Construction Quality Report

Uploaded by

Amirul Faez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
107 views1 page

Construction Quality Report

Uploaded by

Amirul Faez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

NCR

SUHATI SDN BHD NCR NO.: SSB/TAPS/NCR/0001


NON-CONFORMANCE REPORT (NCR)

PROJEK PEMBINAAN TAKUNGAN AIR PINGGIRAN SUNGAI


(TAPS) JERNIH, MELAKA
Issued Date:

Category [Please Tick]: QUALITY  SAFETY ENVIRONMENT OTHER …………………..

Part 1 – NON-CONFORMANCE STATEMENT [By Originator-Main Contractor] Attachment: Yes / No

Originated by: Quality Assurance Received by: Construction Acknowledged by (Consultant):


& Quality Control Department Department
Signature Signature Signature
Name Name Name
Position Position Position
Date Date Date
Part 2 – REMEDIAL ACTION [By Recepient-Sub Contractor/Supplier] Attachment: Yes / No
Root Cause of Non-Conformity:

Remedial Action:

Expected Completion Date:


The above actions are jointly agreed by (to be filled within 5 working days)
Recipient Originator Reviewed and agreed by
Signature Signature (Consultant) Signature:
Name of Name of
Name of Reviewer
recipient Originator
Date Date Date

Part 3 – FOLLOW UP & CLOSE OUT [By Consultant]


Proposed Signature & Date
Close? Remarks
Follow-up Consultant
Yes/No (Effectiveness, reference to evidence, etc.) Originator
date (Acknowledged by)

Revision No: 0