New Onshore Project
New Onshore Project
Overall input
Design oil production flowrate 0.25 Mbbl/day Reserves 1.00 MMbbl
Design associated gas flowrate 0.04 MMscf/day Terrain Jungle
Design gross liquids flowrate 0.28 Mbbl/day Elevation 50.00 m
Water injection Yes Reservoir depth 1310.00 m
Water injection capacity factor 1.10 Reservoir pressure 158.00 bara
Design water injection flowrate 0.31 Mbbl/day Reservoir length 2.00 km
Gas injection No Reservoir width 1.00 km
Design gas injection rate -
Design gas lift rate -
Gas oil ratio 150.00 scf/bbl
Design factor 1.10
Distance to operations base 150.00 km
Distance to delivery point 150.00 km
Fluid characteristics
Oil density @ STP 37.30 °API H2S content 30.00 ppm
CO2 content 22.00 % Gas molecular weight 33.10
Waxy crude Yes Initial water cut 10.00 %
Number of wells
Production wells 1 Gas injection wells -
Water injection wells 1 Maximum well deviation 45.00
Artificial lift No
Artificial lift type -
Pumped wells type -
Item name Metric name Metric value Metric units Metric description
Project
Total project CAPEX (including project costs) / BOE recoverable reserves
Total project CAPEX/BOE of recoverable reserves 33.6 $/BOE
(based on field level inputs)
Components
Onshore drilling
Onshore drilling 1
Cost/well 3,540,000 $/well Total cost / total number of wells
Cost/metre 2,680 $/m Total cost / sum of the measured depths
Production facilities
Production facility 1
Cost/BOE/day hydrocarbon throughput 201,000 $/BOE/day Total cost / total design oil, gas and gas injection throughput in BOE/day
Cost/tonne 66,600 $/te Total cost / total dry weight
Onshore pipelines
Oil pipeline (onshore 1)
Cost/kilometre length.inch diameter 24,600 $/km.in Total cost / sum of the length times diameter for each section
Cost/BOE/day hydrocarbon throughput 24,600 $/BOE/day Total cost / total design oil and gas throughput in BOE/day
PRODUCTION PROFILE REPORT
Onshore drilling 1 7,081,000 783,000 1,744,000 2,715,000 271,000 330,000 58,000 1,180,000
Wellpad group 1 0
Production facility 1 20,069,000 6,972,000 2,920,000 961,000 4,276,000 1,392,000 757,000 173,000 2,618,000
Terminal 1 4,875,000 2,178,000 459,000 223,000 911,000 271,000 155,000 42,000 636,000
Oil pipeline (onshore 1) 2,457,000 1,925,000 304,000 59,000 29,000 23,000 117,000
CAPEX TOTALS 34,482,000 9,933,000 7,048,000 1,184,000 8,206,000 1,993,000 1,271,000 296,000 4,551,000
Decommissioning
Cost centre Totals Scrap
/ removal
Wellpad group 1 0
E & A cost 0.00 Drilling cost 7.08 Facilities cost 27.40 Operating cost 216.87 Decommission cost 10.69
Cost/BOE 0.00 Cost/BOE 6.88 Cost/BOE 26.64 Cost/BOE 210.89 Cost/BOE 10.40
Design production
0.09 0.01
1.12 1.028337
EXPLORATION & APPRAISAL PROD. DRILLING FACILITIES COSTS OPERATING COSTS CO2 emitted PRODUCTION
PROJECT
Year Production Wellpad Infra- Other Variable DECOMM. Cond.
COSTS Expl. Seismic Apprsl. Tangible Intangible Terminals Pipelines Fixed OPEX Tariffs Leases CO2 tax 000s te/yr Oil MMbbl/yr Gas Bscf/yr
facilities groups structure facilities OPEX MMbbl/yr
1.01 0 0.11
TOTAL 0.00 0.00 0.00 0.00 3.06 4.02 20.07 0.00 4.87 2.46 0.00 0.00 209.20 7.67 0.00 0.00 0.00 10.69 34.98 1.01 0.00 0.11
1 3.06 3.90 6.51 1.44
2 0.12 13.56 3.43 2.46 3.26 0.12 0.68 0.02 0.00
3 13.05 0.49 2.70 0.09 0.01
4 13.05 0.49 2.70 0.09 0.01
5 13.05 0.55 2.70 0.09 0.01
6 13.09 0.68 2.70 0.09 0.01
7 13.13 0.49 2.70 0.09 0.01
8 13.05 0.53 2.70 0.09 0.01
9 13.06 0.66 2.66 0.09 0.01
10 13.06 0.64 2.48 0.08 0.01
11 13.13 0.40 2.22 0.06 0.01
12 13.31 0.36 2.00 0.05 0.01
13 13.04 0.39 1.81 0.04 0.01
14 13.05 0.49 1.66 0.04 0.00
15 13.03 0.32 1.54 0.03 0.00
16 13.03 0.38 1.43 0.03 0.00
17 13.03 0.31 1.34 0.02 0.00
18 9.78 0.37 0.96 0.01 0.00
19 1.78
20 7.13
21 1.78
True
Component values
Oil pipeline (onshore 1)
Nominal diameter 4.00 in
Length 25.00 km
Cost values
Construction
Lay pipe 2 day Quantity
Lay pipe 75,000 $/day Unit rate
Mob / Demob 2 day Quantity
Mob / Demob 75,000 $/day Unit rate
Design & Project management
Design 500 mhr Quantity
Project management 150 mhr Quantity
Contingency
Contingency 5.00 % Quantity
Section a
Nominal diameter 4.00 in
Production facility 1
Function compression 0
Wellpad group 1
Wellpad configuration edited 1
Wellpad 1
Natural production well count 0
False
True
False
Message list
Warning Oil pipeline (onshore 1)
Nominal diameter in Production facility 1 oil product export pipeline is different from Oil pipeline (onshore 1) nominal diameter
Onshore drilling input report
Component name Onshore drilling 1
Well Well type TVD Kick Horizontal Profile Horizontal Measured Maximum Rig class Completion Duration
off shift type section depth deviation Drilling Completion type Drilling Completion
(degrees from
m m m m m vertical) days days
1 Production 1,310 0 0 Vertical 0 1,310 0 C C Cased hole 19.0 8.0
2 Water injection 1,310 300 202 BH 0 1,330 12 C C Cased hole 19.4 9.2
Total depth Total duration
m days
2,640 56
Onshore drilling 1 Name Onshore drilling 1
EQUIPMENT
CAPITAL COST % COST
Equipment 783,000 0 0
Total Equipment $ 0
MATERIALS
CAPITAL COST % COST
Materials 1,744,000 0 0
Total Materials $ 0
CONSTRUCTION
CAPITAL COST % COST
Construction 2,715,000 20 543,000
Total Construction $ 543,000
DESIGN & PROJECT MANAGEMENT
CAPITAL COST % COST
Design & Project management 601,000 0 0
Total Design & project management $ 0
INSURANCE & CERTIFICATION
CAPITAL COST % COST
Insurance & certification 58,000 0 0
Total Insurance & certification $ 0
CONTINGENCY
CAPITAL COST % COST
Contingency 1,180,000 0 0
Total Contingency $ 0
SCRAP MATERIAL
QUANTITY UNIT RATE COST
Scrap material 0 te -215 0
Total Scrap material $ 0
Onshore pipeline input report
Component name Oil pipeline (onshore 1)
Fixed diameter No
Fixed pressure Outlet pressure
Pipeline sections
Section Inlet Oulet Inlet Oulet Length Nominal Wall Corrosion Cladding Insulation Coating + Corrosion
pressure pressure elevation elevation diameter thickness allowance thickness U value wrapping protection
bara bara m m km in mm mm W/m².°C
Section A 1.57 1.5 50 50 25 4 6.02 3 - None Yes Yes
MATERIALS
CAPITAL COST % COST
Materials 1,925,000 35 674,000
Total Materials $ 674,000
CONSTRUCTION
CAPITAL COST % COST
Construction 304,000 35 106,000
Total Construction $ 106,000
DESIGN & PROJECT MANAGEMENT
CAPITAL COST % COST
Design & Project management 88,000 0 0
Total Design & project management $ 0
INSURANCE & CERTIFICATION
CAPITAL COST % COST
Insurance & certification 23,000 0 0
Total Insurance & certification $ 0
CONTINGENCY
CAPITAL COST % COST
Contingency 117,000 0 0
Total Contingency $ 0
SCRAP MATERIAL
QUANTITY UNIT RATE COST
Scrap material 402 te -215 -86,000
Total Scrap material $ -86,000
Production facility input report
Component name Production facility 1
Fluid capacities
Inlet high pressure fluids Inlet medium pressure fluids
Arrival temperature 63.2 °C Arrival temperature 0 °C
Arrival pressure 35 bara Arrival pressure 0 bara
Prefabrication Winterisation
Type Other - Increased foundation No
Piping spools Yes 75% Winterisation of facilities No
Steelwork Yes 75%
Oil processing Trains Des. cap./train Pressure Temp. out Wt / train Duty Type
Separator 1 1 100% 35 bara 63.2 °C 2.09 te 3 Phase (Horizontal)
Separator 2 1 100% 7.18 bara 80 °C 1.2 te 3 Phase (Horizontal)
Separator 3 1 100% 1.49 bara 80 °C 1.2 te 3 Phase (Horizontal)
Test separator - - - - - -
Dehydrator 1 100% 1.02 bara 15 °C - - Settling tank
Desalter - - - - - - -
Stabiliser - - - - -
Heat exchanger 1 1 100% 35 bara 80 °C 1.12 te 0.00706 MW Shell & tube
Heat exchanger 2 - - - - - -
Heat exchanger 3 - - - - - - -
Heat exchanger 4 - - - - - - -
Product storage Oil Oil and water NGL LPG Gasoline Water
Number of days storage 1 day - - - - -
Storage capacity 0.1 Mbbl - - - - -
Pressure vessel type - - - - - -
Number of vessels - - - - - -
Vapour space - - - - - -
Design capacity / vessel - - - - - -
Number of tanks 2 - - - - -
Design capacity / tank 0.05 Mbbl - - - - -
Diameter 2.5 m - - - - -
Height 2.5 m - - - - -
Length - - - - - -
Product export Oil Oil and water NGL LPG Gasoline Water
Export rate 0.1 Mbbl/day - - - - -
Pump differential pressure 2.91 bar - - - - -
Total pump power 0.08 kW - - - - -
Metering Yes - - - - -
Driver type Electric - - - - -
Derating factor - - - - - -
Derating based on 32 °C 32 °C 32 °C 32 °C 32 °C 32 °C
Derated power - - - - - -
Elevation 50 m 50 m 50 m 50 m 50 m 50 m
Training 2 - - - - -
Sparing % 100.00 - - - - -
Driver model - - - - - -
Driver rating - - - - - -
Pump weight 0 te - - - - -
Pump driver weight 0.01 te - - - - -
Metering capacity 0.1 Mbbl/day - - - - -
Metering weight 0.11 te - - - - -
Pipeline length Oil Oil and water NGL LPG Gasoline Water
Length 25 km - - - - -
Power generation
Wellpads 0 MW Water injection 0.00702 MW
Export pumping 0 MW Custom equipment 0 MW
Oil processing Produced water treatment 0 MW
Oil pumps 7.66E-05 MW Utilities 0.283 MW
Oil and water pumps 0 MW Controls and comms 0.125 MW
NGL pumps 0 MW Base load 0.0415 MW
LPG pumps 0 MW Emergency power 0.323 MW
Gasoline pumps 0 MW
Water pumps 0 MW Type Power generation and distribution
Gas processing Ambient temperature 32 °C
Gas cooling 0 MW Derating factor -
Gas dehydration 0 MW Total power 0.457 MW
Acid gas removal 0 MW Power factor 0.83
Dewpoint control 0 MW Design power 0.55 MW
NGL production 0 MW Number of generators 2
LPG production 0 MW Design duty/generator % 100
Compressors Driver type Diesel / gas engine
Flash gas 0 MW Model -
Export 0 MW Driver power -
Gas lift 0 MW Generator set weight 13.4 te
Gas injection 0 MW Distribution weight 12.1 te
Emergency power weight 4.62 te
Civils area
Manifolding 0 m² Export pumping
Oil processing Oil 0.098 m²
Separation / stabilisation 52.1 m² Oil and water 0 m²
Heating 25.7 m² NGL 0 m²
Cooling 0 m² LPG 0 m²
Dehydration (vessels...) 0 m² Gasoline 0 m²
Dehydration tankage 78.5 m² Water 0 m²
Desalting 0 m² Metering
Gas processing Oil 0.795 m²
Cooling 0 m² Oil and water 0 m²
Gas dehydration 0 m² NGL 0 m²
Acid gas removal 0 m² LPG 0 m²
Dewpoint control 0 m² Gasoline 0 m²
NGL production 0 m² Water 0 m²
LPG production 0 m² Gas 0 m²
Others Storage
Gas compression - Atmospheric 31.8 m²
Water injection 30.7 m² Pressurised 0 m²
Custom equipment 0 m²
Produced water 0 m² Total foundation area 705 m²
Utilities 422 m² Total plot area 4830 m²
Power generation 59.2 m² Vehicular access 494 m²
Power distribution 4.4 m² Buildings 106 m²
Production facility 1 Name Production facility 1
PREFABRICATION DETAIL
QUANTITY MAN HOURS MAN HOURS COST UNIT RATE COST
PER PER
UNIT MAN HOUR
Equipment 0 te 29 0 45 1,310 0
Steelwork 39 te 117 4,563 45 5,270 206,000
Piping 32 te 413 13,216 45 18,600 595,000
Electrical 0 te 587 0 45 26,400 0
Instruments 0 te 880 0 45 39,600 0
Others 0 te 293 0 45 13,200 0
Production facility 1 construction detail US Dollars
CONSTRUCTION DETAIL
QUANTITY PRODUCTIVITY MAN HOURS MAN HOURS MAN HOURS COST UNIT RATE COST
TERRAIN PER COST TERRAIN PER
FACTOR UNIT FACTOR MAN HOUR
Site preparation 4831 m² 2.5 0.6 2,899 1.1 53 32 153,000
Civils
General 4831 m² 1.1 1.59 7,690 1.1 50 79 380,000
Foundations 705 m² 1.1 12 8,531 1.1 51 607 428,000
Roads 494 m² 1.1 8.8 4,347 1.1 50 436 215,000
Buildings 106 m² 1.1 28 2,915 1.1 51 1,420 151,000
Skid / spool erection 71 te 1.1 41 2,877 1.1 52 2,120 151,000
Equipment installation 160 te 1.1 41 6,484 1.1 52 2,120 339,000
Tank erection 137 bbl 1.1 0.25 35 1.1 52 13 2,000
Steelwork 13 te 1.1 261 3,389 1.1 53 13,800 179,000
Piping 10 te 1.1 564 5,643 1.1 47 26,700 267,000
Electrical 15 te 1.1 1114 16,715 1.1 51 56,400 846,000
Instruments 11 te 1.1 1114 12,257 1.1 51 56,400 620,000
Others 21 te 1.1 564 11,850 1.1 46 26,100 548,000
Process utilities
EQUIPMENT
CAPITAL COST % COST
Equipment 6,972,000 60 4,183,000
Total Equipment $ 4,183,000
MATERIALS
CAPITAL COST % COST
Materials 2,920,000 0 0
Total Materials $ 0
PREFABRICATION
CAPITAL COST % COST
Prefabrication 961,000 0 0
Total Prefabrication $ 0
CONSTRUCTION
CAPITAL COST % COST
Construction 4,276,000 60 2,566,000
Total Construction $ 2,566,000
DESIGN & PROJECT MANAGEMENT
CAPITAL COST % COST
Design & Project management 2,149,000 0 0
Total Design & project management $ 0
INSURANCE & CERTIFICATION
CAPITAL COST % COST
Insurance & certification 173,000 0 0
Total Insurance & certification $ 0
CONTINGENCY
CAPITAL COST % COST
Contingency 2,618,000 0 0
Total Contingency $ 0
SCRAP MATERIAL
QUANTITY UNIT RATE COST
Scrap material 301 te -215 -65,000
Total Scrap material $ -65,000
Production facility 1 equipment list
Pressure Temperature Dimensions (m)
Number of items
Power (kW)
Duty (MW)
Operating
Operating
Capacity
H (t / t) ID V (t / t)
Design
(bara)
Manifolding
Manifolding 1.6
Control package 1 100 1
Hydraulic power unit 1 100 0.6
Oil processing
Separation 4.49
1st stage separator 1 100 0.113 Mbbl/day 35 37.4 63.2 4.27 1.07 2.09 3 Phase (Horizontal)
2nd stage separator 1 100 0.114 Mbbl/day 7.18 7.17 80 2.83 0.944 1.2 3 Phase (Horizontal)
3rd stage separator 1 100 0.109 Mbbl/day 1.49 2.5 80 2.83 0.943 1.2 3 Phase (Horizontal)
Dehydration (tankage)
Dehydrator tank 1 100 1.02 15 10 0.0756 Settling tank
Heating 1.12
Heater 1 1 100 0.00706 35 38.5 80 0.127 1.12 Shell & tube
Product export
Pumping 0.0766 0.0107
Oil export pump 2 100 0.1 Mbbl/day 0.0766 0.0107 Electric
Liquid metering 0.106
Oil export metering package 1 100 0.1 Mbbl/day 0.106
Product storage
Atmospheric storage
Oil storage tank 2 50 0.1 Mbbl 2.5 2.5
Water injection
Water injection 7.02 30.5
Fine filter 1 100 15.2
Vacuum deaerator 1 100 15.1
Vacuum pump 2 100
Water injection pump 1 100 0.306 Mbbl/day 7.02 87.4 0.251 Electric motor
Process support utilities
Produced water
Recycle pump 2 100
Heating medium 8.9 1
Fired heater package 1 100 0.00777
Heating medium make-up tank 1 100
Heating medium make-up pump 2 100
Expansion vessel 1 100
Heating medium filter 1 100
Heating medium circulation pump 2 100
Cooling medium 8.9 1
CCCW expansion / make-up tank 1 100
Water / CCCW exchanger 1 100 0.291
CCCW circulation pump 2 100
Cooling medium filter 1 100
Flare and vent 0.7 1
HP flare tip 1 100
HP flare drum 1 100
HP flare drum pump 2 100
HP ignition system 1 100
LP flare tip 1 100
LP flare drum 1 100
LP flare drum pump 2 100
LP ignition system 1 100
Vent tip 1 100
Vent KO drum 1 100
Halon snuffing system 1 100
Fuel gas 10 1
Fuel gas heater 1 100
KO drum 1 100
Fuel gas filter 1 100
Chemical injection and storage 0.00394 10.3
Chemical injection pumps Chemical injection is provided to the wellheads, oil and gas
processing, gas compression and water injection systems.
Chemical storage tanks
General utilities
Closed drains 2 1
Closed drain vessel 1 100
Closed drain pump 2 100
Reclaimed oil tank 1 100
Reclaimed oil return pump 2 100
Open drains 2 1
Oily water tank 1 100
Oily water return pump 2 100
Non-hazardous open drains tank 1 100
Non-hazardous open drains tank return pump 2 100
Hazardous open drains tank 1 100
Hazardous open drains tank return pump 2 100
Oily water separation tank 1 100
Diesel system 8.29 4.15
Diesel storage tank 1 100
Diesel transfer pump 2 100
Diesel filter 1 100
Instrument and plant air 9 1
Filter / silencer 1 100
Air compressor 1 100
Plant air receiver 1 100
Instrument air dryer 2 100
Filter 2 100
Instrument air receiver 1 100
Inert gas 1 1
Inert gas storage vessel 1 100
Inert gas distribution system 1 100
Plant steam 1 1
Steam generation system 1 100
Steam distribution system 1 100
Firefighting 231 61.9
Firewater pump 2 100
Foam unit
Firewater storage tank
Hose reels
Monitors
Hydrants
Control and communications
Control and communications 125 8
Cable / fibre
Conventional 125
Power generation
Power generation 30.2
Generator set 2 100 0.55 MW 13.4 Diesel / gas engine
Power distribution 12.1 Includes transformers, buses, power cabling between switchboards,
switchboards and ancillary controls
Emergency power generator 4.62
Terminal input report
Component name Terminal 1
Location Inland
Terrain Jungle
Elevation 50 m
Prefabrication Other -
Piping spools Yes 75%
Steelwork Yes 75%
Product export
Export rate 0.3 Mbbl/day - - -
Pump differential pressure 3.5 bar - - -
Total pump power 0.28 kW - - -
Metering Yes - - -
Driver type Electric - - -
Derating factor - - - -
Derating based on 32 °C 32 °C 32 °C 32 °C
Derated power - - - -
Elevation 50 m 50 m 50 m 50 m
Training 2 - - -
Sparing % 100.00 - - -
Driver model - - - -
Driver rating - - - -
Pump weight 0.02 te - - -
Pump driver weight 0.02 te - - -
Metering capacity 0.3 Mbbl/day - - -
Metering weight 0.32 te - - -
Pipeline
Material Carbon steel - - -
Liquid flowrate 0.3 Mbbl/day - - -
Length 0 km - - -
Pressure Outlet pressure - - -
Pressure in - - - -
Pressure out - - - -
Fluid temperature 24 °C - - -
Nominal diameter - - - -
Corrosion allowance - - - -
Cladding thickness - - - -
Wall thickness - - - -
Control system Conventional
Communication system Cable / fibre
Utilities
Process support utilities
Flare and vent 1 te
Fuel gas -
Chemical injection and storage -
General utilities
Closed drains 1 te
Open drains 1 te
Diesel storage 1 te
Instrument and plant air -
Inert gas -
Plant water -
Plant steam -
Firefighting 1 te
Other -
Weights
Generator set weight 0 te
Distribution weight 3.9 te
Emergency power weight 1.89 te
Civils
Atmospheric storage 66.4 m²
Pressurised storage 0 m²
Oil NGL LPG Gasoline
Export pumping 0.353 m² 0 m² 0 m² 0 m²
Metering 2.38 m² 0 m² 0 m² 0 m²
Product loading Road Rail Marine
2 m² 0 m² 0 m²
Utilities 22 m²
Power generation 7.9 m²
Power distribution 1.42 m²
Total foundations 102 m²
Vehicular access 71.7 m²
Buildings 15.4 m²
Total plot area 868 m²
Terminal 1 Name Terminal 1
PREFABRICATION DETAIL
QUANTITY MAN HOURS MAN HOURS COST UNIT RATE COST
PER PER
UNIT MAN HOUR
Equipment 0 te 29 0 45 1,310 0
Steelwork 7 te 117 799 45 5,270 37,000
Piping 8 te 413 3,428 45 18,600 149,000
Electrical 0 te 587 0 45 26,400 0
Instruments 0 te 880 0 45 39,600 0
Others 0 te 293 0 45 13,200 0
Terminal 1 construction detail US Dollars
CONSTRUCTION DETAIL
QUANTITY PRODUCTIVITY MAN HOURS MAN HOURS MAN HOURS COST UNIT RATE COST
TERRAIN PER COST TERRAIN PER
FACTOR UNIT FACTOR MAN HOUR
Site preparation 868 m² 2.5 0.6 521 1.1 53 32 28,000
Civil construction
General 868 m² 1.1 1.59 1,381 1.1 50 79 68,000
Foundations 102 m² 1.1 12 1,239 1.1 51 607 62,000
Roads 72 m² 1.1 8.8 631 1.1 50 436 31,000
Buildings 15 m² 1.1 28 422 1.1 51 1,420 21,000
Tank erection 500 bbl 1.1 0.25 127 1.1 52 13 6,000
Equipment erection 11 te 1.1 41 452 1.1 52 2,120 23,000
Skid/spool erection 15 te 1.1 41 613 1.1 52 2,120 32,000
Steelwork 2 te 1.1 261 593 1.1 53 13,800 28,000
Piping 3 te 1.1 564 1,561 1.1 47 26,700 80,000
Electrical 5 te 1.1 1114 5,850 1.1 51 56,400 282,000
Instruments 3 te 1.1 1114 3,813 1.1 51 56,400 169,000
Others 3 te 1.1 564 1,719 1.1 46 26,100 78,000
Process utilities
EQUIPMENT
CAPITAL COST % COST
Equipment 2,178,000 90 1,960,000
Total Equipment $ 1,960,000
MATERIALS
CAPITAL COST % COST
Materials 459,000 0 0
Total Materials $ 0
PREFABRICATION
CAPITAL COST % COST
Prefabrication 223,000 0 0
Total Prefabrication $ 0
CONSTRUCTION
CAPITAL COST % COST
Construction 911,000 90 820,000
Total Construction $ 820,000
DESIGN & PROJECT MANAGEMENT
CAPITAL COST % COST
Design & Project management 426,000 0 0
Total Design & project management $ 0
INSURANCE & CERTIFICATION
CAPITAL COST % COST
Insurance & certification 42,000 0 0
Total Insurance & certification $ 0
CONTINGENCY
CAPITAL COST % COST
Contingency 636,000 0 0
Total Contingency $ 0
SCRAP MATERIAL
QUANTITY UNIT RATE COST
Scrap material 60 te -215 -13,000
Total Scrap material $ -13,000
Wellpad group input report
Component name Wellpad group 1
Location
Terrain Jungle
Elevation 50 m
Wells summary
Count Flowrate
Production Natural 0 0 Mbbl/day
Pumped 0 0 Mbbl/day
Gas lifted 0 0 Mbbl/day
Water injection 1 0.306 Mbbl/day
Gas injection 0 -
Gas lift rate 0 MMscf/day
Wellpad group configuration edited Yes
Prefabrication
Type Other Module percent %
Steelwork Yes Steelwork percent 75 %
Piping spools Yes Piping spools percent 75 %
Winterisation
Increased depth of gravel base No
Winterisation of facilities (e.g. prefabrication modules ) including HVAC No
and insulation of piping system
Flowlines Civils
Production material Duplex Total foundations 21.3 m²
Water injection material Carbon steel Buildings 0 m²
Gas injection material Carbon steel Vehicular access 14.9 m²
Gas lift material Carbon steel Total facilities plot area 217.5 m²
Production insulation U value 6 W/m².°C Total drilling plot area 11520 m²
Water injection insulation U value None
Construction type Surface
Routing Corridor Installation
Coating Yes Number of spreads 1
Cathodic protection No Mob / demob per spread 15 day
Control systems
Control system Basic local
Wellpad details
Wellpad Manifolding and equipment weights Utilities Power Civils
Production Test Gas lift Water Gas Test Utilities Safety Generation Distribution Foundations Drilling
separator injection injection facilities plot area
Wellpad 1 - - - - - 0 te 0 te 0 te 0.3 te 0.1 te 21.3 m² 11520 m²
Wellpad group 1 Name Wellpad group 1
PREFABRICATION DETAIL
QUANTITY MAN HOURS MAN HOURS COST UNIT RATE COST
PER PER
UNIT MAN HOUR
Equipment 0 te 29 0 45 1,310 0
Steelwork 0.3 te 117 34 45 5,270 2,000
Piping 0.2 te 413 91 45 18,600 4,000
Electrical 0 te 587 0 45 26,400 0
Instruments 0 te 880 0 45 39,600 0
Others 0 te 293 0 45 13,200 0
Wellpad group 1 construction detail US Dollars
CONSTRUCTION DETAIL
QUANTITY PRODUCTIVITY MAN HOURS MAN HOURS MAN HOURS COST UNIT RATE COST
TERRAIN PER COST TERRAIN PER
FACTOR UNIT FACTOR MAN HOUR
Site preparation 11520 m² 2.5 0.6 6,912 1.1 53 32 365,000
Civil construction
General 218 m² 1.1 1.59 346 1.1 50 79 17,000
Foundations 21 m² 1.1 12 258 1.1 51 607 13,000
Roads 15 m² 1.1 8.8 131 1.1 50 436 7,000
Buildings 0 m² 1.1 28 0 1.1 51 1,420 0
Skid/spool erection 0.5 te 1.1 41 21 1.1 52 2,120 1,000
Equipment erection 1 te 1.1 41 40 1.1 52 2,120 2,000
Steelwork 0.1 te 1.1 261 25 1.1 53 13,800 1,000
Piping 0.1 te 1.1 564 41 1.1 47 26,700 3,000
Electrical 0.1 te 1.1 1114 92 1.1 51 56,400 6,000
Instruments 0 te 1.1 1114 47 1.1 51 56,400 0
Others 0.4 te 1.1 564 200 1.1 46 26,100 10,000
DECOMMISSIONING
Wellpad group 1 Name Wellpad group 1
EQUIPMENT
CAPITAL COST % COST
Equipment 55,000 30 17,000
Total Equipment $ 17,000
MATERIALS
CAPITAL COST % COST
Materials 45,000 30 14,000
Total Materials $ 14,000
PREFABRICATION
CAPITAL COST % COST
Prefabrication 7,000 0 0
Total Prefabrication $ 0
CONSTRUCTION
CAPITAL COST % COST
Construction 1,919,000 30 576,000
Total Construction $ 576,000
DESIGN & PROJECT MANAGEMENT
CAPITAL COST % COST
Design & Project management 137,000 0 0
Total Design & project management $ 0
INSURANCE & CERTIFICATION
CAPITAL COST % COST
Insurance & certification 22,000 0 0
Total Insurance & certification $ 0
CONTINGENCY
CAPITAL COST % COST
Contingency 328,000 0 0
Total Contingency $ 0
SCRAP MATERIAL
QUANTITY UNIT RATE COST
Scrap material 3 te -215 -1,000
Total Scrap material $ -1,000
Operating personnel
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Personnel count
Expatriates 3 3 3 3 3 3 3 3 3 3
Management 13 13 13 13 13 13 13 13 13 13
Other 87 87 87 87 87 87 87 87 87 87
Wellpad & production facilities $ 112,800,000 7,050,000 7,050,000 7,050,000 7,050,000 7,050,000 7,050,000 7,050,000 7,050,000 7,050,000 7,050,000
Terminal facilities $ 34,912,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000
Pipelines $ 2,304,000 144,000 144,000 144,000 144,000 144,000 144,000 144,000 144,000 144,000 144,000
Total operating personnel cost $ 150,016,000 9,376,000 9,376,000 9,376,000 9,376,000 9,376,000 9,376,000 9,376,000 9,376,000 9,376,000 9,376,000
Management personnel
Annual unit cost $/yr 78,000
Days on days 30
Days off days 14
Percentage of staff % 15
Operating personnel
Annual unit cost $/yr 49,000
Days on days 30
Days off days 14
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Total expatriates 2 2 2 2 2 2 2 2 2 2
Total management 10 10 10 10 10 10 10 10 10 10
Total other 67 67 67 67 67 67 67 67 67 67
Wellpad groups
Wellpad group 1 (Linked to Production facility 1)
Day Operators 1 1 1 1 1 1 1 1 1 1
Maintenance 1 1 1 1 1 1 1 1 1 1
Night Operators 1 1 1 1 1 1 1 1 1 1
Maintenance 0 0 0 0 0 0 0 0 0 0
Cost $ 3,456,000 216,000 216,000 216,000 216,000 216,000 216,000 216,000 216,000 216,000 216,000
Total wellpad group costs $ 3,456,000 216,000 216,000 216,000 216,000 216,000 216,000 216,000 216,000 216,000 216,000
Production facilities
Production facility 1
Others - day Operators 20 20 20 20 20 20 20 20 20 20
Maintenance 20 20 20 20 20 20 20 20 20 20
Base personnel 4 4 4 4 4 4 4 4 4 4
Catering / cleaning 8 8 8 8 8 8 8 8 8 8
Others - night Operators 10 10 10 10 10 10 10 10 10 10
Maintenance 0 0 0 0 0 0 0 0 0 0
Base personnel 0 0 0 0 0 0 0 0 0 0
Catering / cleaning 2 2 2 2 2 2 2 2 2 2
Management 10 10 10 10 10 10 10 10 10 10
Expatriates 2 2 2 2 2 2 2 2 2 2
Cost $ 109,344,000 6,834,000 6,834,000 6,834,000 6,834,000 6,834,000 6,834,000 6,834,000 6,834,000 6,834,000 6,834,000
Total production facilities costs $ 109,344,000 6,834,000 6,834,000 6,834,000 6,834,000 6,834,000 6,834,000 6,834,000 6,834,000 6,834,000 6,834,000
Total $ 112,800,000 7,050,000 7,050,000 7,050,000 7,050,000 7,050,000 7,050,000 7,050,000 7,050,000 7,050,000 7,050,000
Management personnel
Annual unit cost $/yr 78,000
Days on days 30
Days off days 14
Percentage of staff % 15
Operating personnel
Annual unit cost $/yr 49,000
Days on days 30
Days off days 14
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Total expatriates 1 1 1 1 1 1 1 1 1 1
Total management 3 3 3 3 3 3 3 3 3 3
Total other 18 18 18 18 18 18 18 18 18 18
Terminal 1
Others - day Operators 6 6 6 6 6 6 6 6 6 6
Maintenance 6 6 6 6 6 6 6 6 6 6
Base personnel 2 2 2 2 2 2 2 2 2 2
Catering / cleaning 1 1 1 1 1 1 1 1 1 1
Others - night Operators 3 3 3 3 3 3 3 3 3 3
Maintenance 0 0 0 0 0 0 0 0 0 0
Base personnel 0 0 0 0 0 0 0 0 0 0
Catering / cleaning 0 0 0 0 0 0 0 0 0 0
Management 3 3 3 3 3 3 3 3 3 3
Expatriates 1 1 1 1 1 1 1 1 1 1
Cost $ 34,912,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000
Total terminals cost $ 34,912,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000
Operating personnel
Annual unit cost $/yr 49,000
Days on days 30
Days off days 14
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Total management 0 0 0 0 0 0 0 0 0 0
Total other 2 2 2 2 2 2 2 2 2 2
Total pipelines cost $ 2,304,000 144,000 144,000 144,000 144,000 144,000 144,000 144,000 144,000 144,000 144,000
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Wellpad groups
Labour rate $/hr 92
Maintenance hrs per te hr/te 3.00
Multiphase meter op. cost $ 21,500
Spares % of equip & matl cost % 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Wellpad group 1
Equipment weight te 1
Manhours for specialist maint. hrs 3 3 3 3 3 3 3 3 3 3
Labour cost $ 276 276 276 276 276 276 276 276 276 276
Equip & matl spares $ 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000
Multiphase meters $ 0 0 0 0 0 0 0 0 0 0
Costs $ 16,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000
Total cost wellpad groups $ 16,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000
Production facilities
Labour rate $/hr 92
Maintenance hrs per te hr/te 3.00
Multiphase meter op. cost $ 21,500
Spares % of equip & matl cost % 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Production facility 1
Equipment weight te 161
Manhours for specialist maint. hrs 483 483 483 483 483 483 483 483 483 483
Labour cost $ 44,436 44,436 44,436 44,436 44,436 44,436 44,436 44,436 44,436 44,436
Equip & matl spares $ 98,920 98,920 98,920 98,920 98,920 98,920 98,920 98,920 98,920 98,920
Multiphase meters $ 0 0 0 0 0 0 0 0 0 0
Costs $ 2,288,000 143,000 143,000 143,000 143,000 143,000 143,000 143,000 143,000 143,000 143,000
Total cost production facilities $ 2,288,000 143,000 143,000 143,000 143,000 143,000 143,000 143,000 143,000 143,000 143,000
Terminal facilities
Labour rate $/hr 92
Maintenance hrs per te hr/te 3.00
Spares % of equip & matl cost % 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Terminal 1
Equipment weight te 12
Manhours for specialist maint. hrs 36 36 36 36 36 36 36 36 36 36
Labour cost $ 3,312 3,312 3,312 3,312 3,312 3,312 3,312 3,312 3,312 3,312
Equip & matl spares $ 26,370 26,370 26,370 26,370 26,370 26,370 26,370 26,370 26,370 26,370
Costs $ 480,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000
Total cost terminal facilities $ 480,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000
Pipelines
Intelligent pigging
Pig rate km/day 10.00
Day rate $/day 10,000
Min crew days days 7
Mob demob days days 2
Analysis cost $/km 1,250
Total cost inspection & maintenance $ 3,226,000 174,000 174,000 174,000 174,000 275,000 174,000 174,000 174,000 174,000 515,000
Consumables
Power generation
Wellpad groups
Wellpad group 1
Electrical load Diesel MW 0.02
Production facilities
Production facility 1
Electrical load External gas MW 0.55
Compressor load Own gas MW 0
Water injection load Own gas MW 0
Export pump load Own gas MW 0
Heating medium load Own gas MW 0.0078
Terminal facilities
Terminal 1
Electrical load From grid MW 0.177
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Oil production MMbbl/yr 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.08 0.07 0.06
Gas production Bscf/yr 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Water production MMbbl/yr 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.02 0.03 0.04
Water injection MMbbl/yr 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11
Diesel
Unit cost $/bbl 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00
Quantity bbl/yr 608 608 608 608 608 608 608 590 558 531
Cost $ 792,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 53,000 50,000 48,000
Power
Unit cost $/MW.hr 96.00 96.00 96.00 96.00 96.00 96.00 96.00 96.00 96.00 96.00
Quantity MW.hr/yr 1,487 1,487 1,487 1,487 1,487 1,487 1,487 1,398 1,239 1,107
Cost $ 1,829,000 143,000 143,000 143,000 143,000 143,000 143,000 143,000 134,000 119,000 106,000
Chemicals
Total oil processing chemicals $ 78,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 6,000 5,000 4,000
Total water injection chemicals $ 64,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000
Total wellpads chemicals $ 24,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 1,000
Total cost $ 6,325,000 488,000 488,000 488,000 488,000 488,000 488,000 488,000 459,000 410,000 368,000
Expatriates
Distance km 5,000
Frequency days 90
Method Air
Number of men 3 3 3 3 3 3 3 3 3 3
Transportation cost $ 1,408,000 88,000 88,000 88,000 88,000 88,000 88,000 88,000 88,000 88,000 88,000
Management
Distance km 150
Frequency days 30
Method Road
Number of men 13 13 13 13 13 13 13 13 13 13
Transportation cost $ 64,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000
Other labour
Distance km 150
Frequency days 30
Method Road
Number of men 87 87 87 87 87 87 87 87 87 87
Transportation cost $ 400,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000
Messing
Cost per man per day $/man/d 22
Total men on site 103 103 103 103 103 103 103 103 103 103
Cost $ 12,400,000 775,000 775,000 775,000 775,000 775,000 775,000 775,000 775,000 775,000 775,000
Consumables
Transportation (% of consumable costs) % 7
Cost of consumables (excluding fuel gas) $ 68,000 68,000 68,000 68,000 68,000 68,000 68,000 65,000 61,000 57,000
Transportation cost $ 69,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 4,000 4,000
Vehicles
Car lease rate / vehicle $/yr 5,300
Number of cars 0 0 0 0 0 0 0 0 0 0
Pick-up / 4WD lease rate / vehicle $/yr 10,600
Number of pick-ups / 4WD 16 16 16 16 16 16 16 16 16 16
Truck lease rate / vehicle $/yr 16,000
Number of trucks 3 3 3 3 3 3 3 3 3 3
Cost $ 3,488,000 218,000 218,000 218,000 218,000 218,000 218,000 218,000 218,000 218,000 218,000
Total cost $ 17,829,000 1,115,000 1,115,000 1,115,000 1,115,000 1,115,000 1,115,000 1,115,000 1,115,000 1,114,000 1,114,000
Consumables cost $ 6,325,000 488,000 488,000 488,000 488,000 488,000 488,000 488,000 459,000 410,000 368,000
Logistics and vehicles cost $ 17,829,000 1,115,000 1,115,000 1,115,000 1,115,000 1,115,000 1,115,000 1,115,000 1,115,000 1,114,000 1,114,000
Consumables, logistics & vehicles cost $ 24,154,000 1,603,000 1,603,000 1,603,000 1,603,000 1,603,000 1,603,000 1,603,000 1,574,000 1,524,000 1,482,000
Well maintenance
Production wells
Workover frequency years 4
Duration per well days 12
Material cost per well $ 67,000
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Production wells
Workover rig dayrate $ 15,700
Number of onstream wells 1 1 1 1 1 1 1 1 1 1
Number of new wells onstream this year 1 0 0 0 0 0 0 0 0 0
Wells worked over in the year 0 0 0 1 0 0 0 1 0 0
Maintenance duration days 48 0 0 0 12 0 0 0 12 0 0
Materials cost $ 268,000 0 0 0 67,000 0 0 0 67,000 0 0
Rig cost $ 753,600 0 0 0 188,400 0 0 0 188,400 0 0
Total cost $ 1,020,000 0 0 0 255,000 0 0 0 255,000 0 0
Insurance
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Drilling
Onshore drilling 1 $ 7,081,000 7,081,000 7,081,000 7,081,000 7,081,000 7,081,000 7,081,000 7,081,000 7,081,000 7,081,000
Total CAPEX $ 7,081,000 7,081,000 7,081,000 7,081,000 7,081,000 7,081,000 7,081,000 7,081,000 7,081,000 7,081,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 912,000 57,000 57,000 57,000 57,000 57,000 57,000 57,000 57,000 57,000 57,000
Wellpad group
Wellpad group 1 $ 2,513,000 2,513,000 2,513,000 2,513,000 2,513,000 2,513,000 2,513,000 2,513,000 2,513,000 2,513,000
Total CAPEX $ 2,513,000 2,513,000 2,513,000 2,513,000 2,513,000 2,513,000 2,513,000 2,513,000 2,513,000 2,513,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 320,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000
Production facilities
Production facility 1 $ 20,069,000 20,069,000 20,069,000 20,069,000 20,069,000 20,069,000 20,069,000 20,069,000 20,069,000 20,069,000
Total CAPEX $ 20,069,000 20,069,000 20,069,000 20,069,000 20,069,000 20,069,000 20,069,000 20,069,000 20,069,000 20,069,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 2,576,000 161,000 161,000 161,000 161,000 161,000 161,000 161,000 161,000 161,000 161,000
Terminal facilities
Terminal 1 $ 4,875,000 4,875,000 4,875,000 4,875,000 4,875,000 4,875,000 4,875,000 4,875,000 4,875,000 4,875,000
Total CAPEX $ 4,875,000 4,875,000 4,875,000 4,875,000 4,875,000 4,875,000 4,875,000 4,875,000 4,875,000 4,875,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 624,000 39,000 39,000 39,000 39,000 39,000 39,000 39,000 39,000 39,000 39,000
Pipelines
Oil pipeline (onshore 1) $ 2,457,000 2,457,000 2,457,000 2,457,000 2,457,000 2,457,000 2,457,000 2,457,000 2,457,000 2,457,000
Total CAPEX $ 2,457,000 2,457,000 2,457,000 2,457,000 2,457,000 2,457,000 2,457,000 2,457,000 2,457,000 2,457,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 320,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000
Total insurance cost $ 4,752,000 297,000 297,000 297,000 297,000 297,000 297,000 297,000 297,000 297,000 297,000
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Administration $ 7,504,000 469,000 469,000 469,000 469,000 469,000 469,000 469,000 469,000 469,000 469,000
Warehousing $ 7,504,000 469,000 469,000 469,000 469,000 469,000 469,000 469,000 469,000 469,000 469,000
Operations support $ 18,351,000 1,145,000 1,145,000 1,145,000 1,171,000 1,155,000 1,145,000 1,161,000 1,168,000 1,137,000 1,167,000
Land costs
Production facilities and wellsites $ 32,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
Terminal facilities $ 0 0 0 0 0 0 0 0 0 0 0
Pipeline booster stations $ 0 0 0 0 0 0 0 0 0 0 0
Special items $ 0 0 0 0 0 0 0 0 0 0 0
Total cost $ 33,391,000 2,085,000 2,085,000 2,085,000 2,111,000 2,095,000 2,085,000 2,101,000 2,108,000 2,077,000 2,107,000
Tariffs paid
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Oil production rate MMbbl/yr 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.08 0.07 0.06
Gas production profile Bscf/yr 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
NGL production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LPG production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gasoline production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tariff rate
-- Oil / condensate -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.2500 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.2000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Total oil / condensate $ 0 0 0 0 0 0 0 0 0 0 0
-- Gas -- $/Mscf
Pipeline No $ 0.2000 0 0 0 0 0 0 0 0 0 0
Processing No $ 0.2500 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Total gas $ 0 0 0 0 0 0 0 0 0 0 0
-- NGL -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1500 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.7000 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Total NGL $ 0 0 0 0 0 0 0 0 0 0 0
-- LPG -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.7000 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Total LPG $ 0 0 0 0 0 0 0 0 0 0 0
-- Gasoline -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.2500 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.2000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Total gasoline $ 0 0 0 0 0 0 0 0 0 0 0
Tariffs received
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Oil production rate MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gas production profile Bscf/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
NGL production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LPG production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gasoline production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tariff rate
-- Oil / condensate -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.2500 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.2000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Total oil / condensate $ 0 0 0 0 0 0 0 0 0 0 0
-- Gas -- $/Mscf
Pipeline No $ 0.2000 0 0 0 0 0 0 0 0 0 0
Processing No $ 0.2500 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Total gas $ 0 0 0 0 0 0 0 0 0 0 0
-- NGL -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1500 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.7000 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Total NGL $ 0 0 0 0 0 0 0 0 0 0 0
-- LPG -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.7000 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Total LPG $ 0 0 0 0 0 0 0 0 0 0 0
-- Gasoline -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.2500 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.2000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Total gasoline $ 0 0 0 0 0 0 0 0 0 0 0
Tariffs
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Tariffs paid $ 0 0 0 0 0 0 0 0 0 0 0
Tariffs received $ 0 0 0 0 0 0 0 0 0 0 0
Tariffs total $ 0 0 0 0 0 0 0 0 0 0 0
CO2 Emissions
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Total volume CO2 released Mscf/y 51,329 51,329 51,329 51,329 51,329 51,329 51,329 48,400 43,201 38,864
Total mass CO2 released te/yr 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,546 2,273 2,044
Leases
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Lease cost 1 $ 0 0 0 0 0 0 0 0 0 0 0
Lease cost 2 $ 0 0 0 0 0 0 0 0 0 0 0
Lease cost 3 $ 0 0 0 0 0 0 0 0 0 0 0
Lease cost 4 $ 0 0 0 0 0 0 0 0 0 0 0
Lease cost 5 $ 0 0 0 0 0 0 0 0 0 0 0
Total lease cost $ 0 0 0 0 0 0 0 0 0 0 0
Grand total operating cost $ 216,879,000 13,535,000 13,535,000 13,535,000 13,816,000 13,646,000 13,535,000 13,711,000 13,784,000 13,448,000 13,777,000
Direct costs
Operating personnel $ 150,016,000 9,376,000 9,376,000 9,376,000 9,376,000 9,376,000 9,376,000 9,376,000 9,376,000 9,376,000 9,376,000
Inspection and maintenance $ 3,226,000 174,000 174,000 174,000 174,000 275,000 174,000 174,000 174,000 174,000 515,000
Logistics and consumables $ 24,154,000 1,603,000 1,603,000 1,603,000 1,603,000 1,603,000 1,603,000 1,603,000 1,574,000 1,524,000 1,482,000
Wells $ 1,340,000 0 0 0 255,000 0 0 160,000 255,000 0 0
Insurance $ 4,752,000 297,000 297,000 297,000 297,000 297,000 297,000 297,000 297,000 297,000 297,000
Direct costs total $ 183,488,000 11,450,000 11,450,000 11,450,000 11,705,000 11,551,000 11,450,000 11,610,000 11,676,000 11,371,000 11,670,000
Field / project costs $ 33,391,000 2,085,000 2,085,000 2,085,000 2,111,000 2,095,000 2,085,000 2,101,000 2,108,000 2,077,000 2,107,000
Tariff costs $ 0 0 0 0 0 0 0 0 0 0 0
CO2 emissions tax $ 0 0 0 0 0 0 0 0 0 0 0
Lease costs $ 0 0 0 0 0 0 0 0 0 0 0
Operating personnel
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16
Personnel count
Expatriates 3 3 3 3 3 3
Management 13 13 13 13 13 13
Other 87 87 87 87 87 87
Wellpad & production facilities $ 112,800,000 7,050,000 7,050,000 7,050,000 7,050,000 7,050,000 7,050,000
Terminal facilities $ 34,912,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000
Pipelines $ 2,304,000 144,000 144,000 144,000 144,000 144,000 144,000
Total operating personnel cost $ 150,016,000 9,376,000 9,376,000 9,376,000 9,376,000 9,376,000 9,376,000
Management personnel
Annual unit cost $/yr 78,000
Days on days 30
Days off days 14
Percentage of staff % 15
Operating personnel
Annual unit cost $/yr 49,000
Days on days 30
Days off days 14
Total expatriates 2 2 2 2 2 2
Total management 10 10 10 10 10 10
Total other 67 67 67 67 67 67
Wellpad groups
Wellpad group 1 (Linked to Production facility 1)
Day Operators 1 1 1 1 1 1
Maintenance 1 1 1 1 1 1
Night Operators 1 1 1 1 1 1
Maintenance 0 0 0 0 0 0
Cost $ 3,456,000 216,000 216,000 216,000 216,000 216,000 216,000
Total wellpad group costs $ 3,456,000 216,000 216,000 216,000 216,000 216,000 216,000
Production facilities
Production facility 1
Others - day Operators 20 20 20 20 20 20
Maintenance 20 20 20 20 20 20
Base personnel 4 4 4 4 4 4
Catering / cleaning 8 8 8 8 8 8
Others - night Operators 10 10 10 10 10 10
Maintenance 0 0 0 0 0 0
Base personnel 0 0 0 0 0 0
Catering / cleaning 2 2 2 2 2 2
Management 10 10 10 10 10 10
Expatriates 2 2 2 2 2 2
Cost $ 109,344,000 6,834,000 6,834,000 6,834,000 6,834,000 6,834,000 6,834,000
Total production facilities costs $ 109,344,000 6,834,000 6,834,000 6,834,000 6,834,000 6,834,000 6,834,000
Management personnel
Annual unit cost $/yr 78,000
Days on days 30
Days off days 14
Percentage of staff % 15
Operating personnel
Annual unit cost $/yr 49,000
Days on days 30
Days off days 14
Total expatriates 1 1 1 1 1 1
Total management 3 3 3 3 3 3
Total other 18 18 18 18 18 18
Terminal 1
Others - day Operators 6 6 6 6 6 6
Maintenance 6 6 6 6 6 6
Base personnel 2 2 2 2 2 2
Catering / cleaning 1 1 1 1 1 1
Others - night Operators 3 3 3 3 3 3
Maintenance 0 0 0 0 0 0
Base personnel 0 0 0 0 0 0
Catering / cleaning 0 0 0 0 0 0
Management 3 3 3 3 3 3
Expatriates 1 1 1 1 1 1
Cost $ 34,912,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000
Total terminals cost $ 34,912,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000 2,182,000
Operating personnel
Annual unit cost $/yr 49,000
Days on days 30
Days off days 14
Total management 0 0 0 0 0 0
Total other 2 2 2 2 2 2
Total pipelines cost $ 2,304,000 144,000 144,000 144,000 144,000 144,000 144,000
Wellpad groups
Labour rate $/hr 92
Maintenance hrs per te hr/te 3.00
Multiphase meter op. cost $ 21,500
Spares % of equip & matl cost % 1.00 1.00 1.00 1.00 1.00 1.00
Wellpad group 1
Equipment weight te 1
Manhours for specialist maint. hrs 3 3 3 3 3 3
Labour cost $ 276 276 276 276 276 276
Equip & matl spares $ 1,000 1,000 1,000 1,000 1,000 1,000
Multiphase meters $ 0 0 0 0 0 0
Costs $ 16,000 1,000 1,000 1,000 1,000 1,000 1,000
Total cost wellpad groups $ 16,000 1,000 1,000 1,000 1,000 1,000 1,000
Production facilities
Labour rate $/hr 92
Maintenance hrs per te hr/te 3.00
Multiphase meter op. cost $ 21,500
Spares % of equip & matl cost % 1.00 1.00 1.00 1.00 1.00 1.00
Production facility 1
Equipment weight te 161
Manhours for specialist maint. hrs 483 483 483 483 483 483
Labour cost $ 44,436 44,436 44,436 44,436 44,436 44,436
Equip & matl spares $ 98,920 98,920 98,920 98,920 98,920 98,920
Multiphase meters $ 0 0 0 0 0 0
Costs $ 2,288,000 143,000 143,000 143,000 143,000 143,000 143,000
Total cost production facilities $ 2,288,000 143,000 143,000 143,000 143,000 143,000 143,000
Terminal facilities
Labour rate $/hr 92
Maintenance hrs per te hr/te 3.00
Spares % of equip & matl cost % 1.00 1.00 1.00 1.00 1.00 1.00
Terminal 1
Equipment weight te 12
Manhours for specialist maint. hrs 36 36 36 36 36 36
Labour cost $ 3,312 3,312 3,312 3,312 3,312 3,312
Equip & matl spares $ 26,370 26,370 26,370 26,370 26,370 26,370
Costs $ 480,000 30,000 30,000 30,000 30,000 30,000 30,000
Total cost terminal facilities $ 480,000 30,000 30,000 30,000 30,000 30,000 30,000
Pipelines
Intelligent pigging
Pig rate km/day 10.00
Day rate $/day 10,000
Min crew days days 7
Mob demob days days 2
Analysis cost $/km 1,250
Total cost inspection & maintenance $ 3,226,000 174,000 174,000 174,000 174,000 174,000 174,000
Consumables
Power generation
Wellpad groups
Wellpad group 1
Electrical load Diesel MW 0.02
Production facilities
Production facility 1
Electrical load External gas MW 0.55
Compressor load Own gas MW 0
Water injection load Own gas MW 0
Export pump load Own gas MW 0
Heating medium load Own gas MW 0.0078
Terminal facilities
Terminal 1
Electrical load From grid MW 0.177
0 0
Ignore cost of own fuel gas No
0.00072226798 0
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16
Oil production MMbbl/yr 0.05 0.04 0.03 0.03 0.02 0.02
Gas production Bscf/yr 0.01 0.01 0.00 0.00 0.00 0.00
Water production MMbbl/yr 0.05 0.06 0.06 0.07 0.07 0.08
Water injection MMbbl/yr 0.11 0.11 0.11 0.11 0.11 0.11
Diesel
Unit cost $/bbl 90.00 90.00 90.00 90.00 90.00 90.00
Quantity bbl/yr 509 490 475 462 451 442
Cost $ 792,000 46,000 44,000 43,000 42,000 41,000 40,000
Power
Unit cost $/MW.hr 96.00 96.00 96.00 96.00 96.00 96.00
Quantity MW.hr/yr 997 906 829 766 712 668
Cost $ 1,829,000 96,000 87,000 80,000 74,000 68,000 64,000
Chemicals
Total oil processing chemicals $ 78,000 4,000 3,000 2,000 2,000 2,000 1,000
Total water injection chemicals $ 64,000 4,000 4,000 4,000 4,000 4,000 4,000
Expatriates
Distance km 5,000
Frequency days 90
Method Air
Number of men 3 3 3 3 3 3
Transportation cost $ 1,408,000 88,000 88,000 88,000 88,000 88,000 88,000
Management
Distance km 150
Frequency days 30
Method Road
Number of men 13 13 13 13 13 13
Transportation cost $ 64,000 4,000 4,000 4,000 4,000 4,000 4,000
Other labour
Distance km 150
Frequency days 30
Method Road
Number of men 87 87 87 87 87 87
Transportation cost $ 400,000 25,000 25,000 25,000 25,000 25,000 25,000
Messing
Cost per man per day $/man/d 22
Total men on site 103 103 103 103 103 103
Cost $ 12,400,000 775,000 775,000 775,000 775,000 775,000 775,000
Consumables
Transportation (% of consumable costs) % 7
Cost of consumables (excluding fuel gas) $ 55,000 52,000 50,000 49,000 48,000 45,000
Transportation cost $ 69,000 4,000 4,000 4,000 3,000 3,000 3,000
Vehicles
Car lease rate / vehicle $/yr 5,300
Number of cars 0 0 0 0 0 0
Pick-up / 4WD lease rate / vehicle $/yr 10,600
Number of pick-ups / 4WD 16 16 16 16 16 16
Truck lease rate / vehicle $/yr 16,000
Number of trucks 3 3 3 3 3 3
Cost $ 3,488,000 218,000 218,000 218,000 218,000 218,000 218,000
Consumables, logistics & vehicles cost $ 24,154,000 1,450,000 1,421,000 1,398,000 1,378,000 1,361,000 1,345,000
Well maintenance
Production wells
Workover frequency years 4
Duration per well days 12
Material cost per well $ 67,000
Production wells
Workover rig dayrate $ 15,700
Number of onstream wells 1 1 1 1 1 1
Number of new wells onstream this year 0 0 0 0 0 0
Wells worked over in the year 0 1 0 0 0 1
Maintenance duration days 48 0 12 0 0 0 12
Materials cost $ 268,000 0 67,000 0 0 0 67,000
Rig cost $ 753,600 0 188,400 0 0 0 188,400
Total cost $ 1,020,000 0 255,000 0 0 0 255,000
Insurance
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16
Drilling
Onshore drilling 1 $ 7,081,000 7,081,000 7,081,000 7,081,000 7,081,000 7,081,000
Total CAPEX $ 7,081,000 7,081,000 7,081,000 7,081,000 7,081,000 7,081,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 912,000 57,000 57,000 57,000 57,000 57,000 57,000
Wellpad group
Wellpad group 1 $ 2,513,000 2,513,000 2,513,000 2,513,000 2,513,000 2,513,000
Total CAPEX $ 2,513,000 2,513,000 2,513,000 2,513,000 2,513,000 2,513,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 320,000 20,000 20,000 20,000 20,000 20,000 20,000
Production facilities
Production facility 1 $ 20,069,000 20,069,000 20,069,000 20,069,000 20,069,000 20,069,000
Total CAPEX $ 20,069,000 20,069,000 20,069,000 20,069,000 20,069,000 20,069,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 2,576,000 161,000 161,000 161,000 161,000 161,000 161,000
Terminal facilities
Terminal 1 $ 4,875,000 4,875,000 4,875,000 4,875,000 4,875,000 4,875,000
Total CAPEX $ 4,875,000 4,875,000 4,875,000 4,875,000 4,875,000 4,875,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 624,000 39,000 39,000 39,000 39,000 39,000 39,000
Pipelines
Oil pipeline (onshore 1) $ 2,457,000 2,457,000 2,457,000 2,457,000 2,457,000 2,457,000
Total CAPEX $ 2,457,000 2,457,000 2,457,000 2,457,000 2,457,000 2,457,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 320,000 20,000 20,000 20,000 20,000 20,000 20,000
Total insurance cost $ 4,752,000 297,000 297,000 297,000 297,000 297,000 297,000
Land costs
Production facilities and wellsites $ 32,000 2,000 2,000 2,000 2,000 2,000 2,000
Terminal facilities $ 0 0 0 0 0 0 0
Pipeline booster stations $ 0 0 0 0 0 0 0
Special items $ 0 0 0 0 0 0 0
Tariffs paid
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16
Oil production rate MMbbl/yr 0.05 0.04 0.03 0.03 0.02 0.02
Gas production profile Bscf/yr 0.01 0.00 0.00 0.00 0.00 0.00
NGL production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00
LPG production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00
Gasoline production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00
Tariff rate
-- Oil / condensate -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0
Processing No $ 1.0000 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0
Transport - road No $ 1.2500 0 0 0 0 0 0
Transport - rail No $ 1.2000 0 0 0 0 0 0
Transport - marine No $ 1.0000 0 0 0 0 0 0
Total oil / condensate $ 0 0 0 0 0 0 0
-- Gas -- $/Mscf
Pipeline No $ 0.2000 0 0 0 0 0 0
Processing No $ 0.2500 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0
Total gas $ 0 0 0 0 0 0 0
-- NGL -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0
Storage No $ 0.1500 0 0 0 0 0 0
Transport - road No $ 1.7000 0 0 0 0 0 0
Transport - rail No $ 1.5000 0 0 0 0 0 0
Transport - marine No $ 1.5000 0 0 0 0 0 0
Total NGL $ 0 0 0 0 0 0 0
-- LPG -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0
Transport - road No $ 1.7000 0 0 0 0 0 0
Transport - rail No $ 1.5000 0 0 0 0 0 0
Transport - marine No $ 1.5000 0 0 0 0 0 0
Total LPG $ 0 0 0 0 0 0 0
-- Gasoline -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0
Transport - road No $ 1.2500 0 0 0 0 0 0
Transport - rail No $ 1.2000 0 0 0 0 0 0
Transport - marine No $ 1.0000 0 0 0 0 0 0
Total gasoline $ 0 0 0 0 0 0 0
Tariffs received
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16
Oil production rate MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00
Gas production profile Bscf/yr 0.00 0.00 0.00 0.00 0.00 0.00
NGL production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00
LPG production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00
Gasoline production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00
Tariff rate
-- Oil / condensate -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0
Processing No $ 1.0000 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0
Transport - road No $ 1.2500 0 0 0 0 0 0
Transport - rail No $ 1.2000 0 0 0 0 0 0
Transport - marine No $ 1.0000 0 0 0 0 0 0
Total oil / condensate $ 0 0 0 0 0 0 0
-- Gas -- $/Mscf
Pipeline No $ 0.2000 0 0 0 0 0 0
Processing No $ 0.2500 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0
Total gas $ 0 0 0 0 0 0 0
-- NGL -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0
Storage No $ 0.1500 0 0 0 0 0 0
Transport - road No $ 1.7000 0 0 0 0 0 0
Transport - rail No $ 1.5000 0 0 0 0 0 0
Transport - marine No $ 1.5000 0 0 0 0 0 0
Total NGL $ 0 0 0 0 0 0 0
-- LPG -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0
Transport - road No $ 1.7000 0 0 0 0 0 0
Transport - rail No $ 1.5000 0 0 0 0 0 0
Transport - marine No $ 1.5000 0 0 0 0 0 0
Total LPG $ 0 0 0 0 0 0 0
-- Gasoline -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0
Transport - road No $ 1.2500 0 0 0 0 0 0
Transport - rail No $ 1.2000 0 0 0 0 0 0
Transport - marine No $ 1.0000 0 0 0 0 0 0
Total gasoline $ 0 0 0 0 0 0 0
Tariffs
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16
Tariffs paid $ 0 0 0 0 0 0 0
Tariffs received $ 0 0 0 0 0 0 0
Tariffs total $ 0 0 0 0 0 0 0
CO2 Emissions
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16
Total volume CO2 released Mscf/y 35,253 32,237 29,729 27,634 25,886 24,430
Total mass CO2 released te/yr 1,855 1,696 1,564 1,454 1,362 1,285
Leases
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16
Lease cost 1 $ 0 0 0 0 0 0 0
Lease cost 2 $ 0 0 0 0 0 0 0
Lease cost 3 $ 0 0 0 0 0 0 0
Lease cost 4 $ 0 0 0 0 0 0 0
Lease cost 5 $ 0 0 0 0 0 0 0
Total lease cost $ 0 0 0 0 0 0 0
Grand total operating cost $ 216,879,000 13,367,000 13,615,000 13,310,000 13,464,000 13,269,000 13,532,000
Direct costs
Operating personnel $ 150,016,000 9,376,000 9,376,000 9,376,000 9,376,000 9,376,000 9,376,000
Inspection and maintenance $ 3,226,000 174,000 174,000 174,000 174,000 174,000 174,000
Logistics and consumables $ 24,154,000 1,450,000 1,421,000 1,398,000 1,378,000 1,361,000 1,345,000
Wells $ 1,340,000 0 255,000 0 160,000 0 255,000
Insurance $ 4,752,000 297,000 297,000 297,000 297,000 297,000 297,000
Direct costs total $ 183,488,000 11,297,000 11,523,000 11,245,000 11,385,000 11,208,000 11,447,000
Field / project costs $ 33,391,000 2,070,000 2,092,000 2,065,000 2,079,000 2,061,000 2,085,000
Tariff costs $ 0 0 0 0 0 0 0
CO2 emissions tax $ 0 0 0 0 0 0 0
Lease costs $ 0 0 0 0 0 0 0
Decommissioning scenario name: Onshore decommissioning scenario