0% found this document useful (0 votes)
24 views7 pages

C.V Eng - Aminabdelkawi Aminabdelkawi: June, 2023

Uploaded by

Salim Ashor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views7 pages

C.V Eng - Aminabdelkawi Aminabdelkawi: June, 2023

Uploaded by

Salim Ashor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

C.

ENG AMINABDELKAWI
ENG.AMINABDELKAWI

june , 2023

CELL PHONE : (+ 20-01550559494)


WHAT’S UP : (+ 20-01007529775)
E-MAIL
MAIL : aminabdelkawi444@yahoo.com
Eng. / amin abdelkawi abdelghany

 01007529775 & 01550559494

 aminabdelkawi444@yahoo.com
yahoo.com

Cairo - Egypt

Summary : OBJECTIVE :
I bring forth expertise in team building
Personal Introduction as infrastructure Projects Manger
Manger.
leadership, management for every job I
Looking for a challenging position in a dynamic organization, which can utilize
take on. Over 28 year experience in
execution & management & planning my potential to its full extent and where there is a need to share broad
for projects. Ability to help in quality cooperative efforts through sound in the field of management for all found
control , study projects , make value development of the Company within time constraints on a professional way .
engineering , and cost control for many PERSONAL INFORMATION :
projects .  Full Name : Amin Abdelkawi Abdelghany .
Focused and driven team player  Date of Birth : 31/07/1971
practices in leading multiple  Place of Birth : Cairo–Egypt.
simultaneous projects leveraging  Nationality : Egyptian
proven project management tools.  Marital Status : Married.
Experienced and driven projects
 Cell phone : 01007529775& 01550559494
Manager with over twenty eight years
 what 's up : 01007529775
of experience in the normal structure
Education Summary :
Infrastructure management industry.  Bachelors in Civil Engineering (B.Sc.) - June 1994.
Proven track record of successfully Faculty of Engineering - University of Ain Shames,
managing mega projects from Training & courses :
conception to fruition. 1-- General program " Arab contractors–institute(ACTI)"
institute(ACTI)"
The ability to coordinate trades, build 2-- Quality control "Arab contractors–institute(ACTI)"
institute(ACTI)"
partnerships, and work collaboratively 3-- P3 "Arab contractors– institute(ACTI)"
with engineers, vendors, and local 4-- Sanitary works " Arab contractors – institute ( ACTI )"
officials to ensure the timely and 5-- Management–Primavera Software V.6.
budget friendly completion of a project.
6-- Microsoft project.
Experienced in building codes and
7-- Auto CAD Program Software
regulations and negotiating contracts,
8-- Microsoft office(word–excel– power point)
making claims according to fidic .
9-- PMP training
10 Water cad, sewer cad, master flow
10-
11 Etab prog.
11-
12 Sap prog.
12-
Eng. / amin abdelkawi abdelghany

 01007529775 & 01550559494

 aminabdelkawi444@yahoo.com
yahoo.com

Cairo - Egypt

Skills : Experience :
1- |Dec 2021 - Current
o team building
o quality control 1 company Constec company
o study projects 2 position Infrastructure Head Sector
o value engineering Cairo, Egypt
3 location
o cost control .
4 projects Zaglol WWTP 40000m3/day ( the European Union )
o Technical Documentation
o Cost Reduction and Containment ULILAH WWTP 25000 m3/day ( The World Bank )
o Purchasing and Procurement Beltag WWTP 10000m3/day
0000m3/day ( the European Union )
o Performance Improvements 2-|Dec 2019 - Dec 2021
o Multi-Unit Operations Management
1 company Unico company
o Budgeting and Forecasting
2 position Projects Manager
o Workforce Training
o Project Development and Lifecycle 3 location Cairo, Egypt
o Staff Management 4 projects structure and infrastructure projects of Foka bay
o Project Management stage 1,2 projects
o Performance Monitoring
Hydpark Clusters 2,4,4ext,9,18 ( 300 villa with 130
o Detail Oriented
km water - sewage network ) projects
o Budget Control
o Team Collaboration 3- |Jan 2019 - Dec 2019
o Team Leadership 1 company Tbarak company
o Cost Analysis
o Technical Presentations
2 position Projects Manager
o Resource Allocation 3 location Cairo, Egypt
o Staff Retention
4 projects Dronka - Assiut water & waste water net work & pump
o Baseline Schedules Creation
station , tanks project ( U.S. aid )
o Safety Protocol
o Project Scope Qena water & waste water net work & pump station ,
o Risk Management tanks project
o Site Safety Coordinator
o Client Rapport Aswan tanks project
o Staff Training and Motivation R 6 network - new capital project
o Cost Control
o Quality Assurance and Control Farafra -New Valley - hayaat karima - water , waste
o Reporting water network project
Eng. / amin abdelkawi abdelghany

 01007529775 & 01550559494

 aminabdelkawi444@yahoo.com
yahoo.com

Cairo - Egypt

COMPUTER SKILLS 4-|Aug 2014 - Dec 2018


o windows,
1 company (Fouad Fahad AL-sleh
sleh & khaledhamad al al-dhowalia co.
o MS-DOS operating systems
for eng. Consultants)
o Management–PrimaveraV.6.
2 position Projects Manager
o Microsoft project.
3 location RIYADH , KSA
o Drawing–Auto CAD Program
4 projects Project Study sites collect runoff and rain in Riyadh - the
o Microsoft office
fifth stage
(word–excel– power point)
The Environmental Studies for 10 Wastewater treatment
o Sewer cad prog.
plant.
o Water cad prog.
The Study for Groups of Water Tanks, Haael, Ksa.
o Master flow prog.
The Study for Groups of School, makaa, Ksa.
o Pipe flow prog.
The Participation in Sanitary Discharge Project, Riyadh,
o Etab prog.
KSA.
o Sap prog.
The Participation in Execution Of Sanitary Discharge
SCOPE OF WORK : Project ,South of Riyadh, In Part Of (Badr , El
El- Shefa , El –
Azizia ,El – Faysilia , Toweek ) .
A. Design Scope: Working with the Water & Waste Water authority for
1- Design water tanks Riyadh – KSA.
2- Design normal structure
3- Design water structure
5- |Sep 2010 - Jul 2014
4- Design pump stations
1 company Elgabrian company

B. Management Scope: 2 position Projects Manager


5- Study( Dwg’s – Bill of Quantity – 3 location Jeddah , KSA
Contract’s) 4 projects water & waste water projects of makaa zone " 340 km
6- Cost Analysis for Each Activity to network
Evaluate the Profit of the project.
storm network project of Riyadh network " 250 km
7- Create Economical and Suitable
Water , waste water projects of hail zone network “3700
Suggestion for Execution
km network, 38 P.S,, 2 bowser gate, 17 Wastewater
8- Preparing Tender Dwg’s, B.O.Q., and
treatment plant ".1500 , 2500 m3/day
Specifications & Contracts.
9- Estimating & Pricing for the New al Tlal Residential Building project 150 villa
Eng. / amin abdelkawi abdelghany

 01007529775 & 01550559494

 aminabdelkawi444@yahoo.com
yahoo.com

Cairo - Egypt

Projects. 6 |Apr 2008 - Aug 2010


6-
10- Preparing Organization Charts 1 company alkharif company
along with their quirement staff 2 position Project Manager
11- Preparing Material List –Shop 3 location Alkharaj , KSA
drawing list & Submittal Dates (E1 Log.) 4 projects Alkharaj WWTP 100000m3/day
12- Preparing Lists of Subcontractors. , main force pipes 700 mm , pump station
13- Preparing Monthly Progress
Report. 7-- | Oct 2004- Mar 2008
14- Prepare Subcontractors 1 company Aziz company
Agreements. 2 position Project Manager
15- Follow up Method of Statements 3 location RIYADH , KSA
For construction works 4 projects HAIR WWTP 600000m3/day , phase 1
16- Follow-up Daily & Weekly Reports.
HAIT WWTP 200000 m3/day .
sewage , water network for Elkhliag , Nseam with 380
17- Follow up Submitted Shop
km ( main line - house connection )
Drawing.
18- Follow up Material Submittals &
8-- |Jan 1996 - Oct 2004
Approval – Inspection Requests
1 company (Water & Sanitary drainage department - Arab
19- Follow-up Procurement–E2 Log.
Contractors Company)
20- Follow up Claims, Monthly
Certificate & Change Orders 2 position Site Engineer
21- Follow up & Coordination between 3 location Cairo, Egypt
Struc., Arch., Elec., Mech., Engineers
4 projects el –gable
gable el safer (contract 16/2) WWTP project.

C. Planning Scope Sues gulf networks project.( water - sewage - roads -


1-Preparing Master & Detailed
telecom ......)
Construction Schedule Using Primavera
bashteel waste water project.( main force line - network
Software
- Pump station -house
house connection )
2-Estimating Resources for Each Activity
(Manpower, equipment, Material) Almultaqaa alearbaa waste water project.( main force
3-Manpower Categories – Rates –
line - network - house connection
connection-150 Residential
Cost/Day
Building )
4- Equipment Types –Rates Cost/Day
Eng. / amin abdelkawi abdelghany

 01007529775 & 01550559494

 aminabdelkawi444@yahoo.com
yahoo.com

Cairo - Egypt

5- Material Types–Specifications – 9-- |Jan 1996 - Oct 2004


Price/Unit
6- Preparing Reports & Graphic 1 company Structure & Soil Centre "Ph., Dr Ezzat Abd el Fattah ".
Reports(Primavera Software)
2 position design Engineer
3 location Cairo, Egypt
D. Cash Flow
4 projects Design water tanks
7- Histogram & Cumulative Curves For
Resources & costs Design normal structure
8-Comparison Bet. The Target & Actual Design water structure
Activity Dates to Evaluate the Project Design pump stations
Monthly &Give Suggestion to Catch
Design water, sewage network
Any Delays.
Soil Investigation for Different Projects.

You might also like