Manual Bomba PVX Eaton
Manual Bomba PVX Eaton
PFX/PVX
EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006 1
Contents
2 EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006
1. Spare parts Vickers - Hydrokraft
Repairs during the warranty period must be made Piston Pump
by EATON or authorized service stations only, Auftrag-Nr.
otherwise warranty claims will not be accepted. V
The CD-ROM „Hydrokraft Information“ V-PUPI-
TM005-E includes information on spare parts with
the number of the part and shows the availability of
the parts as a single part or as a subassembly. Sub-
assemblies are not available as single parts. Only
original spare parts should be used. All seals must
be replaced whenever an assembly is disassem-
bled. 350
20 .. 70 420
To ensure a fast response to inquiries and that the
correct spare parts are supplied, always provide the
model code, the part no. and the order no. as
shown on the name plate.
„Model code“ shows an abbreviated type code, in
which the last seven characters indicate a special
design. If it is not 0000-000, then this number must
always be provided to indicate the special design.
Example: P*XS-130-M-R-DF-0999-099
0999-099
For an explanation of the complete type code, see
the product brochure.
Name plate
Telephone contact:
+49 6081 103 0 (switchboard)
2. General points
General
The assembly manual assumes use of appropriate- Tighten all screws and screw plugs to the specified
ly trained technicians with specialized knowledge of torque (see Appendix A). Exceptions are specified
assembly and disassembly. in the text.
Assembly must be conducted in a clean environ- Grease O-rings and shaft sealing rings lightly with
ment. acid-free grease for easier installation and to hold
Dispose of leakage oil and oily cloths in an environ- the O-ring in place in its groove or cavity.
mentally responsible manner.
In addition to standard tools, the following tools are
Before assembly, carefully clean all parts and required:
blow out holes with compressed air. – Torque wrench 6-50 Nm, 40-200 Nm and
150-750 Nm.
Lock all bolts and straight pins in the housing with
Loctite, except for tension pins. Use Loctite The tapered sleeves required for ease of assembly
Type 222 or Type 274 for screws, and Loctite Type must be manufactured in house.
648 for straight pins and bolts. Follow the manufac-
turers directions at all times. Read the assembly manual for the axial piston
pumps and the associated controllers and actuators
thoroughly before starting work on the pumps. De-
pending on pump size some illustrations serve only
as examples.
EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006 3
3. Disassembly of the axial piston pumps
piston
3.1 General
Disassembly of axial piston pumps takes place in
reverse order to the assembly operations described
below. For variable pumps the link between control
piston and swashplate must be released first. See
Appendix D.
Press in two roll pins to fix the valve plate in place. Roll pin for
The roll pins must fit exactly with the valve plate or valve plate
be slightly below and never project above it.
Mounting for
the housing
Valve plate
4 EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006
4.1.4 Assembly/set
4.1.4 ting up the holding do
Assembly/setting wn device
down
Lubricate valve plate well. Set cylinder block on the
port plate with valve plate and lay the retaining
collar on the cylinder block.
Cylinder block
Valve plate
Retaining collar
EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006 5
Lubricate the guide disk in the fixed angle swashplate
well and firmly mount the fixed angle swashplate on the
piston shoe. The roll pins in the fixed angle swashplate
align with the holes in the retaining collar. Introduce
thefour bolts from below and furnish them with springs,
washers and nuts.Insert four bolts from below and fit
with springs, washers and nuts. Tighten nuts until the
washers touch the swashplate.
Locknut Counternut
6 EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006
Introduce the shaft in the cylinder block and port
plate to check the contact pressure of the piston
shoe against the guide disc. Screw bolt into the
rear of the shaft and determine the required torque
with a torque wrench to turn the cylinder block.
Apply the counter-torque using a screwed lever on
the fixed angle swashplate. The torque must be
read off for an evenly rotating shaft. If the values
according to the table are not reached then the set-
tings of the holding down device must be correc-
ted.
BREAKAWAY TORQUE
Size 66 90/130 180 250
Breakaway Torque 15-20 Nm 20-25 Nm 25-30 Nm 30-35 Nm
4.1.6 Shaf
4.1.6 Shaftt
Pull the cylinder roller bearing for the shaft with the
loose cam belonging to the bearing to the coupling Adjusting washer
side of the shaft against the collar of the shaft. For
pump size 250 an additional adjusting washer is
required. Lock the opposite side with a retaining
ring.
EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006 7
4.1.7 Housing assembly
Lay a flat gasket on the port plate. The cylinder
block with fixed angle swashplate stands in its
right position on the valve plate. Standing in the
right position means that the housing with the Hole for
unsymmetrically located straight pins for fixing indexing pin
purposes is congruent to the port plate. The hole
in the housing to receive the indexing pin now
determines the position oft he swashplate. The
slot in the fixed angle swashplate to receive the
indexing pin points towards the corresponding
hole in the housing.
Slot for
indexing pin
8 EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006
Lead the shaft with the splined shaft through the
housing into the cylinder block until this sits
against the spring pretension of the cylinder block.
Place the spacer ring in the outer race of the roller
bearing. If the shaft is seated properly then the
spring pretension is perceptible. The O-ring will lie
in the housing or in the corresponding groove in Spacer ring
the cover depending in the design of the cover.
Press shaft sealing ring into the cover all the way.
The spring-tensioned dust lip points to the hou-
sing. Lead cover with shaft seal over the shaft and
tighten diagonally. See appendix A for the tighte-
ning torque. Provide mounting screws with a
sealing ring.
A tapered sleeve pushed over the shaft simplifies
assembly and prevents possible damage of the lip
due to the shoulder on the shaft.
The O-ring for sealing will lie in the housing or the
cover has an appropriate groove for receiving the
O-ring depending in the design of the cover.
EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006 9
5. Assembly of variable basic pumps
5.1 Model sizes 66/90/130/180/250 Control piston
5.1.1 P
5.1.1 or
ortt plat
Por e
plate Control piston
Grind the inside of the port plate with a grinding sleeve
stone. Press in the control piston sleeve from outsi-
de all the way. Insert the control piston from the
inner side of the port plate into the control piston
sleeve.
Press in cylinder roller bearing to the stop.
Press in two roll pins to fix the valve plate in place.
The roll pins must fit exactly with the valve plate or
be slightly below, but never project above it. Port plate
Press in two straight pins to fix the housing in pla-
ce.
Roll pin
valve plate
5.1.2 Valv
5.1.2 e plat
alve e
plate
If the valve plate is guided over the roll pins, it
must not be under tension. It has a slight clearan-
ce against the roll pins.
Valve plate
10 EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006
5.1.3 Subassembly - sw
5.1.3 ashplate
swashplate
Hammer four roll pins into the swashplate.
The protrusion (see table) is dependent on
the model size of the pump.
PROTRUSION ROLL PINS
Size 66/90 130/180 250
Protrusion 13 mm 16 mm 23 mm Sliding disk
5.1.4 Assembly/set
5.1.4 ting up the holding do
Assembly/setting wn device
down
Lubricate valve plate well. Set cylinder block on the
port plate with valve plate and lay the retaining
collar on the cylinder block.
Cylinder block
Valve plate
EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006 11
Insert piston in the hole plate and place all pistons
in the holes of the cylinder block. Also lubricate the
holes of the cylinder block well beforehand.
Depending on the design the hole plate has a tape-
red internal hole. The side with the greatest diame-
ter must be mounted pointing towards the cylinder
block.
Hole plate
Locknut Counternut
12 EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006
In order to check the contact pressure, introduce
the shaft in the cylinder block and port plate. Screw
bolt into the rear of the shaft and determine the
required torque with a torque wrench to turn the
cylinder block. The torque must be read off for an
evenly rotating shaft. If the values according to the
table are not reached then the settings of the hol-
ding down device must be corrected.
BREAKAWAY TORQUE
Size 66 90/130 180 250
Breakaway Torque 15-20 Nm 20-25 Nm 25-30 Nm 30-35 Nm
EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006 13
5.1.6 Contr
5.1.6 ol pist
Control on sleev
piston e
sleeve
Bring two O-rings and two backup rings into the
grooves. The backu rings site on the outer side Backup
of the control piston sleeve. Grease the area of ring
the seal well to mount in the port plate.
5.1.8 Shaf
5.1.8 Shaftt
Pull the cylinder roller bearing for the shaft with
Adjusting washer
the loose cam belonging to the bearing to the
coupling side of the shaft against the collar of the
shaft. For pump size 250 an additional adjusting
washer is required. Lock the opposite side with a
retaining ring.
14 EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006
5.1.9 Assembly of the subassembly sw
5.1.9 ashplat
swashplat e/
ashplate/
portt plat
por e
plate
Lubricate the contact surface of the valve plate and
cylinder block as well the holes in the cylinder
block. After placing the cylinder block on the valve
plate, introduce the piston of the preassembled
device from the swashplate/piston into the holes in
the cylinder block. The swashplate is supported on
two straight pins. Lay in the flat gasket.
Flat gasket
EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006 15
5.1.1
5.1.10 Housing assembly
.10
Fasten the two cradle bearings of the swashplate.
The screw head must be below the surface of the
cradle bearing and must never be the same height
or higher. See table in Appendix A for tightening
torques for the bolts; secure with Loctite 222.
Cradle bea-
Lubricate sliding surfaces on the cradle bearing ring
and place housing on the port plate with cylinder
block and in the right position for the swashplate.
Pull forward the pump standing vertically on the
port plate sufficiently to the edge of the assembly
table that two bolts for connecting the port plate
and housing can be tightened finger-tight. The
remaining two bolts are screwed in later finger-
tight when the pump is lying horizontally. Tighte-
ning to the specified torque (see Appendix A) takes
place after inserting
the shaft.
Spacer ring
O-ring
Lead the shaft with the splined shaft through the
housing into the cylinder block until this sits
against the spring pretension of the cylinder block.
Place the spacer ring in the outer race of the roller
bearing. If the shaft is seated properly then the
spring pretension is perceptible. Insert O-ring for
sealing the cover into the housing.
Press shaft sealing ring into the cover all the way.
The spring-tensioned dust lip points to the hou-
sing. Lead cover with shaft seal over the shaft and
tighten diagonally. See appendix A for the tighte-
ning torque. Provide mounting screws with a
sealing rings. A tapered sleeve pushed over the
shaft simplifies assembly and prevents possible
damage of the lip due to the shoulder on the shaft.
16 EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006
If a position indicator is not required, a cover is used to
seal the opening in the housing. Place a flat gasket on
top of the cover and secure cover with screws. The
number of fixing bolts is dependent on the size of the
pump. Tapped holes outside the swashplate bearing are
through holes. In this area bolts are fitted with a sealing
ring.
Cradle bearing
Cylinder pin
Sealing ring
EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006 17
Place spring cup on the swashplate return spring
and position in the spherical cutout on the swash-
plate. Lead screw plug/spring guide over the some-
what protruding spring and tighten.
For model size 250, the spring cup has two cylindri-
cal bearings that are led into the corresponding
cutouts on
the swashplate.
18 EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006
6. Assembly position indicator
Sealing
ring
EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006 19
6.3 Electrical position indicator
In order to operate the position indicator the cylind- Dog flange
rical pin must be inserted into the swashplate. See
picture on page 12. Spacing
Insert O-rings into the corresponding grooves of the washer
sleeve and of the levered shaft. Grease O-rings and
shaft before fitting into the cover. Press sleeve fully
into the inside of the cover. Insert the levered shaft
Fork
from the inside of the cover into the sleeve. Slide
coupling
thrust washer and shim onto the shaft from the
outside and secure with retaining ring.
The potentiometer is connected via a fork coupling. Potentio-
Fit the drive end fork coupling to the shaft (with meter
recess for pin of fork coupling potentiometer) .
Attach dog flange with hole for connector to the Levered
cover using two bolts so that the connector points shaft
downwards when pump is in horizontal position. Cover
See picture.
Using three fixing clamps attach potentiometer to Connector
the spacing washer. The soldering tags of the poten-
tiometer must not interfere with the fixing bolts. Fit
the second half of the coupling to the potentiometer
shaft. Fit potentiometer and spacing washer to the
dog flange so that the outlet is aligned with the con-
nector cables. Both halves of the fork coupling
must mesh. This can be checked via a hole in the
dog flange, which will later be closed off with a
screw plug. Fit O-ring onto locating disk. Following Dog flange
electrical connection and final adjustment of the
potentiometer, the cover can be mounted using two Lever
bolts. position
Fit the subassembly to the pump by fitting a flat
gasket and securing the cover with four (or six)
bolts. The lever must engage with the cylindrical Sealing ring
pin in the swashplate.
20 EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006
6.4 Electrical and optical position indicator
Fit as per instruction in section 6.3.
The potentiometer has a second shaft end for fitting
the dial.
Dial
Fit the dial to the second shaft end. Fit O-ring
around spacing washer. Following electrical con-
nection and final adjustment of the potentiometer
and/or dial/glass the cover can be mounted using
two bolts.
The middle marker of the dial will be vertical when
the pump is horizontal and in center position. Dial
glass and marker should be rotated to the middle
marker before tightening the cover. The dial glass is
sealed with an O-ring to the cover.
Dial glass
1 3
EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006 21
Appendix A
Tightening torques
TIGHTENING TORQUES
Bolts DIN 912/DIN 7991 12.9 M5 M6 M8 M 10 M 12 M14 M 16 M 18 M 20
Thightening torque 8 Nm 17 Nm 41 Nm 79 Nm 136 Nm 216 Nm 336 Nm 461 Nm 656 Nm
Bolts DIN 912/DIN 7991 8.8
Thightening torque 5,5 Nm 10 Nm 25 Nm 46 Nm
Screw plugs VSTI G 1/8 G 1/4 G 3/8 G1/2 G 3/4 G1 G 1 1/4 G 1 1/2
Thightening torque 11 Nm 30 Nm 50 Nm 80 Nm 130 Nm 200 Nm 400 Nm 450 Nm
22 EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006
Appendix B
Commissioning
B1.2 Pipe ports Observance of the above conditions are the prere-
quisite for validity of the warranty and for operati-
All pipes and hoses must be thoroughly cleaned
on without faults and a long service life
before assembly. The openings for the input, return
of the unit.
and leakage oil lines are to be adequately laid un-
der the level of the fluid.
B1.6 Pressure settings
B1.2.1 Pump suction ttube
B1.2.1 ube Adjust pressure settings in accordance with the
system requirements. Turning the adjustment screw
The input pressure in the intake line of the pump
to the right increases the pressure and turning it to
must not go below 1 bar (absolute). This is also
the left reduces the pressure. Lock setting using a
achieved for setup of the pump above the level of
locknut.
the fluid if an intake manifold with the largest pos-
If a pump is disassembled, the settings (position
sible cross-section (low pressure range) is used
of the adjustment screws according to a fixed
according to the size of the connection. The suction
point) must be noted. Only minor corrections will
tube is to be laid as short a possible without a bend
be required when the pump is put into operation
with the intake opening separate or sufficiently re-
again.
moved from the return and leakage oil lines. The
suction tube must be air-sealed.
B1.2.2 Leak
B1.2.2 ag
Leakage oil line
age
The pressure in the housing must not exceed
0.5 bar. This is ensured if the leakage oil line is con-
nected to the tank by the shortest path and has the
greatest possible cross-section (low-pressure se-
ries). The leakage oil line must be not bunched to-
gether with other lines, ore with the return line.
EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006 23
Appendix C
Adjustment settings
24 EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006
Appendix D
Assembly limiting rings
Appendix D
Pressure
compensator
Cover
Max. limitation
EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006 25
Eaton Eaton Eaton
14615 Lone Oak Road 20 Rosamond Road Dr.-Reckeweg-Str. 1
Eden Prairie, MN 55344 Footscray D-76532 Baden-Baden
USA Victoria 3011 German
Tel: 952 937-9800 Australia Tel: (49) 7221 682-0
Fax: 952 974-7722 Tel: (61) 3 9319 8222 Fax: (49) 7221 682-788
www.hydraulics.eaton.com Fax: (61) 3 9318 5714
26 EATON CORPORATION Hydrokraft Axial Piston Pumps Service Manual V-PUPI-TS003-E January 2006