140 MKC/BRO/HWY/2037 30-12-2023 IPC-8
3 GSB Top Layer 03+706 04+000 RHS Km 0.294 MKC/BRO/HWY/2010 15-12-2023 IPC-8
4 GSB Top Layer 04+200 04+400 RHS Km 0.200 MKC/BRO/HWY/2012 16-12-2023 IPC-8
5 GSB Top Layer 04+400 04+580 RHS Km 0.180 MKC/BRO/HWY/2019 21-12-2023 IPC-8
6 GSB Top Layer 04+750 04+977 RHS Km 0.227 MKC/BRO/HWY/2030 26-12-2023 IPC-8
7 GSB Top Layer 04+980 05+165 RHS Km 0.185 MKC/BRO/HWY/2036 29-12-2023 IPC-8
8 GSB Top Layer 05+182 05+250 RHS Km 0.068 MKC/BRO/HWY/2038 30-12-2023 IPC-8
9 GSB Top Layer 05+250 05+469 RHS Km 0.219 MKC/BRO/HWY/2022 23-12-2023 IPC-8

1 GSB Top Layer 05+845 05+919 RHS Km 0.074 MKC/BRO/HWY/2040 02-01-2024 IPC-9
2 GSB Top Layer 02+700 02+928 RHS Km 0.228 MKC/BRO/HWY/2043 04-01-2024 IPC-9
3 GSB Top Layer 03+400 03+693 RHS Km 0.293 MKC/BRO/HWY/2044 04-01-2024 IPC-9
4 GSB Top Layer 05+931 06+144 RHS Km 0.213 MKC/BRO/HWY/2046 04-01-2024 IPC-9
5 GSB Top Layer 04+000 04+169 RHS Km 0.169 MKC/BRO/HWY/2048 05-01-2024 IPC-9
6 GSB Top Layer 04+181 04+200 RHS Km 0.019 MKC/BRO/HWY/2049 05-01-2024 IPC-9
7 GSB Top Layer 04+580 04+654 RHS Km 0.074 MKC/BRO/HWY/2057 10-01-2024 IPC-9
8 GSB Top Layer 04+666 04+750 RHS Km 0.084 MKC/BRO/HWY/2058 10-01-2024 IPC-9
9 GSB Top Layer 27+580 27+905 RHS Km 0.325 MKC/BRO/HWY/2062 13-01-2024 IPC-9
10 GSB Top Layer 27+915 28+320 RHS Km 0.405 MKC/BRO/HWY/2064 13-01-2024 IPC-9
11 GSB Top Layer 28+330 28+500 RHS Km 0.170 MKC/BRO/HWY/2071 16-01-2024 IPC-9
12 GSB Top Layer 29+765 30+020 RHS Km 0.255 MKC/BRO/HWY/2089 25-01-2024 IPC-9
13 GSB Top Layer 30+030 30+245 RHS Km 0.215 MKC/BRO/HWY/2090 25-01-2024 IPC-9
14 GSB Top Layer 30+255 30+535 RHS Km 0.280 MKC/BRO/HWY/2091 25-01-2024 IPC-9
15 GSB Top Layer 05+469 05+825 RHS Km 0.356 MKC/BRO/HWY/2092 26-01-2024 IPC-9
16 GSB Top Layer 06+156 06+355 RHS Km 0.199 MKC/BRO/HWY/2094 27-01-2024 IPC-9
17 GSB Top Layer 30+550 30+557 RHS Km 0.007 MKC/BRO/HWY/2088 25-01-2024 IPC-9

1 GSB Top Layer 00+246 00+500 RHS Km 0.254 MKC/BRO/HWY/2129 04-02-2024 IPC-10
2 GSB Top Layer 00+500 00+715 RHS Km 0.215 MKC/BRO/HWY/2133 05-02-2024 IPC-10
3 GSB Top Layer 00+900 01+135 RHS Km 0.235 MKC/BRO/HWY/2143 08-02-2024 IPC-10
4 GSB Top Layer 01+135 01+345 RHS Km 0.210 MKC/BRO/HWY/2158 11-02-2024 IPC-10
5 GSB Top Layer 01+345 01+451 RHS Km 0.106 MKC/BRO/HWY/2164 13-02-2024 IPC-10
6 GSB Top Layer 01+451 01+648 RHS Km 0.197 MKC/BRO/HWY/2167 14-02-2024 IPC-10
7 GSB Top Layer 01+662 01+720 RHS Km 0.058 MKC/BRO/HWY/2144 08-02-2024 IPC-10
8 GSB Top Layer 01+720 01+800 RHS Km 0.080 MKC/BRO/HWY/2154 10-02-2024 IPC-10
9 GSB Top Layer 01+857 02+087 RHS Km 0.230 MKC/BRO/HWY/2113 02-02-2024 IPC-10
10 GSB Top Layer 11+280 11+450 RHS Km 0.170 MKC/BRO/HWY/2178 17-02-2024 IPC-10
11 GSB Top Layer 23+000 23+060 RHS Km 0.060 MKC/BRO/HWY/2168 14-02-2024 IPC-10
12 GSB Top Layer 23+080 23+250 RHS Km 0.170 MKC/BRO/HWY/2182 18-02-2024 IPC-10
13 GSB Top Layer 23+250 23+400 RHS Km 0.150 MKC/BRO/HWY/2185 19-02-2024 IPC-10
14 GSB Top Layer 23+415 23+650 RHS Km 0.235 MKC/BRO/HWY/2195 22-02-2024 IPC-10
15 GSB Top Layer 23+670 23+900 RHS Km 0.230 MKC/BRO/HWY/2189 20-02-2024 IPC-10
16 GSB Top Layer 25+200 25+280 RHS Km 0.080 MKC/BRO/HWY/2169 14-02-2024 IPC-10
17 GSB Top Layer 25+280 25+310 RHS Km 0.030 MKC/BRO/HWY/2186 19-02-2024 IPC-10
18 GSB Top Layer 25+310 25+620 RHS Km 0.310 MKC/BRO/HWY/2211 27-02-2024 IPC-10
19 GSB Top Layer 25+630 25+830 RHS Km 0.200 MKC/BRO/HWY/2215 28-02-2024 IPC-10
20 GSB Top Layer 25+830 26+020 RHS Km 0.190 MKC/BRO/HWY/2219 29-02-2024 IPC-10
21 GSB Top Layer 26+040 26+140 RHS Km 0.100 MKC/BRO/HWY/2161 12-02-2024 IPC-10
22 GSB Top Layer 26+140 26+585 RHS Km 0.445 MKC/BRO/HWY/2172 15-02-2024 IPC-10
23 GSB Top Layer 26+595 26+700 RHS Km 0.105 MKC/BRO/HWY/2216 28-02-2024 IPC-10
24 GSB Top Layer 26+700 26+895 RHS Km 0.195 MKC/BRO/HWY/2175 16-02-2024 IPC-10
25 GSB Top Layer 26+905 27+000 RHS Km 0.095 MKC/BRO/HWY/2191 21-02-2024 IPC-10
26 GSB Top Layer 27+000 27+220 RHS Km 0.220 MKC/BRO/HWY/2203 24-02-2024 IPC-10
27 GSB Top Layer 27+230 27+570 RHS Km 0.340 MKC/BRO/HWY/2200 23-02-2024 IPC-10
28 GSB Top Layer 30+560 30+695 RHS Km 0.135 MKC/BRO/HWY/2206 25-02-2024 IPC-10

1 GSB Top Layer 00+715 00+900 RHS Km 0.185 MKC/BRO/HWY/2223 02-03-2024 IPC-11

2 GSB Top Layer 11+520 11+720 RHS Km 0.200 MKC/BRO/HWY/2226 04-03-2024 IPC-11

3 GSB Top Layer 11+780 12+072 RHS Km 0.292 MKC/BRO/HWY/2235 07-03-2024 IPC-11

4 GSB Top Layer 14+275 14+460 RHS Km 0.185 MKC/BRO/HWY/2236 07-03-2024 IPC-11

5 GSB Top Layer 14+475 14+655 RHS Km 0.180 MKC/BRO/HWY/2241 08-03-2024 IPC-11

6 GSB Top Layer 14+666 14+930 RHS Km 0.264 MKC/BRO/HWY/2234 06-03-2024 IPC-11

7 GSB Top Layer 14+941 15+135 RHS Km 0.194 MKC/BRO/HWY/2275 20-03-2024 IPC-11

8 GSB Top Layer 15+160 15+480 RHS Km 0.320 MKC/BRO/HWY/2273 19-03-2024 IPC-11

9 GSB Top Layer 15+490 15+690 RHS Km 0.200 MKC/BRO/HWY/2271 18-03-2024 IPC-11

10 GSB Top Layer 15+700 16+020 RHS Km 0.320 MKC/BRO/HWY/2268 17-03-2024 IPC-11

11 GSB Top Layer 16+030 16+255 RHS Km 0.225 MKC/BRO/HWY/2244 09-03-2024 IPC-11

12 GSB Top Layer 16+270 16+590 RHS Km 0.320 MKC/BRO/HWY/2231 05-03-2024 IPC-11

13 GSB Top Layer 20+400 20+640 RHS Km 0.240 MKC/BRO/HWY/2266 16-03-2024 IPC-11

14 GSB Top Layer 20+650 20+805 RHS Km 0.155 MKC/BRO/HWY/2263 15-03-2024 IPC-11

15 GSB Top Layer 20+815 21+020 RHS Km 0.205 MKC/BRO/HWY/2254 12-03-2024 IPC-11

16 GSB Top Layer 21+250 21+500 RHS Km 0.250 MKC/BRO/HWY/2256 13-03-2024 IPC-11

17 GSB Top Layer 21+560 21+810 RHS Km 0.250 MKC/BRO/HWY/2259 14-03-2024 IPC-11

Cummulative Qty up to Date bill RHS 15.299

Cummulative Qty Upto Previous Qty RHS 11.314

This Bill Qty RHS 3.985

For contractor For Authority Engineer For Authority Engineer For Authority Engineer

Authorized Signatory Quantity Surveyor Resident Engineer Team Leader,


MKC Infrastructur Ltd. Global Infra Solutions Global Infra Solutions Global Infra Solutions
Construction and improvement of Road bakhasar-mavasari from km 0.000 to 32.490(net length 32.49 km) (design chainage km 0.000 to km 25.682 in rajestan and km 25.682 to 31.703 in gujarat )
(Design Length 31.703 km) from existing CL-9 Specification to NHDL specificaton under 45 BRTF of project Chetak in Rajasthan and Gujarat

Client CHIEF ENGINEER PROJECT CHETAK


Authority Engineer M/s. GLOBAL INFRA SOLUTIONS
Contractor M/S. MKC Infrastructure Ltd.
Stage Payment Statment No. - 11
Period 1st March 2024 to 20th March 2024

Measurement Sheet
Description of Item- Reconstruction & New Culverts (Miscellaneous Work)

SR. No. LOCATION RFI DATE ACTIVITY Side UNIT TOTAL IN NOS IPC No.

1 02+935 MKC/BRO/STR/2265 08-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

2 03+700 MKC/BRO/STR/2131 04-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11
3 14+470 MKC/BRO/STR/1685 29-01-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

4 14+660 MKC/BRO/STR/2325 09-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

5 14+935 MKC/BRO/STR/2259 07-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

6 15+485 MKC/BRO/STR/2362 10-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

7 15+695 MKC/BRO/STR/1995 27-02-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

8 16+025 MKC/BRO/STR/2404 11-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

9 16+265 MKC/BRO/STR/2445 12-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

10 16+595 MKC/BRO/STR/2446 12-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

11 16+850 MKC/BRO/STR/2363 10-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

12 17+130 MKC/BRO/STR/2555 15-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

13 17+280 MKC/BRO/STR/2512 14-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

14 17+525 MKC/BRO/STR/2556 15-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

15 17+815 MKC/BRO/STR/2515 14-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

16 18+535 MKC/BRO/STR/2261 07-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

17 19+125 MKC/BRO/STR/2483 13-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

18 19+645 MKC/BRO/STR/2614 18-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

19 20+645 MKC/BRO/STR/2598 18-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

20 20+810 MKC/BRO/STR/2034 01-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

21 22+360 MKC/BRO/STR/2629 19-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

22 22+835 MKC/BRO/STR/2642 20-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

23 23+070 MKC/BRO/STR/2616 18-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

24 23+410 MKC/BRO/STR/2619 19-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

25 23+655 MKC/BRO/STR/2620 19-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

26 24+085 MKC/BRO/STR/1156 16-12-2023 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

27 25+625 MKC/BRO/STR/2643 20-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

28 26+590 MKC/BRO/STR/1174 17-12-2023 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

29 27+225 MKC/BRO/STR/2450 12-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

30 27+575 MKC/BRO/STR/2295 08-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

31 27+910 MKC/BRO/STR/2558 15-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

32 28+325 MKC/BRO/STR/2617 18-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

33 28+730 MKC/BRO/STR/2329 09-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11
SR. No. LOCATION RFI DATE ACTIVITY Side UNIT TOTAL IN NOS IPC No.

34 29+760 MKC/BRO/STR/2451 12-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

35 30+025 MKC/BRO/STR/2365 10-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

36 30+250 MKC/BRO/STR/2452 12-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

37 30+540 MKC/BRO/STR/2618 18-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

38 30+840 MKC/BRO/STR/2517 14-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

39 30+950 MKC/BRO/STR/2486 13-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

40 31+150 MKC/BRO/STR/2578 16-03-2024 Box Culvert Misc. Work BHS Nos. 1.00 IPC-11

Abstract of Qty for Box culverts


Up to Cumulative Qty in Numbers 40.000
Less Qty paid up to Last IPC in Numbers 0.000
Work done Qty to be paid in this IPC in Numbers 40.000

For contractor For Authority Engineer For Authority Engineer For Authority Engineer For Authority Engineer

Authorized Signatory Quantity Surveyor Bridge Engineer Resident Engineer Team Leader
MKC Infrastructur Ltd. Global Infra Solutions Global Infra Solution Global Infra Solutions Global Infra Solutions
Construction and improvement of Road bakhasar-mavasari from km 0.000 to 32.490(net length 32.49 km) (design chainage km 0.000 to km 25.682 in rajestan and km 25.682 to
31.703 in gujarat ) (Design Length 31.703 km) from existing CL-9 Specification to NHDL specificaton under 45 BRTF of project Chetak in Rajasthan and Gujarat

Client CHIEF ENGINEER PROJECT CHETAK


Authority Engineer M/s. GLOBAL INFRA SOLUTIONS
Contractor M/S. MKC Infrastructure Ltd.
Stage Payment Statment No. - 11
Period 1st March 2024 to 20th March 2024

Measurement Sheet
Description of Item- MNB Foundation

SR. NO. LOCATION RFI DATE ACTIVITY SIDE UNIT TOTAL IPC No.

1 21+525 MKC/BRO/STR/606 25-05-2023 Raft BHS Rmt. 24.000 IPC-2


2 21+825 MKC/BRO/STR/562 21-05-2023 Raft BHS Rmt. 24.000 IPC-2
3 23+930 MKC/BRO/STR/499 16-05-2023 Raft BHS Rmt. 10.000 IPC-2

4 18+015 MKC/BRO/STR/768 14-06-2023 Raft BHS Rmt. 10.000 IPC-3


5 18+260 MKC/BRO/STR/730 08-06-2023 Raft BHS Rmt. 24.000 IPC-3
6 19+220 MKC/BRO/STR/792 22-06-2023 Raft BHS Rmt. 10.000 IPC-3
7 19+285 MKC/BRO/STR/803 24-06-2023 Raft BHS Rmt. 16.000 IPC-3
8 24+040 MKC/BRO/STR/630 27-05-2023 Raft BHS Rmt. 16.000 IPC-3

9 11+255 MKC/BRO/STR/1436 06-01-2024 Raft BHS Rmt. 10.000 IPC-9


10 11+740 MKC/BRO/STR/1467 09-01-2024 Raft BHS Rmt. 10.000 IPC-9
11 12+335 MKC/BRO/STR/1511 12-01-2024 Raft BHS Rmt. 16.000 IPC-9
12 18+730 MKC/BRO/STR/1547 16-01-2024 Raft BHS Rmt. 24.000 IPC-9
13 12+085 MKC/BRO/STR/1563 19-01-2024 Raft BHS Rmt. 16.000 IPC-9
14 13+020 MKC/BRO/STR/1577 20-01-2024 Raft BHS Rmt. 10.000 IPC-9
15 15+150 MKC/BRO/STR/1604 23-01-2024 Raft BHS Rmt. 10.000 IPC-9

16 06+810 MKC/BRO/STR/1866 16-02-2024 Raft BHS Rmt. 10.000 IPC-10


17 09+170 MKC/BRO/STR/1830 13-02-2024 Raft BHS Rmt. 10.000 IPC-10
18 10+680 MKC/BRO/STR/1820 12-02-2024 Raft BHS Rmt. 16.000 IPC-10

19 05+835 MKC/BRO/STR/2412 12-03-2024 Raft BHS Rmt. 10.000 IPC-11


20 09+965 MKC/BRO/STR/2299 09-03-2024 Raft BHS Rmt. 10.000 IPC-11

Abstract of Qty for MNB Foundation


Up to Cumulative Qty in Meter 286.000
Less Qty paid up to Last IPC in Meter 266.000
Work done Qty to be paid in this IPC in Meter 20.000

For contractor For Authority Engineer For Authority Engineer For Authority Engineer For Authority Engineer

Authorized Signatory Quantity Surveyor Bridge Engineer Resident Engineer Team Leader
MKC Infrastructur Ltd. Global Infra Solutions Global Infra Solution Global Infra Solutions Global Infra Solutions
Construction and improvement of Road bakhasar-mavasari from km 0.000 to 32.490(net length 32.49 km) (design chainage km 0.000 to km 25.682 in rajestan and km 25.682 to 31.703
in gujarat ) (Design Length 31.703 km) from existing CL-9 Specification to NHDL specificaton under 45 BRTF of project Chetak in Rajasthan and Gujarat

Client CHIEF ENGINEER PROJECT CHETAK


Authority Engineer M/s. GLOBAL INFRA SOLUTIONS
Contractor M/S. MKC Infrastructure Ltd.
Stage Payment Statment No. - 11
Period 1st March 2024 to 20th March 2024

Measurement Sheet
Description of Item- MNB Sub Structure

SR. NO. LOCATION RFI DATE ACTIVITY SIDE UNIT TOTAL IPC NO.

1 21+525 MKC/BRO/STR/667 29-05-2023 Wall Final Lift BHS Rmt. 24.000 IPC-2
2 21+825 MKC/BRO/STR/607 25-05-2023 Wall Final Lift BHS Rmt. 24.000 IPC-2
3 23+930 MKC/BRO/STR/589 23-05-2023 Wall Final Lift BHS Rmt. 10.000 IPC-2

4 18+015 MKC/BRO/STR/1255 23-12-2023 Wall Final Lift BHS Rmt. 10.000 IPC-8
19+285 MKC/BRO/STR/1240 22-12-2023 Wall Final Lift BHS Rmt.
5 16.000 IPC-8
19+285 MKC/BRO/STR/1325 27-12-2023 Wall Final Lift BHS Rmt.
6 24+040 MKC/BRO/STR/1114 07-12-2023 Wall Final Lift BHS Rmt. 16.000 IPC-8

7 19+220 MKC/BRO/STR/1434 06-01-2024 Wall Final Lift BHS Rmt. 10.000 IPC-9
8 18+730 MKC/BRO/STR/1602 23-01-2024 Wall Final Lift BHS Rmt. 24.000 IPC-9
9 15+150 MKC/BRO/STR/1660 27-01-2024 Wall Final Lift BHS Rmt. 10.000 IPC-9
10 18+260 MKC/BRO/STR/1675 28-01-2024 Wall Final Lift BHS Rmt. 24.000 IPC-9

11 9+170 MKC/BRO/STR/2008 28-02-2024 Wall Final Lift BHS Rmt. 10.000 IPC-10
12 10+680 MKC/BRO/STR/2009 28-02-2024 Wall Final Lift BHS Rmt. 16.000 IPC-10
13 11+255 MKC/BRO/STR/1834 13-02-2024 Wall Final Lift BHS Rmt. 10.000 IPC-10
14 12+335 MKC/BRO/STR/1827 12-02-2024 Wall Final Lift BHS Rmt. 16.000 IPC-10
15 13+020 MKC/BRO/STR/1848 14-02-2024 Wall Final Lift BHS Rmt. 10.000 IPC-10

16 05+835 MKC/BRO/STR/2539 15-03-2024 Wall Final Lift BHS Rmt. 10.000 IPC-11
17 06+810 MKC/BRO/STR/2266 08-03-2024 Wall Final Lift BHS Rmt. 10.000 IPC-11
18 09+965 MKC/BRO/STR/2523 15-03-2024 Wall Final Lift BHS Rmt. 10.000 IPC-11
19 11+740 MKC/BRO/STR/2417 12-03-2024 Wall Final Lift BHS Rmt. 10.000 IPC-11
20 12+085 MKC/BRO/STR/2169 05-03-2024 Wall Final Lift BHS Rmt. 16.000 IPC-11

Abstract of Qty for MNB Sub-Structure


Up to Cumulative Qty in Meter 286.000
Less Qty paid up to Last IPC in Meter 230.000
Work done Qty to be paid in this IPC in Meter 56.000

For contractor For Authority Engineer For Authority Engineer For Authority Engineer For Authority Engineer

Authorized Signatory Quantity Surveyor Bridge Engineer Resident Engineer Team Leader
MKC Infrastructur Ltd. Global Infra Solutions Global Infra Solution Global Infra Solutions Global Infra Solutions
Construction and improvement of Road bakhasar-mavasari from km 0.000 to 32.490(net length 32.49 km) (design chainage km 0.000 to km 25.682 in rajestan and km 25.682 to
31.703 in gujarat ) (Design Length 31.703 km) from existing CL-9 Specification to NHDL specificaton under 45 BRTF of project Chetak in Rajasthan and Gujarat

Client CHIEF ENGINEER PROJECT CHETAK


Authority Engineer M/s. GLOBAL INFRA SOLUTIONS
Contractor M/S. MKC Infrastructure Ltd.
Stage Payment Statment No. - 11
Period 1st March 2024 to 20th March 2024

Measurement Sheet
Description of Item- MNB Sup. Structure

SR. NO. LOCATION RFI DATE ACTIVITY SIDE UNIT TOTAL IPC

1 23+930 MKC/BRO/STR/632 27-05-2023 Slab BHS Rmt. 10.00 IPC-3

2 21+825 MKC/BRO/STR/1366 29-12-2023 Slab BHS Rmt. 24.00 IPC-8


3 24+040 MKC/BRO/STR/1386 31-12-2023 Slab BHS Rmt. 16.00 IPC-8

4 19+285 MKC/BRO/STR/1487 10-01-2024 Slab BHS Rmt. 16.00 IPC-9


5 21+525 MKC/BRO/STR/1528 14-01-2024 Slab BHS Rmt. 24.00 IPC-9

6 18+015 MKC/BRO/STR/1408 04-01-2024 Slab BHS Rmt. 10.00 IPC-10


7 18+260 MKC/BRO/STR/1898 18-02-2024 Slab BHS Rmt. 24.00 IPC-10
8 18+730 MKC/BRO/STR/1923 21-02-2024 Slab BHS Rmt. 24.00 IPC-10
9 19+220 MKC/BRO/STR/1994 27-02-2024 Slab BHS Rmt. 10.00 IPC-10

10 05+835 MKC/BRO/STR/2599 18-03-2024 Slab BHS Rmt. 10.00 IPC-11


11 06+810 MKC/BRO/STR/2309 09-03-2024 Slab BHS Rmt. 10.00 IPC-11
12 09+170 MKC/BRO/STR/2500 14-03-2024 Slab BHS Rmt. 10.00 IPC-11
13 09+965 MKC/BRO/STR/2540 15-03-2024 Slab BHS Rmt. 10.00 IPC-11
14 10+680 MKC/BRO/STR/2093 03-03-2024 Slab BHS Rmt. 16.00 IPC-11
15 11+255 MKC/BRO/STR/2467 13-03-2024 Slab BHS Rmt. 10.00 IPC-11
16 11+740 MKC/BRO/STR/2559 16-03-2024 Slab BHS Rmt. 10.00 IPC-11
17 12+085 MKC/BRO/STR/2345 10-03-2024 Slab BHS Rmt. 16.00 IPC-11
18 12+335 MKC/BRO/STR/2600 18-03-2024 Slab BHS Rmt. 16.00 IPC-11
19 13+020 MKC/BRO/STR/2069 20-03-2024 Slab BHS Rmt. 10.00 IPC-11
20 15+150 MKC/BRO/STR/2634 20-03-2024 Slab BHS Rmt. 10.00 IPC-11

Abstract of Qty for Box culverts


Up to Cumulative Qty in Meter 286.00
Less Qty paid up to Last IPC in Meter 158.00
Work done Qty to be paid in this IPC in Meter 128.00

For contractor For Authority Engineer For Authority Engineer For Authority Engineer For Authority Engineer

Authorized Signatory Quantity Surveyor Bridge Engineer Resident Engineer Team Leader
MKC Infrastructur Ltd. Global Infra Solutions Global Infra Solution Global Infra Solutions Global Infra Solutions
Construction and improvement of Road bakhasar-mavasari from km 0.000 to 32.490(net length 32.49 km) (design chainage km 0.000 to km 25.682 in rajestan and km 25.682 to 31.703 in gujarat ) (Design Length
31.703 km) from existing CL-9 Specification to NHDL specificaton under 45 BRTF of project Chetak in Rajasthan and Gujarat

Client CHIEF ENGINEER PROJECT CHETAK

Authority Engineer M/s. GLOBAL INFRA SOLUTIONS

Contractor M/S. MKC Infrastructure Ltd.

Stage Payment Statment No. - 11

Period 1st March 2024 to 20th March 2024

Measurement Sheet

Description of Item- Major Bridge Pilling Work

Span/Length
Chainage as Type of
Sl.No RFI Description Date Side arrangement as Up to Date IPC in mtr IPC No.
per design Structure
per design

1 MKC/BRO/STR/315 Abutment A1 Pile No 1 25-04-2023

2 MKC/BRO/STR/318 Abutment A2 Pile No 1 25-04-2023

3 MKC/BRO/STR/278 Pier P4 Pile No 1 20-04-2023


4 MKC/BRO/STR/308 Pier P4 Pile No 2 24-04-2023
5 MKC/BRO/STR/319 Pier P4 Pile No 3 25-04-2023

6 MKC/BRO/STR/234 Pier P5 Pile No 1 15-04-2023


7 MKC/BRO/STR/306 Pier P5 Pile No 3 24-04-2023
8 MKC/BRO/STR/316 Pier P5 Pile No 4 25-04-2023

9 MKC/BRO/STR/063 Pier P6 Pile No 1 30-03-2023


10 MKC/BRO/STR/078 Pier P6 Pile No 2 01-04-2023
11 MKC/BRO/STR/098 Pier P6 Pile No 3 03-04-2023
12 MKC/BRO/STR/120 Pier P6 Pile No 4 05-04-2023

13 MKC/BRO/STR/065 Pier P7 Pile No 1 30-03-2023


14 MKC/BRO/STR/079 Pier P7 Pile No 2 01-04-2023
15 MKC/BRO/STR/099 Pier P7 Pile No 3 03-04-2023
16 MKC/BRO/STR/109 Pier P7 Pile No 4 04-04-2023

17 MKC/BRO/STR/144 Pier P8 Pile No 1 07-04-2023


18 MKC/BRO/STR/174 Pier P8 Pile No 2 10-04-2023
19 MKC/BRO/STR/185 Pier P8 Pile No 3 11-04-2023
20 MKC/BRO/STR/199 Pier P8 Pile No 4 12-04-2023

21 MKC/BRO/STR/122 Pier P9 Pile No 1 05-04-2023


22 MKC/BRO/STR/140 Pier P9 Pile No 2 06-04-2023
23 MKC/BRO/STR/164 Pier P9 Pile No 3 09-04-2023
24 MKC/BRO/STR/187 Pier P9 Pile No 4 11-04-2023

25 MKC/BRO/STR/137 Pier P10 Pile No 1 06-04-2023


26 MKC/BRO/STR/146 Pier P10 Pile No 2 07-04-2023
27 MKC/BRO/STR/165 Pier P10 Pile No 3 09-04-2023
28 29+075 MKC/BRO/STR/188 Pier P10 Pile No 4 11-04-2023 MJB 600 Mtr. 442.105 IPC-1

29 MKC/BRO/STR/175 Pier P11 Pile No 1 10-04-2023


30 MKC/BRO/STR/186 Pier P11 Pile No 2 11-04-2023
31 MKC/BRO/STR/307 Pier P11 Pile No 3 24-04-2023
32 MKC/BRO/STR/211 Pier P11 Pile No 4 13-04-2023

33 MKC/BRO/STR/203 Pier P12 Pile No 1 12-04-2023


34 MKC/BRO/STR/212 Pier P12 Pile No 2 13-04-2023
35 MKC/BRO/STR/222 Pier P12 Pile No 3 14-04-2023
36 MKC/BRO/STR/235 Pier P12 Pile No 4 15-04-2023

37 MKC/BRO/STR/204 Pier P13 Pile No 1 12-04-2023


38 MKC/BRO/STR/213 Pier P13 Pile No 2 13-04-2023
39 MKC/BRO/STR/236 Pier P13 Pile No 3 15-04-2023
40 MKC/BRO/STR/245 Pier P13 Pile No 4 16-04-2023
Span/Length
Chainage as Type of
Sl.No RFI Description Date Side arrangement as Up to Date IPC in mtr IPC No.
per design Structure
per design

41 MKC/BRO/STR/243 Pier P14 Pile No 1 16-04-2023


42 MKC/BRO/STR/251 Pier P14 Pile No 2 17-04-2023
43 MKC/BRO/STR/258 Pier P14 Pile No 3 18-04-2023
44 MKC/BRO/STR/268 Pier P14 Pile No 4 19-04-2023

45 MKC/BRO/STR/320 Pier P15 Pile No 1 25-04-2023


46 MKC/BRO/STR/279 Pier P15 Pile No 2 20-04-2023
47 MKC/BRO/STR/281 Pier P15 Pile No 3 20-04-2023
48 MKC/BRO/STR/309 Pier P15 Pile No 4 24-04-2023

49 MKC/BRO/STR/257 Pier P16 Pile No 1 18-04-2023


50 MKC/BRO/STR/267 Pier P16 Pile No 2 19-04-2023
51 MKC/BRO/STR/280 Pier P16 Pile No 3 20-04-2023
52 MKC/BRO/STR/310 Pier P16 Pile No 4 24-04-2023

53 MKC/BRO/STR/270 Pier P17 Pile No 1 19-04-2023


54 MKC/BRO/STR/282 Pier P17 Pile No 2 20-04-2023
55 MKC/BRO/STR/305 Pier P17 Pile No 3 24-04-2023
56 MKC/BRO/STR/300 Pier P17 Pile No 4 20-04-2023

57 MKC/BRO/STR/618 Abutment A1 Pile No 1 26-05-2023


58 MKC/BRO/STR/693 Abutment A1 Pile No 2 31-05-2023
59 MKC/BRO/STR/610 Abutment A1 Pile No 3 25-05-2023
60 MKC/BRO/STR/603 Abutment A1 Pile No 4 24-05-2023

61 MKC/BRO/STR/576 Abutment A2 Pile No 1 22-05-2023


62 MKC/BRO/STR/602 Abutment A2 Pile No 2 24-05-2023
63 MKC/BRO/STR/591 Abutment A2 Pile No 3 23-05-2023
64 MKC/BRO/STR/609 Abutment A2 Pile No 4 25-05-2023
24+410 MJB 100 Mtr. 100.000 IPC-2
65 MKC/BRO/STR/637 Abutment P1 Pile No 1 27-05-2023
66 MKC/BRO/STR/653 Abutment P1 Pile No 3 28-05-2023
67 MKC/BRO/STR/669 Abutment P1 Pile No 4 29-05-2023
68 MKC/BRO/STR/617 Abutment P1 Pile No 2 26-05-2023

69 MKC/BRO/STR/575 Pier P2 Pile No 1 22-05-2023


70 MKC/BRO/STR/601 Pier P2 Pile No 2 24-05-2023
71 MKC/BRO/STR/590 Pier P2 Pile No 3 23-05-2023
72 MKC/BRO/STR/608 Pier P2 Pile No 4 25-05-2023

73 MKC/BRO/STR/439 Abutment A2 Pile No 1 10-05-2023


74 MKC/BRO/STR/448 Abutment A2 Pile No 2 11-05-2023
75 MKC/BRO/STR/426 Abutment A2 Pile No 3 09-05-2023
76 MKC/BRO/STR/420 Abutment A2 Pile No 4 08-05-2023

77 MKC/BRO/STR/516 Pier P1 Pile No 1 17-05-2023


78 MKC/BRO/STR/541 Pier P1 Pile No 2 19-05-2023
79 MKC/BRO/STR/528 Pier P1 Pile No 3 18-05-2023
80 MKC/BRO/STR/554 Pier P1 Pile No 4 20-05-2023

81 MKC/BRO/STR/459 Pier P10 Pile No 1 12-05-2023


82 MKC/BRO/STR/490 Pier P10 Pile No 2 15-05-2023
83 MKC/BRO/STR/480 Pier P10 Pile No 3 14-05-2023
84 MKC/BRO/STR/501 Pier P10 Pile No 4 16-05-2023

85 MKC/BRO/STR/421 Pier P11 Pile No 1 08-05-2023


86 MKC/BRO/STR/440 Pier P11 Pile No 2 10-05-2023
87 MKC/BRO/STR/427 Pier P11 Pile No 3 09-05-2023
88 MKC/BRO/STR/449 Pier P11 Pile No 4 11-05-2023

89 MKC/BRO/STR/422 Pier P12 Pile No 1 08-05-2023


90 MKC/BRO/STR/452 Pier P12 Pile No 2 11-05-2023
91 MKC/BRO/STR/443 Pier P12 Pile No 3 10-05-2023
92 MKC/BRO/STR/504 Pier P12 Pile No 4 16-05-2023

93 MKC/BRO/STR/429 Pier P13 Pile No 1 09-05-2023


94 MKC/BRO/STR/451 Pier P13 Pile No 2 11-05-2023
95 MKC/BRO/STR/442 Pier P13 Pile No 3 10-05-2023
Span/Length
Chainage as Type of
Sl.No RFI Description Date Side arrangement as Up to Date IPC in mtr IPC No.
per design Structure
per design

96 MKC/BRO/STR/493 Pier P13 Pile No 4 15-05-2023

97 MKC/BRO/STR/428 Pier P14 Pile No 1 09-05-2023


98 MKC/BRO/STR/461 Pier P14 Pile No 2 12-05-2023
99 MKC/BRO/STR/450 Pier P14 Pile No 3 11-05-2023
100 MKC/BRO/STR/441 Pier P14 Pile No 4 10-05-2023

101 MKC/BRO/STR/517 Pier P2 Pile No 1 17-05-2023


102 MKC/BRO/STR/529 Pier P2 Pile No 2 18-05-2023
103 MKC/BRO/STR/542 Pier P2 Pile No 3 19-05-2023
104 MKC/BRO/STR/555 Pier P2 Pile No 4 20-05-2023
24+940 MJB 500 Mtr. 500.000 SPS-02
105 MKC/BRO/STR/515 Pier P3 Pile No 1 17-05-2023
106 MKC/BRO/STR/540 Pier P3 Pile No 2 19-05-2023
107 MKC/BRO/STR/553 Pier P3 Pile No 3 20-05-2023
108 MKC/BRO/STR/566 Pier P3 Pile No 4 21-05-2023

109 MKC/BRO/STR/514 Pier P4 Pile No 1 17-05-2023


110 MKC/BRO/STR/539 Pier P4 Pile No 2 19-05-2023
111 MKC/BRO/STR/526 Pier P4 Pile No 3 18-05-2023
112 MKC/BRO/STR/552 Pier P4 Pile No 4 20-05-2023

113 MKC/BRO/STR/513 Pier P5 Pile No 1 17-05-2023


114 MKC/BRO/STR/538 Pier P5 Pile No 2 19-05-2023
115 MKC/BRO/STR/525 Pier P5 Pile No 3 18-05-2023
116 MKC/BRO/STR/551 Pier P5 Pile No 4 20-05-2023

117 MKC/BRO/STR/494 Pier P6 Pile No 1 15-05-2023


118 MKC/BRO/STR/505 Pier P6 Pile No 3 16-05-2023
119 MKC/BRO/STR/530 Pier P6 Pile No 4 18-05-2023
120 MKC/BRO/STR/634 Pier P6 Pile No 2 27-05-2023

121 MKC/BRO/STR/567 Pier P7 Pile No 1 21-05-2023


122 MKC/BRO/STR/578 Pier P7 Pile No 2 22-05-2023
123 MKC/BRO/STR/593 Pier P7 Pile No 4 23-05-2023
124 MKC/BRO/STR/635 Pier P7 Pile No 3 27-05-2023

125 MKC/BRO/STR/471 Pier P8 Pile No 1 13-05-2023


126 MKC/BRO/STR/492 Pier P8 Pile No 2 15-05-2023
127 MKC/BRO/STR/482 Pier P8 Pile No 3 14-05-2023
128 MKC/BRO/STR/503 Pier P8 Pile No 4 16-05-2023

129 MKC/BRO/STR/460 Pier P9 Pile No 1 12-05-2023


130 MKC/BRO/STR/491 Pier P9 Pile No 2 15-05-2023
131 MKC/BRO/STR/481 Pier P9 Pile No 3 14-05-2023
132 MKC/BRO/STR/502 Pier P9 Pile No 4 16-05-2023

133 MKC/BRO/STR/592 Abutment A1 Pile No 2 23-05-2023


134 MKC/BRO/STR/577 Abutment A1 Pile No 3 22-05-2023
135 MKC/BRO/STR/636 Abutment A1 Pile No 1 27-05-2023
136 MKC/BRO/STR/652 Abutment A1 Pile No 4 28-05-2023

137 MKC/BRO/STR/356 Abutment A1 pile no. 2 01-05-2023


138 MKC/BRO/STR/365 Abutment A1 pile no. 3 02-05-2023
139 MKC/BRO/STR/389 Abutment A1 pile no. 4 05-05-2023

140 MKC/BRO/STR/353 Abutment A2 pile no. 2 01-05-2023


141 MKC/BRO/STR/363 Abutment A2 pile no. 3 02-05-2023
142 MKC/BRO/STR/397 Abutment A2 pile no. 4 06-05-2023

143 MKC/BRO/STR/354 Pier P1 Pile No 1 01-05-2023


144 MKC/BRO/STR/364 Pier P1 Pile No 2 02-05-2023
145 MKC/BRO/STR/380 Pier P1 Pile No 3 04-05-2023
146 MKC/BRO/STR/388 Pier P1 Pile No 4 05-05-2023

29+075 MJB 600 Mtr. 157.895 SPS-02


147 MKC/BRO/STR/381 Pier P5 Pile No 2 04-05-2023

148 MKC/BRO/STR/334 Pier P2 Pile No 1 28-04-2023


Span/Length
Chainage as Type of
Sl.No RFI Description Date Side arrangement as Up to Date IPC in mtr IPC No.
per design Structure
per design

149 MKC/BRO/STR/341 Pier P2 Pile No 2 29-04-2023


150 MKC/BRO/STR/347 Pier P2 Pile No 3 30-04-2023
151 MKC/BRO/STR/355 Pier P2 Pile No 4 01-05-2023

152 MKC/BRO/STR/340 Pier P3 Pile No 1 29-04-2023


153 MKC/BRO/STR/342 Pier P3 Pile No 2 29-04-2023
154 MKC/BRO/STR/335 Pier P3 Pile No 4 28-04-2023
155 MKC/BRO/STR/373 Pier P3 Pile No 3 03-05-2023

156 MKC/BRO/STR/651 Pier P4 Pile No 4 28-05-2023

157 MKC/BRO/STR/795 Abutment A1 pile no. 2 22-06-2023


158 MKC/BRO/STR/800 Abutment A1 pile no. 4 23-06-2023
159 MKC/BRO/STR/809 Abutment A1 pile no. 1 25-06-2023
160 MKC/BRO/STR/812 Abutment A1 pile no. 2 26-06-2023

161 MKC/BRO/STR/788 Abutment A2 pile no. 4 21-06-2023


162 MKC/BRO/STR/793 Abutment A2 pile no. 2 22-06-2023
163 MKC/BRO/STR/797 Abutment A2 pile no. 3 23-06-2023
164 MKC/BRO/STR/804 Abutment A2 pile no. 1 24-06-2023
22+510 MJB 100 Mtr. 100 IPC-03
165 MKC/BRO/STR/807 Pier P1 Pile No 1 24-06-2023
166 MKC/BRO/STR/808 Pier P1 Pile No 2 25-06-2023
167 MKC/BRO/STR/810 Pier P1 Pile No 3 25-06-2023
168 MKC/BRO/STR/811 Pier P1 Pile No 4 26-06-2023

169 MKC/BRO/STR/813 Pier P2 Pile No 4 26-06-2023


170 MKC/BRO/STR/794 Pier P2 Pile No 1 22-06-2023
171 MKC/BRO/STR/799 Pier P2 Pile No 3 23-06-2023
172 MKC/BRO/STR/806 Pier P2 Pile No 2 24-06-2023

173 MKC/BRO/STR/706 Abutment A1 pile no. 2 04-06-2023


174 MKC/BRO/STR/723 Abutment A1 pile no. 4 06-06-2023
175 MKC/BRO/STR/752 Abutment A1 pile no. 1 11-06-2023
176 MKC/BRO/STR/707 Abutment A1 pile no. 3 11-06-2023

177 MKC/BRO/STR/722 Abutment A2 pile no. 4 06-06-2023


178 MKC/BRO/STR/732 Abutment A2 pile no. 2 08-06-2023
179 MKC/BRO/STR/739 Abutment A2 pile no. 3 09-06-2023
180 MKC/BRO/STR/749 Abutment A2 pile no. 1 11-06-2023
22+720 MJB 100 Mtr. 100 IPC-03
181 MKC/BRO/STR/714 Pier P1 Pile No 3 05-06-2023
182 MKC/BRO/STR/720 Pier P1 Pile No 2 06-06-2023
183 MKC/BRO/STR/724 Pier P1 Pile No 4 07-06-2023
184 MKC/BRO/STR/750 Pier P1 Pile No 1 11-06-2023

185 MKC/BRO/STR/721 Pier P2 Pile No 1 06-06-2023


186 MKC/BRO/STR/751 Pier P2 Pile No 3 11-06-2023
187 MKC/BRO/STR/758 Pier P2 Pile No 2 12-06-2023
188 MKC/BRO/STR/767 Pier P2 Pile No 4 13-06-2023

189 MKC/BRO/STR/840 Pier P1 Pile No 3 16-09-2023


190 MKC/BRO/STR/848 Pier P1 Pile No 2 19-09-2023

191 MKC/BRO/STR/841 Pier P1 Pile No 4 16-09-2023

192 MKC/BRO/STR/842 Pier P1 Pile No 1 16-09-2023

193 MKC/BRO/STR/843 Pier P2 Pile No 1 17-09-2023

194 21+185 MKC/BRO/STR/844 Pier P2 Pile No 3 17-09-2023 MJB 100 Mtr. 67 IPC-6
195 MKC/BRO/STR/845 Pier P2 Pile No 2 18-09-2023

196 MKC/BRO/STR/846 Pier P2 Pile No 4 18-09-2023

197 MKC/BRO/STR/847 Abutment A1 pile no. 2 19-09-2023

198 MKC/BRO/STR/849 Abutment A1 pile no. 4 20-09-2023

199 MKC/BRO/STR/850 Abutment A1 pile no. 1 20-09-2023


Span/Length
Chainage as Type of
Sl.No RFI Description Date Side arrangement as Up to Date IPC in mtr IPC No.
per design Structure
per design

200 MKC/BRO/STR/939 Abutment A1 pile no. 3 17-11-2023

201 MKC/BRO/STR/950 Abutment A2 pile no. 4 18-11-2023

202 21+185 MKC/BRO/STR/961 Abutment A2 pile no. 2 19-11-2023 MJB 100 Mtr. 33 IPC-7
203 MKC/BRO/STR/966 Abutment A2 pile no. 3 20-11-2023

204 MKC/BRO/STR/979 Abutment A2 pile no. 1 21-11-2023

205, 206 MKC/BRO/STR/980 Abutment A1 pile no. 1 & 3 21-11-2023

207, 208 MKC/BRO/STR/983 Abutment A2 pile no. 1 & 4 22-11-2023


20+225 MJB 300 Mtr. 60 IPC-7
209, 210 MKC/BRO/STR/991 Pier P2 Pile No 1 & 4 23-11-2023

211, 212 MKC/BRO/STR/1042 Abutment A1 pile no. 2 & 4 27-11-2023

213 MKC/BRO/STR/1109 Abutment A2 Pile No 2 06-12-2023

214 MKC/BRO/STR/1113 Abutment A2 Pile No 3 07-12-2023

215 MKC/BRO/STR/1108 Pier P1 Pile No 1 06-12-2023

216 MKC/BRO/STR/1121 Pier P1 Pile No 2 11-12-2023

217 MKC/BRO/STR/1169 Pier P1 Pile No 3 17-12-2023

218 MKC/BRO/STR/1112 Pier P1 Pile No 4 07-12-2023

219 MKC/BRO/STR/1309 Pier P2 Pile No 2 26-12-2023

220 MKC/BRO/STR/1136 Pier P2 Pile No 3 13-12-2023

221 MKC/BRO/STR/1149 Pier P3 Pile No 1 15-12-2023

222 MKC/BRO/STR/1224 Pier P3 Pile No 2 21-12-2023


20+225
223 MKC/BRO/STR/1256 Pier P3 Pile No 3 23-12-2023 MJB 300 Mtr. 157.5 IPC-8

224 MKC/BRO/STR/1191 Pier P3 Pile No 4 19-12-2023

225 MKC/BRO/STR/1192 Pier P6 Pile No 1 19-12-2023

226 MKC/BRO/STR/1257 Pier P6 Pile No 2 23-12-2023

227 MKC/BRO/STR/1310 Pier P6 Pile No 3 26-12-2023

228 MKC/BRO/STR/1225 Pier P6 Pile No 4 21-12-2023

229 MKC/BRO/STR/1148 Pier P8 Pile No 2 15-12-2023

230 MKC/BRO/STR/1170 Pier P8 Pile No 3 17-12-2023

231 MKC/BRO/STR/1135 Pier P8 Pile No 4 13-12-2023

232 MKC/BRO/STR/1122 Pier P8 Pile No1 11-12-2023

233 MKC/BRO/STR/1227 Pier P7 Pile No1 21-12-2023

234 MKC/BRO/STR/1423 Pier P4 Pile No 1 05-01-2024


235 MKC/BRO/STR/1451 Pier P4 Pile No 2 08-01-2024
236 MKC/BRO/STR/1460 Pier P4 Pile No 3 09-01-2024
237 MKC/BRO/STR/1424 Pier P4 Pile No 4 05-01-2024

238 MKC/BRO/STR/1443 Pier P5 Pile No 1 07-01-2024


239 MKC/BRO/STR/1452 Pier P5 Pile No 2 08-01-2024
20+225 MJB 300 Mtr. 82.5 IPC-9
240 MKC/BRO/STR/1461 Pier P5 Pile No 3 09-01-2024
241 MKC/BRO/STR/1444 Pier P5 Pile No 4 07-01-2024

242 MKC/BRO/STR/1389 Pier P7 Pile No 2 01-01-2024


243 MKC/BRO/STR/1400 Pier P7 Pile No 3 02-01-2024
244 MKC/BRO/STR/1412 Pier P7 Pile No 4 04-01-2024

245 MKC/BRO/STR/1435 Pier A1 Pile No 1 06-01-2024


Span/Length
Chainage as Type of
Sl.No RFI Description Date Side arrangement as Up to Date IPC in mtr IPC No.
per design Structure
per design

246 MKC/BRO/STR/1495 Pier A1 Pile No 2 11-01-2024


247 MKC/BRO/STR/1514 Pier A1 Pile No 3 13-01-2024
248 MKC/BRO/STR/1447 Pier A1 Pile No 4 08-01-2024

249 MKC/BRO/STR/1448 Pier A2 Pile No 1 08-01-2024


250 MKC/BRO/STR/1502 Pier A2 Pile No 2 12-01-2024
251 MKC/BRO/STR/1503 Pier A2 Pile No 3 12-01-2024
252 MKC/BRO/STR/1478 Pier A2 Pile No 4 10-01-2024

253 MKC/BRO/STR/1390 Pier P1 Pile No 1 01-01-2024


254 MKC/BRO/STR/1398 Pier P1 Pile No 2 02-01-2024
255 MKC/BRO/STR/1405 Pier P1 Pile No 3 03-01-2024
22+025 MJB 150 Mtr. 150 IPC-9
256 MKC/BRO/STR/1410 Pier P1 Pile No 4 04-01-2024
257 MKC/BRO/STR/1714 Pier P1 Pile No 5 31-01-2024

258 MKC/BRO/STR/1409 Pier P2 Pile No 1 04-01-2024


259 MKC/BRO/STR/1418 Pier P2 Pile No 2 05-01-2024
260 MKC/BRO/STR/1471 Pier P2 Pile No 3 09-01-2024
261 MKC/BRO/STR/1411 Pier P2 Pile No 4 04-01-2024

262 MKC/BRO/STR/1477 Pier P3 Pile No 1 10-01-2024


263 MKC/BRO/STR/1500 Pier P3 Pile No 2 11-01-2024
264 MKC/BRO/STR/1512 Pier P3 Pile No 3 12-01-2024
265 MKC/BRO/STR/1483 Pier P3 Pile No 4 10-01-2024
266 MKC/BRO/STR/1715 Pier P3 Pile No 5 31-01-2024

267, 268 MKC/BRO/STR/1850 Abutment A1 Pile No 1 and 2 14-02-2024


269, 270 MKC/BRO/STR/1884 Abutment A1 Pile No 3 and 4 17-02-2024

271, 272 MKC/BRO/STR/1720 Abutment A2 Pile No 1 and 2 01-02-2024


273 MKC/BRO/STR/1729 Abutment A2 Pile No 3 02-02-2024
274 MKC/BRO/STR/1731 Abutment A2 Pile No 4 02-02-2024

275, 276 MKC/BRO/STR/1719 Pier P1 Pile No 1 & 2 01-02-2024


277 MKC/BRO/STR/1727 Pier P1 Pile No 3 02-02-2024
278 MKC/BRO/STR/1728 Pier P1 Pile No 4 02-02-2024

277 MKC/BRO/STR/1737 Pier P2 Pile No 4 03-02-2024


280, 281 MKC/BRO/STR/1730 Pier P2 Pile No 1 and 2 02-02-2024
282 MKC/BRO/STR/1738 Pier P2 Pile No 3 03-02-2024

283, 284 MKC/BRO/STR/1751 Pier P3 Pile No 1 and 2 04-02-2024


285, 286 MKC/BRO/STR/1759 Pier P3 Pile No 3 and 4 05-02-2024

14+100 MJB 300 Mtr. 300 IPC-10


287 MKC/BRO/STR/1752 Pier P4 Pile No 1 04-02-2024
288 MKC/BRO/STR/1760 Pier P4 Pile No 2 05-02-2024
289, 290 MKC/BRO/STR/1767 Pier P4 Pile No 3 and 4 06-02-2024

291 MKC/BRO/STR/1768 Pier P5 Pile No 1 06-02-2024


292, 293 MKC/BRO/STR/1780 Pier P5 Pile No 2 and 3 07-02-2024
294 MKC/BRO/STR/1791 Pier P5 Pile No 4 08-02-2024

295 MKC/BRO/STR/1781 Pier P6 Pile No 1 07-02-2024


296, 297 MKC/BRO/STR/1790 Pier P6 Pile No 2 and 3 08-02-2024
298 MKC/BRO/STR/1800 Pier P6 Pile No 4 09-02-2024

299, 300 MKC/BRO/STR/1799 Pier P7 Pile No 1 and 2 09-02-2024


301, 302 MKC/BRO/STR/1805 Pier P7 Pile No 3 and 4 10-02-2024
Span/Length
Chainage as Type of
Sl.No RFI Description Date Side arrangement as Up to Date IPC in mtr IPC No.
per design Structure
per design

303 MKC/BRO/STR/1806 Pier P8 Pile No 1 10-02-2024


304, 305 MKC/BRO/STR/1814 Pier P8 Pile No 2 and 3 11-02-2024
306 MKC/BRO/STR/1823 Pier P8 Pile No 4 12-02-2024

307, 308 MKC/BRO/STR/1944 Abutment A1 Pile No 1 & 2 23-02-2024


309 MKC/BRO/STR/1954 Abutment A1 Pile No 4 24-02-2024
310 MKC/BRO/STR/1956 Abutment A1 Pile No 3 24-02-2024

311, 312 MKC/BRO/STR/1829 Abutment A2 Pile No 1 and 2 13-02-2024


313 MKC/BRO/STR/1845 Abutment A2 Pile No 3 14-02-2024
314 MKC/BRO/STR/1857 Abutment A2 Pile No 4 15-02-2024

315 MKC/BRO/STR/1815 Pier P1 Pile No 1 11-02-2024


316 MKC/BRO/STR/1824 Pier P1 Pile No 2 12-02-2024
317 MKC/BRO/STR/1825 Pier P1 Pile No 3 12-02-2024
318 MKC/BRO/STR/1828 Pier P1 Pile No 4 13-02-2024

319 MKC/BRO/STR/1843 Pier P2 Pile No 1 14-02-2024


320 MKC/BRO/STR/1844 Pier P2 Pile No 2 14-02-2024
321 MKC/BRO/STR/1859 Pier P2 Pile No 3 15-02-2024
322 MKC/BRO/STR/1861 Pier P2 Pile No 4 15-02-2024

323 MKC/BRO/STR/1867 Pier P3 Pile No 1 16-02-2024


324 MKC/BRO/STR/1869 Pier P3 Pile No 2 16-02-2024
325 MKC/BRO/STR/1877 Pier P3 Pile No 3 17-02-2024
326 MKC/BRO/STR/1880 Pier P3 Pile No 4 17-02-2024

13+375 MJB 300 Mtr. 300 IPC-10


327, 328 MKC/BRO/STR/1883 Pier P4 Pile No 1 & 3 17-02-2024
329 MKC/BRO/STR/1890 Pier P4 Pile No 2 18-02-2024
330 MKC/BRO/STR/1891 Pier P4 Pile No 4 18-02-2024

331 MKC/BRO/STR/1892 Pier P5 Pile No 1 18-02-2024


332 MKC/BRO/STR/1900 Pier P5 Pile No 2 19-02-2024
333 MKC/BRO/STR/1901 Pier P5 Pile No 3 19-02-2024
334 MKC/BRO/STR/1915 Pier P5 Pile No 4 20-02-2024

335 MKC/BRO/STR/1905 Pier P6 Pile No 1 19-02-2024


336 MKC/BRO/STR/1913 Pier P6 Pile No 2 20-02-2024
337 MKC/BRO/STR/1914 Pier P6 Pile No 3 20-02-2024
338 MKC/BRO/STR/1920 Pier P6 Pile No 4 21-02-2024

339 MKC/BRO/STR/1921 Pier P7 Pile No 1 21-02-2024


340 MKC/BRO/STR/1922 Pier P7 Pile No 2 21-02-2024
341 MKC/BRO/STR/1936 Pier P7 Pile No 3 22-02-2024
342 MKC/BRO/STR/1937 Pier P7 Pile No 4 22-02-2024

343 MKC/BRO/STR/1931 Pier P8 Pile No 1 22-02-2024


344 MKC/BRO/STR/1938 Pier P8 Pile No 2 23-02-2024
345 MKC/BRO/STR/1940 Pier P8 Pile No 3 23-02-2024
346 MKC/BRO/STR/1950 Pier P8 Pile No 4 24-02-2024

347 MKC/BRO/STR/1970 Abutment A1 Pile No 1 25-02-2024


348 MKC/BRO/STR/1972 Abutment A1 Pile No 2 25-02-2024
349 MKC/BRO/STR/1975 Abutment A1 Pile No 3 26-02-2024
350 MKC/BRO/STR/1976 Abutment A1 Pile No 4 26-02-2024
351 12+575 MKC/BRO/STR/1977 Pier P1 Pile No 1 26-02-2024 MJB 200 Mtr. 71.43 IPC-10
352 MKC/BRO/STR/1983 Pier P1 Pile No 2 26-02-2024
353 MKC/BRO/STR/1993 Pier P1 Pile No 3 27-02-2024
354 MKC/BRO/STR/1996 Pier P1 Pile No 4 27-02-2024
355 MKC/BRO/STR/2010 Pier P2 Pile No 1 28-02-2024
Span/Length
Chainage as Type of
Sl.No RFI Description Date Side arrangement as Up to Date IPC in mtr IPC No.
per design Structure
per design

356 MKC/BRO/STR/2011 Pier P2 Pile No 2 28-02-2024

357 MKC/BRO/STR/2076 Abutment A2 Pile No 1 02-03-2024


358 MKC/BRO/STR/2170 Abutment A2 No 2 05-03-2024
359 MKC/BRO/STR/2077 Abutment A2 Pile No 3 02-03-2024
360 MKC/BRO/STR/2171 Abutment A2 Pile No 4 05-03-2024

361 MKC/BRO/STR/2049 Pier P2 Pile No 3 01-03-2024


362 12+575 MKC/BRO/STR/2075 Pier P2 Pile No 4 02-03-2024 MJB 200 Mtr. 71.43 IPC-11

363 MKC/BRO/STR/2240 Pier P3 Pile No 1 07-03-2024


364 MKC/BRO/STR/2207 Pier P3 Pile No 2 06-03-2024
365 MKC/BRO/STR/2208 Pier P3 Pile No 4 06-03-2024
366 MKC/BRO/STR/2241 Pier P3 Pile No 3 07-03-2024

Up to Cumulative Qty in Meter 2692.857


Less Qty paid up to Last IPC in Meter 2621.429
Work done Qty to be paid in this IPC in Meter 71.429

For contractor For Authority Engineer For Authority Engineer For Authority Engineer For Authority Engineer

Authorized Signatory Quantity Surveyor Bridge Engineer Resident Engineer Team Leader
MKC Infrastructur Ltd. Global Infra Solutions Global Infra Solutions Global Infra Solutions Global Infra Solutions
Construction and improvement of Road bakhasar-mavasari from km 0.000 to 32.490(net length 32.49 km) (design chainage km 0.000 to km 25.682 in rajestan and km 25.682 to 31.703 in gujarat ) (Design Length
31.703 km) from existing CL-9 Specification to NHDL specificaton under 45 BRTF of project Chetak in Rajasthan and Gujarat
Client CHIEF ENGINEER PROJECT CHETAK
Authority Engineer M/s. GLOBAL INFRA SOLUTIONS
Contractor M/S. MKC Infrastructure Ltd.
Stage Payment Statment No. - 11
Period 1st March 2024 to 20th March 2024
Measurement Sheet
Description of Item- MJB Pile Cap
Sr. No. LOCATION RFI DATE ACTIVITY Side UNIT TOTAL QTY. IPC NO.
1 MKC/BRO/STR/662 28-05-2023 Pile Cap P10 for MJB BHS
2 MKC/BRO/STR/674 29-05-2023 Pile Cap P11 for MJB BHS
3 MKC/BRO/STR/683 30-05-2023 Pile Cap P12 for MJB BHS
4 29+075 MKC/BRO/STR/691 31-05-2023 Pile Cap P13 for MJB BHS Rmt. 221.053 IPC-2
5 MKC/BRO/STR/454 11-05-2023 Pile Cap P6 for MJB BHS
6 MKC/BRO/STR/558 20-05-2023 Pile Cap P7 for MJB BHS
7 MKC/BRO/STR/569 21-05-2023 Pile Cap P9 for MJB BHS

8 MKC/BRO/STR/733 09-06-2023 Pile Cap P3 for MJB BHS


9 MKC/BRO/STR/753 11-06-2023 Pile Cap P2 for MJB BHS
10 29+075 MKC/BRO/STR/775 14-06-2023 Pile Cap Abutment A1 for MJB BHS Rmt. 157.895 IPC-3
11 MKC/BRO/STR/776 14-06-2023 Pile Cap P1 for MJB BHS
12 MKC/BRO/STR/801 26-06-2023 Pile Cap P5 for MJB BHS

13 MKC/BRO/STR/1232 21-12-2023 Pile Cap Pier P11 BHS


14 24+940 MKC/BRO/STR/1346 28-12-2023 Pile Cap Pier P8 BHS Rmt. 93.750 IPC-8
15 MKC/BRO/STR/1384 31-12-2023 Pile Cap Pier P10 BHS

16 MKC/BRO/STR/1526 14-01-2024 Pile Cap Pier P1 BHS


17 24+940 MKC/BRO/STR/1456 08-01-2024 Pile Cap Pier P14 BHS Rmt. 93.750 IPC-9
18 MKC/BRO/STR/1385 31-12-2024 Pile Cap Pier P12 BHS

19 MKC/BRO/STR/1710 31-01-2024 Pile Cap Abutment A2 BHS


24+410 Rmt. 50.000 IPC-9
20 MKC/BRO/STR/1594 22-01-2024 Pile Cap Pier P2 BHS

21 MKC/BRO/STR/1968 25-02-2024 Pile Cap Abutment A1 BHS


22 MKC/BRO/STR/1957 24-02-2024 Pile Cap Pier P2 BHS
20+225 Rmt. 120.000 IPC-10
23 MKC/BRO/STR/2013 28-02-2024 Pile Cap Pier P3 BHS
24 MKC/BRO/STR/1985 26-02-2024 Pile Cap Pier P4 BHS

25 MKC/BRO/STR/1879 17-02-2024 Pile Cap Pier P1 BHS


24+410 Rmt. 50.000 IPC-10
26 MKC/BRO/STR/1945 23-02-2024 Pile Cap Abutment A1 BHS

27 MKC/BRO/STR/1837 13-02-2024 Pier P3 Pile Cap BHS


28 MKC/BRO/STR/1899 18-02-2024 Pier P6 Pile Cap BHS
29 MKC/BRO/STR/1933 22-02-2024 Pier P9 Pile Cap BHS
30 MKC/BRO/STR/1948 23-02-2024 Pier P2 Pile Cap BHS
24+940 Rmt. 250.000 IPC-10
31 MKC/BRO/STR/1971 25-02-2024 Pier P4 Pile Cap BHS
32 MKC/BRO/STR/2001 27-02-2024 Abutment A1 Pile Cap BHS
33 MKC/BRO/STR/2023 28-02-2024 Abutment A2 Pile Cap BHS
34 MKC/BRO/STR/2026 29-02-2024 Pier P13 Pile Cap BHS

35 MKC/BRO/STR/2242 07-03-2024 Pier P1 Pile Cap BHS


36 14+100 MKC/BRO/STR/2243 07-03-2024 Pier P3 Pile Cap BHS Rmt. 90.000 IPC-11
37 MKC/BRO/STR/2280 08-03-2024 Pier P2 Pile Cap BHS

38 MKC/BRO/STR/2097 03-03-2024 Pier P7 Pile Cap BHS


39 MKC/BRO/STR/2139 04-03-2024 Pier P5 Pile Cap BHS
40 MKC/BRO/STR/2140 04-03-2024 Pier P6 Pile Cap BHS
20+225 Rmt. 180.000 IPC-11
41 MKC/BRO/STR/2209 06-03-2024 Pier P8 Pile Cap BHS
42 MKC/BRO/STR/2210 06-03-2024 Abutement A2 Pile Cap BHS
43 MKC/BRO/STR/2419 12-03-2024 Pier P1 Pile Cap BHS

44 MKC/BRO/STR/2172 05-03-2024 Abutement A1 Pile Cap BHS


45 MKC/BRO/STR/2388 11-03-2024 Pier P1 Pile Cap BHS
21+185 Rmt. 100.000 IPC-11
46 MKC/BRO/STR/2389 11-03-2024 Pier P2 Pile Cap BHS
47 MKC/BRO/STR/2421 12-03-2024 Abutment A2 Pile Cap BHS

48 MKC/BRO/STR/2501 14-03-2024 Pier P1 Pile Cap BHS


49 MKC/BRO/STR/2502 14-03-2024 Pier P2 Pile Cap BHS
50 22+025 MKC/BRO/STR/2543 15-03-2024 Abutement A1 Pile Cap BHS Rmt. 150.000 IPC-11
51 MKC/BRO/STR/2544 15-03-2024 Abutement A2 Pile Cap BHS
52 MKC/BRO/STR/2635 20-03-2024 Pier P3 Pile Cap BHS

53 MKC/BRO/STR/2167 05-03-2024 Abutment A2 Pile Cap BHS


54 MKC/BRO/STR/2281 08-03-2024 Abutment A1 Pile Cap BHS
22+510 Rmt. 100.000 IPC-11
55 MKC/BRO/STR/2582 17-03-2024 Pier P1 Pile Cap BHS
56 MKC/BRO/STR/2583 17-03-2024 Pier P2 Pile Cap BHS

57 MKC/BRO/STR/2313 09-03-2024 Abutment A1 Pile Cap BHS


58 MKC/BRO/STR/2314 09-03-2024 Abutment A2 Pile Cap BHS
22+720 Rmt. 100.000 IPC-11
59 MKC/BRO/STR/2347 10-03-2024 Pier P1 Pile Cap BHS
60 MKC/BRO/STR/2348 10-03-2024 Pier P2 Pile Cap BHS

61 MKC/BRO/STR/2113 03-03-2024 Pier P5 Pile Cap BHS


24+940 Rmt. 62.500 IPC-11
62 MKC/BRO/STR/2562 16-03-2024 Pier P7 Pile Cap BHS

63 MKC/BRO/STR/2601 18-03-2024 Pier P4 Pile Cap BHS


64 MKC/BRO/STR/2602 18-03-2024 Pier P8 Pile Cap BHS
29+075 Rmt. 126.316 IPC-11
65 MKC/BRO/STR/2625 19-03-2024 Pier P14 Pile Cap BHS
66 MKC/BRO/STR/2626 19-03-2024 Pier P15 Pile Cap BHS

Abstract of Qty for MJB Pile Cap


Up to Cumulative Qty in Meter 1945.263
Less Qty paid up to Last IPC in Meter 1036.447
Work done Qty to be paid in this IPC in Meter 908.816

For contractor For Authority Engineer For Authority Engineer For Authority Engineer For Authority Engineer

Authorized Signatory Quantity Surveyor Bridge Engineer Resident Engineer Team Leader
MKC Infrastructur Ltd. Global Infra Solutions Global Infra Solutions Global Infra Solutions Global Infra Solutions
Construction and improvement of Road bakhasar-mavasari from km 0.000 to 32.490(net length 32.49 km) (design chainage km 0.000 to km 25.682 in rajestan and km 25.682 to 31.703 in gujarat ) (Design Length
31.703 km) from existing CL-9 Specification to NHDL specificaton under 45 BRTF of project Chetak in Rajasthan and Gujarat
Client CHIEF ENGINEER PROJECT CHETAK
Authority Engineer M/s. GLOBAL INFRA SOLUTIONS
Contractor M/S. MKC Infrastructure Ltd.
Stage Payment Statment No. - 11
Period 1st March 2024 to 20th March 2024
Measurement Sheet
Description of Item- MJB Pier Cap
Sr. No. LOCATION RFI DATE ACTIVITY Side UNIT TOTAL QTY. IPC NO.
1 MKC/BRO/STR/2315 09-03-2024 Pier P1 Pier Cap BHS
2 MKC/BRO/STR/2349 10-03-2024 Abutment A2 Pier Cap BHS
20+225 Rmt. 120.000
3 MKC/BRO/STR/2563 16-03-2024 Pier P4 Pier Cap BHS
4 MKC/BRO/STR/2603 18-03-2024 Abutment A1 Pier Cap BHS

5 MKC/BRO/STR/2174 05-03-2024 Pier P1 Pier Cap BHS


6 MKC/BRO/STR/2193 06-03-2024 Pier P2 Pier Cap BHS
24+410 Rmt. 100.000
7 MKC/BRO/STR/2244 07-03-2024 Abutment A1 Pier Cap BHS
8 MKC/BRO/STR/2283 08-03-2024 Abutment A2 Pier Cap BHS

9 MKC/BRO/STR/2431 12-03-2024 Abtement A2 Pier Cap BHS


10 MKC/BRO/STR/2470 13-03-2024 Pier P3 Pier Cap BHS
11 MKC/BRO/STR/2545 15-03-2024 Pier P12 Pier Cap BHS
12 24+940 MKC/BRO/STR/2581 17-03-2024 Pier P2 Pier Cap BHS Rmt. 187.500
13 MKC/BRO/STR/2604 18-03-2024 Pier P13 Pier Cap BHS
14 MKC/BRO/STR/2636 20-03-2024 Pier P1 Pier Cap BHS

Abstract of Qty for MJB Pile Cap


Up to Cumulative Qty in Meter 407.500
Less Qty paid up to Last IPC in Meter 0.000
Work done Qty to be paid in this IPC in Meter 407.500

For contractor For Authority Engineer For Authority Engineer For Authority Engineer For Authority Engineer

Authorized Signatory Quantity Surveyor Bridge Engineer Resident Engineer Team Leader
MKC Infrastructur Ltd. Global Infra Solutions Global Infra Solutions Global Infra Solutions Global Infra Solutions
Construction and improvement of Road bakhasar-mavasari from km 0.000 to 32.490(net length 32.49 km) (design chainage km 0.000 to km 25.682 in rajestan and km 25.682 to 31.703 in gujarat ) (Design
Length 31.703 km) from existing CL-9 Specification to NHDL specificaton under 45 BRTF of project Chetak in Rajasthan and Gujarat

Client CHIEF ENGINEER PROJECT CHETAK


Authority Engineer M/s. GLOBAL INFRA SOLUTIONS
Contractor M/S. MKC Infrastructure Ltd.
Stage Payment Statment No. - 11
Period 1st March 2024 to 20th March 2024

Measurement Sheet
Description of Item- MJB Girder

Sr.No. LOCATION RFI DATE ACTIVITY Side UNIT TOTAL QTY. IPC NO.

1 MKC/BRO/STR/969 20-11-2023 P1-P2 PSC Girder G-01 BHS


2 MKC/BRO/STR/1012 24-11-2023 P1-P2 PSC Girder G-02 BHS

3 MKC/BRO/STR/1039 26-11-2023 P4-P5 PSC Girder G-03 BHS


4 29+075 MKC/BRO/STR/1076 30-11-2023 P4-P5 PSC Girder G-02 BHS Rmt. 66.667 IPC-7

5 MKC/BRO/STR/1043 27-11-2023 P7-P8 PSC Girder G-01 BHS


6 MKC/BRO/STR/1066 29-11-2023 P7-P8 PSC Girder G-02 BHS

7 MKC/BRO/STR/1298 25-12-2023 P10-P11 PSC Girder G-01 BHS


8 MKC/BRO/STR/1176 17-12-2023 P10-P11 PSC Girder G-02 BHS
9 MKC/BRO/STR/1247 22-12-2023 P10-P11 PSC Girder G-03 BHS

10 MKC/BRO/STR/1245 22-12-2023 P4-P5 PSC Girder G-01 BHS

11 MKC/BRO/STR/1277 24-12-2023 P7-P8 PSC Girder G-03 BHS

12 29+075 MKC/BRO/STR/1200 20-12-2023 P1-P2 PSC Girder G-03 BHS Rmt. 133.333 IPC-8

13 MKC/BRO/STR/1275 24-12-2023 P13-P14 PSC Girder G-01 BHS


14 MKC/BRO/STR/1291 25-12-2023 P13-P14 PSC Girder G-02 BHS
15 MKC/BRO/STR/1300 25-12-2023 P13-P14 PSC Girder G-03 BHS

16 MKC/BRO/STR/1342 28-12-2023 P16-P17 PSC Girder G-01 BHS


17 MKC/BRO/STR/1363 29-12-2023 P16-P17 PSC Girder G-02 BHS
18 MKC/BRO/STR/1260 23-12-2023 P16-P17 PSC Girder G-03 BHS

19 24+940 MKC/BRO/STR/1271 24-12-2023 P1-P2 PSC Girder G-01 BHS Rmt. 11.111 IPC-8

20 MKC/BRO/STR/1678 28-01-2024 P10-P11 PSC Girder G-01 BHS


21 MKC/BRO/STR/1678 28-01-2024 P10-P11 PSC Girder G-02 BHS
22 MKC/BRO/STR/1704 30-01-2024 P10-P11 PSC Girder G-03 BHS

23 MKC/BRO/STR/1628 24-01-2024 P13-P14 Girder G-01 BHS


24 MKC/BRO/STR/1712 31-01-2024 P13-P14 Girder G-02 BHS
25 MKC/BRO/STR/1712 31-01-2024 P13-P14 Girder G-03 BHS

26 MKC/BRO/STR/1606 23-01-2024 P1-P2 PSC Girder G-02 BHS


27 MKC/BRO/STR/1652 26-01-2024 P1-P2 PSC Girder G-03 BHS

28 MKC/BRO/STR/1640 25-01-2024 P4-P5 PSC Girder G-01 BHS


29 MKC/BRO/STR/1696 29-01-2024 P4-P5 PSC Girder G-02 BHS
24+940 Rmt. 222.222 IPC-9
30 MKC/BRO/STR/1664 27-01-2024 P4-P5 PSC Girder G-03 BHS

31 MKC/BRO/STR/1679 28-01-2024 A1-P1 PSC Girder G-01 BHS


32 MKC/BRO/STR/1679 28-01-2024 A1-P1 PSC Girder G-02 BHS
33 MKC/BRO/STR/1713 31-01-2024 A1-P1 PSC Girder G-03 BHS
34 MKC/BRO/STR/1654 26-01-2024 P2-P3 PSC Girder G-01
35 MKC/BRO/STR/1654 26-01-2024 P2-P3 PSC Girder G-02
36 MKC/BRO/STR/1688 29-01-2024 P2-P3 PSC Girder G-03

37 MKC/BRO/STR/1642 25-01-2024 P7-P8 PSC Girder G-01 BHS


38 MKC/BRO/STR/1642 25-01-2024 P7-P8 PSC Girder G-02 BHS
39 MKC/BRO/STR/1665 27-01-2024 P7-P8 PSC Girder G-03 BHS

40 MKC/BRO/STR/1455 08-01-2024 P2-P3 PSC Girder G-01 BHS


41 MKC/BRO/STR/1486 10-01-2024 P2-P3 PSC Girder G-02 BHS
42 MKC/BRO/STR/1505 12-01-2024 P2-P3 PSC Girder G-03 BHS

43 MKC/BRO/STR/1583 21-01-2024 A1-P1 PSC Girder G-01 BHS


44 29+075 MKC/BRO/STR/1693 29-01-2024 A1-P1 PSC Girder G-02 BHS Rmt. 100.000 IPC-9
45 MKC/BRO/STR/1703 30-01-2024 A1-P1 PSC Girder G-03 BHS

46 MKC/BRO/STR/1446 07-01-2024 P3-P4 PSC Girder G-01 BHS


47 MKC/BRO/STR/1519 13-01-2024 P3-P4 PSC Girder G-02 BHS
48 MKC/BRO/STR/1530 15-01-2024 P3-P4 PSC Girder G-03 BHS

49 MKC/BRO/STR/1736 03-02-2024 P3-P4 PSC Girder G-03


50,51 MKC/BRO/STR/1753 04-02-2024 P3-P4 PSC Girder G-01 & 02
52 MKC/BRO/STR/1769 06-02-2024 P5-P6 PSC Girder G-01
24+940 Rmt. 88.889 IPC-10
53 MKC/BRO/STR/1779 07-02-2024 P5-P6 PSC Girder G-02
54,55 MKC/BRO/STR/1792 08-02-2024 P8-P9 PSC Girder G-01 & 02
56 MKC/BRO/STR/2025 29-02-2024 P5-P6 PSC Girder G-03

57 MKC/BRO/STR/1895 18-02-2024 P11-P12 PSC Girder G-01 BHS


58 MKC/BRO/STR/1903 19-02-2024 P11-P12 PSC Girder G-02 BHS
59 MKC/BRO/STR/2020 28-02-2024 P11-P12 PSC Girder G-03 BHS

60 MKC/BRO/STR/1941 23-02-2024 P12-P13 PSC Girder G-01 BHS

61,62 MKC/BRO/STR/2022 28-02-2024 P5-P6 PSC Girder G-01 & 02 BHS


63 MKC/BRO/STR/2024 29-02-2024 P5-P6 PSC Girder G-03 BHS
29+075 Rmt. 177.778 IPC-10
64,65 MKC/BRO/STR/1935 22-02-2024 P6-P7 PSC Girder G-01 & 02 BHS
66,67 MKC/BRO/STR/1932 22-02-2024 P6-P7 PSC Girder G-03 BHS

68 MKC/BRO/STR/1961 24-02-2024 P8-P9 PSC Girder G-01 & 02 BHS


69 MKC/BRO/STR/1928 22-02-2024 P8-P9 PSC Girder G-03 BHS

70,71 MKC/BRO/STR/1973 25-02-2024 P9-P10 PSC Girder G-01 & 02 BHS


72 MKC/BRO/STR/1974 26-02-2024 P9-P10 PSC Girder G-03 BHS

73 MKC/BRO/STR/2623 19-03-2024 A1-P1 PSC Girder G-01 BHS


74 MKC/BRO/STR/2624 19-03-2024 A1-P1 PSC Girder G-02 BHS

75, 76 MKC/BRO/STR/2278 08-03-2024 P1-P2 PSC Girder G-01 & 02


77 MKC/BRO/STR/2310 09-03-2024 P1-P2 PSC Girder G-03

78, 79 MKC/BRO/STR/2279 08-03-2024 P2-P3 PSC Girder G-01 & 02


80 14+100 MKC/BRO/STR/2346 10-03-2024 P2-P3 PSC Girder G-03 Rmt. 155.556 IPC-11

81, 82 MKC/BRO/STR/2386 11-03-2024 P3-P4 PSC Girder G-01 & 02


83 MKC/BRO/STR/2541 15-03-2024 P3-P4 PSC Girder G-3
84, 85 MKC/BRO/STR/2387 11-03-2024 P4-P5 PSC Girder G-01 & 02
86 MKC/BRO/STR/2542 15-03-2024 P4-P5 PSC Girder G-3

87 MKC/BRO/STR/2476 13-03-2024 A1-P1 PSC Girder G-01 BHS


88 MKC/BRO/STR/2550 15-03-2024 A1-P1 PSC Girder G-02 BHS
89 MKC/BRO/STR/2568 16-03-2024 A1-P1 PSC Girder G-03 BHS

90 MKC/BRO/STR/2080 02-03-2024 P1-P2 PSC Girder G-01 BHS


91 MKC/BRO/STR/2319 09-03-2024 P1-P2 PSC Girder G-02 BHS
92 MKC/BRO/STR/2320 09-03-2024 P1-P2 PSC Girder G-03 BHS

93 MKC/BRO/STR/2081 02-03-2024 P2-P3 PSC Girder G-01 BHS


94 MKC/BRO/STR/2249 07-03-2024 P2-P3 PSC Girder G-02 BHS
95 MKC/BRO/STR/2082 02-03-2024 P2-P3 PSC Girder G-03 BHS

96 MKC/BRO/STR/2083 02-03-2024 P3-P4 PSC Girder G-01 BHS


97 MKC/BRO/STR/2586 17-03-2024 P3-P4 PSC Girder G-02 BHS
98 MKC/BRO/STR/2084 02-03-2024 P3-P4 PSC Girder G-03 BHS

99 MKC/BRO/STR/2587 17-03-2024 P4-P5 PSC Girder G-01 BHS


100 20+225 MKC/BRO/STR/2250 07-03-2024 P4-P5 PSC Girder G-02 BHS Rmt. 300.000 IPC-11
101 MKC/BRO/STR/2251 07-03-2024 P4-P5 PSC Girder G-03 BHS

102 MKC/BRO/STR/2215 06-03-2024 P5-P6 PSC Girder G-01 BHS


103 MKC/BRO/STR/2252 07-03-2024 P5-P6 PSC Girder G-02 BHS
104 MKC/BRO/STR/2216 06-03-2024 P5-P6 PSC Girder G-03 BHS

105 MKC/BRO/STR/2551 15-03-2024 P6-P7 PSC Girder G-01 BHS


106 MKC/BRO/STR/2588 17-03-2024 P6-P7 PSC Girder G-02 BHS
107 MKC/BRO/STR/2560 16-03-2024 P6-P7 PSC Girder G-03 BHS

108 MKC/BRO/STR/2589 17-03-2024 P7-P8 PSC Girder G-01 BHS


109 MKC/BRO/STR/2609 18-03-2024 P7-P8 PSC Girder G-02 BHS
110 MKC/BRO/STR/2621 19-03-2024 P7-P8 PSC Girder G-03 BHS

111 MKC/BRO/STR/2622 19-03-2024 P8-A2 PSC Girder G-01 BHS


112 MKC/BRO/STR/2639 20-03-2024 P8-A2 PSC Girder G-02 BHS
113 MKC/BRO/STR/2640 20-03-2024 P8-A2 PSC Girder G-03 BHS

114 MKC/BRO/STR/2606 18-03-2024 A1-P1 PSC Girder G-01 BHS


115 MKC/BRO/STR/2607 18-03-2024 A1-P1 PSC Girder G-02 BHS
116 MKC/BRO/STR/2608 18-03-2024 A1-P1 PSC Girder G-03 BHS

117 MKC/BRO/STR/2637 20-03-2024 P1-P2 PSC Girder G-01 BHS


118 21+185 MKC/BRO/STR/2638 20-03-2024 P1-P2 PSC Girder G-02 BHS Rmt. 100.000 IPC-11
119 MKC/BRO/STR/2605 18-03-2024 P1-P2 PSC Girder G-03 BHS

120 MKC/BRO/STR/2475 13-03-2024 P2-A2 PSC Girder G-01 BHS


121 MKC/BRO/STR/2508 14-03-2024 P2-A2 PSC Girder G-02 BHS
122 MKC/BRO/STR/2435 12-03-2024 P2-A2 PSC Girder G-03 BHS

123 MKC/BRO/STR/2547 15-03-2024 A1-P1 PSC Girder G-01 BHS


124 MKC/BRO/STR/2548 15-03-2024 A1-P1 PSC Girder G-02 BHS
125 MKC/BRO/STR/2564 16-03-2024 A1-P1 PSC Girder G-03 BHS
126 MKC/BRO/STR/2317 09-03-2024 P1-P2 PSC Girder G-01 BHS
127 22+510 MKC/BRO/STR/2354 10-03-2024 P1-P2 PSC Girder G-02 BHS Rmt. 100.000 IPC-11
128 MKC/BRO/STR/2318 09-03-2024 P1-P2 PSC Girder G-03 BHS

129 MKC/BRO/STR/2565 16-03-2024 P2-A2 PSC Girder G-01 BHS


130 MKC/BRO/STR/2566 16-03-2024 P2-A2 PSC Girder G-02 BHS
131 MKC/BRO/STR/2584 17-03-2024 P2-A2 PSC Girder G-03 BHS

132 MKC/BRO/STR/2473 13-03-2024 A1-P1 PSC Girder G-01 BHS


133 MKC/BRO/STR/2503 14-03-2024 A1-P1 PSC Girder G-02 BHS
134 MKC/BRO/STR/2504 14-03-2024 A1-P1 PSC Girder G-03 BHS

135 MKC/BRO/STR/2395 11-03-2024 P1-P2 PSC Girder G-01 BHS


136 22+720 MKC/BRO/STR/2396 11-03-2024 P1-P2 PSC Girder G-02 BHS Rmt. 100.000 IPC-11
137 MKC/BRO/STR/2472 13-03-2024 P1-P2 PSC Girder G-03 BHS

138 MKC/BRO/STR/2505 14-03-2024 P2-A2 PSC Girder G-01 BHS


139 MKC/BRO/STR/2506 14-03-2024 P2-A2 PSC Girder G-02 BHS
140 MKC/BRO/STR/2546 15-03-2024 P2-A2 PSC Girder G-03 BHS

141 MKC/BRO/STR/2424 12-03-2024 A1-P1 PSC Girder G-01 BHS


142 MKC/BRO/STR/2285 08-03-2024 A1-P1 PSC Girder G-02 BHS
143 MKC/BRO/STR/2286 08-03-2024 A1-P1 PSC Girder G-03 BHS

144 MKC/BRO/STR/2162 05-03-2024 P1-P2 PSC Girder G-01 BHS


145 24+410 MKC/BRO/STR/2284 08-03-2024 P1-P2 PSC Girder G-02 BHS Rmt. 100.000 IPC-11
146 MKC/BRO/STR/2338 10-03-2024 P1-P2 PSC Girder G-03 BHS

147 MKC/BRO/STR/2287 08-03-2024 P2-A2 PSC Girder G-01 BHS


148 MKC/BRO/STR/2393 11-03-2024 P2-A2 PSC Girder G-02 BHS
149 MKC/BRO/STR/2394 11-03-2024 P2-A2 PSC Girder G-03 BHS

150 MKC/BRO/STR/2119 03-03-2024 P11-P12 PSC Girder G-01 BHS


151 MKC/BRO/STR/2175 05-03-2024 P11-P12 PSC Girder G-02 BHS
152 MKC/BRO/STR/2176 05-03-2024 P11-P12 PSC Girder G-03 BHS

153 MKC/BRO/STR/2177 05-03-2024 P12-P13 PSC Girder G-01 BHS


154 MKC/BRO/STR/2211 06-03-2024 P12-P13 PSC Girder G-02 BHS
155 MKC/BRO/STR/2212 06-03-2024 P12-P13 PSC Girder G-03 BHS

156 MKC/BRO/STR/2178 05-03-2024 P14-A2 PSC Girder G-01 BHS


157 MKC/BRO/STR/2179 05-03-2024 P14-A2 PSC Girder G-02 BHS
24+940 Rmt. 177.778 IPC
158 MKC/BRO/STR/2213 06-03-2024 P14-A2 PSC Girder G-03 BHS

159, 160 MKC/BRO/STR/1998 27-02-2024 P6-P7 PSC Girder G-01 and 02 BHS
161 MKC/BRO/STR/2145 04-03-2024 P6-P7 PSC Girder G-03 BHS

162 MKC/BRO/STR/2116 03-03-2024 P8-P9 PSC Girder G-03 BHS

163 MKC/BRO/STR/2117 03-03-2024 P9-P10 PSC Girder G-01 BHS


164 MKC/BRO/STR/2146 04-03-2024 P9-P10 PSC Girder G-02 BHS
165 MKC/BRO/STR/2118 03-03-2024 P9-P10 PSC Girder G-03 BHS

166 MKC/BRO/STR/2471 13-03-2024 P12-P13 PSC Girder G-02 BHS


167 MKC/BRO/STR/2264 08-03-2024 P12-P13 PSC Girder G-03 BHS

168 MKC/BRO/STR/2351 10-03-2024 P14-P15 PSC Girder G-01 BHS


169 MKC/BRO/STR/2392 11-03-2024 P14-P15 PSC Girder G-02 BHS
170 MKC/BRO/STR/2352 10-03-2024 P14-P15 PSC Girder G-03 BHS

29+075 Rmt. 122.222 IPC-11


171 MKC/BRO/STR/2432 12-03-2024 P15-P16 PSC Girder G-01 BHS
172 MKC/BRO/STR/2433 12-03-2024 P15-P16 PSC Girder G-02 BHS
173 MKC/BRO/STR/2434 12-03-2024 P15-P16 PSC Girder G-03 BHS

174 MKC/BRO/STR/2115 03-03-2024 P17-A2 PSC Girder G-01 BHS


175 MKC/BRO/STR/2142 04-03-2024 P17-A2 PSC Girder G-02 BHS
176 MKC/BRO/STR/2143 04-03-2024 P17-A2 PSC Girder G-03 BHS

Abstract of Qty for MJB Girder


Up to Cumulative Qty in Meter 1955.556
Less Qty paid up to Last IPC in Meter 800.000
Work done Qty to be paid in this IPC in Meter 1155.556

For contractor For Authority Engineer For Authority Engineer For Authority Engineer For Authority Engineer

Authorized Signatory Quantity Surveyor Bridge Engineer Resident Engineer Team Leader
MKC Infrastructur Ltd. Global Infra Solutions Global Infra Solutions Global Infra Solutions Global Infra Solutions
Construction and improvement of Road bakhasar-mavasari from km 0.000 to 32.490(net length 32.49 km) (design
PROJECT NAME chainage km 0.000 to km 25.682 in rajestan and km 25.682 to 31.703 in gujarat ) (Design Length 31.703 km) from existing
CL-9 Specification to NHDL specificaton under 45 BRTF of project Chetak in Rajasthan and Gujarat
AUTHORITY CHIEF ENGINEER PROJECT CHETAK
AUTHORITY ENGINEER M/s. GLOBAL INFRA SOLUTIONS
EPC CONTRACTOR M/S. MKC Infrastructure Ltd.
Stage Payment Statment No. - 11
Period 1st March 2024 to 20th March 2024
Measurement Sheet
Description of Item :- Toe Wall-LHS

SR. No. Item From To Side unit Length RFI No. Date IPC No. Remarks

1 Toe Wall 02+010 02+110 LHS Km 0.100 MKC/BRO/STR/821 07-09-2023 IPC-6


2 Toe Wall 02+700 02+800 LHS Km 0.100 MKC/BRO/STR/822 08-09-2023 IPC-6
3 Toe Wall 03+500 03+600 LHS Km 0.100 MKC/BRO/STR/823 09-09-2023 IPC-6
4 Toe Wall 02+110 02+210 LHS Km 0.100 MKC/BRO/STR/828 11-09-2023 IPC-6
5 Toe Wall 02+800 02+900 LHS Km 0.100 MKC/BRO/STR/834 13-09-2023 IPC-6
6 Toe Wall 02+210 02+300 LHS Km 0.090 MKC/BRO/STR/835 14-09-2023 IPC-6
7 Toe Wall 02+900 03+000 LHS Km 0.100 MKC/BRO/STR/836 14-09-2023 IPC-6
8 Toe Wall 03+600 03+700 LHS Km 0.100 MKC/BRO/STR/837 15-09-2023 IPC-6
9 Toe Wall 03+700 03+800 LHS Km 0.100 MKC/BRO/STR/824 09-09-2023 IPC-6
10 Toe Wall 03+800 03+900 LHS Km 0.100 MKC/BRO/STR/829 11-09-2023 IPC-6

1 Toe Wall 05+700 05+800 LHS Km 0.100 MKC/BRO/STR/883 08-11-2023 IPC-7


2 Toe Wall 05+880 05+923 LHS Km 0.043 MKC/BRO/STR/887 08-11-2023 IPC-7
3 Toe Wall 05+927 05+954 LHS Km 0.027 MKC/BRO/STR/887 08-11-2023 IPC-7
4 Toe Wall 06+100 06+148 LHS Km 0.048 MKC/BRO/STR/895 08-11-2023 IPC-7
5 Toe Wall 06+152 06+204 LHS Km 0.052 MKC/BRO/STR/895 08-11-2023 IPC-7
6 Toe Wall 06+780 06+805 LHS Km 0.025 MKC/BRO/STR/899 08-11-2023 IPC-7
7 Toe Wall 06+700 06+780 LHS Km 0.080 MKC/BRO/STR/906 09-11-2023 IPC-7
8 Toe Wall 07+090 07+127 LHS Km 0.037 MKC/BRO/STR/908 09-11-2023 IPC-7
9 Toe Wall 07+136 07+148 LHS Km 0.012 MKC/BRO/STR/908 09-11-2023 IPC-7
10 Toe Wall 05+100 05+168 LHS Km 0.068 MKC/BRO/STR/955 19-11-2023 IPC-7
11 Toe Wall 05+182 05+240 LHS Km 0.058 MKC/BRO/STR/955 19-11-2023 IPC-7
12 Toe Wall 05+240 05+300 LHS Km 0.060 MKC/BRO/STR/957 19-11-2023 IPC-7

1 Toe Wall 07+148 07+200 LHS Km 0.052 MKC/BRO/STR/1133 13-12-2023 IPC-8


2 Toe Wall 09+195 09+265 LHS Km 0.070 MKC/BRO/STR/1146 15-12-2023 IPC-8
3 Toe Wall 09+265 09+300 LHS Km 0.035 MKC/BRO/STR/1155 16-12-2023 IPC-8
4 Toe Wall 09+300 09+339 LHS Km 0.039 MKC/BRO/STR/1215 21-12-2023 IPC-8
5 Toe Wall 09+351 09+400 LHS Km 0.049 MKC/BRO/STR/1253 23-12-2023 IPC-8
6 Toe Wall 10+520 10+620 LHS Km 0.100 MKC/BRO/STR/1336 28-12-2023 IPC-8
7 Toe Wall 10+620 10+640 LHS Km 0.020 MKC/BRO/STR/1340 28-12-2023 IPC-8

1 Toe Wall 01+500 01+647 LHS Km 0.147 MKC/BRO/STR/2552 15-03-2024 IPC-11


2 Toe Wall 01+663 01+720 LHS Km 0.057 MKC/BRO/STR/2356 10-03-2024 IPC-11
3 Toe Wall 03+400 03+500 LHS Km 0.100 MKC/BRO/STR/2289 08-03-2024 IPC-11
4 Toe Wall 06+690 06+700 LHS Km 0.010 MKC/BRO/STR/2254 07-03-2024 IPC-11
5 Toe Wall 06+820 06+830 LHS Km 0.010 MKC/BRO/STR/2255 07-03-2024 IPC-11
6 Toe Wall 06+830 06+990 LHS Km 0.160 MKC/BRO/STR/2220 06-03-2024 IPC-11
7 Toe Wall 09+100 09+160 LHS Km 0.060 MKC/BRO/STR/2221 06-03-2024 IPC-11
8 Toe Wall 09+180 09+195 LHS Km 0.015 MKC/BRO/STR/2256 07-03-2024 IPC-11

Cummulative Qty up to Date bill LHS 2.524


Cummulative Qty Upto Previous Qty LHS 1.965
This Bill Qty LHS 0.559

For contractor For Authority Engineer For Authority Engineer For Authority Engineer

Authorized Signatory Quantity Surveyor Resident Engineer Team Leader


MKC Infrastructur Ltd. Global Infra Solutions Global Infra Solutions Global Infra Solutions
Construction and improvement of Road bakhasar-mavasari from km 0.000 to 32.490(net length 32.49 km) (design
PROJECT NAME chainage km 0.000 to km 25.682 in rajestan and km 25.682 to 31.703 in gujarat ) (Design Length 31.703 km) from existing
CL-9 Specification to NHDL specificaton under 45 BRTF of project Chetak in Rajasthan and Gujarat
AUTHORITY CHIEF ENGINEER PROJECT CHETAK
AUTHORITY ENGINEER M/s. GLOBAL INFRA SOLUTIONS
EPC CONTRACTOR M/S. MKC Infrastructure Ltd.
Stage Payment Statment No. - 11
Period 1st March 2024 to 20th March 2024
Measurement Sheet
Description of Item :- Toe Wall-RHS

SR. No. Item From To Side unit Length RFI No. Date IPC No. Remarks

1 Toe Wall 02+010 02+110 RHS Km 0.100 MKC/BRO/STR/821 07-09-2023 IPC-6


2 Toe Wall 02+700 02+800 RHS Km 0.100 MKC/BRO/STR/822 08-09-2023 IPC-6
3 Toe Wall 03+500 03+600 RHS Km 0.100 MKC/BRO/STR/823 09-09-2023 IPC-6
4 Toe Wall 02+110 02+210 RHS Km 0.100 MKC/BRO/STR/828 11-09-2023 IPC-6
5 Toe Wall 02+800 02+900 RHS Km 0.100 MKC/BRO/STR/834 13-09-2023 IPC-6
6 Toe Wall 02+210 02+300 RHS Km 0.090 MKC/BRO/STR/835 14-09-2023 IPC-6
7 Toe Wall 02+900 03+000 RHS Km 0.100 MKC/BRO/STR/836 14-09-2023 IPC-6
8 Toe Wall 03+600 03+700 RHS Km 0.100 MKC/BRO/STR/837 15-09-2023 IPC-6
9 Toe Wall 03+700 03+800 RHS Km 0.100 MKC/BRO/STR/824 09-09-2023 IPC-6
10 Toe Wall 03+800 03+900 RHS Km 0.100 MKC/BRO/STR/829 11-09-2023 IPC-6

1 Toe Wall 05+700 05+800 RHS Km 0.100 MKC/BRO/STR/883 08-11-2023 IPC-7


2 Toe Wall 06+830 06+860 RHS Km 0.030 MKC/BRO/STR/864 06-11-2023 IPC-7
3 Toe Wall 06+860 06+890 RHS Km 0.030 MKC/BRO/STR/865 06-11-2023 IPC-7
4 Toe Wall 05+880 05+925 RHS Km 0.045 MKC/BRO/STR/891 08-11-2023 IPC-7
5 Toe Wall 05+927 05+982 RHS Km 0.055 MKC/BRO/STR/891 08-11-2023 IPC-7
6 Toe Wall 07+133 07+200 RHS Km 0.067 MKC/BRO/STR/901 08-11-2023 IPC-7
7 Toe Wall 03+400 03+500 RHS Km 0.100 MKC/BRO/STR/913 10-11-2023 IPC-7
8 Toe Wall 05+100 05+168 RHS Km 0.068 MKC/BRO/STR/956 19-11-2023 IPC-7
9 Toe Wall 05+182 05+265 RHS Km 0.083 MKC/BRO/STR/956 19-11-2023 IPC-7
10 Toe Wall 07+090 07+127 RHS Km 0.037 MKC/BRO/STR/974 21-11-2023 IPC-7
11 Toe Wall 06+890 06+940 RHS Km 0.050 MKC/BRO/STR/975 21-11-2023 IPC-7
12 Toe Wall 09+382 09+485 RHS Km 0.103 MKC/BRO/STR/982 22-11-2023 IPC-7
13 Toe Wall 06+940 06+990 RHS Km 0.050 MKC/BRO/STR/999 24-11-2023 IPC-7
14 Toe Wall 09+200 09+343 RHS Km 0.143 MKC/BRO/STR/1000 24-11-2023 IPC-7
15 Toe Wall 09+347 09+382 RHS Km 0.035 MKC/BRO/STR/1000 24-11-2023 IPC-7

1 Toe Wall 05+265 05+300 RHS Km 0.035 MKC/BRO/STR/1188 19-12-2023 IPC-8


2 Toe Wall 09+060 09+090 RHS Km 0.030 MKC/BRO/STR/1189 19-12-2023 IPC-8
3 Toe Wall 09+090 09+160 RHS Km 0.070 MKC/BRO/STR/1267 24-12-2023 IPC-8
4 Toe Wall 10+350 10+430 RHS Km 0.080 MKC/BRO/STR/1355 29-12-2023 IPC-8
5 Toe Wall 10+480 10+620 RHS Km 0.140 MKC/BRO/STR/1287 25-12-2023 IPC-8

1 Toe Wall 01+500 01+647 RHS Km 0.147 MKC/BRO/STR/2552 15-03-2024 IPC-11


2 Toe Wall 01+663 01+720 RHS Km 0.057 MKC/BRO/STR/2356 10-03-2024 IPC-11
3 Toe Wall 06+690 06+700 RHS Km 0.010 MKC/BRO/STR/2254 07-03-2024 IPC-11
4 Toe Wall 06+700 06+800 RHS Km 0.100 MKC/BRO/STR/2149 04-03-2024 IPC-11
5 Toe Wall 06+820 06+830 RHS Km 0.010 MKC/BRO/STR/2255 07-03-2024 IPC-11
6 Toe Wall 09+180 09+195 RHS Km 0.015 MKC/BRO/STR/2256 07-03-2024 IPC-11

Cummulative Qty up to Date bill RHS 2.680


Cummulative Qty Upto Previous Qty RHS 2.341
This Bill Qty RHS 0.339

For contractor For Authority Engineer For Authority Engineer For Authority Engineer

Authorized Signatory Quantity Surveyor Resident Engineer Team Leader,


MKC Infrastructur Ltd. Global Infra Solutions Global Infra Solutions Global Infra Solutions
Construction and improvement of Road bakhasar-mavasari from km 0.000 to 32.490(net length 32.49 km) (design
PROJECT NAME chainage km 0.000 to km 25.682 in rajestan and km 25.682 to 31.703 in gujarat ) (Design Length 31.703 km) from existing
CL-9 Specification to NHDL specificaton under 45 BRTF of project Chetak in Rajasthan and Gujarat
AUTHORITY CHIEF ENGINEER PROJECT CHETAK
AUTHORITY ENGINEER M/s. GLOBAL INFRA SOLUTIONS
EPC CONTRACTOR M/S. MKC Infrastructure Ltd.
Stage Payment Statment No. - 11
Period 1st March 2024 to 20th March 2024
Measurement Sheet
Description of Item :- Breast Wall-LHS

SR. No. Item From To Side unit Length RFI No. Date IPC No. Remarks

1 Breast Wall 02+560 02+610 LHS Km 0.050 MKC/BRO/STR/953 19-11-2023 IPC-7


2 Breast Wall 02+610 02+670 LHS Km 0.060 MKC/BRO/STR/954 19-11-2023 IPC-7
3 Breast Wall 01+170 01+300 LHS Km 0.130 MKC/BRO/STR/1041 27-11-2023 IPC-7
4 Breast Wall 00+984 01+080 LHS Km 0.096 MKC/BRO/STR/1068 30-11-2023 IPC-7
5 Breast Wall 01+080 01+170 LHS Km 0.090 MKC/BRO/STR/1069 30-11-2023 IPC-7

1 Breast Wall 00+900 00+984 LHS Km 0.084 MKC/BRO/STR/1166 17-12-2023 IPC-8


2 Breast Wall 00+800 00+900 LHS Km 0.100 MKC/BRO/STR/1368 30-12-2023 IPC-8
3 Breast Wall 01+750 01+770 LHS Km 0.020 MKC/BRO/STR/1272 24-12-2023 IPC-8
4 Breast Wall 10+830 10+980 LHS Km 0.150 MKC/BRO/STR/1238 22-12-2023 IPC-8

5 Breast Wall 01+300 01+400 LHS Km 0.100 MKC/BRO/STR/2610 18-03-2024 IPC-11

6 Breast Wall 01+400 01+500 LHS Km 0.100 MKC/BRO/STR/2631 19-03-2024 IPC-11

7 Breast Wall 01+720 01+750 LHS Km 0.030 MKC/BRO/STR/2627 19-03-2024 IPC-11


8 Breast Wall 01+770 01+800 LHS Km 0.030 MKC/BRO/STR/2641 20-03-2024 IPC-11
9 Breast Wall 01+900 02+010 LHS Km 0.110 MKC/BRO/STR/2511 14-03-2024 IPC-11
10 Breast Wall 02+300 02+380 LHS Km 0.080 MKC/BRO/STR/2571 16-03-2024 IPC-11
11 Breast Wall 02+550 02+560 LHS Km 0.010 MKC/BRO/STR/2478 13-03-2024 IPC-11
12 Breast Wall 02+670 02+700 LHS Km 0.030 MKC/BRO/STR/2290 08-03-2024 IPC-11
13 Breast Wall 04+310 04+400 LHS Km 0.090 MKC/BRO/STR/2554 15-03-2024 IPC-11
14 Breast Wall 04+400 04+500 LHS Km 0.100 MKC/BRO/STR/2591 17-03-2024 IPC-11
15 Breast Wall 04+500 04+655 LHS Km 0.155 MKC/BRO/STR/2258 07-03-2024 IPC-11
16 Breast Wall 04+664 04+710 LHS Km 0.046 MKC/BRO/STR/2224 06-03-2024 IPC-11
17 Breast Wall 04+810 04+910 LHS Km 0.100 MKC/BRO/STR/2443 12-03-2024 IPC-11
18 Breast Wall 04+910 05+030 LHS Km 0.120 MKC/BRO/STR/2458 13-03-2024 IPC-11
19 Breast Wall 06+020 06+050 LHS Km 0.030 MKC/BRO/STR/2444 12-03-2024 IPC-11
20 Breast Wall 06+270 06+300 LHS Km 0.030 MKC/BRO/STR/2613 18-03-2024 IPC-11
21 Breast Wall 06+540 06+570 LHS Km 0.030 MKC/BRO/STR/2124 03-03-2024 IPC-11
22 Breast Wall 07+330 07+420 LHS Km 0.090 MKC/BRO/STR/2360 10-03-2024 IPC-11
23 Breast Wall 07+730 07+890 LHS Km 0.160 MKC/BRO/STR/2592 17-03-2024 IPC-11
Cummulative Qty up to Date bill LHS 2.221
Cummulative Qty Upto Previous Qty LHS 0.780
This Bill Qty LHS 1.441

For contractor For Authority Engineer For Authority Engineer For Authority Engineer

Authorized Signatory Quantity Surveyor Resident Engineer Team Leader,


MKC Infrastructur Ltd. Global Infra Solutions Global Infra Solutions Global Infra Solutions
Construction and improvement of Road bakhasar-mavasari from km 0.000 to 32.490(net length 32.49 km) (design
PROJECT NAME chainage km 0.000 to km 25.682 in rajestan and km 25.682 to 31.703 in gujarat ) (Design Length 31.703 km) from existing
CL-9 Specification to NHDL specificaton under 45 BRTF of project Chetak in Rajasthan and Gujarat
AUTHORITY CHIEF ENGINEER PROJECT CHETAK
AUTHORITY ENGINEER M/s. GLOBAL INFRA SOLUTIONS
EPC CONTRACTOR M/S. MKC Infrastructure Ltd.
Stage Payment Statment No. - 11
Period 1st March 2024 to 20th March 2024
Measurement Sheet
Description of Item :- Breast Wall-RHS

SR. No. Item From To Side unit Length RFI No. Date IPC No. Remarks

1 Breast Wall 01+160 01+300 RHS Km 0.140 MKC/BRO/STR/1041 27-11-2023 IPC-7


2 Breast Wall 00+984 01+080 RHS Km 0.096 MKC/BRO/STR/1068 30-11-2023 IPC-7
3 Breast Wall 01+080 01+120 RHS Km 0.040 MKC/BRO/STR/1069 30-11-2023 IPC-7
4 Breast Wall 00+840 00+880 RHS Km 0.040
5 Breast Wall 01+960 02+000 RHS Km 0.040 MKC/BRO/STR/1071 30-11-2023 IPC-7

1 Breast Wall 00+880 00+984 RHS Km 0.104 MKC/BRO/STR/1165 17-12-2023 IPC-8


2 Breast Wall 01+750 01+770 LHS Km 0.020 MKC/BRO/STR/1272 24-12-2023 IPC-8
3 Breast Wall 10+200 10+220 RHS Km 0.020 MKC/BRO/STR/1379 31-12-2023 IPC-8
4 Breast Wall 10+220 10+260 RHS Km 0.040 MKC/BRO/STR/1381 31-12-2023 IPC-8
5 Breast Wall 10+830 10+980 RHS Km 0.150 MKC/BRO/STR/1324 27-12-2023 IPC-8

1 Breast Wall 00+800 00+840 RHS Km 0.040 MKC/BRO/STR/2152 04-03-2024 IPC-11


2 Breast Wall 01+120 01+160 RHS Km 0.040 MKC/BRO/STR/2123 03-03-2024 IPC-11
3 Breast Wall 01+300 01+400 RHS Km 0.100 MKC/BRO/STR/2610 18-03-2024 IPC-11
4 Breast Wall 01+400 01+500 RHS Km 0.100 MKC/BRO/STR/2631 19-03-2024 IPC-11
5 Breast Wall 01+720 01+750 RHS Km 0.030 MKC/BRO/STR/2627 19-03-2024 IPC-11
6 Breast Wall 01+770 01+800 RHS Km 0.030 MKC/BRO/STR/2641 20-03-2024 IPC-11
7 Breast Wall 01+900 01+960 RHS Km 0.060 MKC/BRO/STR/2439 12-03-2024 IPC-11
8 Breast Wall 02+000 02+010 RHS Km 0.010 MKC/BRO/STR/2440 12-03-2024 IPC-11
9 Breast Wall 02+300 02+380 RHS Km 0.080 MKC/BRO/STR/2571 16-03-2024 IPC-11
10 Breast Wall 02+550 02+560 RHS Km 0.010 MKC/BRO/STR/2478 13-03-2024 IPC-11
11 Breast Wall 02+560 02+670 RHS Km 0.110 MKC/BRO/STR/2479 13-03-2024 IPC-11
12 Breast Wall 02+670 02+700 RHS Km 0.030 MKC/BRO/STR/2290 08-03-2024 IPC-11
13 Breast Wall 04+310 04+400 RHS Km 0.090 MKC/BRO/STR/2554 15-03-2024 IPC-11
14 Breast Wall 04+400 04+500 RHS Km 0.100 MKC/BRO/STR/2591 17-03-2024 IPC-11
15 Breast Wall 04+500 04+655 RHS Km 0.155 MKC/BRO/STR/2258 07-03-2024 IPC-11
16 Breast Wall 04+664 04+710 RHS Km 0.046 MKC/BRO/STR/2224 06-03-2024 IPC-11
17 Breast Wall 04+810 04+910 RHS Km 0.100 MKC/BRO/STR/2443 12-03-2024 IPC-11
18 Breast Wall 04+910 05+030 RHS Km 0.120 MKC/BRO/STR/2458 13-03-2024 IPC-11
19 Breast Wall 06+020 06+050 RHS Km 0.030 MKC/BRO/STR/2444 12-03-2024 IPC-11
20 Breast Wall 06+270 06+300 RHS Km 0.030 MKC/BRO/STR/2613 18-03-2024 IPC-11
21 Breast Wall 06+540 06+570 RHS Km 0.030 MKC/BRO/STR/2124 03-03-2024 IPC-11
22 Breast Wall 07+330 07+420 RHS Km 0.090 MKC/BRO/STR/2360 10-03-2024 IPC-11
23 Breast Wall 07+730 07+890 RHS Km 0.160 MKC/BRO/STR/2592 17-03-2024 IPC-11
Cummulative Qty up to Date bill RHS 2.281
Cummulative Qty Upto Previous Qty RHS 0.690
This Bill Qty RHS 1.591

For contractor For Authority Engineer For Authority Engineer For Authority Engineer

Authorized Signatory Quantity Surveyor Resident Engineer Team Leader,


MKC Infrastructur Ltd. Global Infra Solutions Global Infra Solutions Global Infra Solutions
Construction and improvement of Road bakhasar-mavasari from km 0.000 to 32.490(net length 32.49 km) (design
PROJECT NAME chainage km 0.000 to km 25.682 in rajestan and km 25.682 to 31.703 in gujarat ) (Design Length 31.703 km) from existing
CL-9 Specification to NHDL specificaton under 45 BRTF of project Chetak in Rajasthan and Gujarat
AUTHORITY CHIEF ENGINEER PROJECT CHETAK
AUTHORITY ENGINEER M/s. GLOBAL INFRA SOLUTIONS
EPC CONTRACTOR M/S. MKC Infrastructure Ltd.
Stage Payment Statment No. - 11
Period 1st March 2024 to 20th March 2024
Measurement Sheet
Description of Item :- Gabion Wall-LHS

SR. No. Item From To Side unit Length RFI No. Date IPC No. Remarks

1 Gabion Wall 14+500 14+610 LHS Km 0.110 MKC/BRO/HWY/2107 01-02-2024 IPC-10


2 Gabion Wall 14+610 14+650 LHS Km 0.040 MKC/BRO/HWY/2108 01-02-2024 IPC-10
3 Gabion Wall 14+650 14+665 LHS Km 0.015 MKC/BRO/HWY/2109 01-02-2024 IPC-10
4 Gabion Wall 14+675 14+740 LHS Km 0.065 MKC/BRO/HWY/2115 02-02-2024 IPC-10
5 Gabion Wall 14+740 14+780 LHS Km 0.040 MKC/BRO/HWY/2146 08-02-2024 IPC-10
6 Gabion Wall 14+780 14+850 LHS Km 0.070 MKC/BRO/HWY/2123 03-02-2024 IPC-10
7 Gabion Wall 14+850 14+930 LHS Km 0.080 MKC/BRO/HWY/2124 03-02-2024 IPC-10
8 Gabion Wall 14+940 15+145 LHS Km 0.205 MKC/BRO/HWY/2131 04-02-2024 IPC-10
9 Gabion Wall 15+155 15+480 LHS Km 0.325 MKC/BRO/HWY/2162 12-02-2024 IPC-10
10 Gabion Wall 15+490 15+690 LHS Km 0.200 MKC/BRO/HWY/2176 16-02-2024 IPC-10
11 Gabion Wall 15+700 15+880 LHS Km 0.180 MKC/BRO/HWY/2187 19-02-2024 IPC-10
12 Gabion Wall 15+960 16+020 LHS Km 0.060 MKC/BRO/HWY/2180 17-02-2024 IPC-10
13 Gabion Wall 16+030 16+250 LHS Km 0.220 MKC/BRO/HWY/2196 22-02-2024 IPC-10
14 Gabion Wall 16+350 16+440 LHS Km 0.090 MKC/BRO/HWY/2209 26-02-2024 IPC-10
15 Gabion Wall 16+520 16+590 LHS Km 0.070 MKC/BRO/HWY/2207 25-02-2024 IPC-10
16 Gabion Wall 16+600 16+610 LHS Km 0.010 MKC/BRO/HWY/2137 06-02-2024 IPC-10
17 Gabion Wall 16+700 16+770 LHS Km 0.070 MKC/BRO/HWY/2220 29-02-2024 IPC-10
18 Gabion Wall 16+855 16+880 LHS Km 0.025 MKC/BRO/HWY/2157 10-02-2024 IPC-10
19 Gabion Wall 16+980 17+040 LHS Km 0.060 MKC/BRO/HWY/2221 29-02-2024 IPC-10
20 Gabion Wall 17+910 17+990 LHS Km 0.080 MKC/BRO/HWY/2205 24-02-2024 IPC-10
21 Gabion Wall 18+090 18+248 LHS Km 0.158 MKC/BRO/HWY/2217 28-02-2024 IPC-10
22 Gabion Wall 18+272 18+380 LHS Km 0.108 MKC/BRO/HWY/2218 28-02-2024 IPC-10
23 Gabion Wall 18+480 18+530 LHS Km 0.050 MKC/BRO/HWY/2166 13-02-2024 IPC-10
24 Gabion Wall 18+540 18+718 LHS Km 0.178 MKC/BRO/HWY/2201 23-02-2024 IPC-10
25 Gabion Wall 18+742 18+820 LHS Km 0.078 MKC/BRO/HWY/2194 21-02-2024 IPC-10
26 Gabion Wall 18+990 19+120 LHS Km 0.130 MKC/BRO/HWY/2177 16-02-2024 IPC-10
27 Gabion Wall 19+130 19+190 LHS Km 0.060 MKC/BRO/HWY/2214 27-02-2024 IPC-10
28 Gabion Wall 23+075 23+200 LHS Km 0.125 MKC/BRO/HWY/2188 19-02-2024 IPC-10
29 Gabion Wall 23+480 23+650 LHS Km 0.170 MKC/BRO/HWY/2202 23-02-2024 IPC-10

1 Gabion Wall 19+230 19+270 LHS Km 0.040 MKC/BRO/HWY/2225 03-03-2024 IPC-11


2 Gabion Wall 19+300 19+490 LHS Km 0.190 MKC/BRO/HWY/2264 15-03-2024 IPC-11

3 Gabion Wall 19+610 19+636 LHS Km 0.026 MKC/BRO/HWY/2237 07-03-2024 IPC-11

4 Gabion Wall 19+654 19+880 LHS Km 0.226 MKC/BRO/HWY/2260 14-03-2024 IPC-11


5 Gabion Wall 20+655 20+800 LHS Km 0.145 MKC/BRO/HWY/2274 19-03-2024 IPC-11
6 Gabion Wall 20+820 20+880 LHS Km 0.060 MKC/BRO/HWY/2243 08-03-2024 IPC-11
7 Gabion Wall 23+665 23+920 LHS Km 0.255 MKC/BRO/HWY/2261 14-03-2024 IPC-11
8 Gabion Wall 23+940 24+025 LHS Km 0.085 MKC/BRO/HWY/2246 09-03-2024 IPC-11
9 Gabion Wall 25+810 26+017 LHS Km 0.207 MKC/BRO/HWY/2257 13-03-2024 IPC-11

Cummulative Qty up to Date bill LHS 4.306


Cummulative Qty Upto Previous Qty LHS 3.072
This Bill Qty LHS 1.234

Cummulative Qty up to Date bill BHS 4.230


Cummulative Qty Upto Previous Qty BHS 2.996
This Bill Qty BHS 1.234

For contractor For Authority Engineer For Authority Engineer For Authority Engineer

Authorized Signatory Quantity Surveyor Resident Engineer Team Leader,


MKC Infrastructur Ltd. Global Infra Solutions Global Infra Solutions Global Infra Solutions