MEP Clearance Form
Project : TG2144-Townhouses and Semi-Detached Villas Clearance Reference No.RHP1P2-BW-TGC-4TV-FN-CLR-ST-00009
Client: Revision No.
Consultant: Date
Main Contractor : M/s. Trojan General Contracting L.L.C (TGC) WIR Reference No.
Sub-Contractor :
Discipline: □ Mechanical □ Electrical □ Plumbing □ HVAC □ Others…………………………
Request by TGC Receiving by MEP Sub-Contractor
Requested by TGC Site Received by Received by
Engineer MEP Site Engineer PE/ CM QA/QC
Name: Jonathan Name:
Requested Date: 01.07.24 Receiving Date:
Clearance for the Activity Clearance Code
Clearance required to start under raft activity MCLR-03
Location Details:
Plot No. Sector/ Cluster/ Zone Building Type/ Villa Type Level/ Floor Villa No./ Room No./ Flat No. Grid Lines/ Area of Work
Phase 1C Cluster 1 Canal Promenade 4TVR FF Villa 368/369 (B004)
Sl. No. Activity Yes No N/A WIR Reference Remarks
1 U/G DRAINAGE PIPING AND LEAK TEST □ □ □
Planned/ Target Clearance required on: Actual Clearance required on:
Mechanical Engineer Comments (MEP Sub-Contractor)
□ Full Approved
□ Partial Approved
□ Not Approved
Name: Signature: Date:
Electrical Engineer Comments (MEP Sub-Contractor)
□ Full Approved
□ Partial Approved
□ Not Approved
Name: Signature: Date:
Project Engineer/ Construction Manager Comments (MEP Sub-Contractor)
□ Full Approved
□ Partial Approved
□ Not Approved
Name: Signature: Date:
QA/QC Comments (MEP Sub-Contractor)
□ Full Approved
□ Partial Approved
□ Not Approved
Name: Signature: Date:
MEP Coordinator Comments (Optional) (Main Contractor)
□ Full Approved
□ Partial Approved
□ Not Approved
Name: Signature: Date:
Consultant Comments (Optional)
□ Full Approved
□ Partial Approved
□ Not Approved
Name: Signature: Date:
Received by TGC Engineer (Main Contractor)
□ Full Approved
□ Partial Approved
□ Not Approved
Name: Signature: Date:
Form : TGC/QAQC/FRM/PR/031 Rev.01-09/03/23 page 1 of 1