0% found this document useful (0 votes)
171 views44 pages

Layher - 2015 - SpeedyScaf Catalogue

Uploaded by

Ilya Malyavin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
171 views44 pages

Layher - 2015 - SpeedyScaf Catalogue

Uploaded by

Ilya Malyavin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 44

LAYHER SPEEDYSCAF ®

CATALOGUE
Edition 04.2015
Ref. No. 8102.256

Quality management
certified according
to ISO 9001:2008
by German TÜV-CERT
Layher

QUALITY MADE BY LAYHER

ead arter in i en ac

Plant 2 in Gueglingen

HERE IS THE BEATING HEART OF LAYHER. MORE POSSIBILITIES. THE SCAFFOLDING SYSTEM.

Quality made by Layher comes from Gueglingen-Eibensbach. Our company i rand pro i e ade y ay er i t e expre ion of a rand p ilo op y t at
has set down deep local roots since it was established. Right up until today, e ve een living y for over 7 year ore peed, ore afety, ore proxi ity,
development, production, logistics and management are all in one place, where more simplicity and more future: values with which we strengthen our customers’
the conditions are best for achieving quality made by Layher: in Gueglingen- competitiveness in the long term. With our innovative systems and solutions,
Eibensbach. The two locations together cover a surface area of 318,000 m². we’re working all the time on making scaffolding construction even simpler, even
This includes more than 142,000 m² of covered production and storage areas. more economical and, above all, even safer. With comprehensive services, a
This is where our scaffolding systems are created by highly automated permanent range of training courses and an ethos of customer focus, more than
production. Short distances and short reaction times mean we can adapt 1,500 dedicated Layher employees are creating more possibilities for our
production to uit our cu to er re uire ent , exi ly and at any ti e customers every single day. In more than 30 countries all over the world.

2
More Possibilities. The Scaffolding System.

MORE SPEED
We can supply any required quantity of the right products at the right time – to anywhere in
t e orld ay er a u idiarie in ore t an 3 countrie in all five continent , it a
tight-knit network of national service centers. Speed is also the motto of our logistics
concept. Customers have the choice of picking up their material at a Layher service center or
having it delivered either to a warehouse or “just in time” directly to the site.

MORE EXPERIENCE
radition a gro n into experience and experti e ur expert pa on t i no ledge all
over t e orld xi ting cu to er ig t ant to try a different approac , ile ne
customers might need support when assembling a Layher scaffolding structure. Layher’s
peciali t get to grip it t e pecific ta and re uire ent , devi ing for our cu to er
per ua ive olution t at are ot profita le and efficient ood advice fro ay er i
guaranteed. We take care of our customers at every level, because cooperation with them on
the basis of mutual trust as well as their success are important to us.

MORE KNOWLEDGE
Further training is the key to success. For this reason, Layher organizes regular training
e inar t at prepare our cu to er for current and future c allenge pecifically in
caffolding i training c e e i ac ed up y any ot er option , for exa ple practical
product training cour e and regular eeting for caffolding erector to pro ote t e o of
infor ation et een expert and colleague nd la t ut not lea t, ay er offer
comprehensive publications on all topics to do with scaffolding construction.

MORE CLARITY
Saving ti e, u ing aterial in t e e t ay, i proving logi tic ll t at can e done it
ay er planning oft are, ay , or t e pecial ay er tool for uto ay er
software means greater reliability when budgeting and planning scaffolding construction
projects. Optimization of inventory management and complete cost transparency for the
material used in a project. Once the dimensions and the required assembly variant have been
entered, the Layher software supplies a scaffolding proposal with matching material list
within seconds.

MORE QUALITY
People talk a lot about quality. We just produce it. Quality from Layher means state-of-the-art
production proce e , carefully elected aterial , art auto ation and a ig ly ualified
or force ur product co ply it t e very late t ecurity tandard and po e I IS
certification, er an approval, and any ot er er an and international uality la el
20,000 kilometres of steel tubing in high-quality workmanship are convincing testimony to
Layher’s quality standards.

3
Lightweight

LIGHTWEIGHT
BUT BETTER AND STRONGER.

I I I S I I I S
Layher has been the driving force behind game-changing innovation in scaffolding
for more than 70 years. In 1965, Layher SpeedyScaf revolutionised the industry;
and 1 7 a t e launc of ay er llround Scaffolding, a odular product portfolio
t at too t e orld ar et y tor nd t e uni ue llround connector ept a ay
conventional scaffolding technology.

But the time is now ripe for a new dimension in scaffolding: Layher Lightweight. Our
mission has always been to lighten your load. In this case, we have taken our mission
literally. By working hand-in-glove with our steel suppliers, Layher engineers have I S
ucceeded in developing pecial ig ten ile teel a teel t at ignificantly
lo er t e eig t of co ponent e pite reduced all t ic ne and lo er eig t,  Enhanced load-bearing capacity.
these new Layher products deliver higher load-bearing capacity than the proven
llround y te e ne connector create con idera ly tronger tran ition e  Lower weight.
innovative ledger uto oc ean fa ter caffolding erection and i proved afety  ully co pati le it all llround co ponent
nd e t of all t e ig t eig t line i co pati le it conventional ay er
caffolding So you can continue to u e your exi ting ay er co ponent ll of t e

THE NEW LIGHTNESS


OF BEING LAYHER.
I S I I S S
ay er i a out ore po i ilitie nd t e ig t eig t line underline our pioneering
role, y ar ing a ne ile tone It i t e re ult of a a or, ulti year pro ect it
a clearly defined o ective to a e caffolding ea ier, afer and a ove all ore co t
effective for you, our customers.

The modular Layher Lightweight line will revolutionise the erection and dismantling of
challenging scaffolding structures. The use of high-tensile steel allows reduced wall
t ic ne , delivering a ignificant eig t aving and ig er load earing capacity
The result is lighter components, easier and faster erection, and lower shipment costs.

Higher productivity and lower shipment costs mean that an investment in Layher
Lightweight pays for itself within less than one year.

4
SPEEDYSCAF LIGHTWEIGHT
S S SS
 it t e a e ly fra e x1 , t e tile all t ic ne
a cut and t e profile rede igned, delivering a total eig t aving of 3 g
 With the gantry frame LW 1.50 m, the wall thickness was also cut. Combined with the
rede igned profile, t i deliver a total eig t aving of g
 Scaffolding can be erected more quickly; working conditions are improved;
each truck can carry more material.
 Fully compatible with all SpeedyScaf components.
 pproval applied for

WEIGHT
YHE R S I
LA
HT
4.2 KG
LI
G H T W EIG

S S SS S S

AY HE R
L
To view video of
SpeedyScaf Lightweight,
simply scan QR code.

LI
HT

GH I G
T WE 5
Contents

LAYHER SPEEDYSCAF®

2 Assembly frames 2 Scaffolding decks


Page 12 Page 14

2 Brackets 2 Stairway access


Page 22 Page 28

I I I IND
e ly fra e , tra dec , o u t dec , Stalu dec , teel dec can
be stamped individually. Wooden toe boards can be printed according to your
preferences. Anti-theft protection and advertising in one.

your ay er partner and order t e ro c ure ay er Individual for free

LAYHER LADDERS & STAIRS


LAYHER SPEEDYSCAF SYSTEM ® LAYHER ALLROUND SCAFFOLDING SYSTEM ® LAYHER SCAFFOLDING ACCESSORIES LAYHER PROTECTIVE SYSTEMS LAYHER EVENT SYSTEMS LAYHER ROLLING TOWERS
CATALOGUE CATALOGUE CATALOGUE CATALOGUE CATALOGUE CATALOGUE
Edition 04.2015 Edition 04.2015 Edition 04.2015 Edition 04.2015 Edition 04.2015 Edition 04.2015
Ref. No. 8102.256 Ref. No. 8116.252 Ref. No. 8103.254 Ref. No. 8121.253 Ref. No. 8111.227 Ref. No. 8118.225

Quality management Quality management Quality management Quality management Quality management Quality management
certified according certified according certified according certified according certified according certified according
to ISO 9001:2008 to ISO 9001:2008 to ISO 9001:2008 to ISO 9001:2008 to ISO 9001:2008 to ISO 9001:2008
by German TÜV-CERT by German TÜV-CERT by German TÜV-CERT by German TÜV-CERT by German TÜV-CERT by German TÜV-CERT

Rolling Towers
Speedyscaf System Allround Scaffolding System Scaffolding Accessories Protective Systems Event Systems Ladders and Stairs
ef o 81 6 ef o 8116 ef o 81 3 ef o 81 1 3 ef o 8111 7 ef o 8118

6
CONTENTS
2 S S S S 8
2 S S I S I 10
2 S S 10
2 SS S, SS I 12
2 Side protection 2S I S 14
Page 18 2 SS S 16
2 SI I 18
2 I I 20
2 S 22
2 I 24
2S I , S I I , I S 26
2S I SS, S I 28
2S S I , SS S, SS I S 30
2 SS I S 32
2 System lattice beams 2 I , II 34
Page 30 2 SS I S, S 36
2 I ,S I S 38
2I 40

ll di en ion and eig t are guideline value Su ect to tec nical odification

Steel part are galvani ed according to IS and 1 811

ur deliverie all e ade exclu ively in accordance it our currently valid eneral er of
Sale. These include the following provisions: The place of performance is Gueglingen-Eibens-
bach. Title to the delivered goods shall be retained until full payment has been made.

etailed tec nical infor ation can e found in our lea e re ue t t e pecific in truction for a e ly and u e en ordering rotected y
SpeedyScaf Technical Brochure. copyrig t ot to e reproduced, eit er in ole or in part i print and error excepted

7
SpeedyScaf System

Guardrail

Toe board

Scaffolding deck

Assembly
frame

Diagonal brace

Base plate

This catalogue provides you with an overview of all the basic elements Simple frame scaffolding
and accessories for the following scaffolding variants:
it u t ix a ic ele ent and a fe anual operation ,
this logically and safely erected scaffolding is “speedy”
SpeedyScaf 0.73 m wide, hot-dip galvanized steel, because it is assembled without bolts. Established on the
up to load cla 3 a per I 1 811 market for several decades as the frame scaffolding
e uip ent t at lead t e field, you can cater for al o t every
SpeedyScaf 0.73 m wide, aluminium, requirement with this unbeatably lightweight yet sturdy and
up to load cla 3 a per I 1 811 stable system:

SpeedyScaf 1.09 m wide, hot-dip galvanized steel, Standard assembly is achieved with the following 6 basic
for load cla e 6 a per I 1 811 components:
(depending on deck design and bay length). 2 Base plates
2 assembly frames
2 scaffolding decks
Layher SpeedyScaf has general building authority approval from the 2 guardrails
eut c e In titut f r autec ni er an ivil ngineering In titute in 2 diagonal braces
Berlin under the approval numbers 2 toe boards
Z-8.1-16.2 SpeedyScaf 70 in steel,
Z-8.1-840 SpeedyScaf 100 in steel and epending on t e roof pro ection, opti u ad u t ent i
Z-8.1-844 SpeedyScaf 70 in aluminium achieved using brackets.
for regular version up to 24 m, plus possible spindle adjustment.
With Layher you choose between different scaffolding widths
ype te t y 6 y t e In pection ffice for Structural ngineering and between hot-dip galvanized steel or lightweight
Statics in Stuttgart relates to 10 standard versions of Layher SpeedyScaf aluminium. Guardrails, diagonal braces and scaffolding decks
70 Steel with platform heights of up to 80 m. Structural calculations are are only needed once, a t ey fit into every SpeedyScaf
availa le for ot er pecial exten ion ver ion structure.

8
I S
 Unbeatably quick and easy.
Speedy assembly thanks to simple insertion technology, lightweight
a e ly fra e and ergono ic andling e led fro ix a ic
elements in a few easy operations.

 Safe from the word go.


nco pro i ing afety during a e ly too ir ly edged co -
ponent , po itively and non po itively connected, en ure axi u
stability while work is in progress.

 Extremely flexible.
The comprehensive range of parts is suitable for every trade.
Combinable with other Layher systems and products.

 Extremely economical.
Simplicity and fitting precision mean a saving in time and
enor ou co t aving too xe plary and long ervice life plu
availability for purchase to come.

9
Software for scaffolding construction

Planning of façade scaffolding using a computer is now Software for scaffolding construction
even ea ier e ne ay oft are i ply a e
proposals for scaffolding, calculates the effort for
assembly and dismantling, and provides printed out
plans for more safety at the site. The completed drawing
can e exported to uto , ic can e u ed to do
further editings.
Complete scaffolding in just three steps:

2 Step 1: Plan out the scaffolding with the clearly


tructured ay oft are

2 Step 2: The printed-out plan provides you with the


legal afeguard re uired y etrSic and a i t you
in your logistics.

2 Step 3: Planning saves you time when assembling the


scaffolding – all the material needed is at the site.

e clearly tructured interface of ay i elf


explanatory i o viate t e need for u er cour e or
t e tudy of t ic anual co pact et of in truction
i provided on t e progra

Base plates

To adjust to the ground, choose between different Base plates


height-adjustable base plates with sturdy and
self-cleaning round threads, with colour and notch
markings to provide protection against overwinding. 3
a e ure t at t ere are ufficient load di tri uting
surfaces.

4 5 6 7 8
Possibility of directly
The round threads of all Layher scaffolding spindles have connecting 48.30 mm dia.
an out ide dia eter of 38 and a pitc of 8 1 scaffolding tubes to the
e ing external di en ion of t e pindle nut i threaded tube of a base
e di en ion of t e foot plate are 1 x 1 plate at any angle.

urt er infor ation can e found in our cce orie


Catalogue.

130 cm

41 cm 55 cm
32 cm
30 cm

10
Pos. Description Dimensions Weight PU Ref. No.
L/H x W [m] approx. [kg] [pcs.]

1 SINGLE LICENCE 6345.200 W


LayPLAN SpeedyScaf system
incl. material manager

2 FOLLOW-UP LICENCE 6345.201 W


LayPLAN SpeedyScaf system
incl. material manager

2 Material manager: Processing, managing and printing out of material lists

Pos. Description Dimensions Weight PU Ref. No.


L/H x W [m] approx. [kg] [pcs.]

3 Scaffolding plank 1 x 5.2 3816.100 P


for load distribution 1 x 7.8 3816.150 P
45 mm high, freshly sawn, sorting category S 10

4 Base plate 60 0.60 3.6 200 4001.060


ax pindle travel 1 c

5 Base plate 80, reinforced 0.80 4.9 200 4002.080


ax pindle travel c

6 Base plate 150, reinforced 1.50 10.0 25 4002.130


ax pindle travel 1 c , en ure ufficient tructural trengt

7 Swivelling base plate 60, reinforced 0.60 6.1 250 4003.000


ax pindle travel 3 c , en ure ufficient tructural trengt

8 Wedge spindle swivel coupler 1.8 25 4735.000 W

WS = wrench size PU = packaging unit W = available ex works P = delivery time on request V = only available in this packaging unit Z = the approval process is not yet completed
IND = Layher Individual possible – see page 6
11
Euro assembly frames

Euro assembly frames


The construction principle of the assembly frames ensures Euro assembly frames
speedy, and stable assembly: The upper crosspiece is
designed as a channel section into which the decks slide
1 2 3 4
easily during assembly. The corner plate for receiving the
diagonal braces and the guardrail wedge housings for
dropping in t e guardrail re uire no direct fitting or
“aiming”; striking with a hammer blow ensures positive H H
LAY ER LAY ER
stable connections. The lower rectangular tube secures
t e dec auto atically for furt er exten ion and t e toe IG IG
H T W EIGH H T W EIGH

T
board pin accommodates the toe boards.

Advantages of the Euro assembly frame:


2 Low weight
2 ery rapid a e ly of internal guardrail
2 er atile po i ilitie for anc oring
2 Fast vertical assembly without a spirit level
5a 5b 5c
2 axi u eig t clearance

ll all t ic ne e are approved for t e connection of


couplers.
The handy Layher assembly frame has no outwardly
projecting parts – it runs smoothly through the hands, and
i t erefore ergono ic ery lo external di en ion ave
on transportation and storage space.

Adjustment frames 6a 6b 6c
H
LAY ER
H
LAY ER

IG H
H T W EIGH LAY ER

T
IG
H T W EIGH
L

IG
H T W EIGH

T
7 8a 8b 8c

The scaffolding can be adapted to the lie of the land with


66 , 1 and 1 ad u t ent fra e e ly
al ay egin at t e ig e t point e 1 x 1
assembly frame has two guardrail wedge housings, making
it suitable for use in bricklayer’s scaffolding.

Gantry frames and assembly frames


for special applications, please see
page 30.

Scaffolding pallets

The assembly frame pin pallet 9 is an optimised and Scaffolding pallets


low-cost solution for vertical palletising. It holds up to
20 assembly frames and is dimensioned such that 3 of
them can be placed side by side on the truck loading 9
surface. Fork guides and a central rung ensure absolute
safety against tilting during fork-lift transport.

Further information and further pallets see chapter


scaffolding pallets on page 38.
10

11

12
Pos. Description Dimensions Weight PU Ref. No.
L/H x W [m] approx. [kg] [pcs.]

1 Euro assembly frame, steel, IND x 73 18.8 24 1700.200


Standard fra e x 73 it 2 guardrail wedge housings
only external guardrail
2 Euro assembly frame, steel, IND x 73 19.6 24 1710.200 W
Standard fra e x 73 it 4 guardrail wedge housings
external and internal guardrail
3 Euro assembly frame LW, steel, z IND H
LAY ER x1 21.5 24 1780.200
Standard fra e x1 ,
with 2 guardrail wedge housings IG
H T W EIGH

T
only external guardrail

4 Euro assembly frame LW, steel, z IND H


LAY ER x1 22.3 24 1785.200 P
Standard fra e x1 ,
with 4 guardrail wedge housings IG
H T W EIGH

T
external and internal guardrail
5 Euro assembly frame, steel, IND
a d u t ent fra e 66 x 73 66 x 73 9.3 75 1700.066
d u t ent fra e 1 x 73 1 x 73 11.9 50 1700.101
c d u t ent fra e 1 x 73 1 x 73 15.8 24 1700.150
it 1 guardrail edge ou ing and toe oard pin
6 Euro assembly frame LW, steel, z IND H
LAY ER

a d u t ent fra e 66 x 1 66 x 1 11.5 75 1780.066 W


d u t ent fra e 1 x 1
IG
H T W EIGH 1 x1 13.8 50 1780.100 W
L

c d u t ent fra e 1 x 1 1 x1 14.9 24 1780.150 W


it guardrail edge ou ing and toe oard pin

7 Euro assembly frame, aluminium, x 73 8.6 24 1714.200


Standard fra e x 73
8 Euro assembly frame, aluminium,
a d u t ent fra e 66 x 73 66 x 73 4.1 75 1714.066
d u t ent fra e 1 x 73 1 x 73 5.2 50 1714.101
c d u t ent fra e 1 x 73 1 x 73 6.7 24 1714.150 W
it 1 guardrail edge ou ing and toe oard pin

Pos. Description Dimensions Weight PU Ref. No.


L/H x W [m] approx. [kg] [pcs.]

9 Assembly frame pin pallet


0.73 m 1 x 77 34.0 10 5113.073
1.09 m 1 x 1 13 36.2 10 5113.109 W

10 Retaining rod 1.20 2.1 5113.120

11 Retaining bar 1.12 3.1 5110.112

WS = wrench size PU = packaging unit W = available ex works P = delivery time on request V = only available in this packaging unit Z = the approval process is not yet completed
IND = Layher Individual possible – see page 6
13
Scaffolding decks

Our scaffolding decks comply with the requirements of Scaffolding decks


I 1 811
In the Layher system, depending on the type of
application and scaffolding group but also in accordance 1
with your working requirements and priorities, choose
from decks made of hot-dip galvanized steel, aluminium,
wood or an aluminium frame with plywood board. The
load-bearing capacity of the overall system must be
observed. The claws of the Layher scaffolding decks slide
ea ily during a e ly into t e ection of t e
assembly frame, ensuring unbeatable speed of assembly.
2
The U-Xtra-N deck 4 is identical in construction with
t e ro u t dec , ut i e uipped it a gla fi re
reinforced plastic plate. It is very weather-resistant: 3
o rotting, no fungu gro t , no plit open rivet ole
The breaking load of the plastic plate is about 3 times
that of dry plywood. The surface has a proven anti-slip
structure, which is very easy to clean. Plaster and dirt
can be easily removed by using a high-pressure cleaner
or a scraper.
4
The U-stalu deck 5-7 is a lightweightand durable
aluminium deck with sturdy, riveted steel caps.

With the Connecting clamp for Stalu deck 8, several


stalu decks can be connected to avoid pedestals in the
case of load.
5

10

11

14
Pos. Description up to load cla Dimensions Weight PU Ref. No.
L/H x W [m] approx. [kg] [pcs.]

1 U-steel deck T4, 0.32 m wide IND 6 73 x 3 6.0 60 3812.073


steel, hot-dip galvanized 6 1 x 3 8.4 60 3812.109
perforated, non-slip working surface 6 1 7x 3 11.9 60 3812.157
6 7x 3 15.0 60 3812.207
5 7x 3 18.2 60 3812.257
4 3 7x 3 21.5 60 3812.307
3 1 x 3 29.8 60 3812.414
2 Steel tube, 33.70 mm, hot-dip galvanized 1.50 3.0 100 4603.150 W
it t roug t e edge ole of ef o 381

3 U-steel deck, 0.19 m wide IND 6 73 x 1 5.1 50 3801.073 W


constructed as 3812 6 1 x 1 6.4 50 3801.109 W
as equalizing deck, e.g. for birdcage scaffolding 6 1 7x 1 8.5 50 3801.157
6 7x 1 10.2 50 3801.207
5 7x 1 13.2 50 3801.257
4 3 7x 1 15.3 50 3801.307
4 U-Xtra-N deck, 0.61 m wide IND 3 73 x 61 7.0 60 3866.073
lu iniu tile ection, gla fi re reinforced pla tic plate 3 1 x 61 9.5 60 3866.109
extre ely dura le, lig t eig t, non lip or ing urface 3 1 7x 61 13.0 40 3866.157
3 7x 61 16.2 40 3866.207
3 7x 61 19.0 40 3866.257
3 3 7x 61 23.5 40 3866.307
5 U-stalu deck T9, 0.61 m wide IND 6 73 x 61 6.6 40 3867.073 W
extre ely lig t eig t alu iniu dec it turdy, 6 1 x 61 8.8 40 3867.109 W
riveted steel caps, stacking height only 54 mm 6 1 7x 61 11.7 40 3867.157
5 7x 61 14.8 40 3867.207
5 7x 61 17.9 40 3867.257
4 3 7x 61 21.0 40 3867.307
6 U-stalu deck T9, 0.32 m wide IND 6 1 7x 3 7.4 30 3856.157 W
constructed as 3867 6 7x 3 9.2 30 3856.207 W
as equalizing deck, e.g. for birdcage scaffolding 5 7x 3 11.0 30 3856.257 W
4 3 7x 3 13.3 30 3856.307 W

7 U-stalu deck T9, 0.19 m wide 6 1 7x 1 5.6 50 3857.157


constructed as 3867 6 7x 1 7.2 50 3857.207
as equalizing deck, e.g. for birdcage scaffolding 5 7x 1 8.7 50 3857.257
4 3 7x 1 10.2 50 3857.307
8 Connecting clamp for Stalu deck 0.1 10 3856.000 W

9 U-alu deck, perforated, 0.32 m wide 6 1 7x 3 6.5 60 3803.157 W


ec and cap of alu iniu it ro u t teel cla 5 7x 3 8.0 60 3803.207 W
perforated, non-slip working surface 4 7x 3 10.0 60 3803.257 W
3 3 7x 3 11.5 60 3803.307 W

10 U-robust deck, 0.61 m wide IND 3 73 x 61 7.2 60 3835.073 W


lu iniu tile ection, ply ood panel 1 3 1 x 61 9.7 60 3835.109 W
phenolic resin coating and rot protection; 3 1 7x 61 13.1 40 3835.157
lightweight, non-slip, easily stackable 3 7x 61 16.4 40 3835.207
3 7x 61 19.3 40 3835.257
3 3 7x 61 24.2 40 3835.307
11 U-robust deck, 0.32 m wide IND 6 1 7x 3 9.9 30 3836.157 W
constructed as 3835 5 7x 3 11.5 30 3836.207 W
as equalizing deck, e.g. for birdcage scaffolding 4 7x 3 14.7 30 3836.257 W
3 3 7x 3 16.0 30 3836.307 W

WS = wrench size PU = packaging unit W = available ex works P = delivery time on request V = only available in this packaging unit Z = the approval process is not yet completed
IND = Layher Individual possible – see page 6
15
Access decks, steel planks, gap decks

Internal scaffolding access Access decks, steel planks, gap decks


Our hatch-type access decks conform to the requirements
of I 1 811, it a eparate or an integrated torey
ladder for internal access. 1 2
dec u t e fitted u ing U-start ledgers ee page 8
or SpeedyScaf transoms ee page 3 a t e erection
surface for the lowest ladders.

4 3

External scaffolding access


lu iniu landing type tair ay it guardrail for
convenient external acce allo ing t e tran portation
of aterial ee page 8
Corner deck, adjustable 6
In t e ca e of ad oining fra e ay in 73 ide caffolding, 5 6
the corners are covered with corner decks. System-conforming
covers are therefore no longer a problem and you have a
continuous deck surface with no risks of tripping or stumbling.
Hatch-type access with offset hatch 8/9
The offset hatch can be opened and closed even when
bridging decks are placed on top.
8 7a + b

The steel plank 11 is a safe bridging element capable of


bearing high loads for all scaffolding systems.
It is preferred to wooden planks for use in areas with 9 10
tringent fire protection re uire ent
2 Long service life, reusable
2 Lower weight compared with wood plank
2 on lip and non in a a le
2 If at least 2 steel planks are adjacent to one another,
they may also be used in brick guards
e upport lengt u t e at lea t 1 c at every 11
support. For scaffolding decks of wood, please see our
catalogue Scaffolding Accessories.

Secure the planks with locking pins, 2 self securing steel


12 14a + b
bolts or 1 securing screw for each end.

13
Further information here

15

For closing of system-caused gaps, gap covers 10 or


the telescopic gap deck 15 can be used.

Further information here

16
Pos. Description up to load cla Dimensions Weight PU Ref. No.
L/H x W [m] approx. [kg] [pcs.]

1 U-Xtra-N deck, 0.61 m wide, IND 3 7 x 61 25.4 40 3869.257


with integrated access ladder 3 3 7 x 61 29.5 40 3869.307
ec urface of gla fi re reinforced pla tic,
aluminium access hatch
2 U-aluminium hatch-type access deck, IND 3 7 x 61 24.0 40 3852.257
0.61 m wide, with integrated access ladder 3 3 7 x 61 28.0 40 3852.307
easy access with aluminium deck surface
and aluminium access hatch

3 U-robust hatch-type access deck, IND 3 7 x 61 24.0 40 3838.257


0.61 m wide, with integrated access ladder 3 3 7 x 61 27.4 40 3838.307
4 U-aluminium access deck, 0.61 m wide IND 3 1 7x 61 15.1 40 3851.157 W
easy access with aluminium deck surface 3 7x 61 17.0 40 3851.207
and aluminium access hatch 3 7x 61 20.0 40 3851.257
3 3 7x 61 24.5 40 3851.307

5 U-hatch-type steel access deck, 0.64 m wide 4 7x 6 28.9 30 3813.207 W


aluminium access hatch 4 7x 6 38.0 30 3813.257 W
6 Corner deck, adjustable
for angles from 45° – 90°, with toe board
in steel 3 0.61 21.5 50 3819.000 W
in aluminium 3 0.61 14.4 25 3826.000 P
7a Access ladder T15, steel, 7 rungs B 1 x 3 7.6 70 4008.007
for llround Scaffolding Sy te and SpeedyScaf Sy te
7b Access ladder, steel, 7 rungs 1 x 3 7.8 70 4005.007
for SpeedyScaf System
8 U-robust hatch-type access, 0.61 m, hatch offset IND 3 1 7 x 61 14.2 40 3858.157 W
without ladder. For use with 4005.007 3 7 x 61 17.2 40 3858.207 W
9 U-robust hatch-type access, 0.61 m, hatch offset, IND 3 7x 61 25.2 40 3859.257 W
with integrated access ladder 3 3 7x 61 28.4 40 3859.307 W
10 Steel-gap cover, 0.32 m wide 6 73 x 3 2.6 150 3881.000 W
Construction height only 10 mm 6 1 x 3 4.0 150 3881.001 W
e up to load cla 6 it axi iu gap idt of c 6 1 7x 3 6.0 100 3881.002 W
6 7x 3 8.0 100 3881.003 W
6 7x 3 10.0 100 3881.004 W
6 3 7x 3 10.7 100 3881.005 W
11 Steel plank, 0.30 m 6 1 x 3 6.5 60 3880.100 W
system-free, completely made of hot-dip galvanized steel 6 1 x 3 10.3 60 3880.150 W
5 x 3 12.8 60 3880.200 W
3 x 3 15.3 60 3880.250 W

Steel plank, 0.20 m 6 1 x 4.8 100 3878.100 W


constructed as 3880 6 1 x 7.2 100 3878.150 W
5 x 9.5 100 3878.200 W
3 x 11.8 100 3878.250 W
12 Locking pin, plastic, dia. 11 mm 0.08 1.0 100 v 3800.006
13 Steel bolt, self-securing, dia 11 x 7 0.08 4.5 50 v 3800.007 W

14a Securing screw, long, steel hot-dip galvanized 19 WS 8x 3 4.0 50 v 3800.009 W


22 WS 8x 3 3.9 50 v 3800.010 W
14b Securing screw, short, steel hot-dip galvanized B 19 WS x 2.3 50 v 3800.011 W
22 WS x 2.3 50 v 3800.012 W
15 Telescopic U-gap deck z 6 0.73 5.2 40 3881.073 W
closes gaps between 40 and 255 mm 6 1.09 7.8 40 3881.109 W
6 1.40 10.1 40 3881.140 W
6 1.57 11.4 40 3881.157 W
6 2.07 14.9 40 3881.207 W
5 2.57 18.6 40 3881.257 W
4 3.07 22.3 40 3881.307 W
WS = wrench size PU = packaging unit W = available ex works P = delivery time on request V = only available in this packaging unit Z = the approval process is not yet completed
IND = Layher Individual possible – see page 6
17
Side protection

You can choose between single 1 and double Side protection


guardrails 2/3 in steel or double guardrails in aluminium.
ll guardrail are dropped into t e guardrail edge
housings of the assembly frames and engaged on the 1
wedge with a hammer blow to provide a positive and
stable connection.

The end guardrails 4/5 are wedged to the vertical tube


with the half-coupler.

The double end guardrails 6/7 are wedged to the


guardrail oxe

The adjustable guardrail 8 is suitable for inner and 2


outer corner and for non y te ay pivoted
guardrail connecting lug is provided.

Internal guardrail fixing device 9


uic fixing of internal guardrail al o on older a e ly
fra e y edging t e profile to t e a e ly fra e 4
standard.

6
Guardrail box for Euro frame 10
Speedy fitting of internal guardrail to t e uro a e ly
fra e uardrail oxe are attac ed i ply y in erting
and then turning them.
7
Guardrail coupler 11
For connecting guardrails outside the standard
di en ion , and al o for fitting all ide guardrail to
older assembly frames.
8

9 10

11

18
Pos. Description Dimensions Weight PU Ref. No.
L/H x W [m] approx. [kg] [pcs.]

1 Single guardrail 0.73 1.6 50 1724.073


steel 1.09 2.0 50 1724.109
1.57 2.9 140 1725.157
2.07 3.8 140 1725.207
2.57 4.7 140 1725.257
3.07 5.6 140 1725.307

2 Double guardrail 1 7x 7.9 70 1728.157


steel 7x 9.8 70 1728.207
7x 11.7 70 1728.257
3 7x 14.1 70 1728.307
1 x 21.0 70 1728.414

3 Double guardrail 1 7x 3.5 50 1732.157


aluminium 7x 4.6 50 1732.207
7x 5.8 50 1732.257
3 7x 6.7 50 1732.307

4 Single end guardrail, 0.73 m 0.73 2.2 200 1725.073

5 Single end guardrail, 1.09 m 1.09 3.5 250 1725.109 W

6 Double end guardrail, 0.73 m 19 WS 0.73 4.4 100 1728.719


22 WS 0.73 4.4 100 1728.722

7 Double end guardrail, 1.09 m 19 WS 1.09 5.6 120 1728.119


22 WS 1.09 5.6 120 1728.122

8 Guardrail, adjustable z 6.9 50 1726.000 W


d u t ent range 1 7 7

9 Guardrail box for Euro frame 0.5 450 1735.100

10 Speedy Internal guardrail fixing device without toe board pin z 1.00 3.1 160 1716.300

Speedy Internal guardrail fixing device with toe board pin z 1.00 3.3 160 1716.301 W

11 Guardrail coupler with box 1.3 25 1735.000

WS = wrench size PU = packaging unit W = available ex works P = delivery time on request V = only available in this packaging unit Z = the approval process is not yet completed
IND = Layher Individual possible – see page 6
19
Side protection

Toe boards 1 Side protection


a y fitting into t e toe oard pin , for co plete
three-part side protection. Wood, reddish-brown
in colour. 1

Individual toe boards 3


The toe boards can be individually designed in printing
and painting.

Half-coupler with toe board pin 4


Toe board connection to inner corners and SpeedyScaf
rolling to er , for exa ple
2

Diagonal bracing

Diagonal braces 5 Diagonal bracing


for vertically bracing the scaffolding parallel and vertical
to the façade, tube diamtetre 42.40 mm.
5
iagonal guidance for regular a e ly i pecified in
t e approval notification e diagonal race are
inserted into the corner plate at the top end of the
assembly frame. Wedged to the lower diagonal point
with the approved wedge half-coupler, they provide an
absolutely positive and stable bracing with easy
correctability during assembly.

The horizontal strut must be installed in the foot area of


the diagonal bay. 6

8 8
8

When the cover of the


5 wedge half-coupler is
directly underneath the hole
marking, the scaffolding bay
7 is vertically aligned.

20
Pos. Description Dimensions Weight PU Ref. No.
L/H x W [m] approx. [kg] [pcs.]

1 Toe board IND 73 x 1 1.6 140 1756.073


for longitudinal side 1 x 1 2.4 140 1756.109
1 7x 1 3.1 140 1757.157
7x 1 4.7 140 1757.207
7x 1 5.6 140 1757.257
3 7x 1 6.8 140 1757.307
1 x 1 10.3 140 1757.414

2 End toe board IND 73 x 1 1.8 250 1757.073


for end side 1 x 1 2.3 140 1757.109 W

3 Half-coupler with toe board pin 19 WS 1.0 25 4708.019


22 WS 1.0 25 4708.022

Pos. Description Dimensions Weight PU Ref. No.


L/H x W [m] approx. [kg] [pcs.]

5 Diagonal brace with wedge half-coupler


for 2.07 m bay length, 2.00 m bay height 2.80 7.0 50 1736.207
for 2.57 m bay length, 2.00 m bay height 3.20 7.8 50 1736.257
for 3.07 m bay length, 2.00 m bay height 3.60 8.3 50 1736.307
for 2.57 m bay length, 1.50 m bay height 2.97 7.3 50 1737.257 W

6 Diagonal brace with 2 half-couplers 19 WS 2.20 6.5 50 1736.157


for 1.57 m bay length, 2.00 m bay height

7 Base ledger with 2 wedge half-couplers


for 2.07 m bay length 2.07 6.9 50 1727.207
for 2.57 m bay length 2.57 8.6 50 1727.257
for 3.07 m bay length 3.07 10.4 50 1727.307

8 Section brace with 2 half-couplers


for supporting the bracket 0.73 m 19 WS 1.80 6.0 50 1740.177
and in assembly frame 0.73 m 22 WS 1.80 6.0 50 1741.177

for supporting the bracket 1.09 m 19 WS 1.90 6.4 50 1740.195


and in assembly frame 1.09 m 22 WS 1.90 6.4 50 1741.195

WS = wrench size PU = packaging unit W = available ex works P = delivery time on request V = only available in this packaging unit Z = the approval process is not yet completed
IND = Layher Individual possible – see page 6
21
Brackets

SpeedyScaf can be quickly widened inwards or Brackets


outwards: the console brackets are secured with the
welded-on half-coupler in the corner plate of the
assembly frame to form a deck level with the main 1 The console bracket, 2 The Console bracket,
scaffolding. 0.22 m for decks, 0.36 m for decks,
1 3
The plug-in console bracket 0.22 m 4 and 0.36 m 5 is
u ed for uic odification ile uilding con truction, 4 3
en external t er al in ulation co pound y te ill
e fitted to t e fa ade u t e re uired axi u
distance between scaffolding and façade is ensured any
ti e, it out u ing internal guardrail It i only fitted
into the locking pin hole. There’s no need for alignment
or screwing. The plug-in console bracket cannot be used
in combination with roof guard supports. 5 6

The console bracket, 0.50 m 6 is used to lengthen or


shorten scaffolding bays. When used for widening on
the 0.73 m assembly frame, two decks, 0.61 m can be
installed without gaps.
8 7
The console bracket, 0.73 m 7 may only be installed
with a bracket support (section brace) 12.

The console bracket, 0.73 m, swivelling 8 is placed


on the spigot of the assembly frame and can be swung
clear after re oval of t e dec furt er advantage i
9 10
its use for corner solutions, since a 0.73 m bracket can
e fitted at t e a e eig t It ay al o only e u ed
with a bracket support.

The console bracket, 0.73 m, reinforced 9 can be used


in SpeedyScaf 7 in teel up to 3 7 ay lengt
(up to load class 3) and in brick guards. In this case, it is
possible to dispense with the bracket support with 11
SpeedyScaf 70 in steel. The advantages of the console
bracket, 0.73 m, reinforced 9:
2 o need for ection race
2 Less material needed
2 Lower overall costs 12
2 Coupler connection to frame possible at bracket level

The console bracket, 1.09 m 10 may only be installed


with a bracket support (section brace) 12.

Bracket decks too must be secured against inadvertent


lifting off, therefore either the single guardrail support or
the lock against lift-off 11 is essential. The lift-off
preventer is secured by means of locking pins.

22
Pos. Description Dimensions Weight PU Ref. No.
L/H x W [m] approx. [kg] [pcs.]

1 Console bracket, 0.22 m 19 WS 0.22 2.8 100 1744.019


without spigot 22 WS 0.22 2.8 100 1744.022
with integrated lift-off preventer

2 Console bracket, 0.36 m 19 WS 0.36 3.3 125 1743.319


without spigot 22 WS 0.36 3.3 125 1743.322
with integrated lift-off preventer

3 Console bracket, 0.36 m 19 WS 0.36 3.5 125 1745.319


with integrated lift-off preventer 22 WS 0.36 3.5 125 1745.322

4 Plug-in console bracket, 0.22 m 0.22 1.3 250 1746.022


without spigot

5 Plug-in console bracket, 0.36 m 0.36 1.6 250 1746.036


without spigot

6 Console bracket, 0.50 m 19 WS 0.50 5.8 130 1744.519


22 WS 0.50 5.8 130 1744.522

7 Console bracket, 0.73 m 19 WS 0.73 6.4 100 1744.719


22 WS 0.73 6.4 100 1744.722

8 Console bracket, 0.73 m, swivelling 0.73 7.0 80 1744.073 W

9 Console bracket, 0.73 m, reinforced 19 WS 0.73 8.8 40 1745.719


22 WS 0.73 8.8 40 1745.722
10 Console bracket, 1.09 m 19 WS 1.09 9.6 30 1745.119
22 WS 1.09 9.6 30 1745.122

11 Lock against lift-off


for bracket 0.36 m wide 0.36 0.9 250 1743.036 W
for bracket 0.50 m wide 0.50 1.3 250 1743.050 W
for bracket 0.73 m wide 0.73 1.5 250 1743.073
for bracket 1.09 m wide 1.09 2.3 50 1743.109 W

12 Section brace with 2 half-couplers


for supporting the bracket 0.73 m 19 WS 1.80 6.0 50 1740.177
22 WS 1.80 6.0 50 1741.177

for supporting the bracket 1.09 m 19 WS 1.90 6.4 50 1740.195


22 WS 1.90 6.4 50 1741.195

e axi u a e ly eig t on
brackets is dependent on the decks,
bay lengths and assembly frames
used. The appropriate structural
trengt pecification u t e
observed. Further information can be
found in our SpeedyScaf Technical
Brochure page 27.

WS = wrench size PU = packaging unit W = available ex works P = delivery time on request V = only available in this packaging unit Z = the approval process is not yet completed
IND = Layher Individual possible – see page 6
23
Anchoring

The scaffolding must be anchored vertically to and Anchoring


parallel with the façade with resistance to both tensile
and compressive stress. Layher offers speedy and safe
solutions: 1
SpeedyScaf wall
2 The SpeedyScaf wall tie 1, which is fastened with tie with double
a double coupler in the corner plate of the assembly coupler
frame and is supported with the fork plate on the
channel section of the assembly frame.

2 The wall tie 2, which is connected with two double 2 2 wall ties
or corner plate couplers to both upright tubes. connected in a
ape it one
2 SpeedyScaf corner plate coupler 3 double coupler each
For outside and inside brackets too, continuous to the inner standard.
anchoring directly on the corner plate of the Euro
assembly frame is possible and ensures a greater
3 4 5
height clearance.

The anchoring forces in accordance with the approval


or individual verification of tructural trengt can vary
widely. The loading capacity of the anchoring, in
7
particular of the anchoring foundation, must be carefully
c ec ed and verified ee in truction for a e ly and
use).

For double couplers see page 36. For insert testing


instrument see catalogue scaffolding accessories.

The ETICS-tie is constructed for carrying high loads,


parallel to t e fa ade, in u e toget er it external
thermal insulation compound systems.

6 9

Allround ledger as wall tie with two


10
corner plate couplers

14

12

13
11
Wall tie with two plate couplers
16

17 15

24
Pos. Description Dimensions Weight PU Ref. No.
L/H x W [m] approx. [kg] [pcs.]

1 SpeedyScaf wall tie 0.69 2.8 100 1755.069

2 Wall tie 0.38 1.6 250 1754.038


0.95 3.7 50 1754.095
1.45 5.7 50 1754.145
1.75 5.8 50 1754.175

3 Gusset coupler 19 WS 0.9 25 1735.019


22 WS 0.9 25 1735.022

4 Plastic wall insert, plastic 7 0.3 25 v 4008.071


drilled hole dia. 14 mm 100 mm 0.3 25 v 4008.101
135 mm 0.3 25 v 4008.136
5 Ring screw, steel, galvanized, 1.6 10 v 4009.096
dia 1 , for expanding plug 120 mm 1.8 10 v 4009.121
190 mm 2.5 10 v 4009.191
230 mm 3.0 10 v 4009.231
300 mm 3.5 10 v 4009.301
350 mm 5.0 10 v 4009.351
6 Cap, 12 mm, white, 12 mm 1.0 100 v 4007.006
for expanding plug ef o 8
7 Telescopic stabilizer, steel, 3.30 – 6.00 m z 3.30 28.4 20 4032.600
8 Peg solid, dia. 24 mm 470 mm 1.8 4032.100

9 Peg extraction device 8.0 4032.200 W


10 ETICS-tie 600 complete, up to approx in ulation 0.68 5.5 120 4000.600
ETICS-tie 800 complete, up to approx 3 in ulation 0.88 6.9 120 4000.800
co pri ing ite ,1 x , 11 x and 1 x
11 ETICS-tie 600 0.68 2.5 4000.200 W
ETICS-tie 800 0.88 3.3 4000.300 W

12 ETICS hanger bolt, 1 x 1 125 mm 2.0 25 V 4000.126


13 ETICS-tie rod 380, up to approx in ulation 0.38 10.0 10 V 4000.121 W
ETICS-tie rod 480, up to approx 3 in ulation 0.48 13.0 10 V 4000.481 W
14 Plastic pipe, 50 m 5.0 4000.050 W

15 Cap for plastic pipe 0.5 50 V 4000.103 W

16 Lock nut, S 36 x 3 4.0 20 V 2671.131 W

17 Open ended wrench, WS 36 0.5 2671.135 W

WS = wrench size PU = packaging unit W = available ex works P = delivery time on request V = only available in this packaging unit Z = the approval process is not yet completed
IND = Layher Individual possible – see page 6
25
Standard brick guard, pedestrian protection, guardrail closure

Roofer’s guard system Standard brick guard, pedestrian protection, guardrail closure
e eig tened ide protection pecified for roofing or
is swiftly assembled in SpeedyScaf scaffolding: at the
top level, attach the brick guard support 1 instead of a 1 2
guardrail support, drop in two brick guards for each bay
(locking element determines how they are installed),
knock in wedges, insert toe boards and locking pins –
done!

Euro assembly frames are used to close off roofer’s


guard system levels at the ends.
Two brick
guards must
Side protection net 3 be dropped
The nets are attached at the bottom (at scaffolding deck into the brick
height) and at the top (2 m above the scaffolding deck) guard support
to a tube. for each bay.

Without a quick strap fastener, the protection


net is threaded with each loop of its mesh into the tubes.
3 4 5
With quick strap fasteners, the protection net is attached
to t e tu e at every 7 toe oard and a andrail
are required in any event.

rotection net 1 x , pecification


Mesh width 100 mm, blue, made of PPM 4.50 mm,
notle , a per I 1 63 1, type

Fan support 6
Protection against falling objects. The surfaces must be 6
covered with system decks. Two decks 0.61 m wide are 1242
dropped in horizontally, and one deck 0.61 m and one
900

deck 0.32 m at an angle.

Guardrail closure, top


Euro intermediate frames 7/8 with welded-on wedge
housings secure the top work deck. Guardrails are
dropped in and wedged as on the assembly frame.

The Euro top end frames 9/10 for securing the


scaffolding end sides are already provided using end
guardrail nly t e toe oard till a to e fitted

lternatively, it i po i le to u e 1 ig a e ly
frames with guardrail wedge housings on the end side. 7 8
n end guardrail acting a a nee rail i al o re uired
here. For fastening reasons, only double guardrails can
then be installed on the longitudinal side. One guardrail
lug of the hand rail is inserted into the channel section
of the assembly frame on the end side. The other three
guardrail lugs are wedged as usual.
Securing of the top scaffolding level with locking pins
i reco ended ee page 3 10 9

11
The Euro guardrail post
is used for 0.36 m brackets. The
guardrail is closed at the end sides
it tu e and coupler n end
toe oard u t e fitted y t e
customer.

26
Pos. Description Dimensions Weight PU Ref. No.
L/H x W [m] approx. [kg] [pcs.]

1 SpeedyScaf roof guard support, 0.36/0.50/0.73 m 2.00 x 0.73 12.1 20 1748.000


(used on assembly frame 0.73 m and
brackets 0.36 m, 0.50 m, and 0.73 m)

SpeedyScaf roof guard support, 1.09 m 2.00 x 1.09 13.6 20 1778.109 W


(used on assembly frame 1.09 m)

2 SpeedyScaf roof guard 1.00 x 1.57 15.5 1749.157 P


1.00 x 2.07 17.7 1749.207 P
1.00 x 2.57 21.1 30 1749.257 W
1.00 x 3.07 24.4 30 1749.307 W

3 Protection net 10.00 x 2.00 4.5 100 6232.000


without quick belt
4 Protection net 10.00 x 2.00 5.9 100 6232.002
with quick belt
5 Quick belt 0.50 1.5 50 v 6235.001

6 Fan support 2.10 18.9 20 1773.019 W

7 For the scaffolding bay


Euro intermediate frame, 0.73 m, steel 1.00 x 0.73 6.5 50 1719.073
Euro intermediate frame, 0.73 m, aluminium, without spigot 1.00 x 0.73 2.7 50 1769.073

8 Euro intermediate frame, 1.09 m, steel 1.00 x 1.09 8.5 50 1719.109 W

9 For the end side


Euro top end frame, 0.73 m, steel 1.00 x 0.73 13.3 50 1722.073
Euro top end frame, 0.73 m, aluminium, without spigot 1.00 x 0.73 4.6 25 1770.073
10 Euro top end frame, 1.09 m, steel 1.00 x 1.09 14.9 50 1722.109 W

11 Euro guardrail post, single,


with guardrail wedge head housing, for bracket 0.36 m wide
in steel 1.00 5.5 100 1716.000
in aluminium 1.00 2.4 100 1768.000

WS = wrench size PU = packaging unit W = available ex works P = delivery time on request V = only available in this packaging unit Z = the approval process is not yet completed
IND = Layher Individual possible – see page 6
27
Stairway access

Scaffolding access, outside Stairway access


The Aluminium platform stairs 2 offers increased
safety, convenience and speed when ascending the
tower. Material transport is facilitated by the additional 1 2 3
use of the work decks as allround walkways. The
external landing type tair ay i covered y t e approval
in it regular ver ion up to t i ean t at it a
load capacity of no furt er verification i
needed axi u con truction eig t depending
on structural analysis.

The platform stairway tower will be connected to the


work scaffolding using the U-distance coupler 6. The
1 ide gap dec ear in t e profile of t e
coupler lternatively t e tair ay to er can e connected 1753.003 1753.002
directly to work scaffolding. The gap will be closed using
the telescopic gap deck (see page 16).
4 5 6
Starter U-transom for 4:
2 Scaffolding access with platform stairs, at the entrance
for dropping into the stairway;
2 Ladder access to the 0.73 m wide scaffolding,
accommodates at the lowest level of an access bay the
deck that may be required for setting up the ladder.
7 8
The Comfort stairway 3 bases on the platform stairway
and has reinforced stringers and step sections. The
175 mm wide grooved steps guarantee more comfort
when ascending the stairs, especially for high stairway
heights. Guardrails, internal guardrails and stairwell
guardrail can be used from the platform stairway.

Outer landing-type stairway access


(stairs in identical direction)

10 9

Modular stairway

With the modular stairway, accesses that Modular stairway


al ay fit and t at atc t e y te can e
con tructed ny inter ediate di en ion
can e ac ieved i ply y fitting toget er 11 12 13
the individual stairway parts. The stairway
ri e c fro tep to tep, and t e
bottom element with spindles is used
for preci e levelling ide variety of
applications thanks to modular design. Little
space needed for transport and assembly. Height differences from 0.60 m to 1.60 m can be bridged. Load-bearing capacity:
3 e ign teel, ot dip galvani ed onnection of ele ent it olt,
dia 1 x and afety clip 8 per oint ey are already included in t e
scope of delivery.

28
Pos. Description Dimensions Weight PU Ref. No.
L/H x W [m] approx. [kg] [pcs.]

1 U-starting stairway, 0.64 m wide, aluminium


1 ig , oad earing cap Step eig t 1 x 6 11.5 10 1753.003 W
1 ig , oad earing cap Step eig t 1 x 6 13.5 10 1753.002 W
2 U-platform stairway, 0.64 m wide, aluminium
oad earing cap , Stair cla acc to 1 811 1
for 2.57 m bay length, Step height 0.20 m, 2.00 m high 7x 6 21.9 10 1753.257
for 3.07 m bay length, Step height 0.20 m, 2.00 m high 3 7x 6 26.3 10 1753.307
for 2.57 m bay length, Step height 0.20 m, 1.50 m high 7x 6 21.5 10 1753.251 W
3 U-comfort stairway, 0.64 m wide, aluminium z
oad earing cap , Stair cla acc to 1 811 1
for 2.57 m bay length, Step height 0.22 m, 2.00 m high 7x 6 27.0 10 1755.257 W
for 3.07 m bay length, Step height 0.22 m, 2.00 m high 3 7x 6 32.0 10 1755.307 W
4 Starter U-transom 0.73 3.8 42 1751.073
1.09 5.1 42 1751.109 W
5 Stairway-guardrail post 19 WS 1.10 5.1 50 1752.006
for stairwell at the top level
6 U-distance coupler 19 WS 2.0 250 1752.019
for connecting stairway tower to the work scaffolding 22 WS 2.0 250 1752.022
7 Stairwell guardrail 19 WS 6.2 40 1752.004
22 WS 6.2 40 1752.014 W
8 Stair guardrail
for 2.57 m bay length, 2.00 m bay height 7x 16.1 70 1752.257
for 3.07 m bay length, 2.00 m bay height 3 7x 17.6 70 1752.307
for 2.57 m bay length, 1.50 m bay height 7x1 14.6 70 1752.003 P
9 Internal guardrail T12
for 7 x ay and 3 7 x ay 19 WS 2.00 13.5 20 1752.007
for 7 x ay and 3 7 x ay 22 WS 2.00 13.5 20 1752.008 W
for 7 x 1 ay 19 WS 1.50 11.5 20 1752.012 W
Mandatory for opposite-direction stairways
Internal guardrail
for tarting tair ay 19 WS 1.00 7.8 20 1752.011 W
10 Initial stairway guardrail 19 WS x17 9.9 20 1752.009 W

The stairway tower 500 is intended for temporary stairway structures with higher live loads. It
is preferably used as a construction stairway tower, e.g. for access to the site or as a road
crossing not open to the public during construction work, and furthermore at buildings as an
LAYHER ALLROUND SCAFFOLDING SYSTEM ®
CATALOGUE
Edition 04.2015

additional e cape tair ay to er nder certain circu tance , t e tair ay to er can


Ref. No. 8116.252

Quality management
certified according
to ISO 9001:2008
by German TÜV-CERT

also be used for public access during construction work or as a mandatory escape stairway
tower.

U-stairway stringer 500: These and further stairway


2 Permissible load-bearing 2 Stair ay di en ion i er , c olution you ll find in t e
capacity read a 7, c Catalogue AllroundScaffolding
for a tair ig t idt of 7 ndercut u , c – for size and public applications.

Pos. Description Dimensions Weight PU Ref. No.


L/H x W [m] approx. [kg] [pcs.]

11 Stair foot section, 0.60 m 0.60 6.8 15 2639.060


Stair foot section, 0.95 m 0.95 7.8 50 2639.095 W

12 Stair middle section, 0.60 m 0.60 9.2 15 2638.060


Stair middle section, 0.95 m 0.95 10.2 50 2638.095 W

13 Stair head section, 0.60 m 0.60 10.7 15 2637.060


Stair head section, 0.95 m 0.95 11.7 50 2637.095 W

WS = wrench size PU = packaging unit W = available ex works P = delivery time on request V = only available in this packaging unit Z = the approval process is not yet completed
IND = Layher Individual possible – see page 6
29
System lattice beam

SpeedyScaf lattice beam LW 1 System lattice beam


The top chord with engagement lugs at both ends and
spigots for further construction in the standard dimension is
dropped into the spigots of the assembly frame, while the 1 H
LAY ER

bottom chord must be connected with lattice beam


couplers 2 to the upright tube. The use of the SpeedyScaf IG
H T W EIGH

T
lattice ea i governed y t e approval notification,
which must be complied with. If the aluminium SpeedyScaf
lattice beam is used, bear in mind the reduced load-bearing
capacitie or ridging of up to 1 di tance it teel
or aluminium decks in the standard SpeedyScaf assembly.

2
e of t e
lattice beam coupler

3a+b

For accommodating scaffolding decks when bridging with SpeedyScaf lattice beams
4
When placed on non-system
lattice beams for bridging, it is also
possible to continue construction in
xa ple SpeedyScaf lattice ea 1 , covered the standard system dimensions
scaffolding (special diagonal guidance) with 0.73 m wide assembly frames.
Steel lattice beam, system free 5 5
with type calculation: dia. 48.30
2 Permissible spans ranging from 3 m to 12 m Outside 450 xi
2 ifferent type of upport and load
2 ll value in ta le for , ence no need for
tructural trengt verification for t e lattice ea
2 Calculation reliability.

urt er lattice ea you ll find in t e catalogue


Scaffolding Accessories.

Assembly frames for special applications

The gantry frame LW 6 for safe protection of Assembly frames for special applications
pedestrians underneath the scaffolding, by rebolting the
central pigot for 73 or 1 caffolding idt
6 H
7
LAY ER

The Euro assembly frame, 2.00 x 0.36 m 8 for assembly


in narrow areas, e.g. between house walls, where a IG
H T W EIGH
L

normal assembly frame is too wide. Possibilities for


connection of locking wedge housings to both side rails.
2200

The Euro assembly frame, 2.00 m, for balustrade 9


is used where a roof projection projects into the
caffolding ove it, a axi u of four furt er level 1500
can be constructed using standard assembly frames.

The Euro eaves bracket, 1.00 m 10 meets workplace 8 9


requirements for painters, plasterers, plumbers and
roofers. It obviates the need for structures requiring much
time and material. The deck in the main scaffolding must
e ecured u ing t e lift off preventer ef o 17 3 e
toe board can be suspended in the eaves bracket.

30
Pos. Description Dimensions Weight PU Ref. No.
L/H x W [m] approx. [kg] [pcs.]

1 SpeedyScaf lattice beam LW, steel H


LAY ER

1 x 7 ay 1 x 46.4 20 1781.514
61 x3 7 ay IG
H T W EIGH 61 x 53.9 20 1781.614

T
7 71 3 x 7 ay 7 71 x 67.2 20 1781.771

SpeedyScaf lattice beam, aluminium


1 x 7 ay 1 x 22.5 50 1767.514 W
61 x3 7 ay 61 x 26.4 50 1767.614 W

2 Lattice beam coupler 19 WS 1.6 25 4720.019


for SpeedyScaf lattice beam 22 WS 1.6 25 4720.022

3 U-ledger for lattice beam for accommodating scaffolding


decks when bridging with SpeedyScaf lattice beams
a) 0.73 m 0.73 3.1 42 4923.073
b) 1.09 m 1.09 4.3 42 4923.109 W
4 Intermediate transom for lattice beam, 0.73 m 6.5 50 4924.073
incl. 4 bolts, for lattice beams 4912 and 4922

5 Steel lattice beam 450, 45 cm high, system free


2.00 m long x 20.7 40 4912.200
3.00 m long, with type approval 3 x 29.6 40 4922.300
4.00 m long, with type approval x 40.5 40 4922.400
5.00 m long, with type approval x 49.3 40 4922.500
6.00 m long, with type approval 6 x 58.2 40 4922.600

Pos. Description Dimensions Weight PU Ref. No.


L/H x W [m] approx. [kg] [pcs.]

6 Gantry frame LW H
LAY ER x1 31.2 24 1779.150
steel, hot-dip galvanized
IG
H T W EIGH
L

7 Guardrail wedge housing cover 0.6 10 V 1710.003 W


Polypropylene

8 Euro assembly frame, 2.00 x 0.36 m x 36 18.3 50 1717.200


steel, hot-dip galvanized
9 Euro assembly frame, 2.00 m, for balustrade x 73 22.7 25 1718.200
steel, hot-dip galvanized
10 Euro eaves bracket, 1.00 m 1 x 73 14.8 50 1718.100
steel, hot-dip galvanized
10

If further construction is planned on


Euro assembly frame 2.00 x 0.36 m with
Euro assembly frame 0.73 m, a bracket 0.36 m
u t e connected e ly fra e 73 can
then be fitted without a lower cross rung.
WS = wrench size PU = packaging unit W = available ex works P = delivery time on request V = only available in this packaging unit Z = the approval process is not yet completed
IND = Layher Individual possible – see page 6
31
Accessories

The SpeedyScaf transom 1 is used for constructing Accessories


intermediate levels.

Many other parts for non-standard scaffolding 1


applications are available on request.

For large roof overhangs, use the installation of


2
aluminium bridging ledgers 3. Spigots 4 on
aluminium bridging ledgers hold the assembly frames
above them and permit a 0.50 m or 1.00 m reduction
of the bay width.
3

With the reducer from 1.09 m to 0.73 m 5, it is possible


to reduce the scaffolding width from 1.09 m to 0.73 m.
i can e nece ary for exa ple at great eig t for
structural reasons. This makes it possible to use 5
assembly frames 70 on a substructure of meter-wide 0.73 m
scaffolding.

The assembly frame joints are secured with


locking pins 6 in special cases against unintentional 1.09 m
lifting off, for exa ple en caffolding unit are oved
with a crane, when brick guard supports are used or in 6
particular wind conditions.

Castors 7
The mobile solution for birdcage, bridge or suspended
scaffolding is often the best alternative in terms of
tec nical uita ility, c eduling and price In t i field
too, the choice, the delivery capability and not least the
experience of t e anufacturer point to ay er If
caffolding i ade o ile u ing ca tor , I 3
applie or t e e rolling to er , verification of tructural
strength is required.

Robust castors 7 with twin brake (it brakes wheel and


slewing ring) for various loads, offer a safer mobility of 8
the scaffolding – without high effort.

Further castors with higher load capacitiy or


for en itive ooring you ll find in t e catalogue
Scaffolding cce orie
e tele copic device idt ax 3 , in 3 e o ile ea can
be used for all scaffolding systems (rolling towers, frame, modular and other
scaffolding, tube-and-coupler) with a tube diameter of 48.30 mm.
9

32
Pos. Description Dimensions Weight PU Ref. No.
L/H x W [m] approx. [kg] [pcs.]

1 Intermediate transom, 0.73 m


with half-coupler, for intermediate layers 19 WS 0.73 3.9 100 1742.719
22 WS 0.73 4.0 100 1742.722
2 Intermediate transom, 1.09 m
with half-coupler, for intermediate layers 19 WS 1.09 5.1 250 1742.119 W
22 WS 1.09 5.1 250 1742.122 W

3 Aluminium bridging ledger, 2.57 m 2.57 8.5 90 1775.257 W


Aluminium bridging ledger, 3.07 m 3.07 9.7 90 1775.307 W
for mounting on spigot,
for reduction of bay length.

4 Spigot 0.20 1.8 250 1775.000 W


incl. 2 bolts
for furt er con truction on alu iniu ridging ledger ef o 177

5 Reducer from 1.09 m to 0.73 m 1.09 8.3 20 4027.000 W


with welded-on channel section

6 Locking pin, red, dia. 11 mm 0.2 100 4000.001

7 Castor 700 dia. 0.20 6.8 70 5218.201


Plastic wheel, dia. 200 mm. With base plate,
adjustment range 0.30 – 0.60 m, spindle nut with lock,
castor with twinbrake lever and load centering when braked.
Wheel and slewing ring can be locked.
er i i le load 7

8 Mobile beam with bar, 3.20 m, adjustable 3.20 42.6 20 4106.032


Steel rectangular tube, hot-dip galvanized.
For base widening in special rolling tower structures.

9 Spigot, adjustable 0.46 2.1 200 4106.005


Steel, hot-dip galvanized. For use with mobile beam
ef o 1338 3

WS = wrench size PU = packaging unit W = available ex works P = delivery time on request V = only available in this packaging unit Z = the approval process is not yet completed
IND = Layher Individual possible – see page 6
33
Weather protection

The weather protection support 1 is used for tarpaulin Weather protection


covering again t expo ure to t e eat er at t e top
level of SpeedyScaf structures.
1
t t e top caffolding level, all a e ly fra e to ic
the weather protection support is attached must be
anchored to the building for resistance to tension and
compression.
The weather protection support must be attached to the
guardrail support and to the assembly frame using two
ivel coupler , ef o 7 , and additionally raced a
shown in the sketch using a steel scaffolding tube

1950
lengt 1 n t e out ide, tilting pin are u ed for
suspension of the tarpaulins, and at the top there are two
guardrail wedge housings for bracing using guardrails.

Layher couplers and further tarpaulins can be found in


our cce orie atalogue

Temporary intermediate roof 2


The roof tarpaulin 2 is secured to the horizontal or
longitudinal ledgers or guardrails of the scaffolding bay.
The inner and outer ledgers must be connected vertically
offset from one another depending on the roof pitch. The
roof tarpaulin ill e fixed it ela tic trap fa tener in
only a few minutes. Quick belts on the wall side allow a
tensioning against the building wall and ensure a good
connection to the building.
The projecting may be between 0.40 and 0.70 m.
ece ed fi ergla rod offer ta ility in t e tran ver e
direction. The installation of the roof plan is scaffolding
bay by bay. The tarpaulin ends will be easily closed with
a hook and loop fastener. Structures outside of the rule
require a proof in individual cases.

it t i innovative olution, for exa ple, painter and


plasterers are protected from precipitation and can per-
for t eir or regardle of t e eat er t t e a e
LAYHER PROTECTIVE SYSTEMS
CATALOGUE
Edition 04.2015
Ref. No. 8121.253

ti e t e roofing en ure protection of t e fre a ony


Quality management
certified according
to ISO 9001:2008
by German TÜV-CERT

More solutions for weather, environment


and pedestrian protection, please see the
catalogue Protective System.
Railing clamp

Railing clamp 3 Railing clamp


ccording to er an regulation relating to
construction work, a fall protection system must be
provided for work areas and walkways on roofs and 3 4
intermediate levels where the height of the fall is more
t an e ay er railing cla p ati fie t e e
re uire ent for ecuring concrete oor la or fa cia Installation
of 16 33 c in eig t and at roof on oor la
BAU/TB.......1)

The brick guard must be built in accordance with Sicherheit geprüft


tested safety
applicable regulations. The bay widths can be freely
elected, ax 3 7 long e guardrail standard 4 is
attached to the railing clamp and receives the guardrail.
en in talling on oor la , toe oard u t e Installation
provided; these can be omitted in installation on fascias. on fascia

34
Pos. Description Dimensions Weight PU Ref. No.
L/H x W [m] approx. [kg] [pcs.]

1 Weather protection support 2.00 13.2 100 1746.000 W


On the outside, tilting pins for suspension of the
tarpaulin, at the top there are two guardrail wedge
housings for bracing using guardrails

2 Tarpaulin for temporary intermediate roof


7 x 73 7x16 4.5 5990.207 P
7 x 73 7x16 5.6 5990.257 W
3 7 x 73 3 7x16 6.7 5990.307 W
7x1 2.07 x 1.95 4.7 5991.207 P
7x1 2.57 x 1.95 5.9 5991.257 W
3 7x1 3.07 x 1.95 7.0 5991.307 W

Pos. Description Dimensions Weight PU Ref. No.


L/H x W [m] approx. [kg] [pcs.]

3 Railing clamp 0.58 7.0 50 4015.100 W

4 Guardrail standard 0.88 4.7 50 4015.101 W

xa ple for u e of t e railing cla p on oor la xa ple for u e of t e railing cla p on fa cia

WS = wrench size PU = packaging unit W = available ex works P = delivery time on request V = only available in this packaging unit Z = the approval process is not yet completed
IND = Layher Individual possible – see page 6
35
Accessories

Scaffolding couplers 1/2 connections, in steel, Accessories


drop forged a per I 7 and general uilding
aut ority approval fro t e I t er an ivil nginee-
ring In titute ig tening tor ue of collar nut 1a + b 2a + b

Standardised scaffolding tubes 3 in steel (hot-dip


galvanized) or aluminium permit, in conjunction with
caffolding coupler , pecial a e ly and exten ion
outside the regular version.

For right-angled For connection at


connection of tubes with any angle of tubes with
dia. 48.30 mm dia. 48.30 mm

Tools

Identification and pro i ition ign for or caffolding Tools


a per I 1 811 1 Suita le see-through pocket 9
made of transparent plastic for weather protection.
The three-piece scaffolding identification pad 6 with 4 5
carbon copy developed to tag work scaffolding. The right
part i t e in pection record for your file our client get
the carbon. On the back side of the carbon, important
application notes are listed.

7 6
Kennzeichnung und Freigabe Prüfprotokoll
für Gerüste DIN EN 12811/ DIN 4420 nach §10/ §11 BetrSichV
Gerüstersteller: befähigte Person beim Aufbau: In Ordnung?
Gerüst-Nr.: ____________________________
(ggf. mit Stempel) Aufbauzeitraum: Ja Nein nicht zu-
befähigte Person zur Prüfung: treffend
Telefonnummer: Prüfungszeitraum: Gerüstbauteile augenscheinlich unbeschädigt   
Maße – Belagbohlen, Rohrwanddicke   
Erstellungsort: Auftraggeber: Kennzeichnung – Rohre, Kupplungen, Bauteile   
Standsicherheit Tragfähigkeit des Untergrunds   
Fußspindeln – Auszugslänge, Auflagerung   
Verstrebungen/Diagonalen (mindestens 1 pro 5
Gerüst-Nr.: Telefonnummer: Felder in jeder Achse), Längsriegel   
Gitterträger – Druckgurtaussteifung, Auflagerung   
Gerüstart: Verankerungen – Anzahl, Ankergrund, Ankerraster,
 Arbeitsgerüst nach EN 12811  Fassadengerüst  Raumgerüst  Schutzdach Abstand, Prüfung   
 Schutzgerüst nach DIN 4420  Fanggerüst  Dachfanggerüst
 Sondergerüst: __________  Treppenturm  Fahrgerüst Beläge Gerüstlagen – voll ausgelegt oder Horizontalaussteifung   
Gerüstbohlen – Querschnitt, Auflagerung   
Bekleidung:  Keine  Planen Netze _______________ Abhubsicherung – bei auftretenden Abhubkräften   
Eckausbildung – in voller Breite, Seitenschutz   
Lastklasse:  2 (150 kg/m²)  3 (200 kg/m²)  4 (300 kg/m²)  ___ (______kg/m²) Arbeits und dreiteiliger Seitenschutz – Stirnseitenschutz   
Die Summe der Verkehrslasten aller übereinanderliegenden Gerüstlagen in einem Gerüstfeld darf Betriebs- Öffnungen – Spalte geschlossen, volle Breitenklasse   
den vorgenannten Wert nicht überschreiten. sicherheit Aufstiege, Zugänge – Anzahl, Eignung, Höhe (Leitern < 5 m),   
Verkehrssicherung – Beleuchtung, Absperrung   
Breitenklasse:  W06  W09  W_____  SW_____ Konsolen, Auskragungen – Abstrebung, Verankerung   
freistehende Türme – Breite zu Höhe, Ballast   
Nutzungsbeschränkungen (Hinweise für den Nutzer siehe Rückseite) : Abstand Bauwerk und Belag – innenliegender Seitenschutz   
______________________________________________________________ Schutzwand im Dachfanggerüst   
______________________________________________________________ Fahrgerüste Fahrrollen, Belastung, Untergrund, Ballast, Verbreiterung   
Kennzeichnung nicht fertiger Bereich abgegrenzt und gekennzeichnet   
Eigenmächtige Änderungen am Gerüst sind ohne vorige Rücksprache mit dem Kennzeichnungsschild an den Zugängen   
Gerüstersteller untersagt! Die Anweisungen der Aufbau- und Verwendungsanleitung
sind sorgfältig zu befolgen!
Konstruktion:  Regelausführung  Typenprüfung  AuV  Einzelnachweis/Montageplan
Geprüft und freigegeben Bemerkungen, Hinweise:
befähigte Person des Gerüsterstellers: befähigte Person des Nutzers: _____________________________________________________________
_____________________________________________________________
Datum, Unterschrift Datum, Unterschrift
Geprüft und freigegeben
09/2010

Wilhelm Layher GmbH & Co. KG befähigte Person des Gerüsterstellers: befähigte Person des Nutzers:
Gerüste Tribünen Leitern
Ochsenbacher Straße 56
6344.500

Datum, Unterschrift Datum, Unterschrift


D-74363 Güglingen-Eibensbach

8 9

Zutritt verboten
Wilhelm Layher GmbH & Co. KG Postfach 40
Gerüste Tribünen Leitern D-74361 Güglingen-Eibensbach
Telefon (0 71 35) 70-0
Ochsenbacher Straße 56 Telefax (0 71 35) 70-2 65
D-74363 Güglingen-Eibensbach E-Mail: info@layher.com
www.layher.com

36
Pos. Description Dimensions Weight PU Ref. No.
L/H x W [m] approx. [kg] [pcs.]

1a Double coupler 19 WS 1.3 25 4700.019


la , 7 1 3
quality-monitored, for use in class B and BB 22 WS 1.3 25 4700.022
on steel and aluminium tube
1b Double coupler with coarse thread Z 19 WS 1.3 25 4777.019
e cription a o 1a
22 WS 1.3 25 4777.022

2a Swivel coupler 19 WS 1.5 25 4702.019


la , 7 1 S 3 ,
quality-monitored, for use in class B on steel and aluminium tube 22 WS 1.5 25 4702.022

2b Swivel coupler with coarse thread Z 19 WS 1.5 25 4778.019


e cription a o a
22 WS 1.5 25 4778.022

3 Scaffolding tube, steel, hot-dip galvanized 1.00 4.5 61 4600.100


Scaffolding tu e dia 8 3 x , a per I 2.00 9.0 61 4600.200
3.00 13.5 61 4600.300
4.00 16.7 61 4600.400
5.00 22.7 61 4600.500
6.00 25.0 61 4600.600

Pos. Description Dimensions Weight PU Ref. No.


L/H x W [m] approx. [kg] [pcs.]

4 Ratchet spanner 19 WS 0.32 0.7 4740.019


with reinforced head
22 WS 0.32 0.7 4740.022

5 Magnetic spirit level 0.4 4006.666

6 Scaffolding identification pad I 0.5 6344.500 W


Pad with 50 + 50 pieces (Original + Carbon)
with centre perforation and foldover as carbon-block

7 Scabbling pick, 600 g, with steel tube handle 0.32 0.9 4421.050 W
and rubber safety grip

8 Prohibition sign 18 x 1 0.2 20 v 6344.201

9 See-through pocket x 16 0.1 10 v 6344.001


for ef o 63 1 and 63

WS = wrench size PU = packaging unit W = available ex works P = delivery time on request V = only available in this packaging unit Z = the approval process is not yet completed
IND = Layher Individual possible – see page 6
37
Fall protection

ccording to er an regulation , e uip ent to Fall protection


prevent falls by personnel must be provided for work areas
and al ay ere t e eig t of t e fall i ore t an
1 3 2
The PSA-safety harness AX 60 C 1 has impressive features:
2 Comfortable, padded and ergonomic back support
2 Convenient tool holders and click-locks for easy fastening
2 High operational dependability and absolute freedom
from maintenance, plus very simple fastening
2 Operating errors are not possible, as the equipment
operates in any position
2 xcellent running even under gruelling or ing
conditions
2 Enormous distribution of forces in the event of a fall.
4 5
Before use, visual checks must be performed regularly to
ensure correct working order. In accordance with German
1 8 regulation , all per onal afety e uip ent u t
e in pected at lea t once a year y an expert e
axi u per i i le period of u e for t e e uip ent 7
u t not e exceeded

The advance guardrail post 4/5, the advance


telescopic guardrail 1.57/2.07 m, the advance
telescopic guardrail 2.57/3.07 m 6 and the End-AGS 7
are used for temporary protection against falls during
assembly of scaffolding parts on the uppermost,
unsecured scaffolding level.

Extension lengths
Article L min. L max. 6
e ly guardrail 1.57/2.07 m 1.57 m 2.90 m
e ly guardrail 2.57/3.07 m 2.20 m 3.70 m

Scaffolding pallets

Tube pallets Scaffolding pallets


in square shape (85) or in rectangular shape (125). The
pallets are open on all sides. Tubes, standards, guardrails,
diagonal braces, toe boards are transported and stored 8 10
with this pallet. The empty pallets, stored permanently in
the base frame using pallet posts, can be transported
and stored in a space-saving way.
9
Tube pallet 125 11
e follo ing can e tran ported, for exa ple
13 Frames, 0.73 m or 11 Robust decks 0.61 m or 11 12
15 Stalu decks 0.61 m or 24 Steel decks 0.32 m.
80 cm
120 cm 71 cm
Modular pallet and skeleton box 13/14 71 cm
e palette or t e eleton ox can e tac ed it uro 80 cm
80 cm

pallets. Crane eyelets at top; an opening allows stacked


material to be removed even if several pallets are stacked
one above the other. The integrated timber base plate is
3 t ic and it nailed onto x uare timbers.

14 13
LAYHER SCAFFOLDING ACCESSORIES
CATALOGUE
Edition 04.2015
Ref. No. 8103.254

Quality management
certified according
to ISO 9001:2008
by German TÜV-CERT

ore pallet you ll find in t e


catalogue Scaffolding Accessories.

38
Pos. Description Dimensions Weight PU Ref. No.
L/H x W [m] approx. [kg] [pcs.]

1 PSA-safety harness AX 60 C with extension, 0.50 m 1.8 5969.160 P


confor 361

2 PSA-Flex safety rope, 2.00 m 2.00 m 1.1 5969.501 W


with fall arrester and snap hook FS 90;
a per 3 3
self-shortening to reduce tripping hazards

3 PSA scaffolding construction set 3.5 5969.170 W


Pos. 1 and 2
safety harness, safety rope 2.00 m, backpack
e only in caffolding con truction
4 Advance guardrail post 4.2 50 4031.001 W
lu iniu
for one advance guardrail (1.00 m high);
rapid attachment of guardrails with tilting pins
5 Advance guardrail post 4.3 50 4031.002 W
lu iniu
for two advance guardrails (0.50 m and 1.00 m high);
rapid attachment of guardrails with tilting pins

6 Assembly guardrail, 1.57 / 2.07 m, lu iniu 1.70 3.2 50 4031.207 W


Assembly guardrail, 2.57 / 3.07 m, lu iniu 2.30 4.0 50 4031.307 W
7 Advance guardrail system (AGS) x 7 9.8 6 4031.000 W
for scaffolding end
lu iniu , ingle part

Pos. Description Dimensions Weight PU Ref. No.


L/H x W [m] approx. [kg] [pcs.]

8 Assembly frame pin pallet


0.73 m 1 x 77 34.0 10 5113.073
1.09 m 1 x 1 13 36.2 10 5113.109 W
9 Retaining rod 1.20 2.1 5113.120
10 Retaining bar 1.12 3.1 5110.112

11 Tube pallet 125 1 37 x 7 35.0 10 5105.125


Steel, hot-dip galvanized, length of pallet posts: 0.86 m,
load 1500 kg

12 Tube pallet 85 7x 7 30.8 10 5105.085


Steel, hot-dip galvanized, length of pallet posts: 0.86 m,
load 1500 kg

13 Modular pallet 1 6 x 86 45.0 5 5101.061 W


Steel, hot-dip galvanized,
fill eig t 7 ,
load g, external di en ion 1 6 x 86

14 Modular skeleton box 1 6 x 86 85.8 5113.002


Steel, hot-dip galvanized,
fill eig t at front 3 , fill eig t at rear 7 ,
load g, external di en ion 1 6 x 86
con i ting of 113 odular eleton ox and 6 1 ti er a e plate
WS = wrench size PU = packaging unit W = available ex works P = delivery time on request V = only available in this packaging unit Z = the approval process is not yet completed
IND = Layher Individual possible – see page 6
39
Index

A Double end guardrail 18 Guardrail closure 26


0.73 m 19 Guardrail closure, top 26
Access deck 16
1.09 m 19
Access ladder 17 Guardrail coupler 18
Double guardrail 18, 26 with box 19
T15 17
aluminium 19
Accessories 32, 36 Guardrail standard 34, 35
steel 19
Adjustable guardrail 18 Guardrail wedge housing cover 31
Adjustment frames 12 Gusset coupler 25
E
Advance guardrail post 38, 39 End-AGS 38
Advance guardrail system (AGS) 39 End guardrail 18
H
Advance telescopic guardrail Half-coupler with toe board pin 20, 21
End toe board 21
1.57/2.07 m 38 Hatch-type access with offset hatch 16
2.57/3.07 m 38 ETICS hanger bolt 25
Allround ledger 24 ETICS-tie 24
600 25 I
Aluminium bridging ledger 32 600 complete 25 Individual toe board 20
2.57 m 33 800 25
3.07 m 33 Initial stairway guardrail 29
800 complete 25
Aluminium platform stair 28 Intermediate transom
ETICS-tie rod 0.73 m 33
Anchoring 24 380 25 1.09 m 33
Assembly frame 12 480 25 for lattice beam 31
Assembly frame pin pallet 12, 13, 39 Euro assembly frame 12, 24, 26 Internal guardrail 29
2.00 m, for balustrade 30, 31 T12 29
Assembly frames for special applications 30
2.00 x 0.36 m 30, 31
Assembly guardrail aluminium 13 Internal guardrail fixing device 18
1.57/2.07 m 39 steel 13 Internal scaffolding access 16
2.57/3.07 m 39 2 guardrail wedge housings 13
3 guardrail wedge housings 13
L
B Euro assembly frame LW
Lattice beam coupler 30, 31
Base ledger 21 steel 13
2 guardrail wedge housings 13 LayPLAN SpeedyScaf system 11
Base plate 10
4 guardrail wedge housings 13 Lock against lift-off 22, 23
60 11
80, reinforced 11 Euro eaves bracket Locking pin 17, 26, 32, 33
150, reinforced 11 1.00 m 30, 31 Lock nut 25
Bracket 22 Euro guardrail post 26, 27
Brick guard support 26 Euro intermediate frame 26 M
aluminium, without spigot
0.73 m 27 Magnetic spirit level 37
C steel Mobile beam with bar 33
Cap 25 0.73 m 27 Modular pallet 38, 39
1.09 m 27
Castor 32 Modular skeleton box 38, 39
700 33 Euro top end frame 26
Modular stairway 28
aluminium, without spigot
Comfort stairway 28
0.73 m 27
Connecting clamp for Stalu deck 14, 15 steel O
Console bracket 22 0.73 m 27 Open ended wrench 25
0.22 m 22, 23 1.09 m 27
0.36 m 22, 23 Outer landing-type stairway access 28
Extension lengths 38
0.50 m 22, 23
External scaffolding access 16
0.73 m 22, 23 P
0.73 m, reinforced 22, 23
Pedestrian protection 26
0.73 m, swivelling 22, 23 F
1.09 m 22, 23 Peg extraction device 25
Fall protection 38
Corner deck, adjustable 16, 17 Peg solid 25
Fan support 26, 27
Plastic pipe 25
D Plastic wall insert 25
G Plug-in console bracket
Deck, 0.61 m 22
Gantry frame 12 0.22 m 22, 23
Diagonal brace 20 0.36 m 22, 23
Gantry frame LW 30, 31
with 2 half-couplers 21
with wedge half-coupler 21 Gap covers 16 Prohibition sign 37
Diagonal bracing 20 Gap deck 16 Protection net
Guardrail, adjustable 19 without quick belt 27
Double coupler 24, 37 with quick belt 27
with coarse thread 37 Guardrail box for Euro frame 18, 19

40
PSA-Flex safety rope 39 Stair head section U-stalu deck 14
PSA-safety harness AX 60 C 38, 39 0.60 m 29 U-stalu deck T9
0.95 m 29 0.19 m wide 15
PSA scaffolding construction set 39
Stair middle section 0.32 m wide 15
0.60 m 29 0.61 m wide 15
Q 0.95 m 29 U-starting stairway
Quick belt 27 Stairway access 28 aluminium
Stairway-guardrail post 29 0.64 m wide 29
R Stairwell guardrail 29 U-start ledgers 16
Railing clamp 34, 35 Standard brick guard 26 U-steel deck, 0.19 m wide 15
Ratchet spanner 37 Starter U-transom 28, 29 U-steel deck T4, 0.32 m wide 15
Reducer 32, 33 Steel bolt, self-securing 17 U-Xtra-N deck 14
0.61 m wide 15, 17
Retaining bar 13, 39 Steel-gap cover, 0.32 m wide 17
Retaining rod 13, 39 Steel lattice beam
Ring screw 25 450 31 W
system free 30 Wall tie 24, 25
Roofer’s guard system 26
Steel plank 16 Weather protection 34
Roof tarpaulin 34
0.20 m 17 Weather protection support 34, 35
0.30 m 17
Wedge spindle swivel coupler 11
S Steel tube, 33.70 mm 15
Scabbling pick 37 Swivel coupler 37
Scaffolding access, outside 28 with coarse thread 37
Scaffolding couplers 36 Swivelling base plate 60, reinforced 11
Scaffolding deck 14 System lattice beam 30
Scaffolding identification pad 36, 37
Scaffolding pallet 12, 38 T
Scaffolding plank 11 Tarpaulin for temporary intermediate roof 35
Scaffolding tube 36, 37 Telescopic gap deck 16, 28
Section brace 21, 22, 23 Telescopic stabilizer, steel 25
Securing screw 17 Telescopic U-gap deck 17
See-through pocket 36, 37 Temporary intermediate roof 34
Side protection 18, 20 Toe board 20, 21
Side protection net 26 Tools 36
Single end guardrail Tube pallet 38
0.73 m 19 85 39
1.09 m 19 125 38, 39
Single guardrail 18, 19
Software for scaffolding construction 10 U
Speedy Internal guardrail fixing device U-alu deck, perforated, 0.32 m wide 15
without toe board pin 19 U-aluminium access deck, 0.61 m wide 17
with toe board pin 19
U-aluminium hatch-type access deck 17
SpeedyScaf corner plate coupler 24
U-comfort stairway
SpeedyScaf lattice beam aluminium
aluminium 31 0.64 m wide 29
LW 30
U-distance coupler 28, 29
SpeedyScaf lattice beam LW
steel 31 U-hatch-type steel access deck, 0.64 m wide 17
SpeedyScaf roof guard 27 U-ledger for lattice beam 31
SpeedyScaf roof guard support U-platform stairway
0.36/0.50/0.73 m 27 aluminium
1.09 m 27 0.64 m wide 29
SpeedyScaf transom 16, 32 U-robust deck
0.32 m wide 15
SpeedyScaf wall tie 24, 25 0.61 m wide 15
Spigot 32, 33 U-robust hatch-type access
adjustable 33 0.61 m, hatch offset 17
Stair foot section U-robust hatch-type access deck
0.60 m 29 0.61 m wide 17
0.95 m 29
U-stairway stringer 500 29
Stair guardrail 29

41
Notes

42
43
Layher is your dependable partner roxi ity to t e cu to er i a central factor e ind ay er ucce geograp ically pea-
it ore t an 7 year of experience king too. Wherever our customers need us, we will be there – with our advice, assistance and
”Made by Layher“ always means ”Made solutions.
in Germany“ too – and that goes for the
entire product range. Superb quality –
and all from one source.

SpeedyScaf

Allround Scaffolding

Accessories

Protective Systems

ead arter in i en ac
Shoring

Event Systems

Rolling Towers

Ladders

Plant 2 in Gueglingen
1
dition

Wilhelm Layher GmbH & Co. KG o t ox


Scaffolding Grandstands Ladders 74361 Gueglingen-Eibensbach
Germany
Ochsenbacher Strasse 56 Telephone +49 (0) 71 35 70-0
6

74363 Gueglingen-Eibensbach elefax 71 3 7 6


o 81

Germany ail export lay er co


www.layher.com
ef

You might also like