0% found this document useful (0 votes)
121 views2 pages

Nanjangud Rob TCS - 1.0

Uploaded by

MAYUR SONI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
121 views2 pages

Nanjangud Rob TCS - 1.0

Uploaded by

MAYUR SONI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

45000

PROPOSED ROW

24000
FORMATION WIDTH
CL OF PROPOSED CARRIAGEWAY

PROW
PROW

EARTHEN PAVED PAVED EARTHEN


SHOULDER SHOULDER LHS CARRIAGEWAY LHS CARRIAGEWAY SHOULDER SHOULDER
MEDIAN
2000 VARIES 1000 1500 7000 500 4000 500 7000 1500 1000 VARIES 2000

SHYNESS

SHYNESS

PROW
PROW

CORRIDOR

CORRIDOR
TOP 150mm COMPACTED TOP 150mm COMPACTED
UTILITY

UTILITY
GRANULAR MATERIAL GRANULAR MATERIAL
3% 3% EARTH FILL
2.5% 2.5%
3.0% 3.0%
PROW

PROW
2 2
1 1

GL
SELECTED FILL SELECTED FILL GL
PROW

PROW
40MM BC 40MM BC
90MM DBM 90MM DBM
125MM WMM LAYER - 2 125MM WMM LAYER - 2
125MM WMM LAYER - 1 125MM WMM LAYER - 1
PROW

PROW
200MM GSB 200MM GSB
500MM SUBGRADE 500MM SUBGRADE
TYPICAL CROSS SECTION - TYPE 1
NEW CONSTRUCTION OF 4 LANE CARRIAGEWAY WITH PAVED SHOULDER
(OPEN COUNTRY PLAIN/ROLLING TERRAIN)

45000
PROPOSED ROW

25000
FORMATION WIDTH

PROW
PROW

CL OF PROPOSED CARRIAGEWAY
500 500
4000
2500 7000 500
MEDIAN
500 7000 2500

SHYNESS
SHYNESS
PAVED LHS CARRIAGEWAY LHS CARRIAGEWAY PAVED
SHOULDER SHOULDER
CRASH BARRIER CRASH BARRIER

PROW
PROW

FRICTION SLAB FRICTION SLAB


BARRIER BARRIER

3% 3%
5500 5500
VARIES 1000 500 2.5% 2.5% 500 1000 VARIES
SERVICE ROAD SERVICE ROAD

PROW
PROW

SHOULDER

SHOULDER
SHYNESS

SHYNESS
EARTHEN

EARTHEN
1000 1000
SELECTED FILL
300 X 150MM
GRATING @ 3M C/C
DRAIN DRAIN 300 X 150MM
GRATING @ 3M C/C SELECTED FILL

PROW
PROW

2.5% 2.5%
2 RE WALL RE WALL 2
1 1
FILTER MEDIA FILTER MEDIA
750 750
40MM BC 40MM BC
100mm Thk.PCC 100mm Thk.PCC
90MM DBM 90MM DBM

PROW
PROW

150 150
GL 125MM WMM LAYER - 2 125MM WMM LAYER - 2 GL
125MM WMM LAYER - 1 125MM WMM LAYER - 1
100mm Ø WEEPHOLE 100mm Ø WEEPHOLE
40MM BC 200MM GSB 200MM GSB 40MM BC
50MM DBM 500MM SUBGRADE 500MM SUBGRADE 50MM DBM
125MM WMM LAYER-2 125MM WMM LAYER-2
125MM WMM LAYER-1 125MM WMM LAYER-1
200MM GSB 200MM GSB
500MM SUBGRADE 500MM SUBGRADE
TYPICAL CROSS SECTION - TYPE 2
NEW CONSTRUCTION OF 4 LANE CARRIAGEWAY WITH PAVED SHOULDER (ROB APPROACH)
(OPEN COUNTRY PLAIN/ROLLING TERRAIN)

NOTE:1. All Dimensions are in MM


REV. DATE DESCRIPTION Notice: Client: Consultants: Project: Title: TYPICAL CROSS SECTION (TCS-1 & TCS-2)
THIS DRAWING HAS NOT BEEN PUBLISHED AND IS ISSUED TO THE PARTY PWD - National Highways
VISTAARA INFRA CONSULTANTS “CONSTRUCTION OF ROB IN LIEU OF LC NO. 27 OF DETAILED
FOR THE SPECIFIC PURPOSE AND IT SHALL NOT BE REPRODUCED, COPIED, Bengaluru Division
#7, OPP ST. ROCK'S CHURCH, MEGINAPALYA MYSURU - CHAMARAJANAGARA RAILWAY LINE AT KM PROJECT Size Scale Drg. No
LENT OR OTHERWISE DISPOSED OF DIRECTLY OR INDIRECTLY, NOR USED CHELEKERE, KALYAN NAGAR 654.950 (RAILWAY CHAINAGE - KM 31.900) OF NH 150A,
(Government Of Karnataka) REPORT
FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT IS FURNISHED. BANGALORE - 560043 JEWARGI-CHAMARAJANAGARA SECTION"
PH: +91 7019345532
A3 AS SHOWN VIC/NH-150A/ROB/TCS/01-03
45000
PROPOSED ROW

26000
FORMATION WIDTH
CL OF PROPOSED CARRIAGEWAY
PROW

PROW
EARTHEN PAVED PAVED EARTHEN
LHS CARRIAGEWAY LHS CARRIAGEWAY SHOULDER
DRAIN SHOULDER SHOULDER MEDIAN SHOULDER DRAIN
2000 VARIES 1000 1000 1500 7000 500 4000 500 7000 1500 1000 1000 VARIES 2000

SHYNESS

SHYNESS
GL
PROW

PROW
CORRIDOR

CORRIDOR
UTILITY

UTILITY
TOP 150mm COMPACTED TOP 150mm COMPACTED
GL GRANULAR MATERIAL GRANULAR MATERIAL
EARTH FILL
1 2.5%
3% 3%
2.5% 1
2 2
PROW

PROW
300 X 500 mm 300 X 500 mm
GRATING at 3m C/C 800 800 GRATING at 3m C/C

100mm Thk. PCC SELECTED FILL SELECTED FILL 100mm Thk. PCC
100mm Ø WEEPHOLE 100mm Ø WEEPHOLE
PROW

PROW
MATCHING GSB BOTTOM MATCHING GSB BOTTOM
40MM BC 40MM BC
90MM DBM 90MM DBM
125MM WMM LAYER - 2 125MM WMM LAYER - 2
125MM WMM LAYER - 1 125MM WMM LAYER - 1
PROW

PROW
200MM GSB 200MM GSB

TYPICAL CROSS SECTION - TYPE 3


NEW CONSTRUCTION OF 4 LANE CARRIAGEWAY WITH PAVED SHOULDER IN CUTTING SECTION
(OPEN COUNTRY PLAIN/ROLLING TERRAIN)

NOTE:1. All Dimensions are in MM


REV. DATE DESCRIPTION Notice: Client: Consultants: Project: Title: TYPICAL CROSS SECTION (TCS-3)
THIS DRAWING HAS NOT BEEN PUBLISHED AND IS ISSUED TO THE PARTY PWD - National Highways
VISTAARA INFRA CONSULTANTS “CONSTRUCTION OF ROB IN LIEU OF LC NO. 27 OF DETAILED
FOR THE SPECIFIC PURPOSE AND IT SHALL NOT BE REPRODUCED, COPIED, Bengaluru Division
#7, OPP ST. ROCK'S CHURCH, MEGINAPALYA MYSURU - CHAMARAJANAGARA RAILWAY LINE AT KM PROJECT Size Scale Drg. No
LENT OR OTHERWISE DISPOSED OF DIRECTLY OR INDIRECTLY, NOR USED CHELEKERE, KALYAN NAGAR 654.950 (RAILWAY CHAINAGE - KM 31.900) OF NH 150A,
(Government Of Karnataka) REPORT
FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT IS FURNISHED. BANGALORE - 560043 JEWARGI-CHAMARAJANAGARA SECTION"
PH: +91 7019345532
A3 AS SHOWN VIC/NH-150A/ROB/TCS/02-03

You might also like