0% found this document useful (0 votes)
18 views4 pages

Daily Activity

Uploaded by

rcalayag11
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views4 pages

Daily Activity

Uploaded by

rcalayag11
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Date Time Activity WIR Remarks

Inspection of Rebar Installation for


Trimmer Bar of Paddle Pipe prior to
restoration of CW3 at Outlet Flowmeter
RL. +4.735 as per highlighted in the WIR-S-
16-Apr-24 3pm drawing. 9956

Inspection of Formworks Installation &


CPR of CW3 at Outlet Flowmeter RL.
+4.735 as per highlighted in the WIR-S-
8pm drawing. 9957

Survey Lay-out Inspection Prior for


Rebar Foundation at PERIMETER
FENCE , STA.493m-516m , AGL351-
RL.4.460m-4.860m as per highlighted EPC-WIR-
09:00AM in the drawing. S-9960

Rebar Inspection for Foundations at


PERIMETER FENCE , STA.493m- AGL351-
10:00AM 516m , RL.4.460m-4.860m as per EPC-WIR-
Onwards highlighted in the drawing. S-9961

FW and CPR Inspection for Foundation


at PERIMETER FENCE , STA.493m- AGL351-
02:00PM 516m , RL.4.460m-4.860m as per EPC-WIR-
Onwards highlighted in the drawing. S-9962
WIR-AR-
10:00AM Torque Test at Generato Room 1360
Inspection of Survey Lay-out for
CB1,CB2,CBR1,CBR2 & CBJ1 along
GL: 1-3/A-F, RL: 10.310 at Workshop
and Spareparts Storeroom as per
highlighted in the drawing.
3pm 9897
Inspection of Steel Reinforcement for
B1,CB2,CBR1,CBR2 & CBJ1 along WIR-S-
GL: 1-3/A-F, RL: 10.310 at Workshop 9898
and Spareparts Storeroom as per
highlighted in the drawing.
8pm
Inspection of Formworks and Concrete
Pouring Request for
B1,CB2,CBR1,CBR2 & CBJ1 along WIR-S-
GL: 1-3/A-F, RL: 10.310 at Workshop 9899
and Spareparts Storeroom as per
highlighted in the drawing.
11pm
WIR-S-
Inspection of Survey Lay-out for FC1 9946
along GL: 3/A, RL: 3.010 at Hazardous
Waste Storage as per highlighted in the
1pm drawing.

Inspection of Steel Reinforcement for


FC1 along GL: 3/C, RL: 3.010 at
Hazardous Waste Storage as per WIR-S-
6pm highlighted in the drawing. 9947

Inspection of Formworks and Concrete


Pouring Request for FC1 along GL:
3/C, RL: 3.010 at Hazardous Waste
Storage as per highlighted in the WIR-S-
10PM drawing. 9948
Date Time Activity WIR Remarks

Inspection of Rebar Installation for


Trimmer Bar of Paddle Pipe prior to
restoration of CW3 at Outlet Flowmeter
RL. +4.735 as per highlighted in the WIR-S-
16-Apr-24 3pm drawing. 9956

Inspection of Formworks Installation &


CPR of CW3 at Outlet Flowmeter RL.
+4.735 as per highlighted in the WIR-S-
8pm drawing. 9957

Survey Lay-out Inspection Prior for


Rebar Foundation at PERIMETER
FENCE , STA.493m-516m , AGL351-
RL.4.460m-4.860m as per highlighted EPC-WIR-
09:00AM in the drawing. S-9960

Rebar Inspection for Foundations at


PERIMETER FENCE , STA.493m- AGL351-
10:00AM 516m , RL.4.460m-4.860m as per EPC-WIR-
Onwards highlighted in the drawing. S-9961

FW and CPR Inspection for Foundation


at PERIMETER FENCE , STA.493m- AGL351-
02:00PM 516m , RL.4.460m-4.860m as per EPC-WIR-
Onwards highlighted in the drawing. S-9962
WIR-AR-
10:00AM Torque Test at Generato Room 1360
Inspection of Survey Lay-out for
CB1,CB2,CBR1,CBR2 & CBJ1 along
GL: 1-3/A-F, RL: 10.310 at Workshop
and Spareparts Storeroom as per
highlighted in the drawing.
3pm 9897
Inspection of Steel Reinforcement for
B1,CB2,CBR1,CBR2 & CBJ1 along WIR-S-
GL: 1-3/A-F, RL: 10.310 at Workshop 9898
and Spareparts Storeroom as per
highlighted in the drawing.
8pm
Inspection of Formworks and Concrete
Pouring Request for
B1,CB2,CBR1,CBR2 & CBJ1 along WIR-S-
GL: 1-3/A-F, RL: 10.310 at Workshop 9899
and Spareparts Storeroom as per
highlighted in the drawing.
11pm
WIR-S-
Inspection of Survey Lay-out for FC1 9946
along GL: 3/A, RL: 3.010 at Hazardous
Waste Storage as per highlighted in the
1pm drawing.

Inspection of Steel Reinforcement for


FC1 along GL: 3/C, RL: 3.010 at
Hazardous Waste Storage as per WIR-S-
6pm highlighted in the drawing. 9947

Inspection of Formworks and Concrete


Pouring Request for FC1 along GL:
3/C, RL: 3.010 at Hazardous Waste
Storage as per highlighted in the WIR-S-
10PM drawing. 9948