EPP Composites Pvt.
Ltd
(Pultrusion Division)
PLOT NO. 2646, KRANTI GATE KALAWAD ROAD, METODA GIDC, RAJKOT.
QUALITY ASSURANCE PLAN
FRP MOULDED GRATING
CLIENT: BLA COKE PVT LTD FORMAT NO. / REV NO. FQC01/001
QAP NO/ REVISION NO. &
P.O. NO. & DATE : MTPOJUL24/021 Date - 06.07.2024 DATE: R1 Date : 11.07.2024
S.O. NO : 13002 NO OF PAGES: 01 (ONE)
S. No Activity / Characteristics Type/ Extent of Reference Acceptance Format of Agency Remarks
Operation Checked Method of Check Check Document/ Norms Records
Standard
EPP CLIENT / TPI
1 2 3 4 5 6 7 8 9 10
1.0 Raw Material Control
1.Relative Density P R
2.Viscosity P R
1.1 Resin 3.Acid Value Physical & 1 sample / Batch IS 6746:1994 EPP's Specification EPP internal P R
Chemical Test Report
4.Volatile Content P R
5.Gel Time P R
1.Roving Weight (Tex) P R
2.Moisture Content P R
Physical & IS 11320:1997 EPP internal
1.2 Fibre Glass Roving Chemical 1 Sample / Lot EPP's Specification Test Report
3.Loss on Ignition P R
4.Cross breaking
strength of rod P R
2.0 Moulded Grating
2.1 Water Absorption Chemical ASTM D-570 P R _
2.2 Barcol Hardness Mechanical ASTM D-2583 P R _
Glass Content, % by
2.3 weight Mechanical Min 30% P R _
2.4 Load test Physical 500 Kg / Mtr2 EPP internal P W _
Acceptance test One sample per lot EPP's Specification Test Report
2.5 Tensile strength Mechanical ASTM D 638 P R _
2.6 Flexural strength Mechanical ASTM D 790 P R _
2.7 Barcol Hardness Mechanical ASTM D-2583 P W _
2.8 Aceton wip test Chemical BS4994 P W _
3.0 Final Inspection
Dimensions, Colour, As per Approved As per Approved Product
3.1 Cutting & Finishing Visual Physical & Visual 100% Product Drawing Drawing Final Inspection Report P W _
P = Performed by, R = Reviewed by, IS - Indian Standard
Sr. No. Rev No Rev. Date Issue Date Reason for changed Prepared By Checked BY Approved By
1 00 Initial revesion
Test requirment
2 01 7/16/2024 7/16/2024 added as per the Mr. Subrat barik Mr. Nirav saha
customer requirment
PREPARED BY (Manager Q.A.) APPROVED BY (CLIENT / TPI)