WORK INSPECTION REQUEST - WIR
Construction of Townhouses & semi-detached Villas
Project Name
                                 (412) for Phase 1B & 1C                                WIR Ref.No:               RHP1P2-BW-TGC-4TV-00-WI-DR-00019
Contract No
                                                                                        Request Submission
Employer                         Reem Hills Sole-Proprietorship LLC                                                     25-Jun-24
                                                                                        (Date & Time)
PMC                              Royal Development Company                              Inspection                      26-Jun-24
PMC                              Royal Architect Project Management                     (Date & Time )                  11:00AM
Engineer                         AECOM Middle East LLC                                  Rev No:                           0
Main Contractor                  Trojan General Contracting LLC                         WIR Submitted By:         M/s.TROJAN
MEP Contractor                   Royal Advance Electro Mechanical Works LLC             WIR Submitted To:         Consultant-AECOM
 Part A: By the Contractor:
 B.O.Q Ref:                                                       N/A                                 Discipline:
 B.O.Q. Description of Works to be inspected and / or tested:                                              General                            MCC Works
                                                                                                             Civil                            Landscaping
                                                                                                             Storm Water                      Architectural
 Description of Works to be inspected and /or tested:                                                        Sewer                            Dredging
                                                                                                           Water                              Highway Bridge Works
                                                                                                           Irrigation                         LRT Bridge Works
     Inspection Request for Installation and leak test of Under                                            Telephone                          MSE Wall
                                                                                                        Signal Works                          Provisional Sum
   Ground Drainage Pipes , As per Attached Highlighted Drawing
                                                                                                        Electrical                            Other (state)
                                                                                                        Street Lighting
 Works Location:                                       Villa-369 4BR (Mirror)                            Landscape Lighting                   Drainage
 Works Quantity:                                                                                        Gas Network
 Drawing attached to show the location(s)                  Yes             No           Checklist attached                          Yes               No
 Attached Test Certificates                                Yes             No
 Shop Drawing Ref:                    PHP1P2-BW-TGC-4TV.M-00-SD-DR-0001                 Method Statement Ref:         RHP1P2-BW-TGC-ZZ-XX-MS-ME-00002_00
 Type of Attachment:                                   Check list                       ITP Ref:                                      ITP-01-Rev-0
 Eng. Dayal Pushpakumar
 (QA/QC Manager )
                                                                                                                                              Date & Signature
 Part B: By the Engineer:
 Received by Engineer on:                         Date:                         Time:                                                         Signed by:
 Engineer's Comments:
  1.Inspection has been done with respect to the grid lines provided by contractor surveyor.
  2.Provide adequate supports to avoid torsional stress and fully restrict the pipe dislocation
  during civil works. Avoid resting the   structural rebars/other loads directly on top of pipes
  (pipe shall be laid load free).
  3.The works at site is done in absence of approved floor tiling layout. Contractor will remain
  responsible for any modification, at no extra time/cost to the project, if the piping is not
  matching as per the latest approved respective tile layout drawings..
  3) FD depths are reduced to 400 MM from FFL.
  Above changes are to be reflected in As built drawings
  Only Highlighted area offered for inspection.Remaining works inside
  kitchen and outside the tie beams shall be completed later.
  No Leak found.No objection for proceeding with following activities.
 Name:                                                                                                                                        Date & Signature
 Discipline Engineer Decision:
         A - Approved
         B - Approved with comments                                                                                                       26-06-2024
         C - Revise & Resubmit
         D - Rejected
Sr.Resident Engineer / Resident Engineer :
 Name : Suheib Aboamir                                                                                           27/06/2024
                                                                                                                                          Date & Signature