This document is a register of requests for clarification (ROC) related to a tunnel project from March 2020. It contains 27 ROCs covering topics like submission of inspection reports, review of design drawings, credentials of materials, and shifting of utility lines. Each ROC includes the date, discipline, reference to previous documents, whether a response is needed, and if it is related to a following document. The register provides details of communications and requests between project stakeholders.

Uploaded by

lol9019
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
146 views3 pages

Faltu 8

This document is a register of requests for clarification (ROC) related to a tunnel project from March 2020. It contains 27 ROCs covering topics like submission of inspection reports, review of design drawings, credentials of materials, and shifting of utility lines. Each ROC includes the date, discipline, reference to previous documents, whether a response is needed, and if it is related to a following document. The register provides details of communications and requests between project stakeholders.

Uploaded by

lol9019
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

Chart Title

50000

45000

40000

35000

30000

25000

20000

15000

10000

5000

0
1

10

13

14

17

21

24

25
11

12

15

16

18

19

20

22

23

26

27
# Date Discipline Code Object of the ROC Reference previous document Answer need If following document location of file attachement 1 Attachement 2 Attachement 3 Note
Register of the Request of Clarification
Reference previous Answer If following
# Date Discipline Code Object of the ROC document need document location of file attachement 1 Attachement 2 Attachement 3 Note

222 ROC-0222

MSRDC-YCEWML-26-2018-
Submission of “Summary of Monthly Inspection
374 3/9/2020 MGT ROC-0374 Part III-2019-5451 dated Not
Report, February 2020 for Package – I & II” 27.08.2019.

General Arrangement Drawings accepted by


379 3/4/2020 MGT ROC-0379 N/A Not
Authority Engineer

Review of Credentials of Ordinary Portland Cement NEC-MPEW-2019-20-


380 3/4/2020 MGT ROC-0380 327,dated 10.02.2020
YES
(OPC 53 Grade)

Regarding Toll Exemption for Missing Link Project MSRDC-04-EE-Missing Link


381 3/3/2020 MGT ROC-0381 2019-5808,dated 16.10.2019
YES
staff

Review of credentials of chemical admixtures, resin NEC-MPEW-2019-20-


382 3/4/2020 MGT ROC-0382 YES
capsule & cement capsule 340,dated 20.02.2020
1.ROC-0231,dated
07.11.2019.
Submission of CV of “Mr.Roopesh Mehta as Tunnel
383 3/4/2020 MGT ROC-0383 2.MSRDC-YCEWML-17-part- YES
Design Engineer” IV-2019-4337,dated
03.07.2019
MSRDC-YCEWML-17-2018-
“Intimation regarding joining of staff Mr. Parvaze
384 3/5/2020 MGT ROC-0384 Part-VI-2020-1383,dated Not
Bhatt as Senior Geologist (Both Tunnel)” 25.02.2020

MSRDC Email dated


385 3/5/2020 MGT ROC-0385 Justification of Change of location of entry in Adit-1 26.02.2020
YES

MSRDC-YCEWML-112-2019-
386 3/7/2020 MGT ROC-0386 Regarding shifting of 22KV HT cable line 2020-1448,dated 27.02.2020

Shifting of jio communication tower at MPEW in AFC-MPEW-AU-2020-520,


387 3/7/2020 MGT ROC-0387 YES
between chainages (37+875 to 38+000) dated 08.02.2020

Review and Recommendation of statement of work


NECL-MSRDC-MPEW-I-IPC-
388 3/7/2020 MGT ROC-0388 done during the period ending upto 29.02.2019; 1. AFC-MPEW-AU-2019-352
09,dated 03.03.2020
YES
Interim Payment Application - IPC09 dated 25.11.2019.
2. SO-P2-0386 dated
13.12.2019.
389 3/9/2020 MGT ROC-0389 Review of “Submission for HT Strand Report”. 3. RFI No. AFC-STR-QC- Not
01182 dated 14.02 2020.
1. RFI No. AFC-STR-QC-4.
AFC-MPEW-AU-2020-524
01182 dated 14.02 2020.
Review of “Submission for reinforcement FE 500D dated 28.02.2020.
390 3/9/2020 MGT ROC-0390 2. AFC- Not
TMT bar”. MPEW-AU-2020-524 dated
28.02.2020.

391 3/12/2020 MGT ROC-0391 Extension for Electrical Engineer N/A Yes

1.MSRDC E-mail dated


NEC-MPEW-2019-20-
392 3/12/2020 MGT ROC-0392 Factory Visit for material Testing Chettinad Cement. 11.03.2020 2.ROC- Not
357,dated 08.03.2020
0385,dated 26.02.2020
3.Roc-0205,dated 11.10.2019
4.NEC-MPEW-2019-20-
393 3/12/2020 MGT ROC-0393 Tentative Cost Implication for Adit-I proposals. 221,dated 01.10.2019 Not
5.NEC-MPEW-
2018-19-012,dated
1.MSRDC Email dated
20.12.2018
28.02.2020
6.U03359/XL0084-0137,
394 3/13/2020 MGT ROC-0394 Regarding shifting of existing wastewater pipeline Not
2.AFC-MPEW-AU-2019-
dated 19.12.2018
493,dated 14.02.2020
Review and Recommendation of “Statement of work AFC-MPEW-AU-2019-
395 3/16/2020 MGT ROC-0395 done during the period from 01.02.2020 to 543,dated 05.03.2020 Not
29.02.2020: Interim Payment Application”. – IPC-05

Submission of Monthly Progress Report for the


396 3/16/2020 MGT ROC-0396 NA YES
month of-February 2020.

397 3/16/2020 MGT ROC-0397 Tentative Cost Implication for Adit-I proposals. ROC-0393,DATED 12.03.2020 Not

Review of Credentials of Birla Shakti Cement and


398 3/18/2020 MGT ROC-0398 NEC-MPEW-2019-20-354 YES
Orient Cement.

Review of Credentials of M/s. Ecmas Construction


399 3/18/2020 MGT ROC-0399 NEC-MPEW-2019-20-354 YES
Chemical Pvt.Ltd.

Regarding Recommendation of Chettinad Cement NEC-MPEW-2019-20-


400 3/18/2020 MGT ROC-0400 YES
(OPC -53 Grade cement). 357,dated 08.03.2020

401 3/20/2020 MGT ROC-0401 Review of Vendor credential of Dowel Bars for PQC AFC-MPEW-AU-2019-556 Not

402 3/20/2020 MGT ROC-0402 Covid-19 epidemic – Home -office work plan NA Not

Compliance of Govt. of Maharashtra Order on “Lock


3/23/2020 MGT ROC-0403 Down” and “Work from Home” due to “COVID-19” NA YES
Pandemic.
Reconciliation of GST - TDS / MSRDC

Review of "CV of Mr. Aziz Qureshi as Tunnel Inspector  (Geodata)

Review of "Toll Plaza Augmentation Works

Review of "CV of Mr. Kartikeyan V. as Tunnel Inspector  (Geodata)


Review of "CV of Mr. Hichem Zammit as Tunnel Design Specialist 
(Design review)” 
Intimation Regarding joining of Mr.Srikanth Aluguri as Safety and
Security Specialist”
Monthly Progress Report for March 2019
Intimation regarding joining of the team
Intimation regarding Biometric Machine Registration
“Felling and Clearance of trees for widening portion ”
Review of “CV of Mr.Shivankar Rathore as Tunnel Inspector

Review of “CV of Mr.Debasis Charkrabarty as Contract specialist

Review of “CV of Mr. Anuj Kumar as Office Assistant”


Design of toll plaza on Mumbai Pune Expressway and National
Highway-4 (NH-4) during capacity augmentation of Mumbai Pune
Expressway

Mobilization of Mr. Mohammad Akhtar as Environmental Specialist ”

Submission of “CV of Mr. Sanjay Jijja as Highway Engineer”


Monthly Progress Report for April 2019
Review of "CV of Mr. Ashok Shamrao Wankhade, Tunnel Design
Specialist (Design Review)" 
Review of "CV of Mr.Aman Gupta as Tunnel Inspector" 
Progress of Navyuga Scope of work
Additional Land Acquisition at T2 Exit
Submission of Geotechnical Investigation Reports ”
“Submission of Axle Load Survey”
Regarding Service Road changes concerning 8-laning project of the
expressway
Professional Fees for the month of February-2019
Professional fees invoice for providing Engineering Consultancy
Services for the month of March 2019.
Professional fees invoice for providing Engineering Consultancy
Services for the month of April 2019.
Handing over of Casting Yard -3