Red. Opasač i prateća oprema za opasač Komada
br.
1. Opasač P-81 za visinske radove 1
2. Opasač P500/P600 1
2. Uže 2 m sa kočnicom za podešavanie dužine PROT. 11 (FP26) 1
3. Šok apsorber energiie ABM+LB 102 Y rope (sa užetom od 1.6 m) 1
4. Kopča aluminijumska/Kuka (AZ024) 2
5. Karabin mali OK PETZL (56-051-01) 4
6. Karabin TREE RUNNER OVAL ALU-EN 362 1
7. Vodootpoma torba 1
Work at height - Falling object - Work at height procedure - Se
injur
- Falling personnel -LSR for work at height
- Ma
- Fall arrest equipment available
- Tools for securing tools available
- Barrier material available
-Dropped object zones
-HSSE verifications - Best practice presentations
Securing control of piping, - Load is unstable - Use correct support equipment - Se
load, equipment with injur
challening COG - Unexpected movement - Supports with sufficient load capacity
- Ma
- Tool Box Talk
- SJA to be performed as applicable for heavy lift operations,
including release of lifting equipment
- Secure load before releasing it from crane/forklift etc and
vice versa if COG is hard to identify
-When transporting loads with fluid take extra precautions
for changing COG and tilt when stopping and accelerating
Scaffolding work; erection, - Falling objects - All scaffold work according to procedure for work at height Seri
modification, dismounting at injur
heights - Falls to lower levels - Ensure all scaffolders are qualified and trained in using fall
arresting equipment and availability of approved equipment.
- Hanging in a safety harness
after a fall - Use necessary barriers/controls to secure drop
zone.Consider rescue equipment or personnel before job
- Unauthorised change of starts (could be people on ground with safety harness on or
scaffold cherry picker)
- Secure loose materials in height.
- Consequence management.
- Special gloves for scaffolding work availiable
- Tool Box Talk and SJA when needed
- Re-check team
-Mandatory Prevent Dropped Object training
-HSSE verifications