FORM No.
Roughness Inspection Report                  Repert NO.
                                                                                                              DATE
                                                                                                              Main Contractor: ITP
      Project Name :     Greater Cairo Metro
                                                                                                                         Surface Roughness: S
        Order No.        07-2022
        DWG No.             Item NO.           QTY
                                                                         Measure Value         AVG   Result                          Remarks
407-G2-FTH-69A-D-135-B        B49               1      67   65   70                            67    ACC
407-G2-FTH-69A-D-136-B        B50               1/3    61   64   70                            65    ACC
407-G2-FTH-69A-D-136-B        B50               2/3    67   61   70                            66    ACC
407-G2-FTH-69A-D-136-B        B50               3/3    61   61   69                            64    ACC
407-G2-FTH-69A-D-137-B        B51               1/8    62   63   62                            62    ACC
407-G2-FTH-69A-D-137-B        B51               2/8    61   66   65                            64    ACC
407-G2-FTH-69A-D-137-B        B51               3/8    66   67   61                            65    ACC
407-G2-FTH-69A-D-137-B        B51               4/8    67   67   64                            66    ACC
407-G2-FTH-69A-D-137-B        B51               5/8    61   70   67                            66    ACC
407-G2-FTH-69A-D-137-B        B51               6/8    68   64   64                            65    ACC
407-G2-FTH-69A-D-137-B        B51               7/8    65   63   65                            64    ACC
407-G2-FTH-69A-D-137-B        B51               8/8    69   62   69                            67    ACC
407-G2-FTH-69A-D-138-B        B52               1/3    62   66   68                            65    ACC
407-G2-FTH-69A-D-138-B        B52               2/3    66   68   62                            65    ACC
407-G2-FTH-69A-D-138-B        B52               3/3    69   61   64                            65    ACC
407-G2-FTH-69A-D-143-B        B58              1/14    67   65   68                            67    ACC
407-G2-FTH-69A-D-143-B        B58              2/14    63   63   61                            62    ACC
407-G2-FTH-69A-D-143-B        B58              3/14    63   63   69                            65    ACC
407-G2-FTH-69A-D-143-B        B58              4/14    64   70   62                            65    ACC
407-G2-FTH-69A-D-143-B        B58              5/14    67   62   70                            66    ACC
407-G2-FTH-69A-D-143-B        B58              6/14    70   63   61                            65    ACC
407-G2-FTH-69A-D-143-B        B58              7/14    67   64   67                            66    ACC
407-G2-FTH-69A-D-143-B        B58              8/14    69   64   68                            67    ACC
407-G2-FTH-69A-D-143-B        B58              9/14    69   68   67                            68    ACC
407-G2-FTH-69A-D-143-B        B58              10/14   65   64   69                            66    ACC
407-G2-FTH-69A-D-143-B        B58              11/14   69   65   66                            67    ACC
                                                                      Page 1 of 6
                                                                                                                                       FORM No.
                                                                                   Roughness Inspection Report                         Repert NO.
                                                                                                                                       DATE
                                                                                                                                       Main Contractor: ITP
          Project Name :    Greater Cairo Metro
                                                                                                                                                  Surface Roughness: S
            Order No.       07-2022
            DWG No.            Item NO.            QTY
                                                                                           Measure Value                AVG   Result                          Remarks
   407-G2-FTH-69A-D-143-B        B58              12/14         64    69           69                                   67    ACC
   407-G2-FTH-69A-D-143-B        B58              13/14         67    70           68                                   68    ACC
   407-G2-FTH-69A-D-143-B        B58              14/14         70    67           65                                   67    ACC
   407-G2-FTH-69A-D-144-B        B59                1           61    70           67                                   66    ACC
COMMENT
            ELFATEH                               Emad Saieed        3RD PARTY                             EFJV QC            NAT/Cons
                 Date:                            11/23/2022               Date:                             Date:                 Date:
              Signature:                                              Signature:                           Signature:           Signature:
                                                                                        Page 2 of 6
                       FTH-PR-PAIF-001/2
                       81
                       11/23/2022
Main Contractor: ITP
           Surface Roughness: SA 2.1/2
                       Remarks
                                 Page 3 of 6
                       FTH-PR-PAIF-001/2
                       81
                       11/23/2022
Main Contractor: ITP
           Surface Roughness: SA 2.1/2
                       Remarks
                                 Page 4 of 6
                                                                                                concrete cub test report
        Project Name :                                                                     LTOM PACKAGE #5 MANFOUHA                                                                                              cube size
               Owner                                                                                National Water Company                                                                                       cement brand
                                                                                                                                                                                                                 Grade of
           contractor                                                                 Alkhorayef Water and Power Technologies                                                                                    Concrete
           Location :                                                                                          Riyadh - KSA                                                                                      Date
                                                                                                                                                                                                                 DOC NO :
                                                                      cube                                                                                 Age of          weight of    crushing                    compression Average                       .
                                                                                                                                         Tim of
          sr                 location             slump           ldentification Date of costing Date of Testing                                          concrete           cube    load (KN)                        Strength  compressiv
                                                                                                                                         testing
                                                                      mark                                                                                  cube           (grams)                                    (N/mm²)   Strength
remarkes :-
…....................................................................................................................................................................................................................................................................
........................................................................................................................................................................................................................................................................
..............................................................................................................................................................................................................................
                                           QA/QC Engineer                                                 QA/QC Manager                                                         NWC Representative
Name
Date:
Signature:
                                                                                                                                            Page 5 of 6
Page 6 of 6