0% found this document useful (0 votes)
915 views2 pages

Transformer - Inspection Checklist

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
915 views2 pages

Transformer - Inspection Checklist

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

TRANSFORMER INSPECTION REPORT

Tag Number : Date of Check :


Manufacture : Report ID :
Serial Number : Report No. :
Capacity / Phase : Type of Cooling :
Rated Voltage / Freq. : Auxilary Equipment :
Weight : Weather :
Year of Manufature : Temperature :

No. Item to checked Condition Remarks


1 Corectness of rating on the nameplate [ ] Yes [ ] No [ ] N/A
2 Corectness of the installation on the area classification [ ] Yes [ ] No [ ] N/A
3 Transformer Base Skid [ ] Good [ ] No [ ] N/A
4 HV Bushing [ ] Good [ ] No [ ] N/A
5 LV Bushing [ ] Good [ ] No [ ] N/A
6 Bushing Sealed [ ] Good [ ] No [ ] N/A
7 Oil Level [ ] Good [ ] No [ ] N/A
8 Oil Leakage [ ] Good [ ] No [ ] N/A
9 Tank Cover [ ] Good [ ] No [ ] N/A
10 Painting / Overall [ ] Good [ ] No [ ] N/A
11 Oil Thermometer [ ] Good [ ] No [ ] N/A
12 Panel Radiator and Radiator Valve [ ] Good [ ] No [ ] N/A
13 Oil Drain Vlave [ ] Good [ ] No [ ] N/A
14 N2 Filling Valve [ ] Good [ ] No [ ] N/A
15 Correctness of the installation pipes & valves [ ] Yes [ ] No [ ] N/A
16 Corectness of the installation of Neutral CT [ ] Yes [ ] No [ ] N/A
17 Cable Connection secure and thight [ ] Yes [ ] No [ ] N/A
18 Plate of cable gland for magnetisation [ ] Yes [ ] No [ ] N/A
19 Terminal Control Box Sealed ( HV & LV Cable Box ) [ ] Yes [ ] No [ ] N/A
20 Bolt and Gasket [ ] Yes [ ] No [ ] N/A
21 Surge Arrester correctness of installation and operated properly [ ] Yes [ ] No [ ] N/A
22 Alarm and trip contact operated properly [ ] Yes [ ] No [ ] N/A
23 Pressure relief device tested and set properly [ ] Yes [ ] No [ ] N/A
24 Tap seting continuity check or test [ ] Good [ ] No [ ] N/A
25 Neutral connection bolted and clamped [ ] Good [ ] No [ ] N/A
26 Grounding continuity to the network check [ ] Good [ ] No [ ] N/A
27 Polarity check & Phase sequence [ ] Good [ ] No [ ] N/A
28 Insulation resistance meet the requirement [ ] Good [ ] No [ ] N/A
29 Transformer Turn Ratio test meet the requirement [ ] Good [ ] No [ ] N/A
30 High Voltage Test meet the requirement [ ] Good [ ] No [ ] N/A
31 Winding Resistance Test Primary side meet the requirement [ ] Good [ ] No [ ] N/A
32 Winding Resistance Test Secondary side meet the requirement [ ] Good [ ] No [ ] N/A
33 Dielectric strenght of the oil insulation [ ] Good [ ] No [ ] N/A

Test Report : □ Accepted □ Rejected / Reinspected □ With Note

Comments

Checked / Inspected by Reviewed / Approved by Acknowledge / Approved by

( ) ( ) ( )
TRANSFORMER INSPECTION REPORT

Tag Number : Date of Check :


Manufacture : Report ID :
Serial Number : Report No. :
Capacity / Phase : Type of Cooling :
Rated Voltage / Freq. : Auxilary Equipment :
Weight : Weather :
Year of Manufature : Temperature :

Photo :

You might also like