S Curve

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views2 pages

S Curve

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Contract Name: PROPOSED CONSTRUCTION OF POST PANDEMIC RESIDENTIAL BUILDING

Location of the Contract: Odiongan, Romblon


CONSTRUCTION SCHEDULE / S-CURVE
TOTAL COST CALENDAR REL. WT.
ITEM DESCRIPTION Qty Unit UNIT COST TOTAL COST 1ST MONTH 2nd MONTH 3rd MONTH 4th MONTH
DAYS (%) 30 C.D. 60 C.D. 90 C.D. 120 C.D.

100
101
102
103
104
105
106
107
108
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
PART I FACILITIES FOR THE ENGINEEER

1
2
3
4
5
6
7
8
9
Provision of Combined Field Office, Laboratory & Living Quarters 0.015% 0.023% 0.023% 0.023%
A.1.1(6) 350.00 days 500.00 175,000.00 175,000.00 350.00 0.266%
Building for the Engineer (Rental Basis)
PART II OTHER GENERAL REQUIREMENTS
0.015%
B.3 Permits and Clearances 1.00 l.s. 10,000.00 10,000.00 10,000.00 10.00 0.015%
0.021%
B.5 Project Billboard/Signboard 1.00 ea. 13,638.16 13,638.16 13,638.16 4.00 0.021%
0.066% 0.099% 0.099% 0.099%
B.7 Occupational Safety and Health Program 1.00 l.s. 760,788.80 760,788.80 760,788.80 350.00 1.155%
0.138%
B.9 Mobilization/Demobilization 1.00 l.s. 200,000.00 200,000.00 200,000.00 11.00 0.304%
PART A EARTHWORKS
0.498% 0.226%
803(1)a Structure Excavation (Common Soil) 1297.41 cu.m. 367.47 476,756.48 476,756.48 16.00 0.724%
2.820%
804(1)a Embankment from Structure Excavation 1169.20 cu.m. 1,588.78 1,857,598.63 1,857,598.63 18.00 2.820%
0.771%
804(1)b Embankment from Borrow 95.54 cu.m. 5,313.80 507,680.50 507,680.50 18.00 0.771%
0.121% 0.091%
804(4) Gravel Fill 64.86 cu.m. 2,154.50 139,740.70 139,740.70 7.00 0.212%
PART B PLAIN AND REINFORCED CONCRETE WORKS
1.132%
900(1)c2 Structural Concrete for Footing and Slab on Fill (Class A, 28 days) 235.98 cu.m. 7,222.59 1,704,387.26 1,704,387.26 32.00 2.588%
1.583% 0.548%
900(1)c3 Structural Concrete for Grade Beam (Class A, 28 days) 175.97 cu.m. 7,977.07 1,403,724.56 1,403,724.56 35.00 2.131%
0.227% 0.544%
900(1)c4 Structural Concrete for Column (Class A, 28 days) 124.42 cu.m. 9,358.75 1,164,415.72 1,164,415.72 39.00 1.768%
0.107%
900(1)c5 Structural Concrete for Suspended Slab (Class A, 28 days) 197.44 cu.m. 15,418.73 3,044,274.95 3,044,274.95 43.00 4.622%
0.053%
900(1)c6 Structural Concrete for Beams/Girders (Class A, 28 days) 175.97 cu.m. 8,518.65 1,499,026.96 1,499,026.96 43.00 2.276%
1.389% 2.779% 2.779% 2.779%
902(1)a Reinforcing Steel (Deformed) Grade 40 98,954.60 kg. 108.51 10,737,791.28 10,737,791.28 176.00 16.303%
1.317% 2.635% 2.635% 2.635%
902(1)b Reinforcing Steel (Deformed) Grade 60 91,128.71 kg. 111.72 10,180,550.28 10,180,550.28 176.00 15.457%
1.511% 3.022% 0.504% 2.519%
903(2) Formworks and Falseworks 1016.64 sq.m. 9,528.96 9,687,525.40 9,687,525.40 146.00 14.708%
PART C FINISHING AND OTHER CIVIL WORKS
0.071%
1000(1) Soil Poisoning 120.00 L 392.18 47,061.36 47,061.36 18.00 0.071%

1001(5)b Catch Basin (CHB) 1.00 each 82,092.77 82,092.77 82,092.77 12.00 0.125%

1001(8) Sewer Line Works 1.00 l.s. 402,634.24 402,634.24 402,634.24 12.00 0.611%

1001(9) Storm Drainage and Downspout 1.00 l.s. 44,175.20 44,175.20 44,175.20 10.00 0.067%

1000(11) Septic Vault (Concrete/CHB) 1.00 l.s. 276,543.22 276,543.22 276,543.22 8.00 0.420%

1002(4) Plumbing Fixtures 1.00 l.s. 1,491,471.36 1,491,471.36 1,491,471.36 18.00 2.264%

1002(24) Cold Water Lines 1.00 l.s. 140,920.40 140,920.40 140,920.40 20.00 0.214%

1003(1)a1 4.5mm Fiber Cement Board on Metal Frame Ceiling 2,540.16 sq.m. 871.18 2,212,924.40 2,212,924.40 70.00 3.360%

1003(2)a1 4.5mm Fiber Cement Board on Metal Frame Wall 1,321.92 sq.m. 1,176.29 1,554,961.00 1,554,961.00 50.00 2.361%

1004(2) Finishing Hardware 1.00 l.s. 251,179.04 251,179.04 251,179.04 4.00 0.381%

1008(1)c Aluminum Glass Windows (Awning Type) 1.00 sq.m. 102,371.20 102,371.20 102,371.20 30.00 0.155%

1010(2)b Doors (Wood Panel) 1.00 sq.m. 977,164.80 977,164.80 977,164.80 26.00 1.484%

1018(1) Glazed Tiles and Trims 405.72 sq.m. 1,574.64 638,864.40 638,864.40 45.00 0.970%

1018(2) Unglazed Tiles 200.52 sq.m. 2,366.25 474,481.40 474,481.40 45.00 0.720%

1027(1) Cement Plaster Finish 4,836.51 sq.m. 551.25 2,666,111.82 2,666,111.82 85.00 4.048%

1032(1)a Painting Works (Masonry/Concrete) 4,160.00 sq.m. 366.55 1,524,840.00 1,524,840.00 75.00 2.315%

1032(1)b Painting Works (Ceilings) 3,120.00 sq.m. 441.75 1,378,275.00 1,378,275.00 75.00 2.093%

1046(2)a1 100mm CHB Non-Load Bearing (including Reinforcing Steel) 511.44 sq.m. 921.84 471,463.47 471,463.47 20.00 0.716%

1046(2)a2 150mm CHB Non-Load Bearing (including Reinforcing Steel) 1,906.88 sq.m. 1,862.76 3,552,057.91 3,552,057.91 30.00 5.393%

1051(6) Railing 1.00 l.s. 1,413,447.52 1,413,447.52 1,413,447.52 25.00 2.146%


PART D ELECTRICAL
1100(10) Conduits, Boxes & Fittings (Conduit Works/Conduit Rough-in) 1.00 l.s. 894,929.60 894,929.60 894,929.60 60.00 1.359%

1101(33) Wires and Wiring Devices 1.00 l.s. 998,314.72 998,314.72 998,314.72 67.00 1.516%

1102(1) Panelboard with Main & Branch Breakers 1.00 l.s. 113,322.40 113,322.40 113,322.40 15.00 0.172%

1103(1) Lighting Fixtures and Lamps 1.00 l.s. 591,364.80 591,364.80 591,364.80 30.00 0.898%
TOTAL 65,863,871.71 65,863,871.71 100.00%
PERIODIC (%) 5.14% 13.52% 7.69% 9.25%
SCHEDULED ACCOMPLISHMENT
CUMULATIVE (%) 5.14% 18.66% 26.35% 35.60%
PERIODIC PHP 3,385,403.01 8,904,795.45 5,064,931.73 6,092,408.13
CASH FLOW
CUMULATIVE PHP 3,385,403.01 12,290,198.46 17,355,130.19 23,447,538.33
MONTHLY AC COMPLISHMENT
4th MONTH 5th MONTH 6th MONTH 7th MONTH 8th MONTH 9th MONTH 10th MONTH 11th MONTH 12th MONTH
120 C.D. 150 C.D. 180 C.D. 210 C.D. 240 C.D. 270 C.D. 300 C.D. 330 C.D. 360 C.D.
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 100%

0.099% 0.099% 0.099% 0.099% 0.099% 0.099% 0.099% 0.099% 0.099%

0.000% 0.166%

0.485% 0.970% 75%


0.548%

0.544% 0.907% 0.091%

0.107% 1.827% 0.860% 1.827%

0.053% 0.900% 0.423% 0.900%

2.779% 2.779% 2.779% 1.019%

2.635% 2.635% 2.635% 0.966%

2.519% 3.022% 3.022% 1.108%

0.083% 0.042%

0.000% 0.611%

0.067%
50%

0.210% 0.210%

0.755% 1.510%

0.214%

0.864% 1.440% 1.056%

0.378% 1.417% 0.567%

0.381%

0.041% 0.114%

0.456% 1.027%

0.388% 0.582%

0.288% 0.432%

1.333% 1.429% 1.286%


25%

0.093% 0.926% 0.926% 0.370%

0.084% 0.837% 0.837% 0.335%

0.716%

1.438% 3.955%

0.258% 1.888%

0.634% 0.679% 0.045%

0.633% 0.679% 0.204%

0.172%

0.180% 0.718%
0%
11.09% 12.59% 12.20% 5.78% 8.13% 5.19% 5.29% 4.13%
35.60% 46.69% 59.28% 71.48% 77.26% 85.39% 90.58% 95.87% 100.00%
6,092,408.13 7,304,303.37 8,292,261.45 8,035,392.35 3,806,931.78 5,354,732.77 3,418,334.94 3,484,198.81 2,720,177.90
23,447,538.33 30,751,841.70 39,044,103.15 47,079,495.50 50,886,427.28 56,241,160.05 59,659,494.99 63,143,693.81 65,863,871.71