With the emergence and growing importance of scaffolding, IMS Ltd have a service association
with renowned Scaffolding brand Reliance Scaffolding PVt. Ltd. They have proven expertise in the
manufacturing of Steel Scaffolding & Form Work System with a widest possible combination for
Building and Construction Industries. It has excelled itself in the field of manufacturing quality
Scaffolding for years.
Our range of scaffolding implements are niche, inch perfect and precise, and are designed keeping the
real world experience of construction in mind. We have unparalleled access to raw materials and our
specially selected team possess the expertise and experience to create and deliver high quality end
scaffolding products.
                                     Why you use Scaffolding?
Scaffolding is a convenient and      Scaffolding are easy to handle     Its Environment friendly
Efficient alternative of bamboo.     and can be easily reused          and safer than alternatives.
Our main motto is to provide superior quality and safe scaffolding products and form works
materials as well. The team of experts of company maintain strict vigil on the entire total process
to ensure that products of high quality reaches our esteemed customers.
We have the capability to meet the challenges of the modern day construction by designing and
developing products as per client's specifications. We assure high standards of quality, pricing,
delivery and qualitative customer services.
International Standards Scaffold
Our scaffolding is fully compliant with the following International Standards:
The success of any construction project depends on how closely you stick to planned time schedules &
cost estimates. This enables everyone to draw on the resources of a well-spread service Organization
& a wide manufacturing base.
Our policy of constant improvement has brought us into dealing with the most reputed customers
in the International Market getting International acceptability & achieving mark of excellence.
                 BS 1139                                          BS EN 74-1:2005
                 BS EN 39:2001                                    SANS 10085
                 BS EN 10219                                      AS 1576
                 BS EN 12810-1:2003                               AS 1577
                 BS EN 12810-2:2003                               AS 3610
                 BS EN 12811-1:2003                               GS 217:1994
                 BS EN 12811-2:2004 & BS EN 12811-3:2002          GI 8.001
                 BS EN 12812:2004                                 OSHA 1910.28
                 BS EN 12813:2004 & BS EN 1065:1999               ANSI A10.8
R-lock System
R-Lock is a proven multi purpose Scaffolding Systems which can be used for all forms of access and
support structure in the Building & Constructions Industries.
Single node point action of unique locking makes “R-Lock” a fast versatile & optimized system of
Scaffolding for Construction, Demolition & Maintenance Projects throughout the world.
Highlights
   Fastest & easily erectable
   Easily stored
   Highly resistant to damage
   Most versatile
   Low maintenance
   Safety with proven track record
1.	R-Lock Standard
   Manufactured from 48.3mm O.D tube welded at 500mm Intervals. The top cups are made from
   malleable castings which provide firm grip to ledger blades castings to endure rough site handling,
   and welded bottom cups are pressed from high quality steel. Access standards are provided with
   integral 150mm long spigots for making
   easy vertical connection.
    sizes Available 3.0m, 2.5m, 2.3m, 2.0m, 1.8m, 1.5m, 1.3m, 1m, .8m
2.	R-Lock Ledger
   Manufactured out of 48.3mm O.D tubes having identical forged blades at the ends with minimum
   of projection, each component locates in the cup joints on the vertical.
   Minimum projection of Blades avoids
   damages in handling and uniform
   dimension makes the cup joint rights.
    sizes Available .6m, .9m, 1.0m, 1.2m, 1.25m, 1.3m, 1.5m, 1.6m, 1.8m, 2.0 m, 2.5 m
3.	R-Lock Transom
   R-Lock transom is used to provide a firm support
   for steel battens. It is back to back angle which
   provides strong support for working platforms.
    sizes Available 0.9mm, 1.3mm, 1.8mm, 2.5mm
4.	R-Lock Hop-up Brackets
   Hop-up Brackets are specially designed section for placing battens
   with the provision of forged blades to be fitted with Cuplock
   Standard by cup joint. Hop-up brackets are available for single
   board, 2 boards & 3 board allocations.
R-lock
5.	Longitudinal (face) Bracing
  Face braces are with Swivel Blades at either ends
  which locate in the cup joints for various sizes. They
  should be longitudinally braced in at least one bay
  to its full height in each 20m.
                                    6. Steel Battens
                                        They are light weight non slip working surface, which can
                                        be used with Transom. They form stable & robust working
                                        platforms and are available in different sizes.
7.	R-Lock Intermediate transoms
  They are available for use with Hop-up Brackets where distances
  between standards exceeds the minimum permitted span of the
  Scaffold Boards.
   sizes Available 1.2m, 1.3m, 1.8m & 2.5m
                                                     8. Inside Board              Transoms          (one
                                                        Board)
                                                           These are used where facility for a single
                                                           Inside Board Platform is required. When
                                                           using Scaffold Boards, the inside based
                                                           transom is utilised. It spans across the ledgers
                                                           for a midbay support. The unit is similar in
                                                           operations to Intermediate Transom.
9.	R-Lock Bridging Horizontals
  These are used in access scaffolds to allow
  vehicles entrance at the base of the scaffold
  or to span over areas where a strong base
  cannot be found.
  These components are used to provide a
  working platform complete with necessary
  guardrails and must be provided at every
  working level.                                                         sizes Available 5m, 7.5m
R-lock
Cantilever Frames
These are used for supporting Decking or Formwork at the edges of slabs.
The frames have blade ends for locating in the cup joint & can accept jacks
in 3 positions. This is suitable for beams or panels of 1.2m, 1.25m or 1.3m.
sizes Available 1m, 1.5m
                        Beam Bracket
                        Eliminates full height support to Beam Formwork by locating on to slab support
                        vehicles as shoven accepts Standard jacks & forkheads. It has a safe working
                        load of 1500 kg.
                         sizes Available 1m, 1.5m
R-Lock Accessories
1.	Fixed ForkHead                                    4.	Universal Jack
   For use with timber                                  The screw jacks provides
   support.    They     are                             a method of jacking
   designed for use with                                which can be used at
   single /double timbers.                              either top or bottom of
                                                        a Scaffold Structure.
                                                        It’s used in conjunction
                                                        with     Forkheads     &
                                                        Drop head adaptors.
                                                        It’s manufactured from
                   2.	Loose spigot                      38mm outside Diameter
                       When necessary, verticals        tube.
                       are connected end to end
                       by an interval spigot.                             5.	Adjustable          base
                       This is lined to the lower                            Jack
                       vertical with the help of
                                                                               This well proven prop
                       Spigot Pins.
                                                                               type-zinc         plated,
3.	Adaptor                                                                     adjustable base jack,
                                                                               is a base component &
   Drophead adaptor units
                                                                               provides a full 500mm
   provide for an easy
                                                                               of cease fine adjustment,
   conversion of dropheads
                                                                               thereby covering the
   from the waffle & trough/
                                                                               entire range between
   metriform support systems
                                                                               cup joints on verticals.
   for use with Cup lock.
Metriform System
Deck Beam                                              Infill Beams
Includes 100mm wide top flange which                   These are used to provide skeletal support for
eliminates the necessity for a plywood infill, so      plywood dealing.
cutting downs maintenance cost.
Dropheads
The quick action drophead supplied complete
with nuts and bolts is designed to fit on standard
props or adaptors for Cuplocks scaffolding. They
allowpanels and beams to be struck and re-used
after only 3n or 4 days, leaving the support in
position for the remaindar of the curing period
of the concrete slab. The primary head remains
in contact with the concrete whilst the secondary
head and its supporting wedge are realeased by
a single hammer blow. The height of the drophead
is 214mm and the striking distance allows the
beams and panels to drop only 115mm for hte their safe removal a marked
improvement in terms of speed and safety compared with other systems.
The drophead has a load carrying capacity of 40kN. Special care has been
taken to ensure that beams cannot be accidentally dslodged once located
with the drophead primed.Fo
                            Floor Form / Slab Form
                            Manufactured out of 14 gauge sheets with pressed flanges and stiffener.
                            Available in standard sizes of 1150x600, 900x600, 1150x300,
                            900x300mm. Other sizes available on request Floor/Slab Form adjusters
                            eliminates use of cut pieces of timber, as these can fill up odd shapes of
                            slab.
                           sizes Available 1150 X 600, 900 X 600      Fillers: 1150 X 400, 900 X 400
Props
Props are re-usable products made from very high
quality material. Their telescopic function allows
for speedy erection & stripping without tools.
 Description	Mass	Length
                             (KG)  (MM)
 Standard Prop
 No. 0 Prop Inner             4,63 1003
 No. 1 Prop Inner             7,17 1676
 No. 2 Prop Inner             8,03 1905
 No. 3 Prop Inner            10,29 2514
 No. 4 Prop Inner            12,56 3124
 No. 1 Beam Head Prop Inner   9,23 1676
 No. 2 Beam Head Prop Inner 10,09  1905
 No. 3 Beam Head Prop Inner     12 2514
 No. 4 Beam Head Prop Inner 14,62  3124
 No. 0 Prop Other (Base)      8,42 1067
 No. 1,2&3 Prop Other (Base) 12,66 1676
 No. 4 Prop Other (Base)     14,55 1981
Note:
   Table is based on props being erected vertically and loaded axially.
   Any deviation will result in a reduction of carrying capacity.
   Props should be laced in both directions with scaffold tube.
   Lacing should be tied to the permanent structure or braced to improve the overall stability of the false work.
 Size	Adjustment	Mass (KG) Safe Working Load (KN)
	Closed	Open        STD	Closed	Extended
NO. 0 1067mm 1829mm  13       35            35
NO. 1 1676mm 3124mm  20       35            19
NO. 2 1981mm 3352mm  21       35            16
NO. 3 2590mm 3962mm  23       25            12
NO. 4 3200mm 4876mm  27       25             9
Props
Accesories used with props
 Description	Mass (KG)
 Prop Spigot “ U” Head 1,01
Used to carry single timber bearers or box floor centres. Spigot
fits into head of prop
                                                                 Description	Mass (KG)
                                                                 Prop Spigot ”J” Head 1,01
                                         Used to carry single timber bearers. Flanges stepped to facilitate
                                         nailing of timber bearers. Spigot fits into head of prop.
Tubes and Fittings
Reliance tubes & fittings includes a comprehensive range of components which are strong, safe and
economical & which are ideally suited for wide application in Building Construction & Maintenance
Industry. Tubes & Fitting are widely used for supporting man & materials, tools & tackles during
Construction, Alteration, Demolition because of their following main advantages.
    Ease & speed in erection & dismantling
    Scopes for multiple & varied re-use (life & flexibility in use)
    Rigidity & stability during erection.
    Ease in storing & maintenance.
Double Coupler                          swivel Coupler                               Forged double Coupler
Used for connecting scaffold tube at    This type of couple is used for connecting   A coupler having captive ‘T’ bolts used
right angle to each other for 40 X 40   two tubes at any angle available for 40      for connecting two scaffold tubes 40 X
NB and 40 X 50 NB tube.                 X 40 NB and 40 X 50 mm NB pipe.              40 mm NB at right angle.
Tubes and Fittings
Forged swivel Coupler                       Putlog Coupler                             Sleeve Coupler
A coupler incorporating captive ‘T’ bolts   A coupler to complement the double         Sleeve coupler for axial connection of
for connecting two scaffold tubes 40 X 40   coupler for two horizontal tubes at        two tubes that are subject to bending
mm NB at any angle for diagonal bracing.    right angle 40 X 40 mm NB.                 or axial tension 40 X 40 mm NB.
Girder Coupler                              Single Coupler                             Joint pin
For fast secure coupling of tube to ‘I’     Enables scaffold tubes to be connected     Joint pin is used internally for connecting
beam.                                       to a permanent fixture.                    two tubes end to end 40 X 40 mm NB.
Fencing Coupler                             roofing Coupler                            Stair tread Bkt.
As strong, high quality coupler designed    Designed for ‘Hole-Free’ rapid             Designed with integral swivel coupling
to secure metal fencing panel upright       clamping of scaffold tube above &          for quick fixing of stair tread.
together.                                   below corrugated sheet.
Ladder Clamp                                                              Supa tie
Clamps the horizontal resting point.                                      Designed to secure scaffold tubes running parallel.
Tubes and Fittings
Scaffold Tubes                                        Scaffold Tubes - Specifications
Steel Scaffold tubes are 40mm N.B.        N.N. & Series    Wall Thickness   Outside Dia.    Nominal Wt.
Mild Steel Continuous weld conforming         mm                mm             mm            Black Tubes
                                                                                           Plain End Kg/m
to IS:1239 or 1161, Grade YST 210 &
                                               20L              2.35           26.90            1.42
240, BS : 1139, 1175. Grade 40-C &              M               2.65                            1.58
50-C. Supplied in random lengths of 4.5         H               3.25                            1.90
                                               25L              2.65            33.7            2.04
to 6 M.                                         M               3.25                            2.46
                                                H               4.06                            2.99
                                               32L              2.65           42.40            2.61
                                                M               3.25                            3.15
                                                H               4.05                            3.86
                                               40L              2.90           48.30            3.27
                                                M               3.25                            3.61
                                                H               4.06                            4.43
                                              50L1              2.90           60.30            4.14
                                              50L2              3.25                            4.67
                                                M               3.65                            5.10
                                                H               4.50                            6.17
Accessories
    unit beam                Ladder beam                  board Clamp                  wooden boards
Tips on scaffold safety
                       BEGiN WItH GOOd                                     USE DOUBLE Guard
                       FooTiNG.                                            RAILs
                       Use base plates, sills, or                          and toe boards on
                       footers (or combination)                            exposed       sides at
                       on solid ground; make                               platform heights of 6
                       sure scaffold is levelled                           feet or more.
                       or plumbed.
                       Tie scaffold to                                     don’t CLIMB ON
                       building.                                           bRACES.
                       Scaffolding should be                               Use the steps provided on
                       tied to the structure,                              most all steel scaffolds to
                       using heavy wire or tie-in                          climb up to or down from
                       device, every 25 feet or                            work levels. Use scaffold
                       less of rise, and every 30                          climbing ladders where
                       feet of length.                                     required.
                       DON’t OVERLOAD                                      DON’T RIDE ON
                       SCAFFOLDING.                                        MOVING SCAFFOLD
                       Follow the safe load                                and remember rolling
                       capacities as given by the                          scaffolding units are lim-
                       scaffold      manufacturer.                         ited in height to 4 times
                       There’s a limit even to what                        their narrowest base di-
                       steel can support. A 4-to-l                         mension (unless base is
                       safety factor must be                               widened by outriggers,
                       figured on scaffolding.                             or more end frames; or
                                                                           tied into building.) Al-
                                                                           ways keep casters locked
USE Metal CATWALKS, PLATFORMS                                              (except to re-spot).
Where available. If wood plank is used, it must
be scaffold grade or better. Inspect thoroughly       PROTECT WORKING LEVELS.
before every job to make sure it is free from         Use overhead canopies to protect workers on
breaks, knots, cracks or warpage. Decking should      lower work levels when work is being done
be full width.                                        overhead. Rope off unsafe areas underneath
                                                      scaffold or provide wire mesh around work
INSPECT AND CHECK                                     area.
Take no chances. Inspect the scaffold set up after
erection, and daily while in use. Don’t remove,          Wear Safety Helmet
or allow removal, of any parts without OK from           Wear gloves
proper authorities. When wire rope is used,              Wear protective footwear
inspect it on each job.                                  More than one person required for assembly