0% found this document useful (0 votes)
48 views1 page

File 6

Uploaded by

myakout531
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views1 page

File 6

Uploaded by

myakout531
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Internal Inspection Request - (IIR)

Project: Construction of hotel complex on "Galawa"


Employer
Contractor Consultant
Gouvernement de l'Union des
ROWAD Modern Engineering BARGE ARCHITECTURE
Comores
INTERNAL INSPECTION DETAILS
IIR #: IIR-RME-R05-002 IR#: SWE-GOV-GAL-IR-STR-R05-001 Rev.00 Date of request: 12/09/2024

Subcontractor: Name: Signature: Date:


RME Construction: Name: Signature: Date:
Location of inspection
Area/ Zone: Building: R05 / A Floor/Level: Foundation Axis: Others:
Attached drawing Ref.: BOQ No :

Inspection checklists attached: ☐YES ☐NO ☐N/A Test certificates attached: ☐YES ☐NO ☐N/A

Required Inspection date: Time: Discipline:

Details of inspection: ☐Survey ☐Mech


☐Earthwork ☐Elect
Pouring for PC Foundation R05/A ☐Roads ☐Instrument
☒Civil ☐HVAC
☐Str steel ☐Landscape
☐Others :
Work requires clearance from the following disciplines (tick as applicable by the initiator)
Discipline Civil Mech Elec Arch Survey Other :
Name:
Signature:
Date:
QC/FW Comments

Inspection is (A) Approved (B) Approved as noted (C) Revise & Resubmit (D) Not Required

Name: Department: Signature: Date: / /