Commissioning Report

The document provides a commissioning report of materials allocated during November 2020 listing the material, quantity, date drawn from store, date of commissioning, and any balance. It includes items like relays, CTs, conductors, fittings, insulators, structures, and reels allocated for work augmenting a 66kv substation which has not been commissioned yet due to pending work order.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views3 pages

Commissioning Report

The document provides a commissioning report of materials allocated during November 2020 listing the material, quantity, date drawn from store, date of commissioning, and any balance. It includes items like relays, CTs, conductors, fittings, insulators, structures, and reels allocated for work augmenting a 66kv substation which has not been commissioned yet due to pending work order.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Commissioning report of material which is allocated durin

Allocated Material
Name of Sub station for Date of
S no. Name of Division which material is allocated allocation Memo no.

1 220 kv S/s, Amloh 10/21/2020 6107/10


2 10/21/2020 6107/10
3 10/28/2020 6221/26
4 11/5/2020 1383/DD-699
5 11/11/2020 1148
8142

P& M div 1 MGG

17-11-2020 &
6
18/11/2020

7 11/5/2020 1383/DD-699
aterial which is allocated during month of Nov 2020

Allocated Material
Date on which
material drawn Date of
Description of Material Quantity from store commissioning Balance if any

11 kv O/C & E/F relay 3 no. 11/6/2020 9/11/20 & 10/11/20 nil
11 kv O/C & E/F relay 1 no. 11/6/2020 12/2/2020 nil
66 Directional O/C & E/F relay 1 no. 11/6/2020 11/7/2020 nil
66 Kv CT ,ratio- 600-300/1-1-1-1-1 3 no. 11/6/2020 12/3/2020 nil
11 kv O/C & E/F relay 2 no. 11/13/2020 11/14/2020 nil
ACSR Conductor 0.4 sq.inch. (ZEBRA) 1500 mtrs 1500 mtrs
Double Tension Fitting 0.4 Sq. inch. 36 no. 36 no.
Double suspension Fitting 0.4 Sq. inch. 6 no. 6 no.
C-Wedge Clamps 0.4 Sq. inch. 58 no. 58 no.
Aluminum Spacer 0.4 Sq. inch 142 no. 142 no.
Anti Fog Disc Insulators 90KN 240 no. 11/20/2020 240 no.
P G clamp 0.4 sq. inch 27 no. 27 no.
R/W clips for disc insulators 240 no. 240 no.
Mixed sub station structure 140 kg 140 kg
Earth wire 7/3.15 120 kg 120 kg
Empty wooden reel 1 no. 1 no.
66 kv line isolator 1 no. 11/27/2020 12/3/2020 nil
Reason for non commissioning

This material is drawn for the work of


Augmentation of 66kv Double bus with
four conductor bus bar by outsource
agency. Work order is still pending.