The CEO asks the Developers to add a "very important" item to a Sprint that is in progress.
What should the Developers do?
A. Add the item to the current Sprint and drop an item of equal size.
D. Inform the other members of the Scrum Team so the team can decide what
to do.
Feedback
The items selected for a Sprint have been selected as most valuable with the Product
Owner. The items serve the Sprint's goal. No changes should be made that endanger the
Sprint Goal. No one external to the Scrum Team can force changes on the Developers.
Question 2 of 30
When many Scrum Teams are working on a single product, what best describes the Definition
of Done?
A. All Scrum Teams must have a Definition of Done that makes their combined
Increment valuable and useful.
B. It depends.
C. Each Scrum Team uses its own, but must make their definition clear to all
other teams so the differences are known.
Feedback
The Increment must be valuable and useful. This means that when many Scrum Teams
are working on a single product, they are expected to adhere to a single Definition of
Done for the Increment.
Question 3 of 30
F. Scrum is a methodology where you can pick and choose which parts of
Scrum you think will work for your environment.
Feedback
1. Scrum is meant to be implemented as prescribed in the Scrum Guide.
For example, the five events in the Scrum Guide are mandatory, each
event has a specific purpose.
2. Scrum does not eliminate the complexity that is inherent in delivering a
product in today’s world, instead it offers a framework for dealing with
complexity. By regularly delivering Increments of value teams gain the
ability to inspect and rapidly adapt based on the feedback received.
3. Project Managers are not simply replaced by self-managing teams.
Scrum is a framework for optimizing decision making based on the
knowledge and experience of the entire team.
Question 4 of 30
A. Short enough to keep the business risk acceptable to the Product Owner.
Feedback
All of these choices are appropriate considerations in determining the length of a Sprint.
Question 5 of 30
B. Identify and remove people that are not working hard enough.
D. Support the Product Owner with insights and information into high value
product and system capabilities. Support the Scrum Master to encourage
organizational change that fosters empiricism, self-management, bottom-up
intelligence, and intelligent product delivery.
Feedback
Management has no official role or accountability on a Scrum Team. However,
management external to the Scrum Team is relevant in setting the vision and strategy to
guide the overall direction of the organization.
Question 6 of 30
Feedback
Scrum Teams typically go through some steps before achieving a state of increased
performance. Changing membership typically reduces cohesion, affecting performance
and productivity in the short term.
Question 7 of 30
B. 15 minutes.
E. 4 hours.
Feedback
The Daily Scrum is a 15-minute event for the Developers of the Scrum Team. The Scrum
Master serves the Scrum Team by ensuring that all Scrum events take place and are
positive, productive, and kept within the timebox.
Question 8 of 30
Which of the following are examples of a Scrum Team practicing Scrum poorly or not exhibiting
traits of a self-managing Scrum Team?
C. The Developers are collaboratively selecting their own work during the
Sprint.
D. The Developers have all the skills they need to create a valuable,
useful Increment.
F. The Developers create their own Sprint Backlog, reflecting all work
that is required to meet the Definition of Done.
Feedback
The Daily Scrum is for the Developers. It should not be used by
external stakeholders to check progress.
During Sprint Planning the Scrum Team should be crafting the Sprint
Goal based on the set of Product Backlog items selected for the Sprint.
The Developers identify the necessary work to meet the Sprint Goal.
Scrum Team members do not have titles, and no sub-teams; such as
testing, architecture, or operations are recognized. Accountability
belongs with the Scrum Team as a whole, regardless of whether team
members have specialized skills.
Question 9 of 30
True or False: When multiple Scrum Teams work together on the same product, each team
should maintain a separate Product Backlog.
True
False
Feedback
Products have one Product Backlog, regardless of how many Scrum Teams are used.
Any other setup makes it difficult for the Developers to determine what they should work
on.
Question 10 of 30
B. Next Monday.
Feedback
A new Sprint starts immediately after the conclusion of the previous Sprint.
Question 11 of 30
True or False: The Scrum Team must choose at least one high priority process improvement
item, identified during the Sprint Retrospective, and place it in the Sprint Backlog.
True
False
Feedback
An earlier version of the Scrum Guide prescribed the practice of placing one
improvement in the Sprint Backlog. This was removed in the 2020 update to the Scrum
Guide because it was felt to be too prescriptive. However, if this practice provides value
to you then you should adopt it. It is simply not prescribed anymore, but can still be
valuable.
Question 12 of 30
Feedback
Timeboxed events are events that have a maximum duration.
Question 13 of 30
A. Scrum Master
B. Customers
C. Developers
D. Product Owner
E. Users
Feedback
The Scrum Team consists of one Scrum Master, one Product Owner, and Developers.
Question 14 of 30
A. Risk, where safer items are at the top, and riskier items are at the bottom.
C. Size, where small items are at the top and large items are at the bottom.
Feedback
The Product Owner is accountable for effective Product Backlog management. The
Product Backlog is an emergent, ordered list of what is needed to improve the product. It
is the single source of work undertaken by the Scrum Team.
Question 15 of 30
Which of the following services is appropriate for a Scrum Master in regard to the Daily Scrum?
A. Teach the Developers to keep the Daily Scrum within the 15 minute timebox.
C. Facilitate in a way that ensures each team member has a chance to speak.
Feedback
The Scrum Master ensures that the Developers have the event, but the Developers are
responsible for conducting the Daily Scrum. The Scrum Master teaches the Developers
to keep the Daily Scrum within the 15-minute timebox. The Scrum Master enforces the
rule that only members participate in the Daily Scrum.
Question 16 of 30
B. When it becomes clear that not everything will be finished by the end of the
Sprint.
Feedback
A Sprint could be cancelled if the Sprint Goal becomes obsolete. Only the Product
Owner has the authority to cancel the Sprint.
Question 17 of 30
D. When the Product Owner decides enough has been delivered to meet the
Sprint Goal.
Feedback
The Sprint is a container for the following timeboxed events: Sprint Planning, Daily
Scrum, Sprint Review, and Sprint Retrospective. Sprints are fixed length events of one
month or less to create consistency, and a new Sprint starts immediately after the
conclusion of the previous Sprint.
The Sprint Retrospective concludes the Sprint, and is timeboxed to a maximum of three
hours for a one-month Sprint. For shorter Sprints, the event is usually shorter
Though not typical, a Sprint can end if the Sprint Goal becomes obsolete. Only the
Product Owner has the authority to end the Sprint prematurely.
Question 18 of 30
Why is the Daily Scrum held at the same time and same place?
Feedback
The Daily Scrum is held at the same time and place each day to reduce complexity.
Question 19 of 30
A. The Product Owner since they are responsible for the product's success.
C. The Scrum Master since they are responsible for the productivity of the
Developers.
D. The Scrum Team, in a collaborative effort where the result is the common
denominator of all members' definitions.
Feedback
If the Definition of Done for an Increment is part of the standards of the organization, all
Scrum Teams must follow it as a minimum. If it is not an organizational standard, the
Scrum Team must create a Definition of Done appropriate for the product.
Question 20 of 30
A. Turn the Product Backlog items they select into an Increment of useful and
valuable product functionality.
B. Complete the project as estimated when the date and cost are committed to
the Product Owner.
C. Do all of the development work, except for specialized testing that requires
additional tools and environments.
Feedback
The Developers are a group of professionals who do the work of delivering an Increment
of done product at the end of each Sprint. As a team, Developers have all of the skills
necessary to create a product Increment.
Question 21 of 30
A. Managing the project and ensuring that the work meets the commitments to
the stakeholders.
Feedback
The Product Owner is accountable for maximizing the value of the product and the work
of the Scrum Team.
Question 22 of 30
A. 10 or fewer.
B. 9.
C. 7 plus or minus 2.
D. Minimum of 7.
Feedback
A Scrum Team is small enough to remain nimble and large enough to complete
significant work within a Sprint, typically 10 or fewer people. Generally smaller teams
communicate better and are more productive
Question 23 of 30
True
False
Feedback
A Scrum Team has a Scrum Master, a Product Owner and Developers. As a whole they
have all controls needed.
Question 24 of 30
When does a Developer become the sole owner of an item on the Sprint Backlog?
C. Never. All Sprint Backlog items are "owned" by the Developers on the Scrum
Team.
Feedback
The entire Scrum Team is accountable for creating a valuable, useful Increment every
Sprint, and the set of Product Backlog items selected for the Sprint are collectively
owned by the Developers. No individual Developer can claim ownership over an item as
this would block communication and collaboration. The Sprint Backlog is updated by the
Developers throughout the Sprint as more is learned.
Question 25 of 30
B. The Developers.
Feedback
The Developers use the Daily Scrum to inspect progress toward the Sprint Goal and to
inspect how progress is trending toward completing the work in the Sprint Backlog.
Question 26 of 30
True or False: The purpose of a Sprint is to produce a valuable and useful Increment of
working product.
True
False
Feedback
The heart of Scrum is a Sprint, a timebox of one month or less during which a done,
useful, and valuable working product Increment is created.
Question 27 of 30
When does a Developer become accountable for the value of a Product Backlog item selected
for the Sprint?
C. Never. The entire Scrum Team is accountable for creating value every Sprint.
Feedback
All members of the Scrum Team share in the accountability for creating value every
Sprint.
Question 28 of 30
A. Hybrid
B. Complex
C. Defined
D. Empirical
Feedback
Scrum is founded on empirical process control theory, or empiricism. Empiricism asserts
that knowledge comes from experience and making decisions based on what is
observed.
Question 29 of 30
An organization has decided to adopt Scrum, but management wants to change the
terminology to fit with terminology already used. What will likely happen if this is done?
B. The organization may not understand what has changed with Scrum and the
benefits of Scrum may be lost.
Question 30 of 30
True or False: It is mandatory that the product Increment be released to production at the end
of each Sprint.
True
False
Feedback
The product Increment should be usable and releasable at the end of every Sprint, but it
does not have to be released.
Scrum Open
Percentage: 70%
Duration: 00:06:35
Feedback
Thank you for taking the Open assessment of Scrum. Please review The Scrum
Guide on Scrum.org and take this assessment again to improve your score.
Ken Schwaber
Continue here
Return to Scrum.org
C. Next Monday.
Feedback
A new Sprint starts immediately after the conclusion of the previous Sprint.
Question 5 of 30
Which two things should the Scrum Team do during the first Sprint?
Feedback
The heart of Scrum is a Sprint, which is one month or less during which a done, usable,
valuable product Increment is created. This applies to every Sprint.
Question 6 of 30
A. Project Manager.
B. Developers.
Feedback
The Scrum Team consists of the Scrum Master, the Product Owner and Developers. The
Scrum Team is a cohesive unit of professionals focused on one objective at a time, the
Product Goal.
Question 7 of 30
A. Monthly.
B. Whenever it is done.
D. 4 hours.
Feedback
Sprint Planning is timeboxed to a maximum of eight hours for a one-month Sprint. For
shorter Sprints, the event is usually shorter.
Question 8 of 30
The Developers should not be interrupted during the Sprint and the Sprint Goal should remain
intact. These are conditions that foster creativity, quality and productivity.
B. The Product Owner can help clarify or optimize the Sprint when asked by the
Developers.
C. The Developers may work with the Product Owner to add or remove work if
they find themselves with more or less capacity than expected.
D. The Sprint Backlog is fully formulated in the Sprint Planning event and does
not change during the Sprint.
Feedback
The Sprint Backlog makes visible all of the work that the Developers identify as
necessary to meet the Sprint Goal. The Developers modify the Sprint Backlog throughout
the Sprint, and the Sprint Backlog emerges during the Sprint.
Question 11 of 30
How much work must the Developers complete for each Product Backlog item they select for a
Sprint?
D. Enough so that each Product Backlog item they select meets the Definition
of Done.
Feedback
The purpose of each Sprint is to deliver useful and valuable Increments that adhere to
the Scrum Team's current Definition of Done.
Question 24 of 30
Feedback
Scrum is founded on empirical process control theory, or empiricism. Empiricism asserts
that knowledge comes from experience and making decisions based on what is known.
Three pillars uphold every implementation of empirical process control: transparency,
inspection, and adaptation.
Question 25 of 30
Feedback
Scrum is a lightweight framework that helps people, teams and organizations generate
value through adaptive solutions for complex problems.
Question 27 of 30
Who has the final say on the order of the Product Backlog?
A. The CEO.
C. The Stakeholders.
E. The Developers.
Feedback
The Product Owner is the sole person responsible for ordering the Product Backlog.
Question 29 of 30
E. The Developers.
Feedback
Only the people doing the work described on the Sprint Backlog need to inspect and
adapt at the Daily Scrum. If the Product Owner or Scrum Master are actively working on
items in the Sprint Backlog, they participate as Developers, they will need to be at the
Daily Scrum.
Scrum Open
Percentage: 83.3%
Duration: 00:07:10
Feedback
Thank you for taking the Open assessment of Scrum. Please review The Scrum
Guide on Scrum.org and take this assessment again to improve your score.
Ken Schwaber
Continue here
Return to Scrum.org
What is the main reason for the Scrum Master to be at the Daily Scrum?
C. They do not have to be there; they only need to ensure the Developers have
a Daily Scrum.
D. To write down any changes to the Sprint Backlog, including adding new
items, and tracking progress on the burn-down.
Feedback
The Scrum Master only ensures that all Scrum events take place and are positive,
productive, and kept within the timebox.
Question 9 of 30
A. Sprint Retrospective.
B. Sprint Planning.
C. Sprint Review.
D. Sprint Testing.
E. Release Testing.
F. Release Retrospective.
G. Refinement.
Feedback
The Scrum Guide states that the Sprint Planning, Sprint Retrospectives, and Sprint
Reviews are timeboxed events. Sprints are fixed length events of one month or less to
create consistency, and the Daily Scrum is a 15-minute event.
Question 10 of 30
During a Sprint, a Developer determines that the Scrum Team will not be able to complete the
items in their forecast. Who should be present to review and adjust the Product Backlog items
selected?
C. The Developers.
Feedback
During the Sprint, scope may be clarified and re-negotiated between the Product Owner
and the Developers as more is learned. It is important to be transparent when challenges
arise since ultimately the entire Scrum Team is accountable for creating a valuable,
useful Increment.
Question 13 of 30
A. 1 day.
D. As long as needed.
E. 2 hours.
Feedback
Sprint Review is a maximum four-hour timeboxed event for one-month Sprints. For
shorter Sprints, the event is usually shorter.
Question 25 of 30
Who should know the most about the progress toward a business objective or a release, and
be able to explain the alternatives most clearly?
A. The Developers
Feedback
The Product Owner is the sole person responsible for ordering the Product Backlog.
Their responsibilities include making the Product Backlog visible, transparent, and clear
to all.
Question 16 of 30
A. It is when the Scrum Team and stakeholders inspect the outcome of a Sprint
and figure out what to do next.
C. It is a demo at the end of the Sprint for everyone in the organization to check
on the work done.
Feedback
Every event in Scrum, besides the Sprint, which is a container for the other events, is an
opportunity to Inspect and Adapt.
Question 17 of 30
What are two ways a Scrum Master serves to enable effective Scrum Teams?
Feedback
The Scrum Master serves the Scrum Team in several ways. Facilitation and removing
impediments are examples of ways a Scrum Master helps a team become more
effective.
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 76 of 87
76. Question
Category: Scrum Artifacts
A Product Backlog could be closed when it contains no items to include into the next Sprint
It is dynamic
When the final version of a product is rolled out, its Product Backlog is dismissed
It is never complete
Incorrect
A Product Backlog is never complete. The earliest development of it only lays out the initially known and best-understood requirements. The Product
Backlog evolves as the product and the environment in which it will be used evolves. The Product Backlog is dynamic; it constantly changes to identify
what the product needs to be appropriate, competitive, and useful. As long as a product exists, its Product Backlog also exists.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 77 of 87
77. Question
Category: Scrum Team
How does the Scrum Master serve the Organization? Select the three most appropriate answers.
Mixing experienced developers and junior specialists across different Development Teams in the organization to speed up Scrum adoption
Making sure the key stakeholders are invited on all Scrum Reviews within organization
Working with other Scrum Masters to increase the effectiveness of the application of Scrum in the organization
Incorrect
The Scrum Master serves the organization in several ways, including:
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 78 of 87
78. Question
Category: Scrum Artifacts
Incorrect
The Development Team is responsible for all estimates in the Product Backlog. The Product Owner may influence the Development Team by helping it
understand and select trade-offs, but the people who will perform the work make the final estimate.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 79 of 87
79. Question
Category: Scrum Team
The Scrum Master does the following regarding the Daily Scrum (select all applicable variants):
If others are present at the Daily Scrum, ensures that they do not disrupt the meeting
Teaches the Development Team to keep the Daily Scrum within the 15-minute time-box
Incorrect
The Scrum Master
Ensures that the Development Team has the meeting, but the Development Team is responsible for conducting the Daily Scrum.
Teaches the Development Team to keep the Daily Scrum within the 15-minute time-box.
If others are present at the Daily Scrum, ensures that they do not disrupt the meeting.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 80 of 87
80. Question
Category: Scrum Artifacts
How does Definition of “Done” help the Scrum Team? Select three most applicable items.
DoD guides the Development Team in knowing how many Product Backlog items it can select during a Sprint Planning
Incorrect
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 81 of 87
81. Question
Category: Scrum Theory
Self-organization
Courage
Agility
Focus
Openness
Effectiveness
Respect
Commitment
Incorrect
The Scrum Guide recognizes the following Scrum Values: commitment, courage, focus, openness and respect.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 82 of 87
82. Question
Category: Scrum Team
Who is responsible for promoting and supporting Scrum? Select the best choice.
Incorrect
The Scrum Master is responsible for promoting and supporting Scrum as defined in the Scrum Guide. Scrum Masters do this by helping everyone
understand Scrum theory, practices, rules, and values.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 83 of 87
83. Question
Category: Scrum Artifacts
Alphabetical
Incorrect
The Product Owner is responsible for placing the most valuable and clear items at the top of the Product Backlog.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 84 of 87
84. Question
Category: Scrum Artifacts
What could be a source of requirements for any changes to be made to the product?
Incorrect
The Product Backlog is an ordered list of everything that might be needed in the product and is the single source of requirements for any changes to be
made to the product.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 85 of 87
85. Question
Category: Scrum Events
20 minutes
Not limited. Every Development Team member should have enough time to answer the three Main Questions.
15 minutes
25 minutes
Incorrect
The Daily Scrum is a 15-minute time-boxed event.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 86 of 87
86. Question
Category: Scrum Events
Several top Product Backlog Items are taken into the Sprint Backlog to replace the obsolete items
At the Sprint Retrospective the Scrum Master determines who from the Development Team is responsible for cancelling the Sprint
If part of the work is potentially releasable, the Product Owner typically accepts it
All incomplete Product Backlog Items are re-estimated and put back on the Product Backlog
Incorrect
When a Sprint is cancelled, any completed and “Done” Product Backlog items are reviewed. If part of the work is potentially releasable, the Product
Owner typically accepts it. All incomplete Product Backlog Items are re-estimated and put back on the Product Backlog.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 87 of 87
87. Question
Category: Scrum Artifacts
What part of the capacity of the Development Team does Product Backlog refinement usually consume?
Incorrect
Product Backlog refinement usually consumes no more than 10% of the capacity of the Development Team.
Quiz-summary
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
Answered Review
Question 51 of 87
51. Question
Category: Scrum Theory
Incorrect
Burn-down chart shows the evolution of remaining effort against time.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
Answered Review
Question 52 of 87
52. Question
Category: Scrum Events
Incorrect
The input to the Sprint Planning is the Product Backlog, the latest product Increment, projected capacity of the Development Team during the Sprint, and
past performance of the Development Team.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
Answered Review
Question 53 of 87
53. Question
Category: Scrum Events
What are the questions the Sprint Planning answers? Select two.
What can be delivered in the Increment resulting from the upcoming Sprint?
What new technologies could be used to speed up the Development Team velocity?
What is the size of the Technical Debt and how it could be removed?
Incorrect
Sprint Planning answers the following:
What can be delivered in the Increment resulting from the upcoming Sprint?
How will the work needed to deliver the Increment be achieved?
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
Answered Review
Question 54 of 87
54. Question
Category: Scrum Artifacts
Incorrect
Only members of the Development Team create the Increment.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
Answered Review
Question 55 of 87
55. Question
Category: Scrum Theory
Incorrect
The essence of Scrum is a small team of people. The individual team is highly flexible and adaptive. These strengths continue operating in single,
several, many, and networks of teams that develop, release, operate and sustain the work and work products of thousands of people. They collaborate
and interoperate through sophisticated development architectures and target release environments.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
Answered Review
Question 56 of 87
56. Question
Category: Scrum Events
It is a meeting where the Development Team synchronizes activities and creates a plan for the next 24 hours
It is a meeting to inspect the Increment and adapt the Product Backlog if needed
It is an opportunity for the Scrum Team to inspect itself and create a plan for improvements to be enacted during the next Sprint
Incorrect
The Sprint Retrospective is an opportunity for the Scrum Team to inspect itself and create a plan for improvements to be enacted during the next Sprint.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
Answered Review
Question 57 of 87
57. Question
Category: Scrum Theory
What is Scrum?
A sequential design process, used in software development processes, in which progress is seen as flowing steadily downwards.
A framework within which people can address complex adaptive problems, while delivering valuable products.
Incorrect
No, Scrum is a framework within which people can address complex adaptive problems, while delivering valuable products.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
Answered Review
Question 58 of 87
58. Question
Category: Scrum Events
Is it allowed to skip the Daily Scrum if there is nothing interesting to talk about?
Yes
No
Incorrect
Each event in Scrum is a formal opportunity to inspect and adapt something. These events are specifically designed to enable critical transparency and
inspection. Failure to include any of these events results in reduced transparency and is a lost opportunity to inspect and adapt.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
Answered Review
Question 59 of 87
59. Question
Category: Scrum Theory
Scrum recommends using only those Scrum components and rules which suit most for a particular project.
True
False
Incorrect
Each component within the Scrum framework serves a specific purpose and is essential to Scrum’s success and usage.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
Answered Review
Question 60 of 87
60. Question
Category: Scrum Events
The Daily Scrum time-box depends on the size of the Development team.
False
True
Incorrect
The Daily Scrum is a 15-minute time-boxed event for the Development Team of any size.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
Answered Review
Question 61 of 87
61. Question
Category: Scrum Theory
True
False
Incorrect
Scrum is not a process, technique, or definitive method. Rather, it is a framework within which you can employ various processes and techniques.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 62 of 87
62. Question
Category: Scrum Events
Incorrect
During the Sprint Review, the Scrum Team and stakeholders collaborate about what was done in the Sprint. Based on that and any changes to the
Product Backlog during the Sprint, attendees collaborate on the next things that could be done to optimize value.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 63 of 87
63. Question
Category: Scrum Team
Incorrect
The Scrum Team consists of a Product Owner, the Development Team, and a Scrum Master.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 64 of 87
64. Question
Category: Scrum Team
How does the Scrum Master serve the Development Team? Select the three most appropriate answers.
Adding or removing developers from the Development Team in accordance with team velocity changes
Incorrect
The Scrum Master serves the Development Team in several ways, including:
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 65 of 87
65. Question
Category: Scrum Artifacts
Incorrect
The Scrum Master’s job is to work with the Scrum Team and the organization to increase the transparency of the artifacts. This work usually involves
learning, convincing, and change.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 66 of 87
66. Question
Category: Scrum Events
The structure of the Daily Scrum is well-defined and constant. Every team member should answer the three main questions:
False
True
Incorrect
There is no any prescribed structure. The structure of the Daily Scrum is set by the Development Team and can be conducted in different ways if it
focuses on progress toward the Sprint Goal. Some Development Teams will use questions, some will be more discussion based. It is still perfectly fine to
use the questions, but other ways of conducting the meeting are also possible.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 67 of 87
67. Question
Category: Scrum Theory
How frequently should scrum users inspect Scrum artifacts and progress toward a Sprint Goal?
As frequently as possible
Incorrect
Scrum users must frequently inspect Scrum artifacts and progress toward a Sprint Goal to detect undesirable variances. Their inspection should not be
so frequent that inspection gets in the way of the work. Inspections are most beneficial when diligently performed by skilled inspectors at the point of
work.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 68 of 87
68. Question
Category: Scrum Events
Other people than the Scrum Team can attend the Sprint Planning in order to provide technical or domain advice.
False
True
Incorrect
The Development Team may also invite other people to attend in order to provide technical or domain advice.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 69 of 87
69. Question
Category: Scrum Artifacts
All Development Teams working on the same Product should use the same Product Backlog.
False
True
Incorrect
Multiple Scrum Teams often work together on the same product. One Product Backlog is used to describe the upcoming work on the product.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 70 of 87
70. Question
Category: Scrum Team
What are the two essential features a Scrum Team should possess?
It should be flexible enough to complete all the work planned for the Sprint even if some team members are on vacation
It should have all competencies needed to accomplish the work without depending on others not part of the team
It should choose how best to accomplish their work, rather than being directed by others outside the team
Incorrect
Scrum Teams are self-organizing and cross-functional. Self-organizing teams choose how best to accomplish their work, rather than being directed by
others outside the team. Cross-functional teams have all competencies needed to accomplish the work without depending on others not part of the team.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 71 of 87
71. Question
Category: Scrum Theory
What should be taken into account for the Definition of “Done”? Select the two most appropriate items.
Incorrect
If the definition of “done” for an increment is part of the conventions, standards or guidelines of the development organization, all Scrum Teams must
follow it as a minimum. If “done” for an increment is not a convention of the development organization, the Development Team of the Scrum Team must
define a definition of “done” appropriate for the product. If there are multiple Scrum Teams working on the system or product release, the development
teams on all of the Scrum Teams must mutually define the definition of “Done.”
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 72 of 87
72. Question
Category: Scrum Theory
It is a good practice to have from time to time a special technical Sprint that consists only of tasks removing the technical debt without implementing any
new functionality.
False
True
Incorrect
It is prohibited. The purpose of each Sprint is to deliver Increments of potentially releasable functionality that adhere to the Scrum Team’s current
definition of “Done.”
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 73 of 87
73. Question
Category: Scrum Team
The Scrum Master is focused primarily on the Scrum Team and usually does not care about those outside the Scrum Team.
False
True
Incorrect
The Scrum Master is a servant-leader for the Scrum Team. The Scrum Master helps those outside the Scrum Team understand which of their
interactions with the Scrum Team are helpful and which aren’t. The Scrum Master helps everyone change these interactions to maximize the value
created by the Scrum Team.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 74 of 87
74. Question
Category: Scrum Events
The Daily Scrum always should take exactly 15 minutes. For example, if your team managed doing it in 5 minutes, you should spend 10 more minutes on
some useful team activity like Product Backlog refinement, but not more.
True
False
Incorrect
All events in Scrum are time-boxed. It means that every event has a maximum duration. However, the Scrum Guide does not require a minimal duration
for any event. As Scrum Teams mature, they can do some events faster (e.g. the Sprint Planning or the Sprint Retrospective).
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
6 8 9 30 3 3 33 3 35 36 3 38 39 0 3 5 6 8 9 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
76 77 78 79 80 81 82 83 84 85 86 87
Answered Review
Question 75 of 87
75. Question
Category: Scrum Artifacts
Incorrect
The Product Owner tracks total work remaining at least every Sprint Review. The Product Owner compares this amount with work remaining at previous
Sprint Reviews to assess progress toward completing projected work by the desired time for the goal. This information is made transparent to all
stakeholders.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 26 of 87
26. Question
Category: Scrum Events
Scrum does not allow additional meetings that are not defined in Scrum.
True
False
Incorrect
Scrum allows additional meetings if they facilitate achieving the Sprint Goal.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 27 of 87
27. Question
Category: Scrum Theory
Transparency
Adaptation
Cross-functionality
Agility
Self-organization
Inspection
Incorrect
Scrum is founded on empirical process control theory, or empiricism. Empiricism asserts that knowledge comes from experience and making decisions
based on what is known. Three pillars uphold every implementation of empirical process control: transparency, inspection, and adaptation.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 28 of 87
28. Question
Category: Scrum Artifacts
Who is allowed to make changes in the Product Backlog? Select two options.
Anyone
Incorrect
The Product Owner is the sole person responsible for the Product Backlog. However, he or she can delegate some work related to product backlog
management to the Development Team.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 29 of 87
29. Question
Category: Scrum Theory
What does the word “development” mean in the context of Scrum? Select the best option.
Complex work that can include all the suggested options and even more
Incorrect
When the words “develop” and “development” are used in the Scrum Guide, they refer to complex work including software and hardware development,
development and releasing of products and enhancements, development and sustaining product operational environments, research and identifying of
viable markets and technologies, and even more.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 30 of 87
30. Question
Category: Scrum Events
Incorrect
The Key Stakeholders are allowed to participate only in the Sprint Review meeting. However, any member of the Scrum Team can interact with them any
time.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 31 of 87
31. Question
Category: Scrum Events
Scope may be clarified and re-negotiated between the Product Owner and Development Team as more is learned
The Sprint Goal is changed frequently to reflect the status of the remaining work
Incorrect
During the Sprint:
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 32 of 87
32. Question
Category: Scrum Events
What provides guidance to the Development Team on why it is building the Increment?
Incorrect
The Sprint Goal is an objective set for the Sprint that can be met through the implementation of Product Backlog. It provides guidance to the
Development Team on why it is building the Increment.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 33 of 87
33. Question
Category: Scrum Events
Get feedback from the Key Stakeholders invited by the Product Owner
Inspect how the last Sprint went with regards to people, relationships, process, and tools
Create a plan for implementing improvements to the way the Scrum Team does its work
Identify and order the major items that went well and potential improvements
Get technical or domain advice from specialists invited by The Development Team or The Scrum Master
Incorrect
The purpose of the Sprint Retrospective is to:
Inspect how the last Sprint went with regards to people, relationships, process, and tools;
Identify and order the major items that went well and potential improvements; and,
Create a plan for implementing improvements to the way the Scrum Team does its work.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 34 of 87
34. Question
Category: Scrum Events
The Sprint
Incorrect
Other than the Sprint itself, which is a container for all other events, each event in Scrum is a formal opportunity to inspect and adapt something. These
events are specifically designed to enable critical transparency and inspection.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 35 of 87
35. Question
Category: Scrum Team
What are the three main qualities the team model in Scrum is designed to optimize?
Agility
Responsibility
Flexibility
Competence
Creativity
Productivity
Incorrect
The team model in Scrum is designed to optimize flexibility, creativity, and productivity.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 36 of 87
36. Question
Category: Scrum Events
Until all the Items in the Sprint Backlog are decomposed to units of one day or less
Incorrect
Sprint Planning is time-boxed to a maximum of eight hours for a one-month Sprint.
There is no need to decompose all the Items in the Sprint Backlog. It can be done only for the first days of the Sprint.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 37 of 87
37. Question
Category: Scrum Theory
If an inspector determines that one or more aspects of a process deviate outside acceptable limits, when must an adjustment be made?
The deviations should be discussed at the Daily Scrum and then an adjustment must be made
Incorrect
If an inspector determines that one or more aspects of a process deviate outside acceptable limits, and that the resulting product will be unacceptable,
the process or the material being processed must be adjusted. An adjustment must be made as soon as possible to minimize further deviation.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 38 of 87
38. Question
Category: Scrum Events
Only the Product Owner and the Development Team participate in the Sprint Planning. There is nothing to do for the Scrum Master.
True
False
Incorrect
The work to be performed in the Sprint is planned at the Sprint Planning. This plan is created by the collaborative work of the entire Scrum Team.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 39 of 87
39. Question
Category: Scrum Team
Imagine you are a Scrum Master in a small Organization that tries to adopt Scrum. There are 10 developers and the Product Owner. How can they be
divided into teams? Choose all applicable options:
2 teams of 6 and 4 people (after a short meeting the developers decided this is the best option)
Incorrect
Number of people in a Development Team should be between 3 and 9. Each team should be cross-functional and self-organized.
Optimal Development Team size is small enough to remain nimble and large enough to complete significant work within a Sprint. Fewer than three
Development Team members decrease interaction and results in smaller productivity gains. Having more than nine members requires too much
coordination. The Product Owner and Scrum Master roles are not included in this count unless they are also executing the work of the Sprint Backlog.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 40 of 87
40. Question
Category: Scrum Artifacts
The Sprint Backlog is created at the Sprint Planning. It is prohibited to add new work into the Sprint Backlog later by the Development Team.
True
False
Incorrect
The Development Team modifies the Sprint Backlog throughout the Sprint, and the Sprint Backlog emerges during the Sprint. This emergence occurs as
the Development Team works through the plan and learns more about the work needed to achieve the Sprint Goal. As new work is required, the
Development Team adds it to the Sprint Backlog.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 41 of 87
41. Question
Category: Scrum Team
What are the characteristics of a Development Team? Select three most appropriate choices.
Incorrect
Development Teams have the following characteristics:
They are self-organizing. No one (not even the Scrum Master) tells the Development Team how to turn Product Backlog into Increments of potentially
releasable functionality;
Development Teams are cross-functional, with all of the skills as a team necessary to create a product Increment;
Scrum recognizes no titles for Development Team members, regardless of the work being performed by the person;
Scrum recognizes no sub-teams in the Development Team, regardless of domains that need to be addressed like testing, architecture, operations, or
business analysis; and,
Individual Development Team members may have specialized skills and areas of focus, but accountability belongs to the Development Team as a
whole.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 42 of 87
42. Question
Category: Scrum Events
Select the two meetings in which people outside the Scrum Team are allowed to participate.
Incorrect
The Development Team may invite other people to attend the Sprint Planning in order to provide technical or domain advice.
The Product Owner is responsible for inviting the Key Stakeholders to the Sprint Review meeting
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 43 of 87
43. Question
Category: Scrum Theory
It is normal to have a “hardening” Sprint to remove all technical debt and prepare the Product for upcoming release.
False
True
Incorrect
It is not normal. Development Teams deliver an Increment of product functionality every Sprint. This Increment is usable, so a Product Owner may
choose to immediately release it. So, there is nothing to prepare. Each increment contains only “Done” functionality that could be released immediately.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 44 of 87
44. Question
Category: Scrum Events
What are the time-boxes for the Sprint Review and the Sprint Retrospective?
Incorrect
The Sprint Review is at most a four-hour meeting for one-month Sprints.
The Sprint Retrospective is at most a three-hour meeting for one-month Sprints.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 45 of 87
45. Question
Category: Scrum Theory
All the Scrum Teams working on the same product should have the same Sprint length.
False
True
Incorrect
False. Scrum does not require having aligned Sprints for multiple teams.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 46 of 87
46. Question
Category: Scrum Team
What does Product Backlog management include? Select three most applicable items.
Ordering the items in the Product Backlog to best achieve goals and missions
Ensuring that the Product Backlog is visible, transparent, and clear to all, and shows what the Scrum Team will work on next
Incorrect
Product Backlog management includes:
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 47 of 87
47. Question
Category: Scrum Events
What are the three questions the Scrum Guide gives as an example that can be used at the Daily Scrum?
What did I do yesterday that helped the Development Team meet the Sprint Goal?
What will I do today to help the Development Team meet the Sprint Goal?
Do I see any impediment that prevents me or the Development Team from meeting the Sprint Goal?
Did I explain all the discovered issues I found yesterday to the Product Owner?
Incorrect
The structure of the Daily Scrum is set by the Development Team and can be conducted in different ways if it focuses on progress toward the Sprint
Goal. Some Development Teams will use questions, some will be more discussion based. Here is an example of what might be used:
What did I do yesterday that helped the Development Team meet the Sprint Goal?
What will I do today to help the Development Team meet the Sprint Goal?
Do I see any impediment that prevents me or the Development Team from meeting the Sprint Goal?
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 48 of 87
48. Question
Category: Scrum Events
A revised Product Backlog that defines the probable Product Backlog items for the next Sprint
A list of improvements that the Scrum Team will implement in the next Sprint
Common understanding of progress toward the Sprint Goal and how progress is trending toward completing the work in the Sprint Backlog
Common understanding of what can be delivered in the Increment and how will the work needed to deliver the Increment be achieved
Incorrect
The result of the Sprint Review is a revised Product Backlog that defines the probable Product Backlog items for the next Sprint. The Product Backlog
may also be adjusted overall to meet new opportunities.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 49 of 87
49. Question
Category: Scrum Events
Incorrect
The work to be performed in the Sprint is planned at the Sprint Planning. This plan is created by the collaborative work of the entire Scrum Team.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 50 of 87
50. Question
Category: Scrum Theory
Definition of “Done” is created during the first Sprint and remains unchanged until the Product release.
False
True
Incorrect
False. During each Sprint Retrospective, the Scrum Team plans ways to increase product quality by adapting the definition of “Done” as appropriate.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 2 of 87
2. Question
Category: Scrum Artifacts
The Product Backlog items selected for this Sprint plus the Team Backlog items
The Product Backlog items selected for this Sprint plus the plan for delivering them
Incorrect
The Sprint Backlog is the set of Product Backlog items selected for the Sprint, plus a plan for delivering the product Increment and realizing the Sprint
Goal.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 1 of 87
1. Question
Category: Scrum Team
How does the Scrum Master help the Product Owner? Select the three most appropriate answers.
Incorrect
The Scrum Master serves the Product Owner in several ways, including:
Ensuring that goals, scope, and product domain are understood by everyone on the Scrum Team as well as possible;
Finding techniques for effective Product Backlog management;
Helping the Scrum Team understand the need for clear and concise Product Backlog items;
Understanding product planning in an empirical environment;
Ensuring the Product Owner knows how to arrange the Product Backlog to maximize value;
Understanding and practicing agility; and,
Facilitating Scrum events as requested or needed.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 3 of 87
3. Question
Category: Scrum Artifacts
The sum of all the Product Backlog items completed during the Sprint and the value of the increments of all previous Sprints
All items in the Sprint Backlog that could be released regardless of whether the Product Owner decides to actually do it
The sum of all the Product Backlog items completed during the Sprint
Incorrect
The Increment is the sum of all the Product Backlog items completed during the Sprint and the value of the increments of all previous Sprints.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 4 of 87
4. Question
Category: Scrum Theory
If an item in the Sprint Backlog cannot be finished by the end of the Sprint (it turned out there is a lot more work to do than was estimated), the Sprint is
cancelled.
True
False
Incorrect
The Sprint is cancelled only in the case if the Sprint Goal became obsolete. If some work could not be done, the Sprint Backlog should be re-negotiated
between the Product Owner and Development Team.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 5 of 87
5. Question
Category: Scrum Artifacts
Who is responsible for tracking the total work remaining in the Sprint Backlog to project the likelihood of achieving the Sprint Goal?
Incorrect
At any point in time in a Sprint, the total work remaining in the Sprint Backlog can be summed. The Development Team tracks this total work remaining at
least for every Daily Scrum to project the likelihood of achieving the Sprint Goal. By tracking the remaining work throughout the Sprint, the Development
Team can manage its progress.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 6 of 87
6. Question
Category: Scrum Artifacts
Incorrect
The Product Owner is responsible for the Product Backlog, including its content, availability, and ordering.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 7 of 87
7. Question
Category: Scrum Team
Incorrect
The Product Owner is the sole person responsible for managing the Product Backlog.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 8 of 87
8. Question
Category: Scrum Theory
Rules
Reports
Roles
Burn-down charts
Events
Artifacts
Incorrect
The Scrum framework consists of Scrum Teams and their associated roles, events, artifacts, and rules. Each component within the framework serves a
specific purpose and is essential to Scrum’s success and usage. The rules of Scrum bind together the events, roles, and artifacts, governing the
relationships and interaction between them.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 9 of 87
9. Question
Category: Scrum Events
The Development Team should be able to explain to the Product Owner and Scrum Master how it intends to work as a self-organizing team to accomplish
the Sprint Goal and create the anticipated Increment.
True
False
Incorrect
By the end of the Sprint Planning, the Development Team should be able to explain to the Product Owner and Scrum Master how it intends to work as a
self-organizing team to accomplish the Sprint Goal and create the anticipated Increment.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 10 of 87
10. Question
Category: Scrum Events
Incorrect
Only the Product Owner has the authority to cancel the Sprint, although he or she may do so under influence from the stakeholders, the Development
Team, or the Scrum Master.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 11 of 87
11. Question
Category: Scrum Events
Who is responsible for crafting the Sprint Goal at the Sprint Planning?
Incorrect
After the Development Team forecasts the Product Backlog items it will deliver in the Sprint, the Scrum Team crafts a Sprint Goal.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 12 of 87
12. Question
Category: Scrum Artifacts
Incorrect
Only the Development Team can change its Sprint Backlog during a Sprint. The Sprint Backlog is a highly visible, real-time picture of the work that the
Development Team plans to accomplish during the Sprint, and it belongs solely to the Development Team.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 13 of 87
13. Question
Category: Scrum Theory
Scrum is founded on
Empiricism
Empirical criticism
Kanban system
Common sense
Incorrect
Scrum is founded on empirical process control theory, or empiricism. Empiricism asserts that knowledge comes from experience and making decisions
based on what is known.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 14 of 87
14. Question
Category: Scrum Artifacts
Imagine the following situation. At the Sprint Retrospective meeting the Scrum Team identified some improvements that can be done. What should the
Scrum Team do? Select the best option.
Make sure the Sprint Backlog for the next Sprint includes at least one high priority process improvement.
Make sure the Sprint Backlog for the next Sprint includes all the improvements.
Assign a responsible team member for at least one improvement. Check the progress at the next Retrospective.
Assign responsible team members for every improvement. Check the progress at the next Retrospective.
Incorrect
The Sprint Backlog makes visible all the work that the Development Team identifies as necessary to meet the Sprint Goal. To ensure continuous
improvement, it includes at least one high priority process improvement identified in the previous Retrospective meeting.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 15 of 87
15. Question
Category: Scrum Artifacts
The Increment
Incorrect
Only the Development Team can change its Sprint Backlog during a Sprint. The Sprint Backlog is a highly visible, real-time picture of the work that the
Development Team plans to accomplish during the Sprint, and it belongs solely to the Development Team.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 16 of 87
16. Question
Category: Scrum Team
True
False
Incorrect
The Product Owner is one person, not a committee, but the Product Owner may represent the desires of a committee in the Product Backlog.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 17 of 87
17. Question
Category: Scrum Theory
Incorrect
The Cone of Uncertainty describes the evolution of the amount of uncertainty during a project.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 18 of 87
18. Question
Category: Scrum Events
Definition of Done can be reviewed and adapted during each Sprint Retrospective. True or False?
True
False
Incorrect
During each Sprint Retrospective, the Scrum Team plans ways to increase product quality by improving work processes or adapting the definition of
“Done”, if appropriate and not in conflict with product or organizational standards.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 19 of 87
19. Question
Category: Scrum Team
What are the three most applicable characteristics of the Product Owner?
Incorrect
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 20 of 87
20. Question
Category: Scrum Team
Could the Product Owner and the Scrum Master be a part of the Development Team?
No
Yes
Incorrect
Yes. Scrum does not prohibit the Product Owner or the Scrum Master do development work. However, it is not the best practice because it could create a
conflict of interest.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 21 of 87
21. Question
Category: Scrum Events
Incorrect
The Daily Scrum is an internal meeting for the Development Team. If others are present, the Scrum Master ensures that they do not disrupt the meeting.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 22 of 87
22. Question
Category: Scrum Theory
Incorrect
If the definition of “done” for an increment is part of the conventions, standards or guidelines of the development organization, all Scrum Teams must
follow it as a minimum. If “done” for an increment is not a convention of the development organization, the Development Team of the Scrum Team must
define a definition of “done” appropriate for the product. If there are multiple Scrum Teams working on the system or product release, the development
teams on all of the Scrum Teams must mutually define the definition of “Done.”
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 23 of 87
23. Question
Category: Scrum Artifacts
Increment
Sprint Backlog
Product Backlog
Incorrect
The Scrum artifacts are Product Backlog, Sprint Backlog and Increment.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 24 of 87
24. Question
Category: Scrum Theory
Development of almost everything we use in our daily lives as individuals and societies
Incorrect
Scrum has been used to develop software, hardware, embedded software, networks of interacting function, autonomous vehicles, schools, government,
marketing, managing the operation of organizations and almost everything we use in our daily lives, as individuals and societies.
Next
PSM I™ Preparation Quiz – Learning Mode
Mikhail Lapshin > Scrum Quizzes > PSM I™ Preparation Quiz – Learning Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1 2 3 4 6 8 9 60 61 62 63 64 6 66 6 68 69 0 1 2 3 4
Answered Review
Question 25 of 87
25. Question
Category: Scrum Events
Could the Sprint Planning be finished if only work planned for the first days of the Sprint is decomposed to units of one day or less?
No, all items in the Sprint Backlog should be decomposed to units of one day or less by the end of the Sprint Planning
Incorrect
The Scrum Guide requires only the work planned for the first days of the Sprint is decomposed by the end of the Sprint Planning, often to units of one
day or less. However, the Development Team should be able to explain to the Product Owner and Scrum Master how it intends to work as a self-
organizing team to accomplish the Sprint Goal and create the anticipated Increment.
Next