Internal Inspection Request - (IIR)
Project: Construction of hotel complex on "Galawa"
Employer
Contractor Consultant
Gouvernement de l'Union des
ROWAD Modern Engineering BARGE ARCHITECTURE
Comores
INTERNAL INSPECTION DETAILS
IIR #: IIR-RME-R05-002 IR#: SWE-GOV-GAL-IR-STR-R05-001 Rev.00 Date of request: 12/09/2024
Subcontractor: Name: Signature: Date:
RME Construction: Name: Signature: Date:
Location of inspection
Area/ Zone: Building: R05 / A Floor/Level: Foundation Axis: Others:
Attached drawing Ref.: BOQ No :
Inspection checklists attached: ☐YES ☐NO ☐N/A Test certificates attached: ☐YES ☐NO ☐N/A
Required Inspection date: Time: Discipline:
Details of inspection: ☐Survey ☐Mech
☐Earthwork ☐Elect
Pouring for PC Foundation R05/A ☐Roads ☐Instrument
☒Civil ☐HVAC
☐Str steel ☐Landscape
☐Others :
Work requires clearance from the following disciplines (tick as applicable by the initiator)
Discipline Civil Mech Elec Arch Survey Other :
Name:
Signature:
Date:
QC/FW Comments
Inspection is (A) Approved (B) Approved as noted (C) Revise & Resubmit (D) Not Required
Name: Department: Signature: Date: / /