0% found this document useful (0 votes)
44 views6 pages

Greater Cairo Metro Roughness Report

The document appears to be a roughness inspection report for various construction projects. It includes item numbers, quantities, measurement values from inspections, average results, and remarks indicating if measurements were acceptable or not.

Uploaded by

ibrahim hegazy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views6 pages

Greater Cairo Metro Roughness Report

The document appears to be a roughness inspection report for various construction projects. It includes item numbers, quantities, measurement values from inspections, average results, and remarks indicating if measurements were acceptable or not.

Uploaded by

ibrahim hegazy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

FORM No.

Roughness Inspection Report Repert NO.


DATE
Main Contractor: ITP
Project Name : Greater Cairo Metro

Surface Roughness: S
Order No. 07-2022

DWG No. Item NO. QTY


Measure Value AVG Result Remarks

407-G2-FTH-69A-D-135-B B49 1 67 65 70 67 ACC


407-G2-FTH-69A-D-136-B B50 1/3 61 64 70 65 ACC
407-G2-FTH-69A-D-136-B B50 2/3 67 61 70 66 ACC
407-G2-FTH-69A-D-136-B B50 3/3 61 61 69 64 ACC
407-G2-FTH-69A-D-137-B B51 1/8 62 63 62 62 ACC
407-G2-FTH-69A-D-137-B B51 2/8 61 66 65 64 ACC
407-G2-FTH-69A-D-137-B B51 3/8 66 67 61 65 ACC
407-G2-FTH-69A-D-137-B B51 4/8 67 67 64 66 ACC
407-G2-FTH-69A-D-137-B B51 5/8 61 70 67 66 ACC
407-G2-FTH-69A-D-137-B B51 6/8 68 64 64 65 ACC
407-G2-FTH-69A-D-137-B B51 7/8 65 63 65 64 ACC
407-G2-FTH-69A-D-137-B B51 8/8 69 62 69 67 ACC
407-G2-FTH-69A-D-138-B B52 1/3 62 66 68 65 ACC
407-G2-FTH-69A-D-138-B B52 2/3 66 68 62 65 ACC
407-G2-FTH-69A-D-138-B B52 3/3 69 61 64 65 ACC
407-G2-FTH-69A-D-143-B B58 1/14 67 65 68 67 ACC
407-G2-FTH-69A-D-143-B B58 2/14 63 63 61 62 ACC
407-G2-FTH-69A-D-143-B B58 3/14 63 63 69 65 ACC
407-G2-FTH-69A-D-143-B B58 4/14 64 70 62 65 ACC
407-G2-FTH-69A-D-143-B B58 5/14 67 62 70 66 ACC
407-G2-FTH-69A-D-143-B B58 6/14 70 63 61 65 ACC
407-G2-FTH-69A-D-143-B B58 7/14 67 64 67 66 ACC
407-G2-FTH-69A-D-143-B B58 8/14 69 64 68 67 ACC
407-G2-FTH-69A-D-143-B B58 9/14 69 68 67 68 ACC
407-G2-FTH-69A-D-143-B B58 10/14 65 64 69 66 ACC
407-G2-FTH-69A-D-143-B B58 11/14 69 65 66 67 ACC
Page 1 of 6
FORM No.
Roughness Inspection Report Repert NO.
DATE
Main Contractor: ITP
Project Name : Greater Cairo Metro

Surface Roughness: S
Order No. 07-2022

DWG No. Item NO. QTY


Measure Value AVG Result Remarks

407-G2-FTH-69A-D-143-B B58 12/14 64 69 69 67 ACC


407-G2-FTH-69A-D-143-B B58 13/14 67 70 68 68 ACC
407-G2-FTH-69A-D-143-B B58 14/14 70 67 65 67 ACC
407-G2-FTH-69A-D-144-B B59 1 61 70 67 66 ACC
COMMENT

ELFATEH Emad Saieed 3RD PARTY EFJV QC NAT/Cons


Date: 11/23/2022 Date: Date: Date:

Signature: Signature: Signature: Signature:

Page 2 of 6
FTH-PR-PAIF-001/2
81
11/23/2022
Main Contractor: ITP

Surface Roughness: SA 2.1/2

Remarks

Page 3 of 6
FTH-PR-PAIF-001/2
81
11/23/2022
Main Contractor: ITP

Surface Roughness: SA 2.1/2

Remarks

Page 4 of 6
concrete cub test report

Project Name : LTOM PACKAGE #5 MANFOUHA cube size

Owner National Water Company cement brand

Grade of
contractor Alkhorayef Water and Power Technologies Concrete

Location : Riyadh - KSA Date

DOC NO :

cube Age of weight of crushing compression Average .


Tim of
sr location slump ldentification Date of costing Date of Testing concrete cube load (KN) Strength compressiv
testing
mark cube (grams) (N/mm²) Strength

remarkes :-
…....................................................................................................................................................................................................................................................................
........................................................................................................................................................................................................................................................................
..............................................................................................................................................................................................................................
QA/QC Engineer QA/QC Manager NWC Representative

Name
Date:

Signature:

Page 5 of 6